Attach_4_Price_Template_Exhibit_A-C.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- N3904018Q0239
About this file
Price Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined_Syn-Sol_N3904018Q0239.docx | DOCX document | |
| Attach_3_Wage_Determination.pdf | ||
| Attach_1_YFNB_41_Barge_Maintenance_SOW_2018.docx | DOCX document | |
| Attach_2_-_Past_Performance.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Supplies/Services | Material or equivalent | Est Qty | Unit | Contractor Unit | |||||
| Price (LABOR) | Contractor Unit | ||||||||
| Price (MATERIAL) | Contractor Bid Amount | ||||||||
| A | 101 | Planned Maintenance Tasks | |||||||
| 101AA | Inspect barge trouble call log weekly | 52 | EA | $0.00 | |||||
| 101AB | Clean washable vent filters quarterly (per barge) | 4 | EA | $0.00 | |||||
| 101AC | Perform Quarterly HVAC system inspection | 4 | EA | $0.00 | |||||
| A | 102 | Habitability Repairs | |||||||
| A | 102AA | Replace flushometer | Sloan royal commode or urinal | 2 | EA | $0.00 | |||
| A | 102AB | Replace lavatory sink faucet | Delta commercial single handle | 1 | EA | $0.00 | |||
| A | 102AC | Replace ceiling tile T-Rail | Armstrong | 50 | LF | $0.00 | |||
| A | 102AD | Replace towel racks | ASI 0755-SS24 | 1 | EA | $0.00 | |||
| A | 102AE | Replace soap dishes | ASI 0720-Z zamac | 1 | EA | $0.00 | |||
| A | 102AF | Replace toilet paper holder (frame and spool) | ASI 0705-Z zamac | 5 | EA | $0.00 | |||
| A | 102AG | Replace water fountains | Elkay FD7003T1Z | 1 | EA | $0.00 | |||
| A | 102AH | Replace in-line potable water filters | Aqua-pure AP-117 | 3 | EA | $0.00 | |||
| A | 102AI | Clean flushometer diaphragm valve | 5 | EA | $0.00 | ||||
| A | 102AJ | Clear clogged commode | 5 | EA | $0.00 | ||||
| A | 102AK | Clear clogged urinal | 5 | EA | $0.00 | ||||
| A | 102AL | Clear sink clog with plunger | 5 | EA | $0.00 | ||||
| A | 102AM | Clear sink clog with auger | 5 | EA | $0.00 | ||||
| A | 102AN | Disassemble/clean/reassemble sink trap | 5 | EA | $0.00 | ||||
| A | 102AO | Disassemble/clean/reassemble urinal trap | 5 | EA | $0.00 | ||||
| A | 102AP | Replace sink trap | Chrome plated brass, 1-1/2" | 2 | EA | $0.00 | |||
| A | 102AQ | Replace urinal trap | Chrome plated brass, 1-1/2" | 2 | EA | $0.00 | |||
| A | 102AR | Replace or install hydraulic door closers | Falcon SC-70 series | 10 | EA | $0.00 | |||
| A | 103 | Electrical Repairs | |||||||
| A | 103AA | Install new nickel cadmium rechargeable emergency light fixtures | Lithonia #ELM-2 | 5 | EA | $0.00 | |||
| A | 103AB | Replace fuses | Bussman SC series | 10 | EA | $0.00 | |||
| A | 103AC | Install new exit light fixtures | Lithonia #LSXW3 | 2 | EA | $0.00 | |||
| A | 103AD | Replace force protection LED light fixtures | LED wallpak LUMAPRO 13E801 | 2 | EA | $0.00 | |||
| A | 103AE | Replace light switches | Single Pole, 120V | 2 | EA | $0.00 | |||
| A | 103AF | Replace light switch/receptacle covers | 2 | EA | $0.00 | ||||
| A | 103AG | Remove/Replace fluorescent ballast | Philips ICN-2P32-N | 20 | EA | $0.00 | |||
| A | 103AH | Remove/Replace 120V duplex receptacle | 1 | EA | $0.00 | ||||
| A | 103AI | Remove/Replace 220V receptacle | 1 | EA | $0.00 | ||||
| A | 103AJ | Remove/Replace 120V circuit breaker (Labor only) | 2 | EA | $0.00 | ||||
| A | 103AK | Remove/Replace 220V circuit breaker (Labor only) | 2 | EA | $0.00 | ||||
| A | 103AL | Remove/Replace 440V circuit breaker (Labor only) | 1 | EA | $0.00 | ||||
| A | 103AM | Replace 2'x4' fluor troffer light fixture with LED panel (Labor only) | Hykolity HY-72W Panel | 20 | EA | $0.00 | |||
| A | 104 | Miscellaneous Repairs | |||||||
| A | 104AA | Replace rubber supratile (labor only) | 5.5mm thick, gray, 18"x18" | 10 | EA | $0.00 | |||
| A | 104AB | Caulk window (<6' high) | 50 | LF | $0.00 | ||||
| A | 104AC | Caulk siding seam | 100 | LF | $0.00 | ||||
| A | 104AD | Caulk door | 2 | EA | $0.00 | ||||
| A | 104AE | Repair door hinge | 4 | EA | $0.00 | ||||
| A | 104AF | Replace door hinge | 4 | EA | $0.00 | ||||
| A | 105 | Unplanned Parts and Repairs | |||||||
| A | 105AA | Undisclosed Work (Correct Discrepancies) - Straight Time (80 hrs per Quarter) | 320 | HR | $0.00 | ||||
| A | 105AB | Undisclosed Work (Correct Discrepancies) - Material (for bidding purposes only) | 10,000 | U.S. DOLLARS | $1.00 | N/A | $10,000.00 | ||
| In negotiating the fixed price for materials, the contractor shall submit quotes for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. |
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies),. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: ELINS are to be fully burdened to include any required rental equipment.
Option Year 1
| Supplies/Services | Material or equivalent | Est Qty | Unit | Contractor Unit | |||||
| Price (LABOR) | Contractor Unit | ||||||||
| Price (MATERIAL) | Contractor Bid Amount | ||||||||
| B | 101 | Planned Maintenance Tasks | |||||||
| B | 101AA | Inspect barge trouble call log weekly | 52 | EA | $0.00 | ||||
| B | 101AB | Clean washable vent filters quarterly (per barge) | 4 | EA | $0.00 | ||||
| B | 101AC | Perform Quarterly HVAC system inspection | 4 | EA | $0.00 | ||||
| B | 102 | Habitability Repairs | |||||||
| B | 102AA | Replace flushometer | Sloan royal commode or urinal | 2 | EA | $0.00 | |||
| B | 102AB | Replace lavatory sink faucet | Delta commercial single handle | 1 | EA | $0.00 | |||
| B | 102AC | Replace ceiling tile T-Rail | Armstrong | 50 | LF | $0.00 | |||
| B | 102AD | Replace towel racks | ASI 0755-SS24 | 1 | EA | $0.00 | |||
| B | 102AE | Replace soap dishes | ASI 0720-Z zamac | 1 | EA | $0.00 | |||
| B | 102AF | Replace toilet paper holder (frame and spool) | ASI 0705-Z zamac | 5 | EA | $0.00 | |||
| B | 102AG | Replace water fountains | Elkay FD7003T1Z | 1 | EA | $0.00 | |||
| B | 102AH | Replace in-line potable water filters | Aqua-pure AP-117 | 3 | EA | $0.00 | |||
| B | 102AI | Clean flushometer diaphragm valve | 5 | EA | $0.00 | ||||
| B | 102AJ | Clear clogged commode | 5 | EA | $0.00 | ||||
| B | 102AK | Clear clogged urinal | 5 | EA | $0.00 | ||||
| B | 102AL | Clear sink clog with plunger | 5 | EA | $0.00 | ||||
| B | 102AM | Clear sink clog with auger | 5 | EA | $0.00 | ||||
| B | 102AN | Disassemble/clean/reassemble sink trap | 5 | EA | $0.00 | ||||
| B | 102AO | Disassemble/clean/reassemble urinal trap | 5 | EA | $0.00 | ||||
| B | 102AP | Replace sink trap | Chrome plated brass, 1-1/2" | 2 | EA | $0.00 | |||
| B | 102AQ | Replace urinal trap | Chrome plated brass, 1-1/2" | 2 | EA | $0.00 | |||
| B | 102AR | Replace or install hydraulic door closers | Falcon SC-70 series | 10 | EA | $0.00 | |||
| B | 103 | Electrical Repairs | |||||||
| B | 103AA | Install new nickel cadmium rechargeable emergency light fixtures | Lithonia #ELM-2 | 5 | EA | $0.00 | |||
| B | 103AB | Replace fuses | Bussman SC series | 10 | EA | $0.00 | |||
| B | 103AC | Install new exit light fixtures | Lithonia #LSXW3 | 2 | EA | $0.00 | |||
| B | 103AD | Replace force protection LED light fixtures | LED wallpak LUMAPRO 13E801 | 2 | EA | $0.00 | |||
| B | 103AE | Replace light switches | Single Pole, 120V | 2 | EA | $0.00 | |||
| B | 103AF | Replace light switch/receptacle covers | 2 | EA | $0.00 | ||||
| B | 103AG | Remove/Replace fluorescent ballast | Philips ICN-2P32-N | 20 | EA | $0.00 | |||
| B | 103AH | Remove/Replace 120V duplex receptacle | 1 | EA | $0.00 | ||||
| B | 103AI | Remove/Replace 220V receptacle | 1 | EA | $0.00 | ||||
| B | 103AJ | Remove/Replace 120V circuit breaker (Labor only) | 2 | EA | $0.00 | ||||
| B | 103AK | Remove/Replace 220V circuit breaker (Labor only) | 2 | EA | $0.00 | ||||
| B | 103AL | Remove/Replace 440V circuit breaker (Labor only) | 1 | EA | $0.00 | ||||
| B | 103AM | Replace 2'x4' fluor troffer light fixture with LED panel (Labor only) | Hykolity HY-72W Panel | 20 | EA | $0.00 | |||
| B | 104 | Miscellaneous Repairs | |||||||
| B | 104AA | Replace rubber supratile (labor only) | 5.5mm thick, gray, 18"x18" | 10 | EA | $0.00 | |||
| B | 104AB | Caulk window (<6' high) | 50 | LF | $0.00 | ||||
| B | 104AC | Caulk siding seam | 100 | LF | $0.00 | ||||
| B | 104AD | Caulk door | 2 | EA | $0.00 | ||||
| B | 104AE | Repair door hinge | 4 | EA | $0.00 | ||||
| B | 104AF | Replace door hinge | 4 | EA | $0.00 | ||||
| B | 105 | Unplanned Parts and Repairs | |||||||
| B | 105AA | Undisclosed Work (Correct Discrepancies) - Straight Time (80 hrs per Quarter) | 320 | HR | $0.00 | ||||
| B | 105AB | Undisclosed Work (Correct Discrepancies) - Material (for bidding purposes only) | 10,000 | U.S. DOLLARS | $1.00 | N/A | $10,000.00 | ||
| In negotiating the fixed price for materials, the contractor shall submit quotes for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. |
Total Estimate for Option Year 1 No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies),. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: ELINS are to be fully burdened to include any required rental equipment.
Option Year 2
| Supplies/Services | Material or equivalent | Est Qty | Unit | Contractor Unit | |||||
| Price (LABOR) | Contractor Unit | ||||||||
| Price (MATERIAL) | Contractor Bid Amount | ||||||||
| C | 101 | Planned Maintenance Tasks | |||||||
| C | 101AA | Inspect barge trouble call log weekly | 52 | EA | $0.00 | ||||
| C | 101AB | Clean washable vent filters quarterly (per barge) | 4 | EA | $0.00 | ||||
| C | 101AC | Perform Quarterly HVAC system inspection | 4 | EA | $0.00 | ||||
| C | 102 | Habitability Repairs | |||||||
| C | 102AA | Replace flushometer | Sloan royal commode or urinal | 2 | EA | $0.00 | |||
| C | 102AB | Replace lavatory sink faucet | Delta commercial single handle | 1 | EA | $0.00 | |||
| C | 102AC | Replace ceiling tile T-Rail | Armstrong | 50 | LF | $0.00 | |||
| C | 102AD | Replace towel racks | ASI 0755-SS24 | 1 | EA | $0.00 | |||
| C | 102AE | Replace soap dishes | ASI 0720-Z zamac | 1 | EA | $0.00 | |||
| C | 102AF | Replace toilet paper holder (frame and spool) | ASI 0705-Z zamac | 5 | EA | $0.00 | |||
| C | 102AG | Replace water fountains | Elkay FD7003T1Z | 1 | EA | $0.00 | |||
| C | 102AH | Replace in-line potable water filters | Aqua-pure AP-117 | 3 | EA | $0.00 | |||
| C | 102AI | Clean flushometer diaphragm valve | 5 | EA | $0.00 | ||||
| C | 102AJ | Clear clogged commode | 5 | EA | $0.00 | ||||
| C | 102AK | Clear clogged urinal | 5 | EA | $0.00 | ||||
| C | 102AL | Clear sink clog with plunger | 5 | EA | $0.00 | ||||
| C | 102AM | Clear sink clog with auger | 5 | EA | $0.00 | ||||
| C | 102AN | Disassemble/clean/reassemble sink trap | 5 | EA | $0.00 | ||||
| C | 102AO | Disassemble/clean/reassemble urinal trap | 5 | EA | $0.00 | ||||
| C | 102AP | Replace sink trap | Chrome plated brass, 1-1/2" | 2 | EA | $0.00 | |||
| C | 102AQ | Replace urinal trap | Chrome plated brass, 1-1/2" | 2 | EA | $0.00 | |||
| C | 102AR | Replace or install hydraulic door closers | Falcon SC-70 series | 10 | EA | $0.00 | |||
| C | 103 | Electrical Repairs | |||||||
| C | 103AA | Install new nickel cadmium rechargeable emergency light fixtures | Lithonia #ELM-2 | 5 | EA | $0.00 | |||
| C | 103AB | Replace fuses | Bussman SC series | 10 | EA | $0.00 | |||
| C | 103AC | Install new exit light fixtures | Lithonia #LSXW3 | 2 | EA | $0.00 | |||
| C | 103AD | Replace force protection LED light fixtures | LED wallpak LUMAPRO 13E801 | 2 | EA | $0.00 | |||
| C | 103AE | Replace light switches | Single Pole, 120V | 2 | EA | $0.00 | |||
| C | 103AF | Replace light switch/receptacle covers | 2 | EA | $0.00 | ||||
| C | 103AG | Remove/Replace fluorescent ballast | Philips ICN-2P32-N | 20 | EA | $0.00 | |||
| C | 103AH | Remove/Replace 120V duplex receptacle | 1 | EA | $0.00 | ||||
| C | 103AI | Remove/Replace 220V receptacle | 1 | EA | $0.00 | ||||
| C | 103AJ | Remove/Replace 120V circuit breaker (Labor only) | 2 | EA | $0.00 | ||||
| C | 103AK | Remove/Replace 220V circuit breaker (Labor only) | 2 | EA | $0.00 | ||||
| C | 103AL | Remove/Replace 440V circuit breaker (Labor only) | 1 | EA | $0.00 | ||||
| C | 103AM | Replace 2'x4' fluor troffer light fixture with LED panel (Labor only) | Hykolity HY-72W Panel | 20 | EA | $0.00 | |||
| C | 104 | Miscellaneous Repairs | |||||||
| C | 104AA | Replace rubber supratile (labor only) | 5.5mm thick, gray, 18"x18" | 10 | EA | $0.00 | |||
| C | 104AB | Caulk window (<6' high) | 50 | LF | $0.00 | ||||
| C | 104AC | Caulk siding seam | 100 | LF | $0.00 | ||||
| C | 104AD | Caulk door | 2 | EA | $0.00 | ||||
| C | 104AE | Repair door hinge | 4 | EA | $0.00 | ||||
| C | 104AF | Replace door hinge | 4 | EA | $0.00 | ||||
| C | 105 | Unplanned Parts and Repairs | |||||||
| C | 105AA | Undisclosed Work (Correct Discrepancies) - Straight Time (80 hrs per Quarter) | 320 | HR | $0.00 | ||||
| C | 105AB | Undisclosed Work (Correct Discrepancies) - Material (for bidding purposes only) | 10,000 | U.S. DOLLARS | $1.00 | N/A | $10,000.00 | ||
| In negotiating the fixed price for materials, the contractor shall submit quotes for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. |
Total Estimate for Option Year 2 No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies),. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: ELINS are to be fully burdened to include any required rental equipment.
File details come from the government source that posted it.