Attach_1_YFNB_41_Barge_Maintenance_SOW_2018.docx

DOCX document 29 KB Posted

Attached to
Maintenance Services for one US Navy Living Barge at SUBASE New London, CT
Solicitation number
N3904018Q0239
Issued by

About this file

SOW

View the file

Other files

File Type Posted
Attach_4_Price_Template_Exhibit_A-C.xlsx XLSX spreadsheet
Combined_Syn-Sol_N3904018Q0239.docx DOCX document
Attach_3_Wage_Determination.pdf PDF
Attach_2_-_Past_Performance.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

C.1. SCOPE OF WORK

C.1.1. The contractor shall furnish the necessary non-personal management, administrative and production services, materials, tools, equipment, facilities, and required support to accomplish a full range of intermediate level troubleshooting, repair, renewal, refurbishment, modernization, maintenance, and testing of YFNB 41 Barge systems (hull, mechanical, and electrical).

C.1.2. It may be in the best interest of the Government to procure/provide materials to complete tasks under any ELIN. The Government reserves the right to identify those instances where Government Furnished Material (GFM) will be utilized. In these instances, the contractor may only invoice for labor costs.

C.1.3. Work shall be accomplished by personnel meeting at least the minimum qualifications set forth elsewhere herein and shall be provided onboard the barge as required. Mechanical and electrical repair and maintenance efforts shall include all areas, hull, mechanical and electrical (HM&E) equipment and systems. Particular emphasis shall be put on quality workmanship in effecting rapid repairs, reinforcement of high standards in maintenance and enhancement of personnel safety.

a. Definition of Repair Requirements - The contractor may be required to identify repair requirements. These efforts, when required, will include, but are not limited to the following: inspect equipment and/or systems to determine repair options and alternatives, and make recommendations to the PNSY Barge Point of Contact (POC), or Contracting Officer’s Representative (COR).

b. Repair Implementation. The contractor shall provide qualified technicians and tradesman to perform equipment repairs, maintenance, renewal, and refurbishment. This effort shall include, but is not limited to, the following:

(1) Conduct liaison barge visits to coordinate schedules for barge repairs, equipment removal for repair, and refurbishment or replacement. Repair actions will include the removal and reinstallation of all interferences.

(2) Correct deficiencies identified during barge visits and/or surveys when authorized by the individual task order.

(3) Provide qualified journeymen level mechanics, and technicians, to accomplish repairs onboard barge.

(4) Provide subcontracting capabilities, administration, and management to accomplish repairs that may require specialized skills beyond the contractor’s internal workforce.

(5) Conduct completion inspections, accompanied by the POC or COR after all repair and/or replacement actions have been accomplished.

(6) Provide Quality Assurance Inspections and Certifications for all repair actions accomplished in accordance with this contract and standard industry practices.

(7) During the barge visits, the contractor shall work closely with the POC or COR to expeditiously fulfill planned or emergent work requirements and keep the Government fully informed of the status of work.

(8) Provide the necessary tools, rigs, and test equipment to perform repairs.

(9) Provide written reports to POC or COR on all work performed, and test documentation of those results.

C.1.4. Except as otherwise provided in this contract, or task orders issued thereunder, the contractor shall provide all material, labor, services, equipment, supplies, accessories, and such other things and services as necessary for accomplishing assigned tasks.

C.1.5. The contractor shall notify the POC or COR verbally and in writing if an established task completion date is in jeopardy.

C.1.6. The contractor shall perform the services listed in the Exhibits as may be ordered by the issuance of task orders from the Contracting Officer (KO). When ordered, the services shall be in accordance with the requirements outlined in this contract. Services shall be performed onboard YFNB 41 located at SUBASE New London, CT.

C.2. REFERENCES

In performing the requirements of this contract, the contractor shall comply with all the following references and attachments (Section J) to this solicitation:

a. The following Category I and II NAVSEA STANDARD ITEMS (NSI) may be viewed on the Internet at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx and will be invoked on all task orders:

009-01
General Criteria, accomplish
07 Nov 2013
009-02
Environmental Compliance Reports for Material Usage at Naval Facilities; provide
29 Jul 2011
009-03
Toxic and Hazardous Substances; control
17 Jan 2013
009-04
Quality Management System; provide
07 Nov 2013
009-05
Temporary Accesses; provide
17 Jan 2013
009-06
Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
17 Jan 2013
009-07
Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish
17 Jan 2013
009-08
Fire Protection at Contractor’s Facility; accomplish
07 Jan 2013
009-09
Process Control Procedure (PCP); provide and accomplish
06 Jan 2014
009-10
Shipboard Asbestos-Containing Material (ACM); control
29 Jul 2011
009-14
Gages and Thermometers; repair and certify calibration
17 Jan 2013
009-20
Government Property; control
17 Jan 2013
009-21
Logistics and Technical Data; provide
29 Jul 2011
009-23
Interferences; remove and install
17 Jan 2013
009-24
Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish
17 Jan 2013
009-32
Cleaning and Painting Requirements; accomplish
07 Nov 2013
009-34
Fire Protection of Unmanned Vessels at Contractor’s Facility; provide
17 Jan 2013
009-35
Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
07 Nov 2013
009-40
Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
29 Jul 2011
009-60
Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage
07 Nov 2013
009-69
Heavy Weather Plan; provide
07 Nov 2013
009-70
Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Craft; accomplish
17 Jan 2013
009-71
Testing Requirements for Piping Systems; accomplish
17 Jan 2013
009-72
Physical Security at Private Contractor’s Facility; accomplish
17 Jan 2013
009-74
Occupational, Safety and Health Requirements; accomplish
17 Jan 2013
009-80
Ship’s Facilities; provide
29 Jul 2011
009-87
Chemical Disinfection Procedures; accomplish
17 Jan 2013
009-88
Collection, Holding, and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping, certify
29 Jul 2011
009-93
Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
17 Jan 2013
009-94
General Environmental Requirements for Work at Contractor’s Facility; accomplish
17 Jan 2013
009-99
Ship Departure Report; provide
17 Jan 2013
009-101
Requirements for Mooring, Entry to, and Departure from Contractor’s Facility; accomplish
17 Jan 2013

b. The following Category I and II NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx and will be invoked on individual task orders as required:

009-06
Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
17 Jan 2013
009-11
Insulation and Lagging Requirements; accomplish
17 Jan 2013
009-12
Welding, Fabrication, and Inspection Requirements; accomplish
07 Nov 2013
009-17
Rotating Electrical Equipment; repair
07 Nov 2013
009-19
Provisioning Technical Documentation (PTD); provide
29 Jul 2011
009-29
Asbestos-Free Pipe Hanger Liner Material; install
29 Jul 2004
009-33
Rotating Electrical Equipment; rewind
07 Nov 2013
009-36
Controller; repair
29 Jul 2011
009-39
Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide
19 Jul 2007
009-59
Organotin Antifouling Materials; control
29 Jul 2011
009-61
Shipboard Use of Fluorocarbons; control
17 Jan 2013
009-64
Synthetic Fire-Resistant Hydraulic Fluid; control
29 Jul 2011
009-65
Polychlorinated Biphenyls (PCB’s); control
29 Jul 2011
009-67
Integrated Total Ship Testing; manage
17 Jan 2013
009-73
Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install
07 Nov 2013
009-79
Government Owned Material (GOM); status reporting
29 Jul 2011
009-82
Data Requirements When Installing an Equal Component Vice Specified Component; provide
29 Jul 2011
009-83
Wire Rope Fitting Verification; provide
17 Jan 2013
009-84
Accountability of Temporary Fasteners; provide
17 Jan 2013
009-86
Recovery of Chlorofluorocarbon (CFCs) and Fire Suppressant Halon (H) Materials; accomplish
01 Aug 2008
009-95
Mechanically Attached Fittings (MAFs) for Piping Systems; install
17 Jan 2013
009-97
Ship Building and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide.
17 Jan 2013

C.3. FACILITY REQUIREMENTS

a. Facilities. Although facility requirements may vary with the work authorized for a specific task order, the successful offeror shall have sufficient facilities in appropriate locations to fully support the work intended by this contract. YFNB 41 barge is berthed at SUBASE New London, CT.

C.4. GENERAL REQUIREMENTS

The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments. Any cost to comply with these requirements shall be included in the price of the CLINs listed in Section B.

C.4.1. The Contractor Shall:

a. Exercise own judgment and expertise to assure the successful completion of all tasks placed hereunder.

b. Designate those persons authorized to accept/reject verbal orders.

c. Coordinate schedules in the work affected areas with the PNSY Barge Point of Contact (POC), or the Contracting Officer’s Representative (COR) during the performance period of the task order. The work effort on task orders shall be coordinated on a daily basis with the POC to allow for changing situations aboard barge to minimize delays and disruptions.

d. Not respond to new performance requirements until a task order or a modification has been signed or verbal authorization has been given by the COR.

e. Not respond to any requests requiring deviations in technical performance as specified in the task order without obtaining prior approval of the COR

f. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day work schedule.

g. Comply with NSI 009-24 in accomplishing isolation, blanking and tagging of equipment, systems, circuits, components, piping and valves.

h. Provide protection during contamination-producing operations and maintain cleanliness in accordance with NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of task performance.

i. Include within the price for applicable ELINs the cost of any required lifting, handling, on-loading/off-loading, and transporting of equipment or materials “off site”. Lifting, handling, on-loading/off-loading of materials on SUBASE will be accomplished with coordination by SUBASE lifting/handling department.

j. Except as otherwise provided in this contract, or task orders issued hereunder, the Contractor shall provide all material, labor services, equipment, supplies, accessories, and such other supplies and services as necessary for accomplishing assigned tasks.

k. Ensure that persons assigned to render services hereunder are at all times under the direction and control of the contractor and are not employees of the Government.

l. Remove and dispose of all debris or trash resulting from cleaning, removal, installation or any other aspects of task performance.

m. Follow all applicable federal, state, and local laws concerning safety, health, and welfare of his personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work.

n. Contact the PNSY Barge POC at (207) 451-3398 when problems are encountered after normal working hours.

o. Provide a verbal weekly report detailing significant events and the progress made during the course of each week to the PNSY POC. Time and location for weekly report shall be agreed upon at the beginning of contract execution, and adjusted, as required, by the POC.

p. The contractor shall be responsible for tag out of systems to be repaired and the removal of all interferences. The contractor shall coordinate with the Barge POC to verify that systems have been properly tagged-out and secured prior to any production effort. The contractor shall reinstall and perform necessary test(s) to all removed interferences/equipment upon completion of all installations specified herein. NSI 009-23 shall apply.

q. Accomplish the requirements of NSI 009-29 where hangers and pipe are removed, disturbed, or new hangers are being installed.

r. Accomplish preservation of the new and disturbed normally painted surfaces in accordance with NSI 009-32, “Cleaning and Painting Requirements; accomplish.”

s. Provide the necessary tools and test equipment to perform the repairs/maintenance actions.

t. Develop and implement test and quality assurance techniques in the performance of maintenance actions. Conduct operational tests and provide written, legible copies of all test results to the Barge POC.

u. Accomplish the requirements of NSI 009-84 when using any temporary fasteners and NSI 009-95 when using any mechanically attached fittings.

v. As soon as practical after contract award date, the contractor’s On-Site Supervisor will meet with the COR/POC to review the contract details, equipment, and schedules.

w. Accomplish the requirements of NSI 009-12 when any welding or brazing services are required.

C.4.2. Environmental and Safety Requirements. The contractor shall:

a. Consider all insulation, lagging, deck tile, underlayment, gasket shipboard cabling and mastic to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable methods, that the material does not contain asbestos, in accordance with 29 CFR 1915.1001. Removal, disturbance or disposal of ACM shall be accomplished IAW the requirements of NSI 009-10.

b. Not enter any confined space without the appropriate certification of PNSY Marine Chemist. Accomplish fire prevention and housekeeping requirements of NSI 009-07, 009-35 and 009-70. Maintain area cleanliness and ensure all residues and refuse are removed daily and ensure that general housekeeping is maintained for the duration of the task in the work areas specified on each task order.

c. Consider all solid waste to be removed from a ship under repair to be potentially hazardous waste. The contractor shall review and evaluate all solid waste to determine if that waste is hazardous IAW 40 CFR 262.11.

d. All solid waste with the known potential to be hazardous, including, but not limited to, non-skid debris, paint chip debris, flooring/debris, and all liquid waste water removed from the ship shall be tested by a certified laboratory for metals IAW 40 CFR 261.24 using the Toxicity Characteristic Leaching Procedure (TCLP), Method 1311 in EPA Publication SW-846. Contractor shall submit all laboratory analysis reports to the COR as soon as possible upon receipt from the laboratory. No solid waste removed from the ship shall be transported off the facility until authorized by the COR.

e. Contractor shall prepare, provide and affix labels/placards for all containers of solid waste accumulated on the land, pier, and/or the vessel, including solid waste that is “Pending Analysis.” Labels/placards shall be weatherproof, large enough to provide ready identification, and provide the following information:

- Contractor Name
- Contractor POC: (name, cell phone number, phone number)
- Vessel
- Contract Number
- Task Order Number
- COR Point of Contact (name, cell phone number, phone number)
- Description of waste
- Analysis Pending/Sample date (if applicable)

f. In the event that a solid waste is determined to be non-hazardous, the contractor shall dispose of the waste in accordance with federal, state, and local regulations.

C.5. DETAILED REQUIREMENTS

C.5.1 ELIN A101 – Planned maintenance.

AA: Report weekly, to YFNB 41 barge, on a day mutually agreeable with vendor and PNSY barge Point of Contact (POC), to review barge Trouble Log, maintained by PNSY. Identify work requirements in Trouble Log with Barge POC. Develop work priorities with Barge POC.

In the event that there will be periods where NO PNSY personnel will be aboard YFNB 41 for an extended period, PNSY POC will inform vendor of that schedule. No weekly PM will be required during that period. PM’s will resume upon return of PNSY personnel to barge.

AB-AC: Quarterly, at a day/time mutually agreeable with vendor and Barge POC, remove Mitsubishi ceiling and wall-mount cassette filters, rinse with clean water in deep sink available on barge. Return cleaned filters to cassettes.

Quarterly, at a day/time mutually agreeable with vendor and Barge POC, inspect/check operation of compressors, motors, cassettes, wiring, switch controls, thermostats and safety components of Mitsubishi HVAC system on barge. Report findings to Barge POC.

C.5.2. ELINS A102 – Habitability Repairs

AA-AR: Provide services/materials for repairs/replacement of equipment in all habitability areas to include, but not limited to, repair of urinals, toilets, sinks, valves, flushometers, soap dishes, towel racks, water fountains, flushometer hoses, hydraulic door closures. Prices to include cost of labor, equipment and material.

C.5.3. ELIN A103 – Electrical Repairs

AA-AM: Provide services/materials for replacement of LED light panels, LED and fluorescent tubes, bulbs, light switches/covers, receptacles/covers, LED Force Protection light fixtures, exit light fixtures, fuses, nickel cadmium rechargeable emergency light fixtures, batteries, starters, halogen light bulbs, breakers, wiring, and light photo cells.

Prices to include cost of labor, equipment and material.

C.5.4. ELIN A104 – Miscellaneous Repairs

AA-AF: Provide services/materials for miscellaneous repairs to decks, walls, doors, to include, but not limited to, repair/replacement of Supratile flooring, walls, doors, and windows.

Prices to include cost of labor and material.

C.5.6. ELIN A105 – Unplanned Parts and Repairs

AA-AB: The Unplanned Parts and Repairs ELIN is to be used to correct any discrepancies that are not represented in another defined ELIN. It includes labor hour and material SUBELINs to cover the requirements. The Unplanned Parts and Repairs ELIN is to be used for unique type requirements that are non-repetitive and no ELIN exists to cover that work. The Unplanned Parts and Repairs ELIN includes labor hour and material SUBELINs.