HEC_CCCD_REV__C.doc

DOC document 29 KB Posted

Attached to
Repairs of Betts-Bridgeport Lathe
Solicitation number
N39040-16-T-0159
Issued by

About this file

Hazardous Energy Control Form

View the file

Other files

File Type Posted
16-T-0159_SOW_Attach_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazardous Energy Control

Contractor Compliance Certification Document Rev C 8/26/2014 Purchase Order Number____________________________ Job Location________________________________ New Equipment Y/N_______ Company name

Date

By the contractor’s representative’s signature below the contractor’s representative certifies that the Company whose name is listed above understands and agrees to the following requirements for any task or work the contractor performs aboard the Portsmouth Naval Shipyard (NAVSHIPYD PTSMH) that involves Hazardous Energy Control (HEC).

29 CFR Part 1915.89, which became effective and enforceable on 31 October 2011, provided a new standard addressing hazardous energy control in shipyard employment. Part 1915.89 applies to private-sector contractors performing servicing operations in shipyard employment, and states the Navy’s HEC Program is in effect in Naval Shipyards. Private-sector contractors performing work that involves HEC aboard NAVSHIPYD PTSMH are responsible for ensuring the safety of their employees who may perform tasks or work involving HEC.

The contractor’s representative’s signature below certifies that the contractor understands and shall comply with all requirements for work involving HEC as provided in 29 CFR Part 1915.89 and the Naval Sea Systems Command (NAVSEA) Occupational Safety, Health and Environmental Corporate Manual (OSHECM) Chapter 250 (latest revision), including Lockout/Tags-Plus (LOTP). The text of 29 CFR Part 1915.89 is available at the OSHA Fact Sheet web site, and the latest revision of OSHECM Chapter 250 is available at;

http://www.navsea.navy.mil/Portals/103/Documents/NNSY/OSHECM%20Chapter%20250-Modified%20for%20Public%20Access.pdf WARNING: CONTRACTOR’S FAILURE TO COMPLY WITH THE HEC REQUIREMENTS REFLECTED IN 29 CFR PART 1915.89 AND OSHECM CHAPTER 250 MAY CAUSE SERIOUS INJURY OR DEATH TO THE CONTRACTOR’S EMPLOYEES. UNDER NO CIRCUMSTANCES SHALL THE PORTSMOUTH NAVAL SHIPYARD ASSUME ANY LIABILITIES THAT RIGHTLY ARE THE RESPONSIBILITIES OF THE CONTRACTOR.

Shop Card Holder/POC_______________________________________________________________________________________ Lockout/Tags-Plus Coordinator _______________________________________________________________________________ Coordination Req’d (circle one) ( Y / N ) LOTP Serial Number ______________________ Contractor’s Representative’s Name (Print clearly) ____________________________________________________________ Contractor’s Representative’s Signature ____________________________________________Date_____________________ Fax completed copy to LOTP Committee at x2540.

File details come from the government source that posted it. Updated .