Specifications_-_Rev_A.doc
DOC document 2 MB Posted
- Attached to
- Temporary Ventilation Equipment Rental Federal contract opportunity
- Solicitation number
- N39040-16-T-0151
About this file
Specifications REV A revised for the purpose of clarification only. Scope and dates remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_16-T-0151-0001.pdf | ||
| Attachment_1_-_Specifications.doc | DOC document | |
| Attachment_3_-_QASP.rtf | RTF text file | |
| Attachment_3a_-_QASP_Matrix.rtf | RTF text file | |
| Attachment_2_-_CAP_FFP.doc | DOC document | |
| RFQ_16-T-0151.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ssn 767 [eoh] lease SCHEDULE: temporary ventilation (tvent) ssn 767 [eoh] lease SCHEDULE: temporary ventilation (tvent)
| no |
| swlin |
or
SYS
lctn sub/mach dd / pier identifier TYPE [style]–SZ (critical cmpnt arrival date Footnote A return date Season term Ftnt B (wks) ship cost
| id |
| IDENT |
| ZONE |
| Machine / Eqpt |
| STD│OPTION |
| STD│OPTION |
| 1ST Cycle |
| usual |
| ITEM |
| QTY |
| Position |
| Purpose │ALTNV |
| ANNOTATION |
| EXTENSION |
| 2ND Cycle |
| extra |
| V01 |
| tCHW |
| To Ship |
| chlr [3"cam]–n |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| R1( |
| 1st of 1 |
| Platf stbd |
| ( CRITICAL ( |
| 1 Non-Seasonal |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V02 |
| tCHW |
| To Ship |
| PUMP [3"cam]–n |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| P1( |
| 1st of 1 |
| Platf stbd |
| ( CRITICAL ( |
| 2 Assoc w/ V01 |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V03 |
| tsply |
| Fwd |
| ddu[CMBD/hsp]-n |
| 14 Jun '16 Tu |
| 16 May '17 Tu |
| S 48 |
| INCL |
| D0 |
| 1st of 3 |
| DD Fwd port |
| Alternative IA |
| 1ST Arr / 2ND Rtn |
| V04 |
| tsply |
| Sail |
| ddu[CMBD/hsp]-n |
| 21 Jun '16 Tu |
| 09 May '17 Tu |
| S 46 |
| INCL |
| d0 |
| 2nd of 3 |
| Platf port |
| Alternative IA |
| 2ND Arr / 1ST Rtn |
| V05 |
| tsply |
| Aft |
| ddu[CMBD/hsp]-n |
| 28 Jun '16 Tu |
| 23 May '17 Tu |
| S 47 |
| INCL |
| d0 |
| 3Rd of 3 |
| DD Aft port |
| Alternative IA |
| 3RD Arr / 3RD Rtn |
| V06 |
| tsply |
| Fwd |
| ddu [DSCC/LSP]-n |
| 14 Jun '16 Tu |
| 16 May '17 Tu |
| S 48 |
| INCL |
| D2 |
| 1st of 3 |
| DD Fwd port |
| Alternative IB |
| 1ST Arr / 2ND Rtn |
| V07 |
| tsply |
| Sail |
| ddu [DSCC/LSP]-n |
| 21 Jun '16 Tu |
| 09 May '17 Tu |
| S 46 |
| INCL |
| D2 |
| 2nd of 3 |
| Platf port |
| Alternative IB |
| 2ND Arr / 1ST Rtn |
| V08 |
| tsply |
| Aft |
| ddu [DSCC/LSP]-n |
| 28 Jun '16 Tu |
| 23 May '17 Tu |
| S 47 |
| INCL |
| D2 |
| 3Rd of 3 |
| DD Aft port |
| Alternative IB |
| 3RD Arr / 3RD Rtn |
| V09 |
| tsply |
| Fwd |
| RHC [STM]–N/2M |
| 14 Jun '16 Tu |
| 16 May '17 Tu |
| S 48 |
| INCL |
| D2a |
| 1st of 3 |
| DD Fwd port |
| Alternative IB |
| 4aRHC Capacity |
| V010 |
| tsply |
| Sail |
| RHC [STM]–N/2M |
| 21 Jun '16 Tu |
| 09 May '17 Tu |
| S 46 |
| INCL |
| D2a |
| 2nd of 3 |
| Platf port |
| Alternative IB |
| 4aRHC Capacity |
| V011 |
| tsply |
| Aft |
| RHC [STM]–N/2M |
| 28 Jun '16 Tu |
| 23 May '17 Tu |
| S 47 |
| INCL |
| d2a |
| 3Rd of 3 |
| DD Aft port |
| Alternative IB |
| 4aRHC Capacity |
| V012 |
| tsply |
| Fwd |
| HTGc [DDU]–n |
| 27 Sep '16 Tu |
| 16 May '17 Tu |
| S 33 |
| INCL |
| d2b |
| 1st of 3 |
| DD Fwd port |
| Alternative IB |
| 5aOverlap CLGC |
| V013 |
| tsply |
| Sail |
| HTGc [DDU]–n |
| 27 Sep '16 Tu |
| 09 May '17 Tu |
| S 32 |
| INCL |
| d2b |
| 2nd of 3 |
| Platf port |
| Alternative IB |
| 5aOverlap CLGC |
| V014 |
| tsply |
| Aft |
| HTGc [DDU]–n |
| 27 Sep '16 Tu |
| 23 May '17 Tu |
| S 34 |
| INCL |
| d2b |
| 3Rd of 3 |
| DD Aft port |
| Alternative IB |
| 5aOverlap CLGC |
| V015 |
| tsply |
| Fwd |
| clGc [PRE]–n |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| d2c |
| 1st of 3 |
| DD Fwd port |
| Alternative IB |
| 6CLGC Capacity |
| V016 |
| tsply |
| Sail |
| clGc [PRE]–n |
| 21 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 14 |
| INCL |
| d2c |
| 2nd of 3 |
| Platf port |
| Alternative IB |
| 6CLGC Capacity |
| V017 |
| tsply |
| Aft |
| clGc [PRE]–n |
| 28 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 13 |
| INCL |
| d2c |
| 3Rd of 3 |
| DD Aft port |
| Alternative IB |
| 6CLGC Capacity |
| V018 |
| tsply |
| Fwd |
| clGc[POST]-n/M |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| d#c |
| 1st of 3 |
| DD Fwd port |
| Alternative IB |
| 6CLGC Capacity |
| V019 |
| tsply |
| Sail |
| clGc[POST]-n/M |
| 21 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 14 |
| INCL |
| d#c |
| 2nd of 3 |
| Platf port |
| Alternative IB |
| 6CLGC Capacity |
| V020 |
| tsply |
| Aft |
| clGc[POST]-n/M |
| 28 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 13 |
| INCL |
| d#c |
| 3Rd of 3 |
| DD Aft port |
| Alternative IB |
| 6CLGC Capacity |
| V021 |
| Tsply |
| Fwd-Intr |
| cOIL [H+C/HSP]–l |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| C2 |
| 1st of 2 |
| Platf stbd |
| Alternative IIA |
| 1 Non-Seasonal |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V022 |
| Tsply |
| Aft-Intr |
| cOIL [H+C/HSP]–l |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| C2 |
| 2nd of 2 |
| Platf stbd |
| Alternative IIA |
| 1 Non-Seasonal |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V023 |
| Tsply |
| Fwd-Intr |
| cOIL[H+C/LSP]-2n |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| C1 |
| 1st of 2 |
| Platf stbd |
| Alternative IIB |
| 1 Non-Seasonal |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V024 |
| Tsply |
| Aft-Intr |
| cOIL[H+C/LSP]-2n |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| C1 |
| 2nd of 2 |
| Platf stbd |
| Alternative IIB |
| 1 Non-Seasonal |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V025 |
| tsply |
| Fwd-Intr |
| coil [fltr]–L/2n |
| 31 May '16 Tu |
| 30 May '17 Tu |
| V 52 |
| INCL |
| c#' |
| 1st of 2 |
| Platf stbd |
| Alternative IV |
| 7 Vendor Choice |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V026 |
| tsply |
| Aft-Intr |
| coil [fltr]–L/2n |
| 31 May '16 Tu |
| 30 May '17 Tu |
| V 52 |
| INCL |
| c#' |
| 2nd of 2 |
| Platf stbd |
| Alternative IV |
| 7 Vendor Choice |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V027 |
| texh |
| Fwd-Intr |
| fan [EXH/SRC]–N |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| f1 |
| 1st of 4 |
| Platf stbd |
| for Fwd Compt-Intr |
| 1 Non-Seasonal |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V028 |
| texh |
| Aft-Intr |
| fan [EXH/SRC]–N |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| f1 |
| 2nd of 4 |
| Platf stbd |
| for Aft Compt-Intr |
| 1 Non-Seasonal |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V029 |
| texh |
| Fwd-Ext |
| fan [EXH/SRC]–N |
| 14 Jun '16 Tu |
| 16 May '17 Tu |
| S 48 |
| INCL |
| f1 |
| 3rd of 4 |
| DD Fwd port |
| for Fwd MBTs-Ext |
| 1 Non-Seasonal |
| V030 |
| texh |
| Aft-Ext |
| fan [EXH/SRC]–N |
| 28 Jun '16 Tu |
| 23 May '17 Tu |
| S 47 |
| INCL |
| f1 |
| 4th of 4 |
| DD Aft port |
| for Aft MBTs-Ext |
| 1 Non-Seasonal |
| V031 |
| Tchw |
| MBT-Ext |
| chlr [6"CAM]–X |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| r3 |
| 1st of 2 |
| DD Aft port |
| for DDUs or CLGCs |
| V03-05 or V15-20 |
| V032 |
| Tchw |
| Sub-Intr |
| chlr [6"CAM]–X |
| 31 May '16 Tu |
| 27 Sep '16 Tu |
| S 17 |
| INCL |
| r3 |
| 2ND of 2 |
| Platf stbd |
| for TCC–L/2N: 1ST |
| V21/22 or V23/24 |
| V033 |
| Tchw |
| Sub-Intr |
| chlr [6"CAM]–X |
| 25 Apr '17 Tu |
| 18 Jul '17 Tu |
| S 12 |
| INCL |
| r3 |
| RETURN |
| Platf stbd |
| for TCC–L/2N: 2ND |
| V21/22 or V23/24 |
| V034 |
| tchw |
| MBT-Ext |
| PUMP [6"CAM]–X |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| p3 |
| 1st of 2 |
| DD Aft port |
| for DDUs or CLGCs |
| 2 Assoc w/ V31 |
| V035 |
| tchw |
| Sub-Intr |
| PUMP [6"CAM]–X |
| 31 May '16 Tu |
| 27 Sep '16 Tu |
| S 17 |
| INCL |
| p3 |
| 2ND of 2 |
| Platf stbd |
| for TCC–L/2N: 1ST |
| 2 Assoc w/ V32 |
| V036 |
| tchw |
| Sub-Intr |
| PUMP [6"CAM]–X |
| 25 Apr '17 Tu |
| 18 Jul '17 Tu |
| S 12 |
| INCL |
| p3 |
| RETURN |
| Platf stbd |
| for TCC–L/2N: 2ND |
| 2 Assoc w/ V33 |
| V037 |
| tchw |
| Fwd DDU |
| manf [4"╬ 6"]–U |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| M-a |
| 1st of 3 |
| DD Fwd port |
| Alternative IIIA |
| 2 Assoc w/ V31 |
| V038 |
| tchw |
| Sail DDU |
| manf [4"╬ 6"]–U |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| M-a |
| 2nd of 3 |
| DD Ctr port |
| Alternative IIIA |
| 2 Assoc w/ V31 |
| V039 |
| tchw |
| Aft DDU |
| manf [4"╬ 6"]–U |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| M-a |
| 3rd of 3 |
| DD Aft port |
| Alternative IIIA |
| 2 Assoc w/ V31 |
| V040 |
| tchw |
| Fwd DDU |
| manf [4":3"×2]–l |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| m2 |
| 1st of 3 |
| DD Fwd port |
| Alternative IIIB |
| 2 Assoc w/ V31 |
| V041 |
| tchw |
| Sail DDU |
| manf [4":3"×2]–l |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| m2 |
| 2nd of 3 |
| DD Ctr port |
| Alternative IIIB |
| 2 Assoc w/ V31 |
| V042 |
| tchw |
| Aft DDU |
| manf [4":3"×2]–l |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| m2 |
| 3rd of 3 |
| DD Aft port |
| Alternative IIIB |
| 2 Assoc w/ V31 |
| V23 |
| tchw |
| Fwd TCC |
| manf [4":3"×2]–l |
| 31 May '16 Tu |
| 27 Sep '16 Tu |
| S 17 |
| INCL |
| m2 |
| TCC–2N |
| Platf stbd |
| Altnv IIB & IIIB |
| 2 Assoc w/ V32 |
| V24 |
| tchw |
| Aft TCC |
| manf [4":3"×2]–l |
| 31 May '16 Tu |
| 27 Sep '16 Tu |
| S 17 |
| INCL |
| m2 |
| TCC–2N |
| Platf stbd |
| Altnv IIB & IIIB |
| 2 Assoc w/ V32 |
| V23 |
| tchw |
| Fwd TCC |
| manf [4":3"×2]–l |
| 25 Apr '17 Tu |
| 18 Jul '17 Tu |
| S 12 |
| INCL |
| m2 |
| RETURN |
| Platf stbd |
| Altnv IIB & IIIB |
| 2 Assoc w/ V33 |
| V24 |
| tchw |
| Aft TCC |
| manf [4":3"×2]–l |
| 25 Apr '17 Tu |
| 18 Jul '17 Tu |
| S 12 |
| INCL |
| m2 |
| RETURN |
| Platf stbd |
| Altnv IIB & IIIB |
| 2 Assoc w/ V33 |
| V043 |
| tchw |
| Fwd DDU |
| manf [4":6"×2]–x' |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| M3a |
| 1st of 3 |
| DD Fwd port |
| Alternative IIIB |
| 2 Assoc w/ V31 |
| V044 |
| tchw |
| Sail DDU |
| manf [4":6"×2]–x' |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| M3a |
| 2nd of 3 |
| DD Ctr port |
| Alternative IIIB |
| 2 Assoc w/ V31 |
| V045 |
| tchw |
| Aft DDU |
| manf [4":6"×2]–x' |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| M3a |
| 3rd of 3 |
| DD Aft port |
| Alternative IIIB |
| 2 Assoc w/ V31 |
| V046 |
| tchw |
| Sub-Intr |
| manf[6":4"×2]–x" |
| 31 May '16 Tu |
| 27 Sep '16 Tu |
| S 17 |
| INCL |
| M3b |
| 1st of 1 |
| Platf stbd |
| for TCC–L/2N: 1ST |
| 2 Assoc w/ V32 |
| V047 |
| tchw |
| Sub-Intr |
| manf[6":4"×2]–x" |
| 25 Apr '17 Tu |
| 18 Jul '17 Tu |
| S 12 |
| INCL |
| M3b |
| RETURN |
| Platf stbd |
| for TCC–L/2N: 2ND |
| 2 Assoc w/ V33 |
| V048 |
| tchw |
| Sub-Ext |
| MANF[GLOBE]–x |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| M-b |
| 1st of 1 |
| DD Fwd port |
| for DD CHW Loop |
| 2 Assoc w/ V31 |
| V049 |
| tchw |
| To Ship |
| MANF [EXCH]–n |
| 20 Sep '16 Tu |
| 09 May '17 Tu |
| S 33 |
| INCL |
| M-c |
| 1st of 1 |
| Platf stbd |
| ( CRITICAL ( |
| 2 Assoc w/ V01 |
| V050 |
| tchw |
| To Ship |
| hose [3"FP/IS]–N |
| 31 May '16 Tu |
| 30 May '17 Tu |
| S 52 |
| INCL |
| h1' |
| 1st of 1 |
| Platf stbd |
| ( CRITICAL ( |
| 2 Assoc w/ V01 |
| 18 Jul '17 Tu |
| U17(07 |
| INCL |
| V051 |
| tchw |
| exterior |
| hose [3"cam]–N |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| h1 |
| 1st of 1 |
| fwd(aft |
| MANF-U or MANF-L |
| 2 Assoc w/ V31 |
| V052 |
| tchw |
| exterior |
| hose [4"cam]–L |
| 31 May '16 Tu |
| 27 Sep '16 Tu |
| S 17 |
| INCL |
| h2 |
| 1st of 1 |
| fwd(aft |
| for MANF-X": 1ST |
| 2 Assoc w/ V32 |
| V053 |
| tchw |
| exterior |
| hose [4"cam]–L |
| 25 Apr '17 Tu |
| 18 Jul '17 Tu |
| S 12 |
| INCL |
| h2 |
| RETURN |
| fwd(aft |
| for MANF-X": 2ND |
| 2 Assoc w/ V33 |
| V054 |
| tchw |
| exterior |
| hose [6"cam]–X |
| 14 Jun '16 Tu |
| 27 Sep '16 Tu |
| S 15 |
| INCL |
| h3 |
| 1st of 1 |
| fwd(aft |
| MANF-U or MANF-X' |
| 2 Assoc w/ V31 |
| V055 |
| tsply |
| ext / intr |
| tube [ftgs]–20 |
| 31 May '16 Tu |
| 30 May '17 Tu |
| F 01 |
| INCL |
| T3 |
| 1st of 1 |
| ( ship |
| for DDUs & COILs |
| 2Assoc w/ V21-4 |
| 18 Jul '17 Tu |
| U17(01 |
| INCL |
| V056 |
| tsply |
| ext / intr |
| Tube [+FLEX]–20 |
| 31 May '16 Tu |
| 30 May '17 Tu |
| F 01 |
| INCL |
| T+3 |
| 1st of 1 |
| ( ship |
| for DDUs & COILs |
| 2Assoc w/ V21-4 |
| 18 Jul '17 Tu |
| U17(01 |
| INCL |
| V057 |
| tvent |
| interior |
| E-Stop [INTR]≥04 |
| 07 Jun '16 Tu |
| 06 Jun '17 Tu |
| F 01 |
| INCL |
| w1 |
| 1st of 1 |
| Guard Area |
| for 2 FANs & COILs |
| 2Assoc w/ V21-8 |
| TBD by TSZM |
| ≥4 Stops |
| FEE |
| V058 |
| OPNL |
| ext / intr |
| opnl [≤3hr]–28 |
| 07 Jun '16 Tu |
| 06 Jun '17 Tu |
| EA( 24 |
| 2 / MO |
| w2 |
| 1st of 1 |
| CHW Loop |
| for All Machinery |
| 10 Schedule |
| 01 Aug '17 Tu |
| U17(04 |
| 2 / MO |
| V059 |
| SVCE |
| ext / intr |
| svce [≤8hr]–14 |
| 07 Jun '16 Tu |
| 06 Jun '17 Tu |
| S 12 EA |
| 1 / MO |
| w3 |
| 1st of 1 |
| Machinery |
| for All Machinery |
| 11 Call & E-mail |
| 01 Aug '17 Tu |
| S 02 EA |
| 1 / MO |
| V060 |
| INSTL |
| exterior |
| instl [≤8hr]–02 |
| 07 Jun '16 Tu |
| 06 Jun '17 Tu |
| S 02 EA |
| INCL |
| w4 |
| 1st of 1 |
| CHW Loop |
| for DD CHW Loop |
| 10 Schedule |
| TBD by TSZM |
| V061 |
| TRNG |
| ext / intr |
| TRNG [≥4hr]–02 |
| 07 Jun '16 Tu |
| 06 Jun '17 Tu |
| S 02 EA |
| INCL |
| w5 |
| 1st of 1 |
| Machinery |
| for All Machinery |
| 10 Schedule |
| TBD by TSDE |
| V062 |
| TECH |
| info [EDS]–24 |
| 07 Jun '16 Tu |
| 06 Jun '17 Tu |
| S 24 EA |
| 2 / MO |
| w6 |
| 1st of 1 |
| Grossman |
| to Satisfy Info Req |
| 11 Call or E-mail |
| TBD by TSDE |
1ST Cycle:
2ND Cycle:
TOTAL:
Table V:
TVENT SWLINs
| TITLE |
| Dehumidified Air |
(100% Outside Air) Industrial Air (100% Outside Air) Conditioned Air (100% Return Air) Sub Chld Wtr (Non-Seasonal) Encl Chld Wtr (Seasonal) Nuclear Chld Wtr (Seasonal)
| Purpose |
| Dry Air |
for Blast & Paint Fresh Air for Ship's Interior Tempered Air for Bow Dome etc.
Chilled Water to Submarine Piping Chilled Water to DD Enclosures Chilled Water to Nuclear Buildings
| SWLIN |
| 176A01 |
036I01
| 036I01 |
| 036i01 |
| 035A01 |
036I01
| 036I01 |
| 860j14 |
JO#
3681486022s16
| SYSTEM |
| Tsply-texh-tchw |
| tsply-texh-tchw |
| TCOND |
| tchw [sub] |
| tchw [rsc/sht/xcl] |
| Tchw [nuc] |
Table V:
TVENT Footnotes with Annotations Footnote A:
1 Non-Seasonal
For the single Normal (–N) capacity Chiller with its respective Pump that provides chilled water (CHW) directly to the ship, the machine(s) are continuously needed irrespective of the season and for the entire duration of the drydock period. The asterisk (() further identifies the machine(s) as critical component(s) in which there are additional mandatory Contractual obligations as specified elsewhere in the Technical Specification (TS). Other Non-Seasonal type machinery are several ITEM Cs (C / C1 / C2): DDUs & RHCs; ITEM Ds: TCCs; and ITEM Es: AHUs & ACUs. Seasonal machinery are all other Chillers with their respective Pumps; several ITEM C#s (C3 & C4): HTGCs & CLGCs associated with a desiccant only dehumidifier, hence, do not require a fan; and ITEM Fs: HTGCs & CLGCs that Stand-Alone, hence, do require a built-in fan. Seasonal equipment are the manifolds, hose assemblies, elbows, valves, and standpipes associated with the Seasonal machinery.
2aDD#1: post-DH
There is an unusual requirement for a dehumidifier at the post-dock Berth just prior to undocking from Drydock No. 1 only (Post DD#1). The dehumidified air is necessary for minor hull repair after removal of Buoyancy cans necessary to undock (UD) a submarine from DD#1. Accordingly: (i) the post-dock scheduled season is as scheduled; (ii) the capacity for airflow and moisture removal is half of what is normally required; and (iii) there is no steam utility at the Berths. Correspondingly: (i) dependent on the actual schedule, the Contractor may either keep the last remaining Normal (–N) capacity dehumidifier (e.g. Fwd DDU) on-site for reuse post-dock or schedule a later delivery of some other dehumidifier; (ii) the capacity of the dehumidifier can be anywhere from half (i.e. Medium –M) to the same as for the Normal (–N) capacity dehumidifier, but, the capacity for any post-heater cannot be less than its associated dehumidifier; and (iii) the dehumidifier will use electric Reactivation, i.e. NO (steam) Reactivation Heating Coil (RHC) will be needed – thus, a combined [CMBD] dehumidifier will not require functioning pre-/post- cooling coils and will use only electric reactivation and the desiccant [DSCC] dehumidifier will not require a separate steam [STM] RHC.
2b DD#2: RSCs
For Los Angeles Class submarines (688 CL) undergoing overhaul in DD#2, the newly refurbished Removable Submarine Covers (RSCs) not only shelters the entire submarine within a weather protective structure, but, also encompasses the submarine within an environmentally controlled envelope. Each of the fourteen (14) permanent RSC Temperature Conditioning Coils (TCCs) has an air-handler, steam coil for heating, and a chilled water coil for cooling. The only rental machinery required to effectuate the engineered controlled environment are a 200 ton chiller with its accompanying pump for the port set of RSC stacks and a similar chiller with pump for the starboard set of RSC stacks.
3aRHC Capacity
For Alternative IB (desiccant type [DSCC] dehumidifier only – neither pre- nor post- air treatment), the Vendor has a choice of either a single Normal (–N) or a pair of Medium (–M) capacity steam [STM]
AND FOR SAIL
Reactivation Heating Coil(s) (RHCs) for all three dehumidifiers. However, subject to footprint, there is the possibility that the Sail DDU may have insufficient space nearby to accommodate the steam RHC.
3b Footprint
The Vendor must provide precise footprint dimensions of each capacity type of steam RHC, along with its other machinery, and be prepared to deliver the Sail RHC as scheduled. Whereas the capacity type of RHC is a Vendor Choice, the decision to deploy the Sail RHC is a Government Option dependent on its footprint and available platform space. The Temporary Systems Design Engineer (C230.1RG) will evaluate as to whether the Sail RHC could fit within the available space. Contracting will then inform the Vendor, sufficiently prior to shipment, as to whether to commence a lease of the Sail RHC.
4aOverlap CLGC
For Alternative IB (desiccant type [DSCC] dehumidifier w/ no built-in pre- nor post- air treatment), the Vendor must provide a spring-time four week (4 week) overlap between its current post heating coils and the following pre- & post- cooling coils AT NO ADDITIONAL COST. Only by allowing for this overlap of pre-treatment and post-treatment coils can the Government equate the Bid offers between a Vendor offering the preferred Alternative IA combined [CMBD] dehumidifier which integrates pre-cooling, post-cooling, & post-heating and the permitted Alternative IB dehumidifier lacking such integrated coils. If the overlap should be greater than four weeks, then the Government is obligated for the additional duration of the previous coil(s) which in this case are the heating coils. To accommodate this particular spring-time four-week overlap, the delivery schedule is such that the preceding post-heating coil may depart up to four weeks after its scheduled RETURN date and not incur an additional fee.
4bOverlap HTGC
For Alternative IB (desiccant type [DSCC] dehumidifier only – neither pre- nor post- air treatment), the Vendor must provide a springtime four week (4 wk) overlap between the previous post-heat coil and the following pre-cool & post-cool coils AT NO ADDITIONAL COST. Only by allowing for this overlap of pre-treatment and post-treatment coils can the Government equate the Bid offers between a Vendor offering the preferred Alternative IA combined [CMBD] dehumidifier which integrates pre-cooling, post-cooling, & post-heating and the permitted Alternative IB dehumidifier lacking such integrated coils. If the overlap should be greater than four weeks, then the Government is obligated for the additional duration of the previous coil(s) which in this case is the single heating coil. For this particular springtime four-week overlap, the succeeding pre-cool and post-cool coils must actually arrive at least four weeks prior to its scheduled ARRIVAL date and the preceding post-heat coil should depart by its scheduled RETURN date so as to not incur any additional fee.
5CLGC Capacity
As background, the needed chilled water cooling capacity for a post-cooler is only half of what is required for a pre-cooler. The pre-cooling coil uses about half of its energy to process the air (moisture removal – i.e. latent heat of condensation) and the other half to treat the air (temperature reduction – i.e. sensible heat). Whereas, the post-cooler, similar to a post-heater, is used for comfort control a.k.a. temperature reduction only (i.e. sensible heat). Thus, a pre-cooler would be sized as a Normal (–N) capacity machine of approximately fifty (50) tons, but, the post-cooler could be sized up to half as much similar to a Medium (–M) capacity machine of twenty-five (25) tons. Although the Vendor has a choice as to the cooling capacity for the post-cooler only as either Normal or Medium (–N / –M) capacity, the advantage of making both the pre-cooler and the post-cooler machines of similar capacity would be their interchangeability.
Table V:
TVENT Footnotes with Annotations (continued)
Footnote A (continuation):
6Vendor Choice
If the Vendor can provide the desired machinery and/or equipment as listed at or below the Government Estimate, then it is in the Shipyard's interest to lease the designated ITEMs. Please note that Vendor Bid comparisons should either both include or exclude such ITEMs.
7 If DH Remains
The scheduled plan is for the Project to complete all Blast and Paint (B&P) operations in the late Spring of 2016 just prior to the requisite pre-cooling and post-cooling of dehumidified air for a second cooling season 2ND CLG Season. However, an option has been included in this Technical Specification to allow for an extension (EXT) of the lease of either the 8FFwd DDU and/or the 8SSail DDU so that the applicable dehumidifier(s) can Remain throughout the second cooling season. Dependent on which dehumidifier remains, specific types of machinery and equipment will be leased as an option to support that dehumidification process. In particular, the 8FFwd DDU, which because of its isolated location on the Drydock floor, would require the lease of a separate chiller (chlr [4"cam]–L) with pump (PUMP [4"cam]–L) besides cooling coils (Alternative IB only) and manifold(s). Whereas, the 8SSail DDU, because of its proximity between the Fwd & Aft TCCs, would connect to the TCC chiller (chlr [6"cam]–X) with pump (PUMP [6"cam]–X) during the second cooling season and would only require the lease of cooling coils (Alternative IB only) and manifold(s).
8 Associated w/
9 PNS Elective
Dependent on Shipyard availability, the lease of rigid duct fittings duct [ftgs]–g and both the positive and negative pressure flexible ducting duct [±flex]–g/–X/–N are a Government PNS Elective as to whether an ITEM shall be leased. Also, these lease items have a one-time fee term for the entire duration that its associated machinery are under lease and not subject to a weekly rental term. The officially issued Contract will inform the Vendor as to whether each of the subject ITEMs are to be leased. The rigid duct fittings and the positive pressure flexible ducting would be required on-site earlier by one week than the later negative pressure flexible ducting. The Contract ARRIVAL DATE will be adjusted so as to provide the Vendor with a three week lead time for the earlier ITEMs and a four week lead time for the later ITEMs unless the Vendor initiates and/or indicates a desire for the original speculative calendar dates. As adjusted, this lead time should be sufficient for the Vendor to place an order after Contract award if it should have an insufficient supply of a particular lease products.
10 Schedule
There are specific Contract Line Items requiring the services (labor) of the Vendor that are non-emergent and are best coordinated in advance and scheduled by the responsible Shipyard Party via communications with the Vendor to include an E-mail (Cc: Vendor / COR / Contract Specialist / TSDE) to document the line ITEM request. The Project's Temporary Systems Zone Manager [TSZM] would be responsible for scheduling (preferably, at least two workdays as advance notice): (a) Vendor installation of E-STOPS (ITEM K1: E-Stop [D&E]≥04); (b) Vendor assistance in the OPERATIONAL aspects of the several TVENT systems especially to include (re)adjustment of temperatures (pre-cool vice post-cool plus post-heat), quantity of air-flows (to achieve desired temperature or Relative Humidity), and manipulating utilities (steam versus electric for Reactivation Heat) (ITEM K2: OPNL [≤⅓DY]–24); and (c) Vendor assistance in the INSTALL of the Chilled Water (CHW) Loop(s) to include Manifolds, Valved Jumper Assembly(ies), Standpipe(s), Hose Assemblies, & Rigid Ducts / Flexible Ducting (ITEM K4: INSTL [≤8HR]–01). The Shipyard's Temporary Systems Design Engineer [TSDE] would be responsible for scheduling (preferably, at least two calendar weeks as advance notice) Shipyard training (ITEM K5: TRNG [≥4HR]–02).
11 Call & E-mail
There are specific Contract Line Items requiring the services (labor) of the Vendor that are emergent and are best coordinated via an immediate phone call to the Vendor followed by an E-mail (Cc: Vendor / COR / Contract Specialist / TSDE) to document the emergent nature of the request by the responsible Shipyard Party. The Project's Temporary Systems Zone Manager [TSZM] would be responsible for coordinating all such emergent requests to include those to be established as not being the fault of the Vendor (ITEM K3: SVCE [≤6HR]–08).
Table V:
TVENT Footnotes with Annotations (continued)
Footnote B:
These initial Standard CLIN (S () durations could span a Leap Day (29th of February) for a Leap Year. When using the Graphic Date Finder / Schedulator (GDF/S), the actual date for a given duration is one day sooner than the date indicated, or conversely, the actual duration is one day more than the duration indicated (for example 05 Jan – 20 Sep 2016 is actually 37 weeks vice 36 weeks plus 6 days as indicated on the GDF/S).
The critical Non-Seasonal Normal (–N) capacity Chiller with Pump is needed for the entire duration of the drydock period regardless of whether or not that duration exceeds one year. Other Non-Seasonal type machinery required for the full or near full duration of the drydock period are the two exhaust blowers dedicated to the ship's Interior Compartments (Fwd & Aft: FAN [EXH / SRC]–N × 2 each) and the Temperature Conditioning Coils which provide ventilation to the ship's Interior Compartments (Fwd & Aft: COIL [H+C / HSP]–L or COIL [H+C / LSP]–2N × 2 each or pair). The scheduled duration for the drydock period is over one year. These ITEMs are initially scheduled for fifty-two (52) weeks as an initial Standard (S) CLIN and require a semi-automatic extension Unfunded CLIN in the following Fiscal Year (U YR () prior to their scheduled RETURN DATE.
The initial durations for each dehumidifier and its supporting machinery (Standard CLIN) reflect an aggressive programmed Blast and Paint (B&P) guesstimate by the C970 Operations Manager. The programmed EXTENSION reflected in Table V: TVENT Machinery & Equipment Schedule are an extension Option(al) CLIN meant to provide the necessary flexibility to defer the RETURN DATE for the Fwd (O (a), Sail (O (b), Aft (O (c), and/or Post-Dock (O (d) dehumidifiers and to obtain associated seasonal supporting machinery for that particular dehumidifier such as a chiller, pump, manifold(s), and/or hose assemblies.
This initial Standard CLIN (S () is for a Post-Dock dehumidifier or for its associated seasonal support machinery.
This initial Option(al) CLIN (O () is for a machine (Sail RHC) in which there has been insufficient platform footprint to deploy at Drydock No. 1 (DD#1) only. A temporary somewhat larger platform will be constructed after docking in lieu of the previous permanent platforms, so, there may be sufficient platform footprint. Also, this particular unit needs to be listed, regardless of intent to lease, so as to equate bids from Vendor(s) offering Alternative IA dehumidification vice Vendor(s) offering Alternative IB dehumidification. The Temporary Systems Design Engineer [TSDE] can determine the practicality of leasing the Alternative IB Sail RHC from the successful Bidder after obtaining the actual footprint(s) of the single Normal capacity or dual Medium capacity RHC unit(s) as well as the footprints of other adjoining machinery sharing the platform.
The elective Option(al) CLIN (E () is for the gigantic size rigid Duct Fittings (duct [ftgs]–g) and for some sizes of Flexible Ducting (duct [±flex]–g/–X/–n). The proposal is for a FIXED FEE for the lease of ITEMS: J series that is not defined by a particular duration rate (i.e. $ / week), but, with the entire duration of the particular associated machinery (TCC–L/2N, DDU–N/M, ACU–L, & AHU–N as applicable) that the elective ITEMS are affixed to. The Government will make an election as to whether or not to lease such ITEMS prior to issuance of the Contract.
The critical Non-Seasonal Normal (–N) capacity Chiller with Pump is needed for the entire duration of the drydock period regardless of whether or not that duration exceeds one year. Other Non-Seasonal type machinery required for the full or near full duration of the drydock period are just the two AHUs dedicated to the ship's Interior Compartments (Fwd & Aft) and all TCCs which happen to also provide ventilation to the ship's Interior Compartments. The scheduled duration for the drydock period is sixteen (16) calendar months. These ITEMs are initially scheduled for fifty-two (52) weeks as an initial Standard (S) CLIN and require a semi-automatic extension Unfunded CLIN (U () prior to their scheduled RETURN DATE.
The initial durations for each dehumidifier and its supporting machinery (Standard CLIN) reflect an aggressive programmed Blast and Paint (B&P) guesstimate by the C970 Operations Manager. The programmed EXTENSION reflected in Table V: TVENT Machinery & Equipment Schedule are an extension Option(al) CLIN meant to provide the necessary flexibility to defer the RETURN DATE for the Fwd (O (a), Sail (O (b), or Post-Dock (O (c) dehumidifiers and to obtain associated seasonal supporting machinery for that particular dehumidifier such as a chiller, pump, or manifold(s).
This initial Standard CLIN (S () is for a Post-Dock dehumidifier or for its associated seasonal support machinery.
This initial Option(al) CLIN (O () is for a machine (Sail RHC) in which there has been insufficient platform footprint to deploy at Drydock No. 1 (DD#1) only. A temporary somewhat larger platform will be constructed after docking in lieu of the previous permanent platforms, so, there may be sufficient platform footprint. Also, this particular unit needs to be listed, regardless of intent to lease, so as to equate bids from Vendor(s) offering Alternative IA dehumidification vice Vendor(s) offering Alternative IB dehumidification. The Temporary Systems Design Engineer [TSDE] can determine the practicality of leasing the Alternative IB Sail RHC from the successful Bidder after obtaining the actual footprint(s) of the single Normal capacity or dual Medium capacity RHC unit(s) as well as the footprints of other adjoining machinery sharing the platform.
The duration for this initial Standard CLIN (S () unit (ITEM F1: ACU) of one year happens to exactly match the planned duration. The extension Option(al) CLIN (O () is just in case the need for this Stand-Alone machine is greater than the planned duration.
The elective Option(al) CLIN (E () is for the gigantic size rigid Duct Fittings (duct [ftgs]–g) and for some sizes of Flexible Ducting (duct [±flex]–g/–X/–n). The proposal is for a FIXED FEE for the lease of ITEMS: J series that is not defined by a particular duration rate (i.e. $ / week), but, with the entire duration of the particular associated machinery (TCC–L/2N, DDU–N/M, ACU–L, & AHU–N as applicable) that the elective ITEMS are affixed to. The Government will make an election as to whether or not to lease such ITEMS prior to issuance of the Contract.
Table V:
TVENT Footnotes with Annotations (continued)
Footnote B:
CLIN (Contract Line Item Number): Double strikethrough for type CLIN indicates Not Applicable for this Project.
C( Conditional CLIN:
This CLIN is a conditional ITEM for an (un)known duration / extension that is indeterminate by the Government as to its necessity prior to Contract issuance and, if necessary, also uncertain as to its precise duration if exercised. Rather, this conditional ITEM is dependent on the Project's work progress as compared to its programmed work schedule. The reason for its indeterminate status is the uncertain ability of the Project and/or Shipyard to achieve an aggressive Blast and Paint (B&P) work schedule in light of manning limitations combined with the normal climatic seasonal changes expected with a significant delay. The normal expectation are that the conditional ITEMs will not be required. Hence, the Project must document (E-mail) to the Contracting Office as to their need and/or duration prior to initiating the lease or extension of the applicable conditional ITEMs.
E( Elective CLIN:
This CLIN is an elective ITEM for a known duration / extension to be determined by the Government prior to Contract issuance and so conveyed to the Vendor via whether or not those particular ITEMs are listed in the issued Contract. If an elective ITEM is listed in the Contract, the CLIN ARRIVAL date(s) may be adjusted to allow more time for the Contractor to obtain additional assets in case the Contractor has an insufficient quantity or is out of stock for that particular resource. Examples of elective ITEMs are negative pressure ducting (i.e. DUCT [−FLEX]–X & DUCT [−FLEX]–N) in which its listing as a CLIN ITEM is dependent on the delivery timeliness of previous Government Purchase Orders. For negative pressure ducting, the Contract should allow at least four (4) weeks between the issuance of the Contract and the required date for its ARRIVAL unless the Vendor indicates a sooner availability.
O( Option(al) CLIN:
This CLIN is an option(al) ITEM for an (un)known duration / extension to be determined by the Government either prior to or after Contract issuance, but, at present, indeterminate as to its necessity or uncertain as to its precise duration. For this Project, the option(al) ITEMs are the two sets of 200 ton chillers (ITEMs V35 & V36: chlr [6"CAM]–X) with their accompanying pumps (ITEMs V39 & V40: PUMP [6"CAM]–X) for the RSCs only. Although the issued Contract is immune to the source(s) of Government funding, funding source(s) other than the Project may be involved and/or the actual durations could be substantially reduced.
S( Standard CLIN:
This CLIN is a mandatory standard ITEM for a known duration / extension as indicated which would initially be limited to not exceed fifty-two weeks (52 wks) or one year (1 yr).
U( Unfunded CLIN:
This CLIN is a mandatory unfunded ITEM for either: (a) a known extension for the duration indicated beyond and immediately following an initial known lease which is limited to one year or (b) a known duration for ITEMS that do not begin until in that Fiscal Year and presently unfunded (e.g. U17 = FY'17). These CLINs should be automatically extended / leased for the duration shown when that year's Fiscal Year funds become available.
V( Vendor CLIN:
This CLIN is a non-mandatory vendor ITEM for a known duration / extension as indicated which would initially be limited to not exceed fifty-two weeks (52 wks) or one year (1 yr). This ITEM is a Vendor's Choice as to its availability and should be leased if at or less than the Government Estimate.
Footnote C:
The summation of the TOTAL Government Estimate for the entire Contract to include all CLINs whether Standard (S), Choice (C), Unfunded (U), Optional (O), or Elective (E) is at the end of the TVENT Machinery & Equipment Schedule. However, some Items are at a Vendor's election as to the machinery type of either Alternative A (preferred) or Alternative B (permitted). Whether Alternative A or Alternative B, the Government Estimate for that particular alternative is exactly the same. The alternative type is annotated in the (last) Government Estimate column as:
IA or IB / IIA or IIB / IIIA or IIIB / and IV – which is a Vendor's Choice ITEM when available by the Vendor and at a reasonable cost (less than or equal to the Government Estimate). The Alternative B Items are shown in a white font with a black background. Thus, the summation of the TOTAL Government Estimate for the entire Contract to include all CLINs is the sum of all non-alternative Items plus let's say Alternative A Items (do not include both Alternatives A + B) plus Alternative IV. Hence, one can compute the Government's TOTAL ESTIMATE by adding all line Items with backgrounds of white (non-alternatives), yellow (Alternative A), plus pink (Alternative IV).
TVENT Machinery & Equipment Basis: SSN 767 (USS Hampton) Basis:
(1a) Per Ref [a], SSN 767 [PIRA]: PNSY Drydock No. 3:
[DD] 04 Jun 2016 (Sa) – [UD] 24 Jul 2016 (Mo).
(1b) Per Ref [a], SSN 767 [PIRA]: PNSY post-Berth 11C:
[NE] 24 Jul 2016 (Mo) – [CR] 21 Feb 2018 (We).
(2a) Per Ref [b], Location (LCTN) information as to the ZONE & Position relative to either the SUB / MACH or the DD / PIER is indicated in Table V. Position machinery per the Docking Arrangement drawing(s).
(2b) Per Ref [b], Hatch Houses (3 ea): WSH – Supply (L: 96"(); FEH – Exhaust (L: 96"(); AEH – Supply (L: 96"().
OR
(3 ea): WSH – Exhaust (M: 56"(); FEH – Supply (L: 96"(); AEH – Supply (L: 96"().
(2c) Per Ref [b], DD#3:
Bow first towards Head End. Platforms for machinery & equipment are Port & Starboard.
DD#2:
Bow first towards Head End. RSC platforms for machinery & equipment are Port only.
Because of its weight bearing, such RSC platforms require a full build (w/ Roofs).
The duration of the build to include RSC platforms is about one month after docking.
DD#1:
Stern first towards Head End. Platforms for machinery & equipment are Starboard only.
Floating cans are required for both Docking & Undocking.
(3) Per Ref [c], Government Estimate considers most recent Contracts, but, other factors are also considered.
(4) Per Ref [d], To support all submarine overhaul operations:
[pnsy/nlon] Submarine cooling (non-Freeze Prevention period) 1 May to 30 Sep (Mean Low / High: 45 / 65ºF);
[pnsy/nlon] Submarine heating ( Freeze Prevention period) 1 Oct to 30 Apr (Mean Low / High: 45 / 65ºF);
[pnsy/nlon] DD#2: RSC cooling operational from 1 May to 30 Sep (Mean Low / High: 45 / 65ºF).
(5) Per Ref [d], Whenever dehumidification is required such as to support Blast and Paint (B&P) operations:
[all lctns] DH Pre-cool is simultaneous w/ Post-cool whereas heating is only Post-heat (downstream of DH);
[pnsy/nlon] DH cooling (4 wk overlap w/ Post-heat) from late-Apr to early-Oct (Mean Low / High: 40 / 60ºF);
[pnsy/nlon] DH heating (4 wk overlap w/ Post-cool) from late-Sep to early-May (Mean Low / High: 45 / 65ºF).
(6) Per Ref [e], LCTN
TDD OPERATIONAL (Start – End)
ARR/RTN
ARRIVAL – DURATION – RETURN
[Note: i]
FWD:
20 JUN '16 [Mo] – 12 MAY '17 [Fr] #1 / #2 ((14 JUN '16 – 48 wks – 16 MAY '17;
[Note: i]
SAIL:
27 JUN '16 [Mo] – 05 MAY '17 [Fr] #2 / #1 ((21 JUN '16 – 46 wks – 09 MAY '17;
[Note: i]
AFT:
05 JUL '16 [Tu] – 19 MAY '17 [Fr] #3 / #3 ((28 JUN '16 – 47 wks – 23 MAY '17;
[Note: iii]
BTH:
NOT APPLICABLE
( duration spans Feb 29th Leap Day Note: i:
Federal Holidays near ARRIVAL or RETURN: 04 JUL '16 [Mo] & 29 MAY '17 [Mo].
Note: ii:
The Sail DH is deployed onto the RSC Center platform which, because of its weight bearing, requires a full build (w/ Roofs) of the RSC minimally in the vicinity of that platform. The duration of the build is approximately one month after docking (as documented in Ref [e/2]). Hence, the expected vice theoretical date for the SAIL TDD OPERATIONAL Start would be 16 Feb '16 [Tu].
Note: iii TDD required for Post-DD#1 (@ B13C) only for repairs after removal of buoyancy can cleats.
Ref:
[a] G [PNS]: Projects\spf\WARR\Other˽WARR˽reports\20150911_350_DD˽and˽BERTH˽7YR˽.xls ['15: Data 9/11; File 9/18; Print 9/29].
[b] G [PNS]: Workfiles\Dept˽200˽Shared˽Files\760˽Project\PS29391: SSN 719 DRY-DOCK arrangement DRY-DOCK 3.
[c] G [PNS]: Workfiles\530˽contracts\Shares\contracts\Code˽410˽Contracts\15˽Contracts\15-P-0176: SSN 760 TVENT @ PNSY.
[d] Climatic Temperature Data (Climogram) for Pease AFB / Portsmouth, NH (KPSM): https://notus2.afccc.af.mil/SCIS/.
[e] J [Grossman]: Rdg-j\Projects\SSN 767 TVENT Project Plan – Rev #.
[f] SSN 719 (USS Providence) Project Team (As Of: 07/15/2015) from 40 PROJECT PHONE LISTS plus other personnel:
https://share.ports.navy.mil/dept/300/Pages/explorerpage.aspx?WebPart=300 Documents&Rootfolder=\\sptsvr067.ports.navy.mil\WEBD_300\Code__300
TVENT Design Criteria: [Non-IA @ PNSY]( [1] Single Non-Seasonal Normal capacity (–N) chiller and pump is required for the ship's TCHW system. Only for an IA overhaul would a second similar, but seasonal chiller & pump be required for the nuclear complex.
[2a] [Non-IA @ PNSY] Three Temporary Desiccant Dehumidification (TDD) systems (FWD / SAIL / AFT) are required to support Blast and Paint (B&P) operations. The Vendor has a choice of either the combined dehumidifier (ddu [CMBD]–n) that integrates steam reactivation, post-heating, pre-cooling, and post-cooling (Alternative IA: PREFERRED for now to be required in the future) or a dehumidification group consisting of additional machinery components (RHC [STM]–N/2M / HTGc [ELEC]–n / clGc [PRE]–n / clGc [POST]–n/M) (Alternative IB: PERMITTED for now to be precluded in the future). The routine home station (PNSY) evolution requires dehumidification for close to an entire year or longer in which pre-cooling & post-cooling would be followed by post-heating and/or vice versa. The dehumidification machinery is equipment supported by twenty inch nominal diameter rigid duct fittings (duct [ftgs]–g) and discharge (positive pressure) flexible ducting (duct [+flex]–G).
[2b] [Post-DD#1 @ PNSY] Besides the dehumidification machinery to support the overhaul during the drydock evolution, a single Temporary Desiccant Dehumidification (TDD) system is only required post Drydock No. 1 [Post-DD#1] to support Blast and Paint (B&P) hull repairs after first removing the "Buoyancy Cans" for floating the ship. This system does not require steam reactivation (no steam utility at the Berths) and is season specific as far as post-heating only. Being a small tented principally unmanned temporary enclosure, pre-cooling and post-cooling for comfort with its ancillary machinery support infrastructure would not be required.
[3a] [Non-IA @ PNSY] Four (4) very powerful exhaust blowers (AHU [EXH]–N: ≥10K cfm @ 14" WG & ≥40 Hp) are required to support both exterior Blast and Paint (B&P) operations (Hull / Fwd & Aft MBTs / Mud Tank) and an interior healthy work environment (via Dirty Air Exhaust) in the Ship's Forward and Aft Compartments. Two units will be deployed near the Bow and likewise for the Stern. The Shipyard will designate each unit either solely for air exchange of the exterior to counterbalance the supply air from the Dehumidification Systems or solely for air exchange of the interior to counterbalance the supply air from Temperature Conditioning Coils. Each exhaust blower has a pair of fourteen inch nominal diameter suction inlets which wye to three each eight inch nominal diameter suction lines (Y = 14"Ø : 8"Ø × 3). The net effect is that each exhaust blower will provide six each exhaust lines of eight-inch nominal diameter (8"Ø) rated for a minimum of 1,600 cfm per exhaust branch run. The exhaust blowers can be equipment supported by strong suction (negative pressure) semi-flexible ducting of fourteen inch (duct [−flex]–X) and eight inch (duct [−flex]–N) nominal diameters.
[4a] [PNSY] For industrial ventilation, two Temperature Conditioning Coil (TCC) systems (FWD & AFT) support an interior healthy work environment (via Clean Air Supply) from all ambient (100% outside fresh) treated (cooled or heated, as necessary) air to the Ship's Forward and Aft (pressurized) Compartments. For each of the two TCC systems, the Vendor has a choice of either a single Large (–L) capacity unit (tcc [H&C]–l) having four outlets (Alternative IIA: PREFERRED) or a pair of Normal (–N) capacity units (tcc [H&C]–N) having two outlets per unit (Alternative IIB: PERMITTED). Penetrations to the ship's interior are via the Submarine Hatch Ventilation Enclosures (SHVEs) on top of the hatches (WSH[FWD] / FEH[FWD] / AEH[AFT]) or the Hull Cut Ventilation Enclosures (HCVEs) surrounding the Hull Cuts (HC#1-1A[FWD] / HC#39A[FWD & AFT] / HC#49[AFT]). For redundancy, the internal ventilation system is designed for a minimum of two (2) and preferably up to four (4) Supply Air ducting runs for each of the ship's interior Compartments for a maximum total of eight (8) runs. This temporary industrial ventilation Supply Air system is equipment supported by twenty inch nominal diameter rigid duct fittings (duct [ftgs]–g) and discharge (positive pressure) flexible ducting (duct [+flex]–G).
[5] [some Non-IA @ PNSY] For comfort conditioning where treated air can be recycled (i.e. retreated with no or very little fresh air intake), a Stand-Alone Air-Conditioning Unit (ACU) with cooling and reheat is available.
[6] Emergency Stops (E-stop [TCC & AhU]–02) will provide a certain measure of Fire Fighting security at the Watch Shack by permitting the instantaneous shutdown of air-handlers that either exhausts air from (ahu [exh]–N) or supplies air to (tcc [H&C]–L/2N) the Forward and Aft Submarine Compartments.
[6b] [DD#2/3 @ PNSY] About half of the seasonal chilled water will run along the drydock floor on the submarine's Port side in support of the Temporary Blast and Paint (TB&P) systems' cooling coils at three locations (FWD / SAIL / AFT). The corresponding other half of the seasonal chilled water is to run along the drydock balcony on the submarine's Starboard side in support of the Temporary Ship's Ventilation (TSHIP) systems' cooling coils positioned on two balcony platforms with its accompanying chiller / pump on a third platform. Hence, this particular docking evolution is best resolved via the lease of two each duplicate capacity (200 ton) chillers.
A lease specification — Machinery & Equipment Overview
Table V1:
TVENT Requirements [ Equipment Underlined / E-Stops highlighted in red ]
| item |
| ID |
| QTY |
| identifier |
| performance capacity |
| transition(s) |
| remark / Note / comment |
| a1 |
| NA |
| 0 |
EA
ACU [H±C]–M
Auxiliary Unit Stand-Alone
STMT #1
load:
{≥25 tn} & [≥240K btuh] cont:
thermostat on return [pnsy] FLA limit 380 Amps [nlon] no limit w/ MUSE eqpt air:
≥2 × 20"Ø sply
≥2 × 20"Ø rtn
[reqt] basis 100% RA Rmk V6:
Fan (Blower) Criteria Item A1:
{Cooling} & [Heating]
Comfort (ΔT≥30°F)
HGB NO:
≥2 Compressors & ≥2 Ckts
| a2 |
| NA |
| 0 |
EA
ACU [H±C]–N
Auxiliary Unit Stand-Alone
STMT #2
load:
{≥60 tn} & [≥360K btuh] cont:
thermostat on return [pnsy] FLA limit 380 Amps [nlon] no limit w/ MUSE eqpt air:
≥4 × 20"Ø sply
≥4 × 20"Ø rtn
[reqt] basis 100% RA Rmk V6:
Fan (Blower) Criteria Item A2:
{Cooling} & [Heating]
Comfort (ΔT≥20°F)
HGB NO:
≥3 Compressors & ≥2 Ckts
| f1 |
| v27 |
v28 V29 V30 ea
FAN [EXH/SRC]–N
Wired to E-Stop Interior: Fwd/Aft
STMT #3 & #4
mtr:
≥40 / 60 Hp LS × w/ VFD fan:
≥10K cfm @ 14" T / ESP max:
≥12K cfm @ 10" T / ESP min:
≥08K cfm @ 17" T / ESP air:
=2 × 14"Ø rtn affixed to ahu wye:
14"Ø : 8"Ø × 3
2 detachable Item F1:
Vendor ID Equipment Prefer:
60 Hp for ESP vice TSP
TS ¶ F4:
Specification Variance
Reviewed by Engineer
Statement (STMT):
1. minimum ACU – heat: [≥070 Kw] ▌mtr: ≥15 Hp LS × 1 EA for PA ▌flow: ≥10K cfm @ 2¼" TSP
(PERMITTED)
prefer ACU – heat: [≥105 Kw] ▌mtr: ≥20 Hp LS × 1 EA for PA ▌flow: ≥20K cfm @ 2¾" TSP
(PREFERRED)
2. minimum ACU – heat: [≥070 Kw] ▌mtr: ≥15 Hp LS × 1 EA for PA ▌flow: ≥10K cfm @ 2¼" TSP
(PERMITTED)
prefer ACU – heat: [≥105 Kw] ▌mtr: ≥20 Hp LS × 1 EA for PA ▌flow: ≥20K cfm @ 2¾" TSP
(PREFERRED)
3. minimum AHU – mtr: ≥40Hp LS VFD & SRC Type C ▌fan-flow (thru the fan): ≥10K cfm @ 14" TSP
(PERMITTED)
prefer AHU – mtr: ≥60Hp LS VFD & SRC Type C ▌air - flow (thru ducting): ≥10K cfm @ 14" ESP
(PREFERRED)
4. NAVSEA Technical Publication 8010: Industrial Ship Safety Manual for Fire Prevention and Response compels the Shipyard to have the ability to immediately stop airflow into the submarine's interior (pressurized) Compartments (Fwd & Aft) in an emergency Fire Fighting situation. Hence, E-Stops (Emergency Stops a.k.a. ECS: Electrical Control Stations) are required for Fire Safety for machines with a Process Air (PA) blower (i.e. tcc [H+C]–L/2N) and for Exhaust Blowers (i.e. ahu [exh]–n) that either supply or exhaust air into the submarine. Thus, up to four E-Stops (one E-Stop per machine) may be required if the Vendor elects to provide two pairs of Normal (–2N) capacity TCCs (Alternative IIB) vice the requirement for only two E-Stops for two each Large (–L) capacity TCCs (Alternative IIA). Exhaust Blowers (ahu [exh]–n) are consigned as to their designated application such as Fwd or Aft interior and/or exterior. The two Exhaust Blowers having some or all of its ducting runs routed to the submarine's interior Compartments (COMPTS: Fwd & Aft) do require E-Stops regardless of location (PNSY / NLON / NBPL). However, for the non-deployed location (PNSY) which may have two additional Exhaust Blowers (Non-IA) with all of its ducting runs routed solely to the submarine's exterior Main Ballast Tanks (MBTs: Fwd & Aft), E-Stops are not required for exterior only Exhaust Blowers.
| c1 |
| v23a |
V23b V24a V24b pr (or( coil[H+C/LSP]-2N Wired to E-Stop Alternative IIB
STMT #4 & 5
load:
{≥50 tn} & [≥400K btuh] mtr:
LSP( ≥20Hp LS × 1 EA fan:
≥10K cfm @ 4/8" E/TSP hose:
3"Ø M & F CAM × 200'
air:
≥2 × 20"Ø sply
≥2 × 20"Ø rtn wtr:
3"Ø M&F CAM
(IIB:
V23c & V24c Rmk V2:
Coolant-Free Rmk V6:
Fan Criteria [LSP] Item C1:
{Cooling} & [Heating] AltnvIIB:
PERMITTED for NOW
| c2 |
| V21 |
V22 ea coil [H+C/HSP]-L Wired to E-Stop Alternative IIA
STMT #4
load:
{≥100 tn}&[≥800K btuh] mtr:
HSP(≥50Hp LS w/ VFD fan:
≥20K cfm @ 10" TSP hose:
4"Ø M & F CAM × 100'
air:
≥4 × 20"Ø sply
≥4 × 20"Ø rtn wtr:
4"Ø M&F CAM
htg:
electric only Rmk V2:
Coolant-Free Rmk V6:
Fan Criteria [HSP] Item C2:
{Cooling} & [Heating] AltnvIIA:
PREFERRED for PNS c1' or C2' v25 v26 pr/ ea COIL[FLTr]-l/2n Vendor's Choice Alternative IV
STMT #6
type:
Moisture Separator and Mist Eliminator sizes:
As Required to entirely fill the Filter Housing Filter Qualities:
Purge 98% of Moisture on Saturated Days
Includes Drainage Item C#':
Demister Filtration
Suggested Source www.AirFilterUSA.com
Phone 713.896-8901
| C1a |
| NA |
| 0 |
ea coil[HTG/fAN]-n Auxiliary Unit Stand-Alone heat:
≥500K Btuh (~150Kw) mtr:
≥10Hp LS×1 EA w/ VFD fan:
≥8K cfm @ 5" ESP util:
electric air:
=1 × 20"Ø sply
=1 × 20"Ø rtn
Rmk V6:
Fan (Blower) Criteria Item C1a:
Temperature Control choice of thermostat and manual (≥4 stages)
| C1b |
| NA |
| 0 |
EA
coil[CLG/fAN]-n Auxiliary Unit CHW-Required cool:
≥50 tons mtr:
≥15Hp LS×1 EA w/ VFD fan:
≥8K cfm @ 5" ESP util:
electric & chilled wtr air:
=1 × 20"Ø sply
=1 × 20"Ø rtn
Rmk V6:
Fan (Blower) Criteria Item C1b:
Temperature Control choice of thermostat and manual bypass
Statement (STMT):
5. If the Vendor chooses to deploy either one or two pairs of Alternative IIB: a pair of Normal (–N) capacity temperature conditioning type Coils (ITEM C1 V23a&b and V24a&b: COIL [H+C/LSP]–2N) vice a single Large (–L) capacity unit (ITEM C2 V21 and V22: COIL [H+C/HSP]–L), then supplemental pair(s) of Large (–L) capacity Wye type Manifolds (ITEM M2 labelled V23c and V24c: manf [4":3"×2]–L) are needed for each pair of COIL–2N. These supplemental Large (–L) capacity Wye Manifolds will be provided for each cooling season at no additional cost to the Government with dates of ARRIVAL & RETURN similar to those of the other manifolds. Also, supplemental three-inch hose assemblies (ITEM H1: HOSE [3"CAM]–N) are necessary for each cooling season at no additional cost to the Government with similar delivery dates (add 200 feet of hose for each COIL–2N pair).
6. As an industrial type ventilation machine (i.e. 100% ambient air) that provides fresh air to the submarine's interior Compartments, only the temperature conditioning type Coils (ITEM C1/2: COIL [H+C]–l/2N) has the potential of supplying fully saturated non-tempered or barely tempered air to a common work environment. Especially during inclement weather (moisture-laden air) when the air is not or barely treated (heated or cooled), the resultant condition can be uncomfortable (excessively high) humidity levels in the common work environment. A Moisture Separator and Mist Eliminator Filtration Bank would completely eliminate such a scenario. Besides enhancing comfort, such a filtration bank rids the air of high moisture levels which would require much higher latent energy inputs to either heat or cool. The savings in energy reduction should be much greater than its lease rate. The Moisture Separator and Mist Eliminator Filtration Bank must fit within the built-in filtration housing of the machine. The Moisture Separator and Mist Eliminator (MS&ME) filter elements shall be washable; function as a low efficiency particulate filter; and be constructed of corrosion-resistant materials such as stainless steel (preferred), galvanized steel, or aluminum. The MS&ME filter elements must completely fill-up the filtration housing so that there is essentially no air-gaps for unfiltered air to penetrate. The machine's filtration housing may require some modification so as to allow for the drainage of water droplets from the filter elements; the collection of the water from the filter bank; and then the eventual diversion of such fluids away from the filtration housing. The MS&ME filter elements shall be permanently etched as to which side is up as well as which side is down. Although highly encouraged to offer such a Filtration Bank, the Vendor has a choice as to whether or not to include such in its Bid proposal. However, the Vendor must clearly state in the Bid proposal as to whether or not the Moisture Separator and Mist Eliminator Filtration Bank is provided and, if so, the exclusive lease rate for only that MS&ME line ITEM.
d0 or d2
| ( |
| 3 |
EA
ddu[CMBD/HSP]-n or ddu[DSCC/LSP]-n
STMT #7
dry:
{230 lb/hr│ 662 gal/dy} (400 lb/hr│1152 gal/dy) [agg] [300 lb/hr│ 864 gal/dy] [ u r ] ▌295 lb/hr│850 gal/dy▐ Desiccant Wheel:
Reactivation (reactvtn) via Electricity & Steam DH incl Elec Reactvtn Rmk V3:
Moisture Removal Rate state MRR & its Basis Altnv IA:
DSCC Wheel & System Altnv IB:
DSCC Wheel only
| d0 |
| V03 |
V04 V05
EA
ddu [CMBD]–n Alternative IA or ( D2 Series ( process air-handler(s) fan:
2 EA at Discharge End mtr:
≥25Hp HS×2 EA w/ VFD flow:
≥10K cfm @ 12" ESP air:
≤2 × 20"Ø sply
≥2 × 20"Ø rtn (in & out same side) mtr:
TEFC premium Altnv IA:
ddu [CMBD / HSP]–n Rmk V4:
Termination Coupling Item D0:
Electrical Power Mgt Item D:
Discharge Duct Wyes
| d2 |
| V06 |
V07 V08
EA
ddu [DSCC]–n Alternative IB
DOCUMENT:
Motor HP process air-handler(s) fan:
≥1 EA for Process Air mtr:
≥20Hp LS×1 EA w/ VFD flow:
≥10K cfm @ 7½" TSP air:
≤2 × 20"Ø sply
≥2 × 20"Ø rtn (access to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .