Attachment_1_-_Specifications.doc

DOC document 1 MB Posted

Attached to
Temporary Ventilation Equipment Rental Federal contract opportunity
Solicitation number
N39040-16-T-0151
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment 1

View the file

Other files for this federal contract opportunity

Other files attached to Temporary Ventilation Equipment Rental, newest first.
File Type Posted
RFQ_16-T-0151-0001.pdf PDF
Specifications_-_Rev_A.doc DOC document
Attachment_3_-_QASP.rtf RTF text file
Attachment_3a_-_QASP_Matrix.rtf RTF text file
Attachment_2_-_CAP_FFP.doc DOC document
RFQ_16-T-0151.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N39040-16-T-0151 Attachment 1 - Specifications N39040-16-T-0151 Attachment 1 - Specifications

Table V:

TVENT Machinery & Equipment Schedule

no
swlin

or

SYS

lctn sub/mach dd / pier identifier TYPE [style]–SZ (critical cmpnt arrival date Footnote A return date Season term Ftnt B (wks)

id
IDENT
ZONE
Machine / Eqpt
STD│OPTION
STD│OPTION
1ST Cycle
ITEM
QTY
Position
Purpose │ALTNV
ANNOTATION
EXTENSION
2ND Cycle
V01
tCHW
To Ship
chlr [3"cam]–n
31 May '16 Tu
30 May '17 Tu
S 52
R1(
1st of 1
Platf stbd
( CRITICAL (
1 Non-Seasonal
18 Jul '17 Tu
U17(07
V02
tCHW
To Ship
PUMP [3"cam]–n
31 May '16 Tu
30 May '17 Tu
S 52
P1(
1st of 1
Platf stbd
( CRITICAL (
2 Assoc w/ V01
18 Jul '17 Tu
U17(07
V03
tsply
Fwd
ddu[CMBD/hsp]-n
14 Jun '16 Tu
16 May '17 Tu
S 48
D0
1st of 3
DD Fwd port
Alternative IA
1ST Arr / 2ND Rtn
V04
tsply
Sail
ddu[CMBD/hsp]-n
21 Jun '16 Tu
09 May '17 Tu
S 46
d0
2nd of 3
Platf port
Alternative IA
2ND Arr / 1ST Rtn
V05
tsply
Aft
ddu[CMBD/hsp]-n
28 Jun '16 Tu
23 May '17 Tu
S 47
d0
3Rd of 3
DD Aft port
Alternative IA
3RD Arr / 3RD Rtn
V06
tsply
Fwd
ddu [DSCC/LSP]-n
14 Jun '16 Tu
16 May '17 Tu
S 48
D2
1st of 3
DD Fwd port
Alternative IB
1ST Arr / 2ND Rtn
V07
tsply
Sail
ddu [DSCC/LSP]-n
21 Jun '16 Tu
09 May '17 Tu
S 46
D2
2nd of 3
Platf port
Alternative IB
2ND Arr / 1ST Rtn
V08
tsply
Aft
ddu [DSCC/LSP]-n
28 Jun '16 Tu
23 May '17 Tu
S 47
D2
3Rd of 3
DD Aft port
Alternative IB
3RD Arr / 3RD Rtn
V09
tsply
Fwd
RHC [STM]–N/2M
14 Jun '16 Tu
16 May '17 Tu
S 48
D2a
1st of 3
DD Fwd port
Alternative IB
4aRHC Capacity
V010
tsply
Sail
RHC [STM]–N/2M
21 Jun '16 Tu
09 May '17 Tu
S 46
D2a
2nd of 3
Platf port
Alternative IB
4aRHC Capacity
V011
tsply
Aft
RHC [STM]–N/2M
28 Jun '16 Tu
23 May '17 Tu
S 47
d2a
3Rd of 3
DD Aft port
Alternative IB
4aRHC Capacity
V012
tsply
Fwd
HTGc [DDU]–n
27 Sep '16 Tu
16 May '17 Tu
S 33
d2b
1st of 3
DD Fwd port
Alternative IB
5aOverlap CLGC
V013
tsply
Sail
HTGc [DDU]–n
27 Sep '16 Tu
09 May '17 Tu
S 32
d2b
2nd of 3
Platf port
Alternative IB
5aOverlap CLGC
V014
tsply
Aft
HTGc [DDU]–n
27 Sep '16 Tu
23 May '17 Tu
S 34
d2b
3Rd of 3
DD Aft port
Alternative IB
5aOverlap CLGC
V015
tsply
Fwd
clGc [PRE]–n
14 Jun '16 Tu
27 Sep '16 Tu
S 15
d2c
1st of 3
DD Fwd port
Alternative IB
6CLGC Capacity
V016
tsply
Sail
clGc [PRE]–n
21 Jun '16 Tu
27 Sep '16 Tu
S 14
d2c
2nd of 3
Platf port
Alternative IB
6CLGC Capacity
V017
tsply
Aft
clGc [PRE]–n
28 Jun '16 Tu
27 Sep '16 Tu
S 13
d2c
3Rd of 3
DD Aft port
Alternative IB
6CLGC Capacity
V018
tsply
Fwd
clGc[POST]-n/M
14 Jun '16 Tu
27 Sep '16 Tu
S 15
d#c
1st of 3
DD Fwd port
Alternative IB
6CLGC Capacity
V019
tsply
Sail
clGc[POST]-n/M
21 Jun '16 Tu
27 Sep '16 Tu
S 14
d#c
2nd of 3
Platf port
Alternative IB
6CLGC Capacity
V020
tsply
Aft
clGc[POST]-n/M
28 Jun '16 Tu
27 Sep '16 Tu
S 13
d#c
3Rd of 3
DD Aft port
Alternative IB
6CLGC Capacity
V021
Tsply
Fwd-Intr
cOIL [H+C/HSP]–l
31 May '16 Tu
30 May '17 Tu
S 52
C2
1st of 2
Platf stbd
Alternative IIA
1 Non-Seasonal
18 Jul '17 Tu
U17(07
V022
Tsply
Aft-Intr
cOIL [H+C/HSP]–l
31 May '16 Tu
30 May '17 Tu
S 52
C2
2nd of 2
Platf stbd
Alternative IIA
1 Non-Seasonal
18 Jul '17 Tu
U17(07
V023
Tsply
Fwd-Intr
cOIL[H+C/LSP]-2n
31 May '16 Tu
30 May '17 Tu
S 52
C1
1st of 2
Platf stbd
Alternative IIB
1 Non-Seasonal
18 Jul '17 Tu
U17(07
V024
Tsply
Aft-Intr
cOIL[H+C/LSP]-2n
31 May '16 Tu
30 May '17 Tu
S 52
C1
2nd of 2
Platf stbd
Alternative IIB
1 Non-Seasonal
18 Jul '17 Tu
U17(07
V025
tsply
Fwd-Intr
coil [fltr]–L/2n
31 May '16 Tu
30 May '17 Tu
V 52
c#'
1st of 2
Platf stbd
Alternative IV
7 Vendor Choice
18 Jul '17 Tu
U17(07
V026
tsply
Aft-Intr
coil [fltr]–L/2n
31 May '16 Tu
30 May '17 Tu
V 52
c#'
2nd of 2
Platf stbd
Alternative IV
7 Vendor Choice
18 Jul '17 Tu
U17(07
V027
texh
Fwd-Intr
fan [EXH/SRC]–N
31 May '16 Tu
30 May '17 Tu
S 52
f1
1st of 4
Platf stbd
for Fwd Compt-Intr
1 Non-Seasonal
18 Jul '17 Tu
U17(07
V028
texh
Aft-Intr
fan [EXH/SRC]–N
31 May '16 Tu
30 May '17 Tu
S 52
f1
2nd of 4
Platf stbd
for Aft Compt-Intr
1 Non-Seasonal
18 Jul '17 Tu
U17(07
V029
texh
Fwd-Ext
fan [EXH/SRC]–N
14 Jun '16 Tu
16 May '17 Tu
S 48
f1
3rd of 4
DD Fwd port
for Fwd MBTs-Ext
1 Non-Seasonal
V030
texh
Aft-Ext
fan [EXH/SRC]–N
28 Jun '16 Tu
23 May '17 Tu
S 47
f1
4th of 4
DD Aft port
for Aft MBTs-Ext
1 Non-Seasonal
V031
Tchw
MBT-Ext
chlr [6"CAM]–X
14 Jun '16 Tu
27 Sep '16 Tu
S 15
r3
1st of 2
DD Aft port
for DDUs or CLGCs
V03-05 or V15-20
V032
Tchw
Sub-Intr
chlr [6"CAM]–X
31 May '16 Tu
27 Sep '16 Tu
S 17
r3
2ND of 2
Platf stbd
for TCC–L/2N: 1ST
V21/22 or V23/24
V033
Tchw
Sub-Intr
chlr [6"CAM]–X
25 Apr '17 Tu
18 Jul '17 Tu
S 12
r3
RETURN
Platf stbd
for TCC–L/2N: 2ND
V21/22 or V23/24
V034
tchw
MBT-Ext
PUMP [6"CAM]–X
14 Jun '16 Tu
27 Sep '16 Tu
S 15
p3
1st of 2
DD Aft port
for DDUs or CLGCs
2 Assoc w/ V31
V035
tchw
Sub-Intr
PUMP [6"CAM]–X
31 May '16 Tu
27 Sep '16 Tu
S 17
p3
2ND of 2
Platf stbd
for TCC–L/2N: 1ST
2 Assoc w/ V32
V036
tchw
Sub-Intr
PUMP [6"CAM]–X
25 Apr '17 Tu
18 Jul '17 Tu
S 12
p3
RETURN
Platf stbd
for TCC–L/2N: 2ND
2 Assoc w/ V33
V037
tchw
Fwd DDU
manf [4"╬ 6"]–U
14 Jun '16 Tu
27 Sep '16 Tu
S 15
M-a
1st of 3
DD Fwd port
Alternative IIIA
2 Assoc w/ V31
V038
tchw
Sail DDU
manf [4"╬ 6"]–U
14 Jun '16 Tu
27 Sep '16 Tu
S 15
M-a
2nd of 3
DD Ctr port
Alternative IIIA
2 Assoc w/ V31
V039
tchw
Aft DDU
manf [4"╬ 6"]–U
14 Jun '16 Tu
27 Sep '16 Tu
S 15
M-a
3rd of 3
DD Aft port
Alternative IIIA
2 Assoc w/ V31
V040
tchw
Fwd DDU
manf [4":3"×2]–l
14 Jun '16 Tu
27 Sep '16 Tu
S 15
m2
1st of 3
DD Fwd port
Alternative IIIB
2 Assoc w/ V31
V041
tchw
Sail DDU
manf [4":3"×2]–l
14 Jun '16 Tu
27 Sep '16 Tu
S 15
m2
2nd of 3
DD Ctr port
Alternative IIIB
2 Assoc w/ V31
V042
tchw
Aft DDU
manf [4":3"×2]–l
14 Jun '16 Tu
27 Sep '16 Tu
S 15
m2
3rd of 3
DD Aft port
Alternative IIIB
2 Assoc w/ V31
V23
tchw
Fwd TCC
manf [4":3"×2]–l
31 May '16 Tu
27 Sep '16 Tu
S 17
m2
TCC–2N
Platf stbd
Altnv IIB & IIIB
2 Assoc w/ V32
V24
tchw
Aft TCC
manf [4":3"×2]–l
31 May '16 Tu
27 Sep '16 Tu
S 17
m2
TCC–2N
Platf stbd
Altnv IIB & IIIB
2 Assoc w/ V32
V23
tchw
Fwd TCC
manf [4":3"×2]–l
25 Apr '17 Tu
18 Jul '17 Tu
S 12
m2
RETURN
Platf stbd
Altnv IIB & IIIB
2 Assoc w/ V33
V24
tchw
Aft TCC
manf [4":3"×2]–l
25 Apr '17 Tu
18 Jul '17 Tu
S 12
m2
RETURN
Platf stbd
Altnv IIB & IIIB
2 Assoc w/ V33
V043
tchw
Fwd DDU
manf [4":6"×2]–x'
14 Jun '16 Tu
27 Sep '16 Tu
S 15
M3a
1st of 3
DD Fwd port
Alternative IIIB
2 Assoc w/ V31
V044
tchw
Sail DDU
manf [4":6"×2]–x'
14 Jun '16 Tu
27 Sep '16 Tu
S 15
M3a
2nd of 3
DD Ctr port
Alternative IIIB
2 Assoc w/ V31
V045
tchw
Aft DDU
manf [4":6"×2]–x'
14 Jun '16 Tu
27 Sep '16 Tu
S 15
M3a
3rd of 3
DD Aft port
Alternative IIIB
2 Assoc w/ V31
V046
tchw
Sub-Intr
manf[6":4"×2]–x"
31 May '16 Tu
27 Sep '16 Tu
S 17
M3b
1st of 1
Platf stbd
for TCC–L/2N: 1ST
2 Assoc w/ V32
V047
tchw
Sub-Intr
manf[6":4"×2]–x"
25 Apr '17 Tu
18 Jul '17 Tu
S 12
M3b
RETURN
Platf stbd
for TCC–L/2N: 2ND
2 Assoc w/ V33
V048
tchw
Sub-Ext
MANF[GLOBE]–x
14 Jun '16 Tu
27 Sep '16 Tu
S 15
M-b
1st of 1
DD Fwd port
for DD CHW Loop
2 Assoc w/ V31
V049
tchw
To Ship
MANF [EXCH]–n
20 Sep '16 Tu
09 May '17 Tu
S 33
M-c
1st of 1
Platf stbd
( CRITICAL (
2 Assoc w/ V01
V050
tchw
To Ship
hose [3"FP/IS]–N
31 May '16 Tu
30 May '17 Tu
S 52
h1'
1st of 1
Platf stbd
( CRITICAL (
2 Assoc w/ V01
18 Jul '17 Tu
U17(07
V051
tchw
exterior
hose [3"cam]–N
14 Jun '16 Tu
27 Sep '16 Tu
S 15
h1
1st of 1
fwd(aft
MANF-U or MANF-L
2 Assoc w/ V31
V052
tchw
exterior
hose [4"cam]–L
31 May '16 Tu
27 Sep '16 Tu
S 17
h2
1st of 1
fwd(aft
for MANF-X": 1ST
2 Assoc w/ V32
V053
tchw
exterior
hose [4"cam]–L
25 Apr '17 Tu
18 Jul '17 Tu
S 12
h2
RETURN
fwd(aft
for MANF-X": 2ND
2 Assoc w/ V33
V054
tchw
exterior
hose [6"cam]–X
14 Jun '16 Tu
27 Sep '16 Tu
S 15
h3
1st of 1
fwd(aft
MANF-U or MANF-X'
2 Assoc w/ V31
V055
tsply
ext / intr
tube [ftgs]–20
31 May '16 Tu
30 May '17 Tu
F 01
T3
1st of 1
( ship
for DDUs & COILs
2Assoc w/ V21-4
18 Jul '17 Tu
U17(01
V056
tsply
ext / intr
Tube [+FLEX]–20
31 May '16 Tu
30 May '17 Tu
F 01
T+3
1st of 1
( ship
for DDUs & COILs
2Assoc w/ V21-4
18 Jul '17 Tu
U17(01
V057
tvent
interior
E-Stop [INTR]≥04
31 May '16
30 May'17
F 01
w1
1st of 1
Guard Area
for 2 FANs & COILs
2Assoc w/ V21-8
18 Jul '17 Tu
≥4 Stops
V058
OPNL
ext / intr
opnl [≤3hr]–28
31 May '16
30 May'17
EA( 24
w2
1st of 1
CHW Loop
for All Machinery
10 Schedule
18 Jul '17 Tu
U17(04
V059
SVCE
ext / intr
svce [≤8hr]–14
31 May '16
30 May'17
S 12 EA
w3
1st of 1
Machinery
for All Machinery
11 Call & E-mail
18 Jul '17 Tu
S 02 EA
V060
INSTL
exterior
instl [≤8hr]–02
31 May '16
30 May'17
S 02 EA
w4
1st of 1
CHW Loop
for DD CHW Loop
10 Schedule
18 Jul '17 Tu
V061
TRNG
ext / intr
TRNG [≥4hr]–02
31 May '16
30 May'17
S 02 EA
w5
1st of 1
Machinery
for All Machinery
10 Schedule
18 Jul '17 Tu
V062
TECH
E-Mail
info [EDS]–24
31 May '16
30 May'17
S 24 EA
w6
1st of 1
Grossman
to Satisfy Info Req
11 Call or E-mail
18 Jul '17 Tu

Table V:

TVENT SWLINs

TITLE
Dehumidified Air

(100% Outside Air) Industrial Air (100% Outside Air) Conditioned Air (100% Return Air) Sub Chld Wtr (Non-Seasonal) Encl Chld Wtr (Seasonal) Nuclear Chld Wtr (Seasonal)

Purpose
Dry Air

for Blast & Paint Fresh Air for Ship's Interior Tempered Air for Bow Dome etc.

Chilled Water to Submarine Piping Chilled Water to DD Enclosures Chilled Water to Nuclear Buildings

SWLIN
176A01

036I01

036I01
036i01
035A01

036I01

036I01
860j14

JO#

3681486022s16

SYSTEM
Tsply-texh-tchw
tsply-texh-tchw
TCOND
tchw [sub]
tchw [rsc/sht/xcl]
Tchw [nuc]

Table V:

TVENT Footnotes with Annotations Footnote A:

1 Non-Seasonal

For the single Normal (–N) capacity Chiller with its respective Pump that provides chilled water (CHW) directly to the ship, the machine(s) are continuously needed irrespective of the season and for the entire duration of the drydock period. The asterisk (() further identifies the machine(s) as critical component(s) in which there are additional mandatory Contractual obligations as specified elsewhere in the Technical Specification (TS). Other Non-Seasonal type machinery are several ITEM Cs (C / C1 / C2): DDUs & RHCs; ITEM Ds: TCCs; and ITEM Es: AHUs & ACUs. Seasonal machinery are all other Chillers with their respective Pumps; several ITEM C#s (C3 & C4): HTGCs & CLGCs associated with a desiccant only dehumidifier, hence, do not require a fan; and ITEM Fs: HTGCs & CLGCs that Stand-Alone, hence, do require a built-in fan. Seasonal equipment are the manifolds, hose assemblies, elbows, valves, and standpipes associated with the Seasonal machinery.

2aDD#1: post-DH

There is an unusual requirement for a dehumidifier at the post-dock Berth just prior to undocking from Drydock No. 1 only (Post DD#1). The dehumidified air is necessary for minor hull repair after removal of Buoyancy cans necessary to undock (UD) a submarine from DD#1. Accordingly: (i) the post-dock scheduled season is as scheduled; (ii) the capacity for airflow and moisture removal is half of what is normally required; and (iii) there is no steam utility at the Berths. Correspondingly: (i) dependent on the actual schedule, the Contractor may either keep the last remaining Normal (–N) capacity dehumidifier (e.g. Fwd DDU) on-site for reuse post-dock or schedule a later delivery of some other dehumidifier; (ii) the capacity of the dehumidifier can be anywhere from half (i.e. Medium –M) to the same as for the Normal (–N) capacity dehumidifier, but, the capacity for any post-heater cannot be less than its associated dehumidifier; and (iii) the dehumidifier will use electric Reactivation, i.e. NO (steam) Reactivation Heating Coil (RHC) will be needed – thus, a combined [CMBD] dehumidifier will not require functioning pre-/post- cooling coils and will use only electric reactivation and the desiccant [DSCC] dehumidifier will not require a separate steam [STM] RHC.

2b DD#2: RSCs

For Los Angeles Class submarines (688 CL) undergoing overhaul in DD#2, the newly refurbished Removable Submarine Covers (RSCs) not only shelters the entire submarine within a weather protective structure, but, also encompasses the submarine within an environmentally controlled envelope. Each of the fourteen (14) permanent RSC Temperature Conditioning Coils (TCCs) has an air-handler, steam coil for heating, and a chilled water coil for cooling. The only rental machinery required to effectuate the engineered controlled environment are a 200 ton chiller with its accompanying pump for the port set of RSC stacks and a similar chiller with pump for the starboard set of RSC stacks.

3aRHC Capacity

For Alternative IB (desiccant type [DSCC] dehumidifier only – neither pre- nor post- air treatment), the Vendor has a choice of either a single Normal (–N) or a pair of Medium (–M) capacity steam [STM]

AND FOR SAIL

Reactivation Heating Coil(s) (RHCs) for all three dehumidifiers. However, subject to footprint, there is the possibility that the Sail DDU may have insufficient space nearby to accommodate the steam RHC.

3b Footprint

The Vendor must provide precise footprint dimensions of each capacity type of steam RHC, along with its other machinery, and be prepared to deliver the Sail RHC as scheduled. Whereas the capacity type of RHC is a Vendor Choice, the decision to deploy the Sail RHC is a Government Option dependent on its footprint and available platform space. The Temporary Systems Design Engineer (C230.1RG) will evaluate as to whether the Sail RHC could fit within the available space. Contracting will then inform the Vendor, sufficiently prior to shipment, as to whether to commence a lease of the Sail RHC.

4aOverlap CLGC

For Alternative IB (desiccant type [DSCC] dehumidifier w/ no built-in pre- nor post- air treatment), the Vendor must provide a spring-time four week (4 week) overlap between its current post heating coils and the following pre- & post- cooling coils AT NO ADDITIONAL COST. Only by allowing for this overlap of pre-treatment and post-treatment coils can the Government equate the Bid offers between a Vendor offering the preferred Alternative IA combined [CMBD] dehumidifier which integrates pre-cooling, post-cooling, & post-heating and the permitted Alternative IB dehumidifier lacking such integrated coils. If the overlap should be greater than four weeks, then the Government is obligated for the additional duration of the previous coil(s) which in this case are the heating coils. To accommodate this particular spring-time four-week overlap, the delivery schedule is such that the preceding post-heating coil may depart up to four weeks after its scheduled RETURN date and not incur an additional fee.

4bOverlap HTGC

For Alternative IB (desiccant type [DSCC] dehumidifier only – neither pre- nor post- air treatment), the Vendor must provide a springtime four week (4 wk) overlap between the previous post-heat coil and the following pre-cool & post-cool coils AT NO ADDITIONAL COST. Only by allowing for this overlap of pre-treatment and post-treatment coils can the Government equate the Bid offers between a Vendor offering the preferred Alternative IA combined [CMBD] dehumidifier which integrates pre-cooling, post-cooling, & post-heating and the permitted Alternative IB dehumidifier lacking such integrated coils. If the overlap should be greater than four weeks, then the Government is obligated for the additional duration of the previous coil(s) which in this case is the single heating coil. For this particular springtime four-week overlap, the succeeding pre-cool and post-cool coils must actually arrive at least four weeks prior to its scheduled ARRIVAL date and the preceding post-heat coil should depart by its scheduled RETURN date so as to not incur any additional fee.

5CLGC Capacity

As background, the needed chilled water cooling capacity for a post-cooler is only half of what is required for a pre-cooler. The pre-cooling coil uses about half of its energy to process the air (moisture removal – i.e. latent heat of condensation) and the other half to treat the air (temperature reduction – i.e. sensible heat). Whereas, the post-cooler, similar to a post-heater, is used for comfort control a.k.a. temperature reduction only (i.e. sensible heat). Thus, a pre-cooler would be sized as a Normal (–N) capacity machine of approximately fifty (50) tons, but, the post-cooler could be sized up to half as much similar to a Medium (–M) capacity machine of twenty-five (25) tons. Although the Vendor has a choice as to the cooling capacity for the post-cooler only as either Normal or Medium (–N / –M) capacity, the advantage of making both the pre-cooler and the post-cooler machines of similar capacity would be their interchangeability.

Table V:

TVENT Footnotes with Annotations (continued)

Footnote A (continuation):

6Vendor Choice

If the Vendor can provide the desired machinery and/or equipment as listed at or below the Government Estimate, then it is in the Shipyard's interest to lease the designated ITEMs. Please note that Vendor Bid comparisons should either both include or exclude such ITEMs.

7 If DH Remains

The scheduled plan is for the Project to complete all Blast and Paint (B&P) operations in the late Spring of 2016 just prior to the requisite pre-cooling and post-cooling of dehumidified air for a second cooling season 2ND CLG Season. However, an option has been included in this Technical Specification to allow for an extension (EXT) of the lease of either the 8FFwd DDU and/or the 8SSail DDU so that the applicable dehumidifier(s) can Remain throughout the second cooling season. Dependent on which dehumidifier remains, specific types of machinery and equipment will be leased as an option to support that dehumidification process. In particular, the 8FFwd DDU, which because of its isolated location on the Drydock floor, would require the lease of a separate chiller (chlr [4"cam]–L) with pump (PUMP [4"cam]–L) besides cooling coils (Alternative IB only) and manifold(s). Whereas, the 8SSail DDU, because of its proximity between the Fwd & Aft TCCs, would connect to the TCC chiller (chlr [6"cam]–X) with pump (PUMP [6"cam]–X) during the second cooling season and would only require the lease of cooling coils (Alternative IB only) and manifold(s).

8 Associated w/

9 PNS Elective

Dependent on Shipyard availability, the lease of rigid duct fittings duct [ftgs]–g and both the positive and negative pressure flexible ducting duct [±flex]–g/–X/–N are a Government PNS Elective as to whether an ITEM shall be leased. Also, these lease items have a one-time fee term for the entire duration that its associated machinery are under lease and not subject to a weekly rental term. The officially issued Contract will inform the Vendor as to whether each of the subject ITEMs are to be leased. The rigid duct fittings and the positive pressure flexible ducting would be required on-site earlier by one week than the later negative pressure flexible ducting. The Contract ARRIVAL DATE will be adjusted so as to provide the Vendor with a three week lead time for the earlier ITEMs and a four week lead time for the later ITEMs unless the Vendor initiates and/or indicates a desire for the original speculative calendar dates. As adjusted, this lead time should be sufficient for the Vendor to place an order after Contract award if it should have an insufficient supply of a particular lease products.

10 Schedule

There are specific Contract Line Items requiring the services (labor) of the Vendor that are non-emergent and are best coordinated in advance and scheduled by the responsible Shipyard Party via communications with the Vendor to include an E-mail (Cc: Vendor / COR / Contract Specialist / TSDE) to document the line ITEM request. The Project's Temporary Systems Zone Manager [TSZM] would be responsible for scheduling (preferably, at least two workdays as advance notice): (a) Vendor installation of E-STOPS (ITEM K1: E-Stop [D&E]≥04); (b) Vendor assistance in the OPERATIONAL aspects of the several TVENT systems especially to include (re)adjustment of temperatures (pre-cool vice post-cool plus post-heat), quantity of air-flows (to achieve desired temperature or Relative Humidity), and manipulating utilities (steam versus electric for Reactivation Heat) (ITEM K2: OPNL [≤⅓DY]–24); and (c) Vendor assistance in the INSTALL of the Chilled Water (CHW) Loop(s) to include Manifolds, Valved Jumper Assembly(ies), Standpipe(s), Hose Assemblies, & Rigid Ducts / Flexible Ducting (ITEM K4: INSTL [≤8HR]–01). The Shipyard's Temporary Systems Design Engineer [TSDE] would be responsible for scheduling (preferably, at least two calendar weeks as advance notice) Shipyard training (ITEM K5: TRNG [≥4HR]–02).

11 Call & E-mail

There are specific Contract Line Items requiring the services (labor) of the Vendor that are emergent and are best coordinated via an immediate phone call to the Vendor followed by an E-mail (Cc: Vendor / COR / Contract Specialist / TSDE) to document the emergent nature of the request by the responsible Shipyard Party. The Project's Temporary Systems Zone Manager [TSZM] would be responsible for coordinating all such emergent requests to include those to be established as not being the fault of the Vendor (ITEM K3: SVCE [≤6HR]–08).

Table V:

TVENT Footnotes with Annotations (continued)

Footnote B:

These initial Standard CLIN (S () durations could span a Leap Day (29th of February) for a Leap Year. When using the Graphic Date Finder / Schedulator (GDF/S), the actual date for a given duration is one day sooner than the date indicated, or conversely, the actual duration is one day more than the duration indicated (for example 05 Jan – 20 Sep 2016 is actually 37 weeks vice 36 weeks plus 6 days as indicated on the GDF/S).

The critical Non-Seasonal Normal (–N) capacity Chiller with Pump is needed for the entire duration of the drydock period regardless of whether or not that duration exceeds one year. Other Non-Seasonal type machinery required for the full or near full duration of the drydock period are the two exhaust blowers dedicated to the ship's Interior Compartments (Fwd & Aft: FAN [EXH / SRC]–N × 2 each) and the Temperature Conditioning Coils which provide ventilation to the ship's Interior Compartments (Fwd & Aft: COIL [H+C / HSP]–L or COIL [H+C / LSP]–2N × 2 each or pair). The scheduled duration for the drydock period is over one year. These ITEMs are initially scheduled for fifty-two (52) weeks as an initial Standard (S) CLIN and require a semi-automatic extension Unfunded CLIN in the following Fiscal Year (U YR () prior to their scheduled RETURN DATE.

The initial durations for each dehumidifier and its supporting machinery (Standard CLIN) reflect an aggressive programmed Blast and Paint (B&P) guesstimate by the C970 Operations Manager. The programmed EXTENSION reflected in Table V: TVENT Machinery & Equipment Schedule are an extension Option(al) CLIN meant to provide the necessary flexibility to defer the RETURN DATE for the Fwd (O (a), Sail (O (b), Aft (O (c), and/or Post-Dock (O (d) dehumidifiers and to obtain associated seasonal supporting machinery for that particular dehumidifier such as a chiller, pump, manifold(s), and/or hose assemblies.

This initial Standard CLIN (S () is for a Post-Dock dehumidifier or for its associated seasonal support machinery.

This initial Option(al) CLIN (O () is for a machine (Sail RHC) in which there has been insufficient platform footprint to deploy at Drydock No. 1 (DD#1) only. A temporary somewhat larger platform will be constructed after docking in lieu of the previous permanent platforms, so, there may be sufficient platform footprint. Also, this particular unit needs to be listed, regardless of intent to lease, so as to equate bids from Vendor(s) offering Alternative IA dehumidification vice Vendor(s) offering Alternative IB dehumidification. The Temporary Systems Design Engineer [TSDE] can determine the practicality of leasing the Alternative IB Sail RHC from the successful Bidder after obtaining the actual footprint(s) of the single Normal capacity or dual Medium capacity RHC unit(s) as well as the footprints of other adjoining machinery sharing the platform.

The elective Option(al) CLIN (E () is for the gigantic size rigid Duct Fittings (duct [ftgs]–g) and for some sizes of Flexible Ducting (duct [±flex]–g/–X/–n). The proposal is for a FIXED FEE for the lease of ITEMS: J series that is not defined by a particular duration rate (i.e. $ / week), but, with the entire duration of the particular associated machinery (TCC–L/2N, DDU–N/M, ACU–L, & AHU–N as applicable) that the elective ITEMS are affixed to. The Government will make an election as to whether or not to lease such ITEMS prior to issuance of the Contract.

The critical Non-Seasonal Normal (–N) capacity Chiller with Pump is needed for the entire duration of the drydock period regardless of whether or not that duration exceeds one year. Other Non-Seasonal type machinery required for the full or near full duration of the drydock period are just the two AHUs dedicated to the ship's Interior Compartments (Fwd & Aft) and all TCCs which happen to also provide ventilation to the ship's Interior Compartments. The scheduled duration for the drydock period is sixteen (16) calendar months. These ITEMs are initially scheduled for fifty-two (52) weeks as an initial Standard (S) CLIN and require a semi-automatic extension Unfunded CLIN (U () prior to their scheduled RETURN DATE.

The initial durations for each dehumidifier and its supporting machinery (Standard CLIN) reflect an aggressive programmed Blast and Paint (B&P) guesstimate by the C970 Operations Manager. The programmed EXTENSION reflected in Table V: TVENT Machinery & Equipment Schedule are an extension Option(al) CLIN meant to provide the necessary flexibility to defer the RETURN DATE for the Fwd (O (a), Sail (O (b), or Post-Dock (O (c) dehumidifiers and to obtain associated seasonal supporting machinery for that particular dehumidifier such as a chiller, pump, or manifold(s).

This initial Standard CLIN (S () is for a Post-Dock dehumidifier or for its associated seasonal support machinery.

This initial Option(al) CLIN (O () is for a machine (Sail RHC) in which there has been insufficient platform footprint to deploy at Drydock No. 1 (DD#1) only. A temporary somewhat larger platform will be constructed after docking in lieu of the previous permanent platforms, so, there may be sufficient platform footprint. Also, this particular unit needs to be listed, regardless of intent to lease, so as to equate bids from Vendor(s) offering Alternative IA dehumidification vice Vendor(s) offering Alternative IB dehumidification. The Temporary Systems Design Engineer [TSDE] can determine the practicality of leasing the Alternative IB Sail RHC from the successful Bidder after obtaining the actual footprint(s) of the single Normal capacity or dual Medium capacity RHC unit(s) as well as the footprints of other adjoining machinery sharing the platform.

The duration for this initial Standard CLIN (S () unit (ITEM F1: ACU) of one year happens to exactly match the planned duration. The extension Option(al) CLIN (O () is just in case the need for this Stand-Alone machine is greater than the planned duration.

The elective Option(al) CLIN (E () is for the gigantic size rigid Duct Fittings (duct [ftgs]–g) and for some sizes of Flexible Ducting (duct [±flex]–g/–X/–n). The proposal is for a FIXED FEE for the lease of ITEMS: J series that is not defined by a particular duration rate (i.e. $ / week), but, with the entire duration of the particular associated machinery (TCC–L/2N, DDU–N/M, ACU–L, & AHU–N as applicable) that the elective ITEMS are affixed to. The Government will make an election as to whether or not to lease such ITEMS prior to issuance of the Contract.

Table V:

TVENT Footnotes with Annotations (continued)

Footnote B:

CLIN (Contract Line Item Number): Double strikethrough for type CLIN indicates Not Applicable for this Project.

C( Conditional CLIN:

This CLIN is a conditional ITEM for an (un)known duration / extension that is indeterminate by the Government as to its necessity prior to Contract issuance and, if necessary, also uncertain as to its precise duration if exercised. Rather, this conditional ITEM is dependent on the Project's work progress as compared to its programmed work schedule. The reason for its indeterminate status is the uncertain ability of the Project and/or Shipyard to achieve an aggressive Blast and Paint (B&P) work schedule in light of manning limitations combined with the normal climatic seasonal changes expected with a significant delay. The normal expectation are that the conditional ITEMs will not be required. Hence, the Project must document (E-mail) to the Contracting Office as to their need and/or duration prior to initiating the lease or extension of the applicable conditional ITEMs.

E( Elective CLIN:

This CLIN is an elective ITEM for a known duration / extension to be determined by the Government prior to Contract issuance and so conveyed to the Vendor via whether or not those particular ITEMs are listed in the issued Contract. If an elective ITEM is listed in the Contract, the CLIN ARRIVAL date(s) may be adjusted to allow more time for the Contractor to obtain additional assets in case the Contractor has an insufficient quantity or is out of stock for that particular resource. Examples of elective ITEMs are negative pressure ducting (i.e. DUCT [−FLEX]–X & DUCT [−FLEX]–N) in which its listing as a CLIN ITEM is dependent on the delivery timeliness of previous Government Purchase Orders. For negative pressure ducting, the Contract should allow at least four (4) weeks between the issuance of the Contract and the required date for its ARRIVAL unless the Vendor indicates a sooner availability.

O( Option(al) CLIN:

This CLIN is an option(al) ITEM for an (un)known duration / extension to be determined by the Government either prior to or after Contract issuance, but, at present, indeterminate as to its necessity or uncertain as to its precise duration. For this Project, the option(al) ITEMs are the two sets of 200 ton chillers (ITEMs V35 & V36: chlr [6"CAM]–X) with their accompanying pumps (ITEMs V39 & V40: PUMP [6"CAM]–X) for the RSCs only. Although the issued Contract is immune to the source(s) of Government funding, funding source(s) other than the Project may be involved and/or the actual durations could be substantially reduced.

S( Standard CLIN:

This CLIN is a mandatory standard ITEM for a known duration / extension as indicated which would initially be limited to not exceed fifty-two weeks (52 wks) or one year (1 yr).

U( Unfunded CLIN:

This CLIN is a mandatory unfunded ITEM for either: (a) a known extension for the duration indicated beyond and immediately following an initial known lease which is limited to one year or (b) a known duration for ITEMS that do not begin until in that Fiscal Year and presently unfunded (e.g. U17 = FY'17). These CLINs should be automatically extended / leased for the duration shown when that year's Fiscal Year funds become available.

V( Vendor CLIN:

This CLIN is a non-mandatory vendor ITEM for a known duration / extension as indicated which would initially be limited to not exceed fifty-two weeks (52 wks) or one year (1 yr). This ITEM is a Vendor's Choice as to its availability and should be leased if at or less than the Government Estimate.

Footnote C:

The summation of the TOTAL Government Estimate for the entire Contract to include all CLINs whether Standard (S), Choice (C), Unfunded (U), Optional (O), or Elective (E) is at the end of the TVENT Machinery & Equipment Schedule. However, some Items are at a Vendor's election as to the machinery type of either Alternative A (preferred) or Alternative B (permitted). Whether Alternative A or Alternative B, the Government Estimate for that particular alternative is exactly the same. The alternative type is annotated in the (last) Government Estimate column as:

IA or IB / IIA or IIB / IIIA or IIIB / and IV – which is a Vendor's Choice ITEM when available by the Vendor and at a reasonable cost (less than or equal to the Government Estimate). The Alternative B Items are shown in a white font with a black background. Thus, the summation of the TOTAL Government Estimate for the entire Contract to include all CLINs is the sum of all non-alternative Items plus let's say Alternative A Items (do not include both Alternatives A + B) plus Alternative IV. Hence, one can compute the Government's TOTAL ESTIMATE by adding all line Items with backgrounds of white (non-alternatives), yellow (Alternative A), plus pink (Alternative IV).

TVENT Design Criteria: [Non-IA @ PNSY]( [1] Single Non-Seasonal Normal capacity (–N) chiller and pump is required for the ship's TCHW system. Only for an IA overhaul would a second similar, but seasonal chiller & pump be required for the nuclear complex.

[2a] [Non-IA @ PNSY] Three Temporary Desiccant Dehumidification (TDD) systems (FWD / SAIL / AFT) are required to support Blast and Paint (B&P) operations. The Vendor has a choice of either the combined dehumidifier (ddu [CMBD]–n) that integrates steam reactivation, post-heating, pre-cooling, and post-cooling (Alternative IA: PREFERRED for now to be required in the future) or a dehumidification group consisting of additional machinery components (RHC [STM]–N/2M / HTGc [ELEC]–n / clGc [PRE]–n / clGc [POST]–n/M) (Alternative IB: PERMITTED for now to be precluded in the future). The routine home station (PNSY) evolution requires dehumidification for close to an entire year or longer in which pre-cooling & post-cooling would be followed by post-heating and/or vice versa. The dehumidification machinery is equipment supported by twenty inch nominal diameter rigid duct fittings (duct [ftgs]–g) and discharge (positive pressure) flexible ducting (duct [+flex]–G).

[2b] [Post-DD#1 @ PNSY] Besides the dehumidification machinery to support the overhaul during the drydock evolution, a single Temporary Desiccant Dehumidification (TDD) system is only required post Drydock No. 1 [Post-DD#1] to support Blast and Paint (B&P) hull repairs after first removing the "Buoyancy Cans" for floating the ship. This system does not require steam reactivation (no steam utility at the Berths) and is season specific as far as post-heating only. Being a small tented principally unmanned temporary enclosure, pre-cooling and post-cooling for comfort with its ancillary machinery support infrastructure would not be required.

[3a] [Non-IA @ PNSY] Four (4) very powerful exhaust blowers (AHU [EXH]–N: ≥10K cfm @ 14" WG & ≥40 Hp) are required to support both exterior Blast and Paint (B&P) operations (Hull / Fwd & Aft MBTs / Mud Tank) and an interior healthy work environment (via Dirty Air Exhaust) in the Ship's Forward and Aft Compartments. Two units will be deployed near the Bow and likewise for the Stern. The Shipyard will designate each unit either solely for air exchange of the exterior to counterbalance the supply air from the Dehumidification Systems or solely for air exchange of the interior to counterbalance the supply air from Temperature Conditioning Coils. Each exhaust blower has a pair of fourteen inch nominal diameter suction inlets which wye to three each eight inch nominal diameter suction lines (Y = 14"Ø : 8"Ø × 3). The net effect is that each exhaust blower will provide six each exhaust lines of eight-inch nominal diameter (8"Ø) rated for a minimum of 1,600 cfm per exhaust branch run. The exhaust blowers can be equipment supported by strong suction (negative pressure) semi-flexible ducting of fourteen inch (duct [−flex]–X) and eight inch (duct [−flex]–N) nominal diameters.

[4a] [PNSY] For industrial ventilation, two Temperature Conditioning Coil (TCC) systems (FWD & AFT) support an interior healthy work environment (via Clean Air Supply) from all ambient (100% outside fresh) treated (cooled or heated, as necessary) air to the Ship's Forward and Aft (pressurized) Compartments. For each of the two TCC systems, the Vendor has a choice of either a single Large (–L) capacity unit (tcc [H&C]–l) having four outlets (Alternative IIA: PREFERRED) or a pair of Normal (–N) capacity units (tcc [H&C]–N) having two outlets per unit (Alternative IIB: PERMITTED). Penetrations to the ship's interior are via the Submarine Hatch Ventilation Enclosures (SHVEs) on top of the hatches (WSH[FWD] / FEH[FWD] / AEH[AFT]) or the Hull Cut Ventilation Enclosures (HCVEs) surrounding the Hull Cuts (HC#1-1A[FWD] / HC#39A[FWD & AFT] / HC#49[AFT]). For redundancy, the internal ventilation system is designed for a minimum of two (2) and preferably up to four (4) Supply Air ducting runs for each of the ship's interior Compartments for a maximum total of eight (8) runs. This temporary industrial ventilation Supply Air system is equipment supported by twenty inch nominal diameter rigid duct fittings (duct [ftgs]–g) and discharge (positive pressure) flexible ducting (duct [+flex]–G).

[5] [some Non-IA @ PNSY] For comfort conditioning where treated air can be recycled (i.e. retreated with no or very little fresh air intake), a Stand-Alone Air-Conditioning Unit (ACU) with cooling and reheat is available.

[6] Emergency Stops (E-stop [TCC & AhU]–02) will provide a certain measure of Fire Fighting security at the Watch Shack by permitting the instantaneous shutdown of air-handlers that either exhausts air from (ahu [exh]–N) or supplies air to (tcc [H&C]–L/2N) the Forward and Aft Submarine Compartments.

[6b] [DD#2/3 @ PNSY] About half of the seasonal chilled water will run along the drydock floor on the submarine's Port side in support of the Temporary Blast and Paint (TB&P) systems' cooling coils at three locations (FWD / SAIL / AFT). The corresponding other half of the seasonal chilled water is to run along the drydock balcony on the submarine's Starboard side in support of the Temporary Ship's Ventilation (TSHIP) systems' cooling coils positioned on two balcony platforms with its accompanying chiller / pump on a third platform. Hence, this particular docking evolution is best resolved via the lease of two each duplicate capacity (200 ton) chillers.

A lease specification — Machinery & Equipment Overview

Table V1:

TVENT Requirements [ Equipment Underlined / E-Stops highlighted in red ]

item
ID
QTY
identifier
performance capacity
transition(s)
remark / Note / comment
a1
NA
0

EA

ACU [H±C]–M

Auxiliary Unit Stand-Alone

STMT #1

load:

{≥25 tn} & [≥240K btuh] cont:

thermostat on return [pnsy] FLA limit 380 Amps [nlon] no limit w/ MUSE eqpt air:

≥2 × 20"Ø sply

≥2 × 20"Ø rtn

[reqt] basis 100% RA Rmk V6:

Fan (Blower) Criteria Item A1:

{Cooling} & [Heating]

Comfort (ΔT≥30°F)

HGB NO:

≥2 Compressors & ≥2 Ckts

a2
NA
0

EA

ACU [H±C]–N

Auxiliary Unit Stand-Alone

STMT #2

load:

{≥60 tn} & [≥360K btuh] cont:

thermostat on return [pnsy] FLA limit 380 Amps [nlon] no limit w/ MUSE eqpt air:

≥4 × 20"Ø sply

≥4 × 20"Ø rtn

[reqt] basis 100% RA Rmk V6:

Fan (Blower) Criteria Item A2:

{Cooling} & [Heating]

Comfort (ΔT≥20°F)

HGB NO:

≥3 Compressors & ≥2 Ckts

f1
v27

v28 V29 V30 ea

FAN [EXH/SRC]–N

Wired to E-Stop Interior: Fwd/Aft

STMT #3 & #4

mtr:

≥40 / 60 Hp LS × w/ VFD fan:

≥10K cfm @ 14" T / ESP max:

≥12K cfm @ 10" T / ESP min:

≥08K cfm @ 17" T / ESP air:

=2 × 14"Ø rtn affixed to ahu wye:

14"Ø : 8"Ø × 3

2 detachable Item F1:

Vendor ID Equipment Prefer:

60 Hp for ESP vice TSP

TS ¶ F4:

Specification Variance

Reviewed by Engineer

Statement (STMT):

1. minimum ACU – heat: [≥070 Kw] ▌mtr: ≥15 Hp LS × 1 EA for PA ▌flow: ≥10K cfm @ 2¼" TSP

(PERMITTED)

prefer ACU – heat: [≥105 Kw] ▌mtr: ≥20 Hp LS × 1 EA for PA ▌flow: ≥20K cfm @ 2¾" TSP

(PREFERRED)

2. minimum ACU – heat: [≥070 Kw] ▌mtr: ≥15 Hp LS × 1 EA for PA ▌flow: ≥10K cfm @ 2¼" TSP

(PERMITTED)

prefer ACU – heat: [≥105 Kw] ▌mtr: ≥20 Hp LS × 1 EA for PA ▌flow: ≥20K cfm @ 2¾" TSP

(PREFERRED)

3. minimum AHU – mtr: ≥40Hp LS VFD & SRC Type C ▌fan-flow (thru the fan): ≥10K cfm @ 14" TSP

(PERMITTED)

prefer AHU – mtr: ≥60Hp LS VFD & SRC Type C ▌air - flow (thru ducting): ≥10K cfm @ 14" ESP

(PREFERRED)

4. NAVSEA Technical Publication 8010: Industrial Ship Safety Manual for Fire Prevention and Response compels the Shipyard to have the ability to immediately stop airflow into the submarine's interior (pressurized) Compartments (Fwd & Aft) in an emergency Fire Fighting situation. Hence, E-Stops (Emergency Stops a.k.a. ECS: Electrical Control Stations) are required for Fire Safety for machines with a Process Air (PA) blower (i.e. tcc [H+C]–L/2N) and for Exhaust Blowers (i.e. ahu [exh]–n) that either supply or exhaust air into the submarine. Thus, up to four E-Stops (one E-Stop per machine) may be required if the Vendor elects to provide two pairs of Normal (–2N) capacity TCCs (Alternative IIB) vice the requirement for only two E-Stops for two each Large (–L) capacity TCCs (Alternative IIA). Exhaust Blowers (ahu [exh]–n) are consigned as to their designated application such as Fwd or Aft interior and/or exterior. The two Exhaust Blowers having some or all of its ducting runs routed to the submarine's interior Compartments (COMPTS: Fwd & Aft) do require E-Stops regardless of location (PNSY / NLON / NBPL). However, for the non-deployed location (PNSY) which may have two additional Exhaust Blowers (Non-IA) with all of its ducting runs routed solely to the submarine's exterior Main Ballast Tanks (MBTs: Fwd & Aft), E-Stops are not required for exterior only Exhaust Blowers.

c1
v23a

V23b V24a V24b pr (or( coil[H+C/LSP]-2N Wired to E-Stop Alternative IIB

STMT #4 & 5

load:

{≥50 tn} & [≥400K btuh] mtr:

LSP: ≥20Hp LS × 1 EA fan:

≥10K cfm @ 5–9" TSP hose:

3"Ø M & F CAM × 200'

air:

≥2 × 20"Ø sply

≥2 × 20"Ø rtn wtr:

3"Ø M&F CAM

(IIB:

V23c & V24c Rmk V2:

Coolant-Free Rmk V6:

Fan (Blower) Criteria Item C1:

{Cooling} & [Heating] AltnvIIB:

PERMITTED for NOW

c2
V21

V22 ea coil [H+C/HSP]-L Wired to E-Stop Alternative IIA

STMT #4

load:

{≥100 tn}&[≥800K btuh] mtr:

HSP: ≥50Hp LS w/ VFD fan:

≥20K cfm @ 5 – 9" TSP hose:

4"Ø M & F CAM × 100'

air:

≥4 × 20"Ø sply

≥4 × 20"Ø rtn wtr:

4"Ø M&F CAM

htg:

elec or steam Rmk V2:

Coolant-Free Rmk V6:

Fan (Blower) Criteria Item C2:

{Cooling} & [Heating] AltnvIIA:

PREFERRED for PNS c1' or C2' v25 v26 pr/ ea COIL[FLTr]-l/2n Vendor's Choice Alternative IV

STMT #6

type:

Moisture Separator and Mist Eliminator sizes:

As Required to entirely fill the Filter Housing Filter Qualities:

Purge 98% of Moisture on Saturated Days

Includes Drainage Item C#':

Demister Filtration

Suggested Source www.AirFilterUSA.com

Phone 713.896-8901

Statement (STMT):

5. If the Vendor chooses to deploy either one or two pairs of Alternative IIB: a pair of Normal (–N) capacity Temperature Conditioning Coils (ITEM D2 V##a & V##b: tcc [H&C]–2N) vice a single Large (–L) capacity unit, then supplemental pair(s) of Large (–L) capacity Wye type Manifolds (ITEM G1 labelled V##c: manf [4":3"×2]–L) are needed for each pair of TCC–2N. These supplemental Large (–L) capacity Wye Manifolds will be provided for each cooling season at no additional cost to the Government with dates of ARRIVAL & RETURN similar to those of the other manifolds. Also, supplemental three-inch hose assemblies (ITEM H1: HOSE [3"CAM]–N) are necessary for each cooling season at no additional cost to the Government with similar delivery dates (200 ft per COIL–2N).

6. As an industrial type ventilation machine (i.e. 100% ambient air) that provides fresh air to the submarine's interior Compartments, only the Temperature Conditioning Coils (ITEM D: tcc [H&C]–l/2N) has the potential of supplying untreated or barely treated or cooled to fully saturated air to a common work environment. The issue is during inclement weather (moisture-laden air) when the air is not or barely treated (heated or cooled) resulting in very uncomfortable (excessively high) humidity levels in the common work environment. A Moisture Separator and Mist Eliminator filtration bank would completely eliminate such a scenario. Besides enhancing comfort conditions, because such a filtration bank rids the air of high moisture levels which requires much higher latent energy inputs to either heat or cool, the computed savings in energy reduction would be triple its lease rate. The Moisture Separator and Mist Eliminator filtration bank must fit within the built-in filtration housing of the TCC machine. The Moisture Separator and Mist Eliminator (MS&ME) filter elements shall be washable, also function as a low efficiency particulate filter, and be constructed of corrosion-resistant materials such as stainless steel (preferred), galvanized steel, or aluminum. The MS&ME filter elements must completely fill-up the filtration housing so that there is essentially no air-gaps for unfiltered air to penetrate. The MS&ME filter elements shall be permanently etched as to which side is up as well as which side is down. Although highly encouraged to do so, the Vendor has a choice as to whether to provide such a filtration bank.

NOTE

The machine's filtration housing may require some modification so as to allow for the drainage of water droplets from the filter elements, the collection of the water from the filter bank, and then the eventual diversion of such fluids away from the filtration housing.

state up front that Either it is included and it cost or that it is not included.? This filtration system is not associative.

d0 or d2

(
3

EA

ddu[CMBD/HSP]-n or ddu[DSCC/LSP]-n

STMT #7

dry:

{230 lb/hr│ 662 gal/dy} (400 lb/hr│1152 gal/dy) [agg] [300 lb/hr│ 864 gal/dy] [ u r ] ▌295 lb/hr│850 gal/dy▐ Desiccant Wheel:

Reactivation (reactvtn) via Electricity & Steam DH incl Elec Reactvtn Rmk V3:

Moisture Removal Rate state MRR & its Basis Altnv IA:

DSCC Wheel & System Altnv IB:

DSCC Wheel only

d0
V03

V04 V05

EA

ddu [CMBD]–n Alternative IA or ( D2 Series ( process air-handler(s) fan:

2 EA at Discharge End mtr:

≥25Hp HS×2 EA w/ VFD flow:

≥10K cfm @ 12" ESP air:

≤2 × 20"Ø sply

≥2 × 20"Ø rtn (in & out same side) mtr:

TEFC premium Altnv IA:

ddu [CMBD / HSP]–n Rmk V4:

Termination Coupling Item D0:

Electrical Power Mgt Item D:

Discharge Duct Wyes

d2
V06

V07 V08

EA

ddu [DSCC]–n Alternative IB

DOCUMENT:

Motor HP process air-handler(s) fan:

≥1 EA for Process Air mtr:

≥20Hp LS×1 EA w/ VFD flow:

≥10K cfm @ 7½" TSP air:

≤2 × 20"Ø sply

≥2 × 20"Ø rtn (access to inlets) mtr:

TEFC premium Altnv IB:

ddu [DSCC / LSP]–n Rmk V4:

Termination Coupling Item D#:

Rigid Duct [ftgs] Item D#:

DH via Separate Units d2a or D1a v09 v10 v11

EA/

PR

RHC [STM]-N/2M

Alternative IB Reactvtn Coil detached unit:

REACTIVATION mode (Steam: 100 psig = 338°F) heat:

≥792K Btuh (232Kw) air:

DH compatible stm:

1½" FNPT in [reqt] ¾" MNPT out

Rmk V5:

Steam as a Utility Alternative IB: ( Item D#:

Steam Reactivation (¶C)

(labor & matériel)

d2b
v12

v13 v14

EA

HTGc [DDU]–n Alternative IB Post-Heat Coil detached unit:

POST-HEATing MODE (Electric: 440 – 460 VAC) C'/C3:

≥512K Btuh (150Kw) C(:

≥792K Btuh (232Kw) air:

DH compatible util:

electric only cont:

thermostat

Alternative IB: ( Rmk V6:

Fan (Blower) Criteria Item D#:

Rigid Duct [ftgs] Item D#:

DH via Separate Units

d2c
v15

v16 v17

EA

CLGc [PRE]–n Alternative IB Pre-Cool Coil detached unit:

PRE-COOLING MODE

cool:

≥50 ton rating [nom] [actl] [≥42.8 ton @ ΔT=10°F] air:

DH compatible wtr:

3"Ø M&F CAM

util:

chilled water cont:

flowrate Rmk V2:

Coolant-Free Rmk V6:

Fan (Blower) Criteria Item D#:

Rigid Duct [ftgs] Item D#:

DH via Separate Units d1c or d2c v18 v19 v20

EA

CLGc[POST]-n/M Alternative IB Post-Cool Coil detached unit:

POST-COOLING MODE

cool:

≥25 ton rating [nom] [actl] [≥24.6 ton @ ΔT=10°F] air:

DH compatible wtr:

3"Ø M&F CAM

util:

chilled water cont:

thermostat Rmk V2:

Coolant-Free Rmk V6:

Fan (Blower) Criteria Item D#:

Rigid Duct [ftgs] Item D#:

DH via Separate Units

Statement (STMT):

{ITEM} / {id} / { qty } / { identifier } are highlighted to demonstrate necessary machinery or equipment for a future or potential redeployment and should not be counted towards the total minimum inventory required by the Vendor. For the │C│{C'}│C1│ as an example, in the QTY column 3 dehumidifiers are indicated for the initial deployment with { 1 } dehumidifier to be redeployed Post-Dock after the RETURN of the original deployment of three dehumidifiers (although, at the election of the Vendor, one DH may remain on-site vice incurring the cost of round-trip transport). Thus, the total minimum inventory required by the Vendor is for only three dehumidifiers.

7. D0:

The functions described for each Altnv IB machine unit │C2│C3│C4'│C4"│ under the column headings of:

D#:

│PERFORMANCE CAPACITY│TRANSITION(S)│ shall also be applicable to the single Alternative IA combined dehumidifier ITEM C: ddu [CMBD]–n unless otherwise annotated. and performance capacity???

p1
(V02
1

ea pump [3"CAM]–n Critical Unit

( FP–RMP

STMT #8 & #9

flow:

≥216 gpm @ 100' HD mot:

≥7 Hp HS | ≥12 Hp LS elb:

3"Ø M & F CAM × 4 EA

hose:

3"Ø M & F CAM × 300'

wtr:

3"Ø M&F CAM

lfm:

3"Ø M&F CAM

in-line w/ flow

(preferred) Rmk V1:

Chilled Water System Rmk V2:

Coolant-Free

ID (V02:

Critical TCHW System Adptrs:

2½"M : 3"F + 2½"F : 3"M

R1
(V01
1

ea chlr [3"CAM]–n Critical Unit

( FP–RMP

STMT #8 & #9

cool:

≥60 ton rating [nom] [actl] [≥57 ton @ 95°F amb]

HGB:

(V01: YES ▌(V0#: YES

CRIT:

(V01: YES ▌(V0#: YES

wtr:

3"Ø M&F CAM

PNSY or NLON (V01):

FP season start Oct 1 [reqt] Hot Gas Bypass Rmk V1:

Chilled Water System Rmk V2:

Coolant-Free

ID (V01:

Critical TCHW System

HGB YES:

≥2 Compressors & ≥2 Ckts

Statement (STMT):

8. ( Compliance to the technical requirements described herein is essential to the Shipyard's Freezing Prevention (FP) Risk Minimization Plan (RMP) for the ship's Temporary non-seasonal CHilled Water system (TCHW[SHIP]). For only the non-seasonal (CRITICAL( chiller with a built-in pump (chlr [3"cam]–n w/ PUMP [3"cam]–n), the pump power must be isolated from the power to the remainder of the chiller unit. Also, regardless of whether the pump is built-in or a separate unit, the power to the pump shall be via a manual switch so that a momentary power loss would only require power recovery for the pump to automatically restart (i.e. human intervention not required). To provide uninterruptible (immediate transfer to battery) and secure (back-up via generator) power to the pump, the start-up load (i.e. recommended Circuit Breaker capacity) must be thirty amps or less (≤30A @ 460VAC) to facilitate having the Nuclear Load House be its power source. This aspect will prevent oversizing a separate pump beyond 300 gpm (30 Amp CB) unless the pump has an automatic restart type Variable Frequency Drive (VFD).

9. ( Compliance to the technical requirements described herein is essential to the Shipyard's Freezing Prevention (FP) Risk Minimization Plan (RMP) for the ship's Temporary non-seasonal CHilled Water system (TCHW[SHIP]). For only the non-seasonal (CRITICAL( chiller and pump (chlr [3"cam]–n & PUMP [3"cam]–n), the Temporary Services Zone Manager (TSZM) / Project's Contract Delivery Point-of Contact (POC) in conjunction with a Vendor's Representative shall visually examine the chiller and pump to determine which exposed piping components require installation of electrical heat tracing followed by insulation. The Shipyard shall provide the electrical heat tracing in the proper lengths with the appropriate terminal fittings and may provide the insulation.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .