QASP_Matrix_-_AMP.doc

DOC document 38 KB Posted

Attached to
Alarm Monitor Personnel
Solicitation number
N39040-15-T-0274
Issued by

About this file

Attachment 3 QASP Matrix

View the file

Other files

File Type Posted
Wage_Determination_Rev_19.pdf PDF
N39040-15-T-0274.pdf PDF
AMP_QASP.doc DOC document
SolicitaionDD254forAMP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN, (MATRIX)

ALARM MONITORING POINT PERSONNEL

IN SUPPORT OF PORTSMOUTH NAVAL SHIPYARD

SECURITY DEPARTMENT, CODE 1700

Deliverable or Service Requirement
Measurement/

Metric

Performance Standards
Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met

Workforce Performance

Quality

Timeliness

Responsiveness

Contractor workforce shall perform all tasks detailed in paragraph 3.3 of the Statement of Work (SOW).

The Contractor shall be required to have the appropriate number of personnel per shift as detailed in Paragraph 2.0 and 3.1 of the SOW

The Contractor shall maintain a stable work force with minimum turnover of personnel.

Contractor shall monitor central station security alarm systems, closed circuit television system.

Contractor shall enter activity data in logs.

Contractor shall notify law enforcement to respond to alarms and other emergencies, receive information from law enforcement personnel and make require notifications without delay.

All required tasks shall be completed in accordance with assignment of work.

Contractor’s ability to respond to performance/quality and scheduling concerns and approach used to resolve problems.

0%

0% error rate of hours per month 10% turn- over of personnel per life of contract 0%

10%

0%

0%

0% Customer Feedback Unannounced inspections by the COR and/or technical point of contact

Positive performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance

Negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance

All performance standards will be assessed utilizing the Contractor Performance Assessment Reporting System (CPARS)

File details come from the government source that posted it. Updated .