N39040-15-T-0274 Solicitation

View the file

Other files

File Type Posted
Wage_Determination_Rev_19.pdf PDF
AMP_QASP.doc DOC document
SolicitaionDD254forAMP.pdf PDF
QASP_Matrix_-_AMP.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PORTSMOUTH NAVAL SHIPYARD

CODE 410

KITTERY ME 03904

207-438-4268

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

X

DO-C9

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

$20.5 M

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

N39040-15-T-0274 02-Jul-2015

b. TELEPHONE NUMBER

207-438-2133

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 09 Jul 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

N39040

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE N39040 16. ADMINISTERED BY

PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

TEL: 207-438-5206 FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANDREA M GLEASON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

561612

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: 100 % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N3904015RQALARM

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

1 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

N39040-15-T-0274

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 6.50 Months

Alarm Monitoring Personnel Services

FFP

Provide on-site security alarm monitoring services in accordance with the

Statement of Work in Section C.

FOB: Destination

MILSTRIP: N3904015RQALARM

PURCHASE REQUEST NUMBER: N3904015RQALARM

NET AMT

SECTION A

Contracting Officer’s point of contact for this action is:

Andrea Gleason, Code 410

Phone 207-438-2133

Email andrea.gleason@navy.mil mailto:andrea.gleason@navy.mil

CORRESPONDENCE:

For mail sent by Untied States Postal Service, address correspondence to Kittery, ME 03904 as shown in the “Issued by” block on page 1.

Correspondence sent by other carriers, e.g. FedEx, UPS, etc., should be addressed to:

Contracting Division

Code 410, Bldg #153 6th Floor

Portsmouth Naval Shipyard

Kitery ME 03904

INVOICING AND PAYMENT INSTRUCTIONS:

For invoices under Wide Area Workflow (WA WF) see clause 5252.232-9002 -Invoicing & Payment

Instructions.

Calls inquiring on payments can be made to DFAS-Customer Service Dept. at 800-756-4571 Option

2 then option 4)

Inquiries can also be made at DF AS MY INVOICE, a web application available at:

https :!/myinvoice.csd .disa.mi l! Registration requires a CAGE code, DUNS number and TIN .

This announcement will close at 3:00 pm on 09 July 2015. Contact Andrea Gleason who can be reached at 207-438-2133 or email andrea.gleason@navy.mil.

SECTION C

PERFORMANCE WORK STATEMENT

1.0 OBJECTIVE

Portsmouth Naval Shipyard (PNS), a field activity of Naval Sea Systems Command (NAVSEA), is seeking qualified

Alarm Monitoring Point (AMP) Personnel, with on-call management support, to perform NAVSEA required duties in support of sensitive industrial operations. AMP Personnel duties and responsibilities will be to aid in preventing and identifying potential or actual acts of theft and/or sabotage of property that is vital to national security.

2.0 SCOPE OF WORK

mailto:andrea.gleason@navy.mil

AMP Personnel will have direct access to classified information and sensitive, controlled unclassified information.

Contractor shall provide a pool of, at minimum, five (5) qualified AMP personnel, as defined in paragraph 4.0 of the

Performance Work Statement, to be available at any time throughout the period of performance for assignment of work.

The NAVSEA Representative, the Fuel Security Officer (FSO), shall review the qualifications of proposed contractor personnel as expeditiously as possible to ensure the proposed contractor personnel are technically capable of performing the required Alarm Monitor Services prior to the contractor personnel beginning Alarm Monitor

Services..

3.0 TASK STATEMENT

Task 3.1 – Period of Performance. Length of contract will be July 15, 2015 to January 31, 2016 and will occur 24 hours per day, 7 days a week, consisting of two (2) 12-hour shifts.

Task 3.2 – Place of Performance. All work will normally be performed in the Emergency Management Dispatch

Center (EMDC), located in Building 29 at the Portsmouth Naval Shipyard.

Task 3.3. – Contractor Performance Requirements. The contractor shall provide onsite coordination and management of the following with the Fuel Security Officer;

Establish management processes to ensure operational support is addressed timely and efficiently.

Ensure that the means and methods associated with required training shall be in accordance with the assigned tasks and shall comply with all US Navy Regulations and Requirements.

Establish a schedule for required training which shall consist of classroom lecture and discussion, followed by a written examination and hands-on, practical training to ensure that each contractor personnel is familiar with their duties, responsibilities and environment to the extent necessary, will be scheduled to take place in the EMDC.

Monitor central station security alarm systems.

Monitor Closed Circuit Television System (CCTV).

Enter activity data.

Notify law enforcement to respond to alarms and other emergencies specific to the mission.

Receive information from law enforcement personnel and make required notifications without delay.

Task 3.4 – NAVSEA Provided Requirements.

NAVSEA will perform on-site inspections of contractor personnel during the performance of their duties at the EMDC to the extent that the Fuel Security Officer or his representative deems necessary, to ensure the quality of services being performed.

NAVSEA will furnish all materials, equipment, parking for personal vehicles and other items necessary to support contractor personnel.

If exigent circumstances require, NAVSEA may augment contractor personnel with federal employees, as needed.

4.0 PERSONNEL SKILLS QUALIFICATION

The ability to Sit or stand for extended periods of time.

A High School Diploma or GED.

The ability to operate computers (for word processing).

The ability to successfully use Microsoft Office® with Windows-XP or Windows-7.

The ability to work with limited supervision.

The ability to speak clearly.

The ability to type 20 words per minute.

The ability to enter, update and retrieve information.

The ability to operate two-way radio communication consoles and telephones.

The ability to prioritize.

The ability to communicate effectively in writing.

5.0 SECURITY REQUIREMENTS

5.1 Facility. The contractor shall possess a CONFIDENTIAL Facility Clearance Level (FCL). Conditions, restrictions, and precautions will be specified in the Contract Security Classification Specification (DD form 254) as required by the National Industrial Security Program Operating Manual, DoD 5220.22-M.

5.2 Personnel. All personnel assigned by the contractor to perform work or site visits must be US citizens and possess a final CONFIDENTIAL security clearance. Personnel are required to obtain and maintain their security clearance as a condition of access to the work site during the period of performance.

5.3 Privacy Act and Sensitive Information. This work may require that contractor personnel have access to

Privacy Information. Contractor must fully understand and shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and all other applicable agency rules and regulations.

6.0 CONTRACTOR ACCESS

Contractor will be required to submit a visit request listing information of personnel needing access aboard

Portsmouth Naval Shipyard. Visit request shall be submitted via the Joint Personnel Access System (JPAS) and shall include the appropriate contract number for reference. Visit request may be in the form of a letter on company stationary with signature from the company facility security officer, manager or authorized company representative and must include the full name of each person, nationality, birth date, birth place (city, state), Social Security

Number and security clearance level. Written visit requests may be faxed to the Pass and ID office at (207) 438-

2669. Company visit requests shall be submitted annually and as often as necessary to update employees of the company who need continued access to the Shipyard.

Criminal history and/or falsification of information provided by an employee of the company may be subject to denial for unescorted access up to and including general access to the Shipyard. All contractor vehicles are subject to inspection prior to allowing entry onto this installation.

6.1 Installation Access Credentials. Each contractor AMP employee is required to complete a “Request for

Common Access Card (CAC)”. The CAC shall be used for general access onto Portsmouth Naval Shipyard.

Contractor company visitor employees that do not have the Department of Defense (DOD) Common Access Card

(CAC) or Navy Contractor Access Card (NCAC), also referred to as RapidGate, must obtain a daily trip pass for general access to the Shipyard.

6.2 NAVSEA Access Credentials. Each contractor AMP employee and all contractor company visitor employees will be processed for a NAVSEA Standard Access Control Badge (SACB) for entry into these spaces. The

NAVSEA SACB must be properly worn and displayed at all times while in the restricted area.

CLAUSES INCORPORATED BY FULL TEXT

MERCURY CONTROL

Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.

VENDOR ACCESS TO PORTSMOUTH NAVAL SHIPYARD

Vendor access to Portsmouth Naval Shipyard: No person not known to be an American citizen of good standing and repute shall be eligible for access to Portsmouth Naval Shipyard and adjacent areas. Proof of citizenship may be required. Entrance of foreign nationals requires approval.

SAFETY/SECURITY

SAFETY: All representatives who have a need to enter the Controlled Industrial Area, or other areas specifically designated as safety hazardous, should provide themselves with safety head wear to be worn while in the area.

Vendors and/or subcontractors performing work on vendor-owned or government-owned plant facilities and equipment shall ensure that all OSHA safety regulations are followed. Prior to working on the Portsmouth Naval

Shipyard, all vendors shall view the Code 106 safety video.

SECURITY: Commercial vehicles (automobiles) must have conspicuous contractor (company) identification (such as magnetic door-type signs) affixed to the outside of the vehicle if it is to enter the Controlled Industrial Area.

OSHA HEALTH & SAFETY CLAUSE

Vendors preparing specifications, designs or drawings for design, modification or procurement of plant facilities and equipment shall ensure that the appropriate OSHA criteria are included. OSHA regulations must be met except when more stringent Navy requirements apply.

RESTRICTIONS ON USE OF YELLOW MATERIAL

Yellow colored items such as those described below are of special significance within the Shipyard and are subject to strict controls. Accordingly, contractors shall not use yellow or orange-yellow colored materials for the following purposes: protective clothing, hoods, sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding, identification marks on tools, boundary markers, ribbons, vent ducts, etc. Contractor generated yellow colored waste shall be disposed of by the Contractor off-yard. Shipyard refuse containers shall not be used for disposal of yellow colored waste materials. Yellow colored contract generated debris shall be bagged in non-translucent containers, and promptly removed from the Portsmouth Naval Shipyard.

RADIOLOGICAL INDOCTRINATION

All Contractor employees performing work within the Portsmouth Naval Shipyard must view a radiological video.

Contractor employees who are expected to be on the Shipyard for greater than thirty (30) calendar days must attend a one-half hour indoctrination briefing. Attendance at the briefing will be required prior to being issued a permanent

Shipyard badge. The indoctrination briefing will provide radiological fundamentals and information on radiological postings and controls at the Portsmouth Naval Shipyard.

RADIOLOGICAL POSTINGS AND INSTRUCTIONS

Any contractor employee who disregards, alters, moves or otherwise tampers with a radiological posting, or who disobeys a radiological instruction, will not be allowed to continue working at the Portsmouth Naval Shipyard.

SPECIFICATION CHANGES

No changes to specification or other contract technical requirements are allowed without Contracting Officer approval.

SECTION E

INSPECTION AND ACCEPTANCE

Inspection and acceptance of the supplies or services to be furnished hereunder shall be made at destination by the receiving activity. Receiving activity shall execute acceptance certificate on the applicable inspection and receiving report form (DD Form 1155, Standard Form 44, DD form 250, or the Wide Area Workflow (WAWF) receipt and

Acceptance Receiving Report) and the executed payment copy shall be forwarded to the paying office within four

(4) workdays thereafter.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 15-JUL-2015 TO

31-JAN-2016

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

FOB: Destination

N39040

SECTION G

NMCARS 5237.102(90)

"5237.102 Policy. DoD contracting activities awarding or administering contracts shall incorporate the following

Enterprise-wide Contractor Manpower Reporting Application (ECMRA) standard language into all contracts which include services, provided the organization that is receiving or benefiting from the contracted service is a

Department of Defense organization, including reimbursable appropriated funding sources from non-DoD executive agencies where the Defense Component requiring activity is the executive agent for the function performed. The reporting requirement does not apply to situations where a Defense Component is merely a contracting agent for another executive agency. The only contracted services excluded from reporting are construction and utilities. The standard language to be inserted is:

"The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [Commander, Portsmouth Naval Shipyard] via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year

(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

SECTION H

HOLIDAYS

The following holiday and Curtailment days are observed by all Federal Employees at the Portsmouth Naval

Shipyard.

NAME TIME OF OBSERVANCE

New Year's Day 1 January

Martin Luther King Day Third Monday in January

President's Day Third Monday in February

Memorial Day Last Monday in May

Independence Day 4 July

Labor Day First Monday in September

Columbus Day Second Monday in October

Veteran’s Day 11 November

Thanksgiving Day Fourth Thursday in November https://doncmra.nmci.navy.mil/

Christmas Day 25 December

In the event any of the above holidays occur on a Saturday or a Sunday, then such holiday shall be observed by the contractor in accordance with the practice as observed by the assigned Government employees at the using activity.

In the event that the contractor is prevented from performance as the result of an Executive Order or an administrative leave determination applying to the using activity, such time may be charged to the contract as direct cost provided such charges are consistent with the contractor's accounting practices.

Unless stated otherwise in the request for quotation, the contractor shall observe the same holidays as the

Government and, otherwise, shall be open for business Monday through Friday during the performance of this contract. If a different holiday schedule is selected, it shall be the contractor's responsibility to advise the

Government each year in writing thirty (30) days in advance of the occasion to allow for mission adjustments.

INFORMATION ON EXPOSURE TO HAZARDOUS MATERIAL (H7F014)

As required by 29 CFR 1910.1200, The Hazard Communications Standard, the shipyard must inform you (as a contractor employer with employees working in the shipyard) of the hazardous materials used at the Shipyard which your employees may be exposed to while working here and also to suggest appropriate protective measures. This section informs you as required. Your own responsibilities as an employer, if any, are given in 29 CFR 1910.1200.

1. Hazardous materials your employees may be exposed to. Hazardous materials are materials which are cancer causing agents, toxic or highly toxic agents, reproductive toxins, irritants, corrosives, sensitizers, liver toxins, kidney toxins, agents which act on the blood forming system, and agents which damage the lungs, skins, eyes or mucous membranes. There are many potentially hazardous chemicals present at Portsmouth Naval Shipyard which, unless controlled properly, could present a safety and health problem. The presence of many potentially hazardous materials may be apparent from the manufacturer’s warning label on the hazardous material containers. These hazardous materials range in type and quantity. Typical hazardous materials are:

a. Metals, e.g., mercury, lead, chromium

b. Solvents, e.g. , disinfectants, cleaning and polishing compounds and preparations, dopes, thinners, flammable inks

c. Paints and adhesives, e.g., varnishes and related products, sealing compounds, asphalt, deck and floor coverings, deck compounds

d. Corrosives, e.g., acids, alkalis

e. Compressed and liquefied gas, e.g., nitrogen, argon, oxygen, acetylene

f. Lubricants and oils, e.g., greases, cutting oils, hydraulic oils, miscellaneous waxes and fats

g. Fuels, e.g., liquid propellants, fuel oils, oxidizers, solid fuels

h. Particulates, e.g., asbestos fiberglass, dust, fumes, mist

Depending on the material involved, materials such as these can present physical hazards and or health hazards. The presence of many potentially hazardous materials may be apparent due to their physical characteristics, such as the visual appearance of abrasive blasting dust or the distinctive smell of many solvents.

2. Labeling of Hazardous Material. Containers of potentially hazardous chemicals bear manufacturer’s labeling, which identifies the chemical and it manufacturer, and provides appropriate hazard warnings. In addition, some materials may be labeled with the National Protection Association (NFPA) 704 label. This label uses a system of color coded symbols and numbers to convey the potential hazard of the material. The contractor should obtain information from NFPA concerning the interpretation of the 704 label.

3. Material Safety Data Sheets (MSDS). The Occupational Safety and Health Office at the shipyard maintains copies of manufacturers’ Material Safety Data sheets for potentially hazardous chemicals/materials that are known to be present in the shipyard. The contractor may, upon request to the Occupational Safety and Health Office, review

Material Safety Data Sheets for any specific materials to which contractor employees may be exposed while performing work in the shipyard workplace. This information may be reviewed in the Occupational Safety and

Health Office.

4. Appropriate Protective Measures. Exposure to potentially hazardous material may occur from inhalation, ingestion or skin contact with the material: therefore, the following precautions should be taken:

a. Obey signs, directions and warning labels;

b. Do not use unknown or labeled materials;

c. Only operate shipyard equipment that you are authorized to operate, familiar with, and qualified to operate;

d. If any health effects (skin rash, trouble breathing, etc.) occur, which you feel are caused by exposure to shipyard hazardous material, contact Code 106.1.

For specific information on any hazardous material contact Code 106.1, Building 22, phone (207)438-2001, Portsmouth Naval Shipyard, Portsmouth, NH 03801-5000.

LIABILITY INSURANCE LIMITS

Pursuant to the terms of the clause of this contract entitled INSURANCE - LIABILITY TO THIRD PARTIES FAR

52.228-7), following are the kinds and minimum amounts of insurance required:

General liability: bodily injury liability insurance coverage written on the comprehensive form of policy--

$500,000.00 per occurrence.

Automobile liability insurance written on the comprehensive form of policy for bodily injury and property damage liability covering the operation of all automobiles operated in the United States and used in connection with performing the contract--$200,000.00 per person and $500,000.00 per occurrence for bodily injury and $20,000 per occurrence for property damage.

Aircraft public and passenger liability when aircraft are used in connection with performing the contract--

$200,000.00 per person and $500,000.00 per occurrence for bodily injury, other than passenger liability, and

$200,000.00 per occurrence for property damage. Coverage for passenger liability bodily injury shall be

$200,000.00 multiplied by the number of seats or passengers, whichever is greater.

CONTRACTING OFFICER'S REPRESENTATIVE.

The following individual has been appointed as the COR for this contract:

Name and Code: Joyce Racicot, Code 420

Activity: Portsmouth Naval Shipyard

Address: Kittery, ME

Tel: 207-438-6588

a. The COR (and in his absence the ACOR) will act as the Contracting Officer's Representative for technical matters, providing technical direction, discussions as necessary with respect to the specification or statement of work, and monitoring the progress and quality of contractor performance. The COR is not an Administrative

Contracting Officer, and does not have authority to take any action, either directly or indirectly, that would change the pricing, quantity, quality, place of performance, delivery schedule, or any other terms and conditions of the contract or delivery order, or to direct the accomplishment of effort which goes beyond the scope of the statement of work in the contract or delivery order.

b. It is emphasized that only a Contracting Officer has the authority to modify the terms of the resulting contract.

Therefore, in no event will any understanding, agreement, modification, change order or other matter deviating from the terms of the basic contract between the contractor and any other person be effective or binding on the

Government. When/if, in the opinion of the Contractor, the effort is outside the existing scope of the contract or delivery order, the contractor shall notify the Procuring Contracting Officer (PCO) in writing. No action shall be taken by the Contractor under such direction, unless the PCO or ACO has issued a contractual change or otherwise resolved the issue.

c. COR APPROVAL: Prior COR approval is required for the following expenditures, unless specifically called out in a negotiated delivery order:

(l) Any travel outside of the 50-mile radius

(2) Any material acquisition.

CONTRACT ADMINISTRATION PLAN (CAP)

FOR FIXED PRICE CONTRACTS

In order to expedite the administration of this contract, the following delineation of duties is provided. The names, addresses and phone numbers for these offices or individuals are included elsewhere in the contract award document. The office or individual designated as having responsibility should be contacted for any questions, clarifications, or information regarding the administration function assigned.

1. The Procuring Contract Office (PCO) is responsible for:

a. All pre-award duties such as solicitation, negotiation and award of contracts.

b. Any information or questions during the pre-award stage of the procurement.

c. Freedom of Information inquiries.

d. Changes in contract terms and/or conditions.

e. Post award conference.

2. The Contract Administration Office (CAO) is responsible for matters specified in the FAR 42.302 and DFARS

42.302 except those areas otherwise designated as the responsibility of the Contracting Officer's Representative

(COR) or someone else herein.

3. The paying office is responsible for making payment of proper invoices after acceptance is documented.

4. The Contracting Officer's Representative (COR) is responsible for interface with the contractor and performance of duties such as those set forth below. It is emphasized that only the PCO/CAO has the authority to modify the terms of the contract. In no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other person be effective or binding on the Government. If in the opinion of the contractor an effort outside the scope of the contract is requested, the contractor shall promptly notify the PCO in writing. No action may be taken by the contractor unless the PCO or

CAO has issued a contractual change. The COR duties are as follows:

a. Technical Interface (1) The COR is responsible for all Government technical interface concerning the contractor and furnishing technical instructions to the contractor. These instructions may include: technical advice/recommendations/clarifications of specific details relating to technical aspects of contract requirements;

milestones to be met within the general terms of the contract or specific subtasks of the contract; or, any other interface of a technical nature necessary for the contractor to perform the work specified in the contract. The COR is the point of contact through whom the contractor can relay questions and problems of a technical nature to the PCO.

(2) The COR is prohibited from issuing any instruction which would constitute a contractual change. The COR shall not instruct the contractor how to perform. If there is any doubt whether technical instructions contemplated fall within the scope of work, contact the PCO for guidance before transmitting the instructions to the contractor.

b. Contract Surveillance

(1) The COR shall monitor the contractor's performance and progress under the contract. In performing contract surveillance duties, the COR should exercise extreme care to ensure that he/she does not cross the line of personal services. The COR must be able to distinguish between surveillance (which is proper and necessary) and supervision

(which is not permitted). Surveillance becomes supervision when you go beyond enforcing the terms of the contract.

If the contractor is directed to perform the contract services in a specific manner, the line is being crossed. In such a situation, the COR's actions would be equivalent to using the contractor's personnel as if they were government employees and would constitute transforming the contract into one for personal services.

(2) The COR shall monitor contractor performance to see that inefficient or wasteful methods are not being used. If such practices are observed, the COR is responsible for taking reasonable and timely action to alert the contractor and the PCO to the situation.

(3) The COR will take timely action to alert the PCO to any potential performance problems. If performance schedule slippage is detected, the COR should determine the factors causing the delay and report them to the PCO, along with the contractor's proposed actions to eliminate or overcome these factors and recover the slippage. Once a recovery plan has been put in place, the COR is responsible for monitoring the recovery and keeping the PCO advised of progress.

(4) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a Contractor Performance Assessment Report (CPAR) in the CPARS Automated

Information System (AIS). The initial CPAR, under an eligible contract, must reflect evaluation of at least 180 days of contractor performance. The completed CPAR, including contractor comments if any, (NOTE: contractors are allowed 30 days to input their comments) should be available in the CPARS AIS for reviewing official (PCO) review no later than 270 days after start of contract performance. Subsequent CPARs covering any contract option periods should be ready at 1-year intervals thereafter.

c. Invoice Review and Approval/Inspection and Acceptance

(1) The COR is responsible for quality assurance of services performed and acceptance of the services or deliverables. The COR shall expeditiously review copies of the contractor's invoices or vouchers, certificate of performance and all other supporting documentation to determine the reasonableness of the billing. In making this determination, the COR must take into consideration all documentary information available and any information developed from personal observations.

(2) The COR must indicate either complete or partial concurrence with the contractor's invoice/voucher by executing the applicable certificate of performance furnished by the contractor. The COR must be cognizant of the invoicing procedures and prompt payment due dates detailed elsewhere in the contract.

(3) The COR will provide the PCO and the CAO with copies of acceptance documents such as Certificates of

Performance.

(4) The COR shall work with the Contractor to obtain and execute a final invoice no more than 60 days after completion of contract performance. The COR shall ensure that the invoice is clearly marked as a “Final Invoice.”

d. Contract Modifications. The COR is responsible for developing the statement of work for change orders or modifications and for preparing an independent government cost estimate of the effort described in the proposed statement of work.

e. Administrative Duties

(1) The COR shall take appropriate action on technical correspondence pertaining to the contract and for maintaining files on each contract. This includes all modifications, government cost estimates, contractor invoices/vouchers, certificates of performance, DD 250 forms and contractor's status reports.

(2) The COR shall maintain files on all correspondence relating to contractor performance, whether satisfactory or unsatisfactory, and on trip reports for all government personnel visiting the contractor's place of business for the purpose of discussing the contract.

(3) The COR must take prompt action to provide the PCO with any contractor or technical code request for change, deviation or waiver, along with any supporting analysis or other required documentation.

f. Government Furnished Property. When government property is to be furnished to the contractor, the COR will take the necessary steps to insure that it is furnished in a timely fashion and in proper condition for use. The COR will maintain adequate records to ensure that property furnished is returned and/or that material has been consumed in the performance of work.

Enclosure (1)

g. Security. The COR is responsible for ensuring that any applicable security requirements are strictly adhered to.

h. Standards of Conduct. The COR is responsible for reading and complying with all applicable agency standards of conduct and conflict of interest instructions.

i. Written Report/Contract Completion Statement.

(1) The COR is responsible for timely preparation and submission to the PCO, of a written, annual evaluation of the contractors performance. The report shall be submitted within 30 days prior to the exercise of any contract option and 60 days after contract completion. The report shall include a written statement that services were received in accordance with the Contract terms and that the contract is now available for close-out. The report shall also include a statement as to the use made of any deliverables furnished by the contractor.

(2) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a final Contractor Performance Assessment Report (CPAR) in the CPARS with 30 days of contract completion.

(3) The COR is responsible for providing necessary assistance to the Contracting Officer in performing Contract

Close-out in accordance with FAR 4.804, Closeout of Contract Files.

5. The Technical Assistant (TA), if appointed, is responsible for providing routine administration and monitoring assistance to the COR. The TA does not have the authority to provide any technical direction or clarification to the contract. Duties that may be performed by the TA are as follows:

a. Identify contractor deficiencies to the COR.

b. Review contract deliverables, recommend acceptance/rejection, and provide the COR with documentation to support the recommendation.

c. Assist in preparing the final report on contractor performance for the applicable contract in accordance with the format and procedures prescribed by the COR.

d. Identify contract noncompliance with reporting requirements to the COR

e. Review contractor status and progress reports, identify deficiencies to the COR, and provide the COR with recommendations regarding acceptance, rejection, and/or Government technical clarification requests.

f. Review invoices and provide the COR with recommendations to facilitate COR certification of the invoice.

g. Provide the COR with timely input regarding technical clarifications for the statement of work, possible technical direction to provide the contractor, and recommend corrective actions.

h. Provide detailed written reports of any trip, meeting, or conversation to the COR subsequent to any interface between the TA and contractor.

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984

52.204-2 Security Requirements AUG 1996

52.204-7 System for Award Management JUL 2013

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-13 System for Award Management Maintenance JUL 2013

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-2 Prohibition on Contracting with Inverted Domestic

Corporations--Representation

DEC 2014

52.211-15 Defense Priority And Allocation Requirements APR 2008

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.223-11 Ozone-Depleting Substances MAY 2001

52.232-9 Limitation On Withholding Of Payments APR 1984

52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.242-15 Stop-Work Order AUG 1989

52.242-17 Government Delay Of Work APR 1984

52.244-6 Subcontracts for Commercial Items APR 2015

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Alt A System for Award Management Alternate A FEB 2014

252.204-7005 Oral Attestation of Security Responsibilities NOV 2001

252.204-7012 Safeguarding of Unclassified Controlled Technical

Information

NOV 2013

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of

Terrorism

DEC 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013

252.225-7002 Qualifying Country Sources As Subcontractors DEC 2012

252.225-7048 Export-Controlled Items JUN 2013

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.239-7001 Information Assurance Contractor Training and Certification JAN 2008

252.243-7002 Requests for Equitable Adjustment DEC 2012

252.247-7023 Transportation of Supplies by Sea APR 2014

252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2015)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014)

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19

U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41

U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment

Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (July 2013) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L.

111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug, 2013) (31 U.S.C. 6101 note).

X (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41

U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)

(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

X (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (OCT 2014) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

____ (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (OCT 2014) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

X (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business

(EDWOSB) Concerns (July 2013) (15 U.S.C. 637(m)).

____ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the

WOSB Program (July 2013) (15 U.S.C. 637(m)).

X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

X (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2014) (E.O. 3126).

X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

X (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).

X (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212).

X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

X (31) 52.222-37, Employment Reports on Veterans (July 2014) (38 U.S.C. 4212).

X (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

X (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

X (34) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May

2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and

13514).

____ (ii) Alternate I (Jun 2014) of 52.223-13.

____ (37)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (39)(i) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Jun 2014) (E.O.s

13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

X (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____(42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter

83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (43) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013)

(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.

5150).

____ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10

U.S.C. 2307(f)).

____ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X (50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C.

3332).

____ (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July

2013) (31 U.S.C. 3332).

____ (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

X (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

X (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple

Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY

2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658).

_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

_____ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .