N39040-15-T-0176_Solicitation.pdf

PDF 366 KB Posted

Attached to
Temporary Ventilation Rental for Kittery, ME 6/16/15
Solicitation number
N39040-15-T-0176
Issued by

About this file

N39040-15-T-0176 Solicitation

View the file

Other files

File Type Posted
N39040-15-T-0176_-_All_attachments.pdf PDF
15-T-0176_FBO_pre_solicitation_notice_4-14-15.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PORTSMOUTH NAVAL SHIPYARD

CONTRACTING DIVISION, CODE 410

BLDG 153, 6TH FLOOR

KITTERY ME 03904

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

N39040-15-T-0176 15-May-2015

b. TELEPHONE NUMBER

207-438-6819

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 27 May 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

N39040

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE N39040 16. ADMINISTERED BY

PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

TEL: 207-438-5206 FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

EMILY K BATEMAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

532490

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

1 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

N39040-15-T-0176

Section SF 30 - BLOCK 14 CONTINUATION PAGE

SECTION A

Emily Bateman, Code 410 Tel: 207-438-6819 emily.bateman@navy.mil

Shipyard DELIVERY POC: Tel:

Cell:

Alternate Delivery POC: Cell:

Shipyard INVOICE POC: Tel:

Vendor POC: Tel:

Cell:

CORRESPONDENCE:

For mail sent by United States Postal Service, address correspondence to Portsmouth, NH 03801 as shown in the “Issued by” block on page 1.

Correspondence sent by other carriers, e.g. FedEx, UPS, etc., should be addressed to:

Contract Division, code 410 Portsmouth Naval Shipyard Kittery, ME 03904

INVOICING AND PAYMENT INSTRUCTIONS:

For invoices under Wide Area Workflow (WAWF) see clause 252.232-7006 Wide Area WorkFlow Payment Instructions.

Calls inquiring on payments can be made to DFAS – Columbus Customer Service Dept. at 800-756-4571 (option 2 then option 4)

Inquiries can also be made at DFAS MY INVOICE, a web application available at: https://myinvoice.csd.disa.mil/ Registration requires a CAGE code, DUNS number and TIN.

ATTACHMENTS:

Attachment 1 Specifications Attachment 2 CAP Attachment 3 QASP Attachment 4 QASP Matrix

NOTES for Line Item Descriptions:

BASE: These items are required, and funded at the time of contract award.

UNFUNDED: These items are required, and will be funded in the fiscal year in which the POP begins.

OPTION: These items may be needed.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 52 Week V01 - Chiller Module

FFP

Line Item 0001 (BASE): Rental of (V01) Chiller Module (A1 - CHLR [3"CAM]– N), The POP is 06/16/15 to 06/14/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1001.

FOB: Destination

MILSTRIP: N3904015RQ50197

NET AMT

0002 52 Week V02 - Pump

FFP

Line Item 0002 (BASE): Rental of (V02) Pump (B1 - PUMP [3"CAM]–N), The POP is 06/16/15 to 06/14/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

Option to extend via Line Item 1002.

0003 49 Week V03 - Desiccant Dehumidification

FFP

Line Item 0003 (BASE): Rental of (V03) Desiccant Dehumidification Unit (C - DDU [CMBD]–N, Alternative IA), The POP is 06/16/15 to 05/24/16, for 49.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1003.

0004 46 Week V04 - Desiccant Dehumidification

FFP

Line Item 0004 (BASE): Rental of (V04) Desiccant Dehumidification Unit (C - DDU [CMBD]–N, Alternative IA), The POP is 06/30/15 to 05/17/16, for 46.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1004.

0005 46 Week V05 - Desiccant Dehumidification

FFP

Line Item 0005 (BASE): Rental of (V05) Desiccant Dehumidification Unit (C - DDU [CMBD]–N, Alternative IA), The POP is 06/23/15 to 05/10/16, for 46.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0006 10 Week V06 - Desiccant Dehumidification

FFP

Line Item 0006 (UNFUNDED): Rental of (V06) Desiccant Dehumidification Unit (C' - DDU [HTG]–N, Alternative IA), The POP is 10/25/16 to 01/03/17, for 10.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1006.

0007 49 Week V07 - Desiccant Dehumidification

FFP

Line Item 0007 (BASE): Rental of (V07) Desiccant Dehumidification Unit (C1 - DDU [DSCC]–N, Alternative IB), The POP is 06/16/15 to 05/24/16, for 49.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1007.

0008 46 Week V08 - Desiccant Dehumidification

FFP

Line Item 0008 (BASE): Rental of (V08) Desiccant Dehumidification Unit (C1 - DDU [DSCC]–N, Alternative IB), The POP is 06/30/15 to 05/17/16, for 46.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1008.

0009 46 Week V09 - Desiccant Dehumidification

FFP

Line Item 0009 (BASE): Rental of (V09) Desiccant Dehumidification Unit (C1 - DDU [DSCC]–N, Alternative IB), The POP is 06/23/15 to 05/10/16, for 46.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0010 10 Week V10 - Desiccant Dehumidification

FFP

Line Item 0010 (UNFUNDED): Rental of (V10) Desiccant Dehumidification Unit (C1 - DDU [DSCC]–N, Alternative IB), The POP is 10/25/16 to 01/03/17, for 10.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1010.

0011 49 Week V11 - React Heating Coil

FFP

Line Item 0011 (BASE): Rental of (V11) React Heating Coil (C2 - RHC [STM]– N/2M, Alternative IB), The POP is 06/16/15 to 05/24/16, for 49.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1011.

0012 46 Week OPTION V12 - React Heating Coil

FFP

Line Item 0012 (OPTION): Rental of (V12) React Heating Coil (C2 - RHC [STM]–N/2M, Alternative IB), The POP is 06/30/15 to 05/17/16, for 46.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1012.

0013 46 Week V13 - React Heating Coil

FFP

Line Item 0013 (BASE): Rental of (V13) React Heating Coil (C2 - RHC [STM]– N/2M, Alternative IB), The POP is 06/23/15 to 05/10/16, for 46.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0014 34 Week V14 - Heating Coil

FFP

Line Item 0014 (BASE): Rental of (V14) Heating Coil (C3 - HTGC [ELEC]–N, Alternative IB), The POP is 09/29/15 to 05/24/16, for 34.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0015 33 Week V15 - Heating Coil

FFP

Line Item 0015 (BASE): Rental of (V15) Heating Coil (C3 - HTGC [ELEC]–N, Alternative IB), The POP is 09/29/15 to 05/17/16, for 33.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0016 32 Week V16 - Heating Coil

FFP

Line Item 0016 (BASE): Rental of (V16) Heating Coil (C3 - HTGC [ELEC]–N, Alternative IB), The POP is 09/29/15 to 05/10/16, for 32.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0017 10 Week V17 - Heating Coil

FFP

Line Item 0017 (UNFUNDED): Rental of (V17) Heating Coil (C3' - HTGC [ELEC]–N, Alternative IB), The POP is 10/25/16 to 01/03/17, for 10.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1017.

0018 15 Week V18 - Cooling Coil

FFP

Line Item 0018 (BASE): Rental of (V18) Cooling Coil (C4' - CLGC [PRE]–N, Alternative IB), The POP is 06/16/15 to 09/29/15, for 15.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0019 15 Week V19 - Cooling Coil

FFP

Line Item 0019 (BASE): Rental of (V19) Cooling Coil (C4" - CLGC [POST]-N/M, Alternative IB), The POP is 06/16/15 to 09/29/15, for 15.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0020 13 Week V20 - Cooling Coil

FFP

Line Item 0020 (BASE): Rental of (V20) Cooling Coil (C4' - CLGC [PRE]–N, Alternative IB), The POP is 06/30/15 to 09/29/15, for 13.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0021 13 Week V21 - Cooling Coil

FFP

Line Item 0021 (BASE): Rental of (V21) Cooling Coil (C4" - CLGC [POST]-N/M, Alternative IB), The POP is 06/30/15 to 09/29/15, for 13.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0022 14 Week V22 - Cooling Coil

FFP

Line Item 0022 (BASE): Rental of (V22) Cooling Coil (C4' - CLGC [PRE]–N, Alternative IB), The POP is 06/23/15 to 09/29/15, for 14.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0023 14 Week V23 - Cooling Coil

FFP

Line Item 0023 (BASE): Rental of (V23) Cooling Coil (C4" - CLGC [POST]-N/M, Alternative IB), The POP is 06/23/15 to 09/29/15, for 14.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0024 18 Week OPTION V24 - Cooling Coil

FFP

Line Item 0024 (OPTION): Rental of (V24) Cooling Coil (C4' - CLGC [PRE]–N, Alternative IB), The POP is 05/24/16 to 09/27/16, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0025 18 Week OPTION V25 - Cooling Coil

FFP

Line Item 0025 (OPTION): Rental of (V25) Cooling Coil (C4" - CLGC [POST]- N/M, Alternative IB), The POP is 05/24/16 to 09/27/16, for 18.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0026 19 Week OPTION V26 - Cooling Coil

FFP

Line Item 0026 (OPTION): Rental of (V26) Cooling Coil (C4' - CLGC [PRE]–N, Alternative IB), The POP is 05/17/16 to 09/27/16, for 19.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with

0027 19 Week OPTION V27 - Cooling Coil

FFP

Line Item 0027 (OPTION): Rental of (V27) Cooling Coil (C4" - CLGC [POST]- N/M, Alternative IB), The POP is 05/17/16 to 09/27/16, for 19.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in

0028 52 Week V28 - Temperature Conditioning Coil

FFP

Line Item 0028 (BASE): Rental of (V28) Temperature Conditioning Coil (D1 - TCC [H&C]–L, Alternative IIA), The POP is 06/23/15 to 06/21/16, for 52.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1028. [PLEASE

NOTE IF PROVIDING V28 OR V30].

*IF [1 EA] V28 is provided, no additional equipment is required.

*IF [1 PR] V30a&b is provided, then V30c [1 PR] shall be provided.

0029 52 Week V29 - Temperature Conditioning Coil

FFP

Line Item 0029 (BASE): Rental of (V29) Temperature Conditioning Coil (D1 - TCC [H&C]–L, Alternative IIA), The POP is 06/23/15 to 06/21/16, for 52.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1029. [PLEASE

NOTE IF PROVIDING V29 OR V31].

*IF [1 EA] V29 is provided, no additional equipment is required.

*IF [1 PR] V31a&b is provided, then V31c [1 PR] shall be provided.

0030 Week V30 - Temperature Conditioning Coil

FFP

[PLEASE NOTE IF PROVIDING V28 OR V30a/b/c]

0030AA 52 Week V30 - Temperature Conditioning Coil

FFP

Line Item 0030 (BASE): Rental of (V30) Temperature Conditioning Coil (D2 - TCC [H&C]–2N, Alternative IIB), The POP is 06/23/15 to 06/21/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1030.

[PLEASE NOTE IF PROVIDING V28 OR V30].

*IF [1 EA] V28 is provided, no additional equipment is required.

*IF [1 PR] V30a&b is provided, then V30c [1 PR] shall be provided.

**V30 c – Rental of 1 PR of Manifold (MANF [4":3"×2]–L: w/ Fwd TCC–2N), The POP is XXX to XXX, for XX.0 weeks. To be delivered to the Portsmouth Naval Shipyard, Kittery, ME. Equipment is to be provided in accordance with the specifications, at no extra cost.

0030AB 17 Week V30 - Manifold

FFP

Line Item 0030AB (BASE): Rental of (V30) Manifold (G1 - MANF [4":3"×2]–L), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0030AC 24 Week V30 - Manifold

FFP

Line Item 0030AC (UNFUNDED): Rental of (V30) Manifold (G1 - MANF [4":3"×2]–L), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0031 Week V31 - Temperature Conditioning Coil

FFP

[PLEASE NOTE IF PROVIDING V29 OR V31a/b/c].

0031AA 52 Week V31 - Temperature Conditioning Coil

FFP

Line Item 0031 (BASE): Rental of (V31) Temperature Conditioning Coil (D2 - TCC [H&C]–2N, Alternative IIB), The POP is 06/23/15 to 06/21/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1031.

[PLEASE NOTE IF PROVIDING V29 OR V31].

*IF [1 EA] V29 is provided, no additional equipment is required.

*IF [1 PR] V31a&b is provided, then V31c [1 PR] shall be provided.

**V31 c – Rental of 1 PR of Manifold (MANF [4":3"×2]–L: w/ Fwd TCC–2N), The POP is XXX to XXX, for XX.0 weeks. To be delivered to the Portsmouth Naval Shipyard, Kittery, ME. Equipment is to be provided in accordance with the specifications, at no extra cost.

0031AB 17 Week V31 - Manifold

FFP

Line Item 0031AB (BASE): Rental of (V31) Manifold (G1 - MANF [4":3"×2]–L), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0031AC 24 Week V31 - Manifold

FFP

Line Item 0031AC (UNFUNDED): Rental of (V31) Manifold (G1 - MANF [4":3"×2]–L), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0032 47 Week V32 - Air-Handling Unit

FFP

Line Item 0032 (BASE): Rental of (V32) Air-Handling Unit (E1 - AHU [EXH]– N), The POP is 06/30/15 to 05/24/16, for 47.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1032.

0033 45 Week V33 - Air-Handling Unit

FFP

Line Item 0033 (BASE): Rental of (V33) Air-Handling Unit (E1 - AHU [EXH]– N), The POP is 06/30/15 to 05/10/16, for 45.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0034 52 Week V34 - Air-Handling Unit

FFP

Line Item 0034 (BASE): Rental of (V34) Air-Handling Unit (E1 - AHU [EXH]– N), The POP is 06/30/15 to 06/28/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1034.

0035 52 Week V35 - Air-Handling Unit

FFP

Line Item 0035 (BASE): Rental of (V35) Air-Handling Unit (E1 - AHU [EXH]– N), The POP is 06/30/15 to 06/28/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1035.

0036 52 Week V36 - Air-Conditioning Unit

FFP

Line Item 0036 (BASE): Rental of (V36) Air-Conditioning Unit (F1 - ACU [H&C]–L), The POP is 07/21/15 to 07/19/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1036.

0037 22 Week OPTION V37 - Chiller Module

FFP

Line Item 0037 (OPTION): Rental of (V37) Chiller Module (A2 - CHLR [4"CAM]–L), The POP is 04/26/16 to 09/27/16, for 22.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with

0038 22 Week OPTION V38 - Pump

FFP

Line Item 0038 (OPTION): Rental of (V38) Pump (B2 - PUMP [4"CAM]–L), The POP is 04/26/16 to 09/27/16, for 22.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0039 24 Week V39 - Chiller Module

FFP

Line Item 0039 (UNFUNDED): Rental of (V39) Chiller Module (A3 - CHLR [6"CAM]–X), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with

0040 24 Week V40 - Pump

FFP

Line Item 0040 (UNFUNDED): Rental of (V40) Pump (B3 - PUMP [6"CAM]–X), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0041 18 Week V41 - Chiller Module

FFP

Line Item 0041 (BASE): Rental of (V41) Chiller Module (A4 - CHLR [8"FLG]– G), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0042 18 Week V42 - Pump

FFP

Line Item 0042 (BASE): Rental of (V42) Pump (B4 - PUMP [8"FLG]–G), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0043 17 Week V43 - Manifold

FFP

Line Item 0043 (BASE): Rental of (V43) Manifold (G - MANF [4" + 6"]–U, Alternative IIIA), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0044 17 Week V44 - Manifold

FFP

Line Item 0044 (BASE): Rental of (V44) Manifold (G - MANF [4" + 6"]–U, Alternative IIIA), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0045 17 Week V45 - Manifold

FFP

Line Item 0045 (BASE): Rental of (V45) Manifold (G - MANF [4" + 6"]–U, Alternative IIIA), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0046 17 Week V46 - Manifold

FFP

Line Item 0046 (BASE): Rental of (V46) Manifold (G - MANF [4" + 6"]–U, Alternative IIIA), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0047 17 Week V47 - Manifold

FFP

Line Item 0047 (BASE): Rental of (V47) Manifold (G - MANF [4" + 6"]–U, Alternative IIIA), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0048 24 Week V48 - Manifold

FFP

Line Item 0048 (UNFUNDED): Rental of (V48) Manifold (G - MANF [4" + 6"]– U, Alternative IIIA), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0049 24 Week OPTION V49 - Manifold

FFP

Line Item 0049 (OPTION): Rental of (V49) Manifold (G - MANF [4" + 6"]–U, Alternative IIIA), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance

0050 24 Week OPTION V50 - Manifold

FFP

Line Item 0050 (OPTION): Rental of (V50) Manifold (G - MANF [4" + 6"]–U, Alternative IIIA), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance

0051 17 Week V51 - Manifold

FFP

Line Item 0051 (BASE): Rental of (V51) Manifold (G1 - MANF [4":3"×2]–L, Alternative IIIB), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0052 17 Week V52 - Manifold

FFP

Line Item 0052 (BASE): Rental of (V52) Manifold (G1 - MANF [4":3"×2]–L, Alternative IIIB), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0053 17 Week V53 - Manifold

FFP

Line Item 0053 (BASE): Rental of (V53) Manifold (G1 - MANF [4":3"×2]–L, Alternative IIIB), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0054 24 Week OPTION V54 - Manifold

FFP

Line Item 0054 (OPTION): Rental of (V54) Manifold (G1 - MANF [4":3"×2]–L, Alternative IIIB), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance

0055 24 Week OPTION V55 - Manifold

FFP

Line Item 0055 (OPTION): Rental of (V55) Manifold (G1 - MANF [4":3"×2]–L, Alternative IIIB), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance

0056 17 Week V56 - Manifold

FFP

Line Item 0056 (BASE): Rental of (V56) Manifold (G2 - MANF [6":4"×2]–X', Alternative IIIB), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0057 17 Week V57 - Manifold

FFP

Line Item 0057 (BASE): Rental of (V57) Manifold (G3 - MANF [4":6"×2]–X, Alternative IIIB), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0058 17 Week V58 - Manifold

FFP

Line Item 0058 (BASE): Rental of (V58) Manifold (G3 - MANF [4":6"×2]–X, Alternative IIIB), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0059 17 Week V59 - Manifold

FFP

Line Item 0059 (BASE): Rental of (V59) Manifold (G3 - MANF [4":6"×2]–X, Alternative IIIB), The POP is 06/23/15 to 10/20/15, for 17.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0060 24 Week V60 - Manifold

FFP

Line Item 0060 (UNFUNDED): Rental of (V60) Manifold (G3 - MANF [4":6"×2]–X, Alternative IIIB), The POP is 04/19/16 to 10/04/16, for 24.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in

0061 24 Week V61 - Manifold

FFP

Line Item 0061 (UNFUNDED): Rental of (V61) Manifold (G3 - MANF [4":6"×2]–X, Alternative IIIB), The POP is 04/19/16 to 10/04/16, for 24.0 weeks.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in

0062 24 Week OPTION V62 - Manifold

FFP

Line Item 0062 (OPTION): Rental of (V62) Manifold (G3 - MANF [4":6"×2]–X, Alternative IIIB), The POP is 04/19/16 to 10/04/16, for 24.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance

0063 18 Week V63 - Stand Pipe

FFP

Line Item 0063 (BASE): Rental of (V63) Stand Pipe (G4 - SP [6"CAM-FLG]-X), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0064 18 Week V64 - Manifold

FFP

Line Item 0064 (BASE): Rental of (V64) Manifold (G5 - MANF [8":6"×2]-G), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0065 18 Week V65 - Hose

FFP

Line Item 0065 (BASE): Rental of (V65) Hose (H1 - HOSE [4"CAM]–L), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0066 18 Week V66 - Hose

FFP

Line Item 0066 (BASE): Rental of (V66) Hose (H2 - HOSE [6"CAM]–X), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0067 18 Week V67 - Hose

FFP

Line Item 0067 (BASE): Rental of (V67) Hose (H3 - HOSE [6"FLG]–X'), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0068 18 Week V68 - Hose

FFP

Line Item 0068 (BASE): Rental of (V68) Hose (H4 - HOSE [8"FLG]–G), The POP is 06/16/15 to 10/20/15, for 18.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0069 52 Week V69 - Duct Fittings

FFP

Line Item 0069 (ELECTIVE): Rental of (V69) Duct Fittings (J1 - DUCT [FTGS]– G), The POP is 06/23/15 to 06/21/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1069.

0070 52 Week V70 - Flexible Ducting

FFP

Line Item 0070 (ELECTIVE): Rental of (V70) Flexible Ducting (J2 - DUCT [+FLEX]–G), The POP is 06/23/15 to 06/21/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1070.

0071 52 Week V71 - Flexible Ducting

FFP

Line Item 0071 (ELECTIVE): Rental of (V71) Flexible Ducting (J3 - DUCT [- FLEX]–X), The POP is 06/30/15 to 06/28/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1071.

0072 52 Week V72 - Flexible Ducting

FFP

Line Item 0072 (ELECTIVE): Rental of (V72) Flexible Ducting (J4 - DUCT [- FLEX]–N), The POP is 06/30/15 to 06/28/16, for 52.0 weeks. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1072.

0073 1 Job V73 - Emergency Stop

FFP

Line Item 0073 (BASE): Rental of (V73) Emergency Stop (K1 - E-STOP [D&E]– 02), The delivery date is 06/23/15, for 1.0 job. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0074 12 Each V74 - Trouble Call

FFP

Line Item 0074 (BASE): Rental of (V74) Trouble Call (K2 - CALL [=6HR]–16), The POP is 06/16/15 to 06/14/16, for Not to Exceed 12.0 each. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications. Option to extend via Line Item 1074.

0075 2 Each V75 - Scheduled Training

FFP

Line Item 0075 (BASE): Rental of (V75) Scheduled Training (K3 - TRNG [=4HR]–02), The POP is 06/16/15 to 06/14/16, for Not to Exceed 2.0 each.

Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0076 2 Each V76 - Technical Support

FFP

Line Item 0076 (BASE): Rental of (V76) Technical Support (K4 - TECH [=8HR]– 02), The POP is 06/16/15 to 06/15/16, for Not to Exceed 2.0 each. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

0077 1 Job V77 - Equipment Data Sheet

FFP

Line Item 0077 (BASE): Rental of (V77) Equipment Data Sheet (L - EDS [A–F]– 01), The delivery date is 06/16/15, for 1.0 job. Equipment is to be delivered to the Portsmouth Naval Shipyard, in Kittery, ME, in accordance with all specifications.

1001 18 Week V01 Extend - Chiller Module

FFP

Option Line Item 1001 (UNFUNDED): Extension of (V01) Chiller Module (A1 - CHLR [3"CAM]–N), The POP is 06/15/16 to 10/18/16, for 18.0 weeks. Extending equipment on original order; this is not authorization to deliver additional equipment.

1002 18 Week V02 Extend - Pump

FFP

Option Line Item 1002 (UNFUNDED): Extension of (V02) Pump (B1 - PUMP [3"CAM]–N), The POP is 06/15/16 to 10/18/16, for 18.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1003 18 Week OPTION V03 Option - Desiccant Dehumid

FFP

Option Line Item 1003 (OPTION): Extension of (V03) Desiccant Dehumidification Unit (C - DDU [CMBD]–N, Alternative IA), The POP is 05/25/16 to 09/27/16, for 18.0 weeks. Extending equipment on original order; this is not authorization to deliver additional equipment.

1004 19 Week OPTION V04 Option - Desiccant Dehumid

FFP

Option Line Item 1004 (OPTION): Extension of (V04) Desiccant Dehumidification Unit (C - DDU [CMBD]–N, Alternative IA), The POP is 05/18/16 to 09/27/16, for 19.0 weeks. Extending equipment on original order; this

1006 10 Week OPTION V06 Option - Desiccant Dehumid

FFP

Option Line Item 1006 (OPTION): Extension of (V06) Desiccant Dehumidification Unit (C' - DDU [HTG]–N, Alternative IA), The POP is 01/04/17 to 03/14/17, for 10.0 weeks. Extending equipment on original order; this is not authorization to deliver additional equipment.

1007 18 Week OPTION V07 Option - Desiccant Dehumid

FFP

Option Line Item 1007 (OPTION): Extension of (V07) Desiccant Dehumidification Unit (C1 - DDU [DSCC]–N, Alternative IB), The POP is 05/25/16 to 09/27/16, for 18.0 weeks. Extending equipment on original order; this

1008 19 Week OPTION V08 Option - Desiccant Dehumid

FFP

Option Line Item 1008 (OPTION): Extension of (V08) Desiccant Dehumidification Unit (C1 - DDU [DSCC]–N, Alternative IB), The POP is 05/18/16 to 09/27/16, for 19.0 weeks. Extending equipment on original order; this

1010 10 Week OPTION V10 Option - Desiccant Dehumid

FFP

Option Line Item 1010 (OPTION): Extension of (V10) Desiccant Dehumidification Unit (C1 - DDU [DSCC]–N, Alternative IB), The POP is 01/04/17 to 03/14/17, for 10.0 weeks. Extending equipment on original order; this

1011 18 Week OPTION V11 Option - React Heating Coil

FFP

Option Line Item 1011 (OPTION): Extension of (V11) React Heating Coil (C2 - RHC [STM]–N/2M, Alternative IB), The POP is 05/25/16 to 09/27/16, for 18.0 weeks. Extending equipment on original order; this is not authorization to deliver additional equipment.

1012 19 Week OPTION V12 Option - React Heating Coil

FFP

Option Line Item 1012 (OPTION): Extension of (V12) React Heating Coil (C2 - RHC [STM]–N/2M, Alternative IB), The POP is 05/18/16 to 09/27/16, for 19.0 weeks. Extending equipment on original order; this is not authorization to deliver

1017 10 Week OPTION V17 Option - Heating Coil

FFP

Option Line Item 1017 (OPTION): Extension of (V17) Heating Coil (C3' - HTGC [ELEC]–N, Alternative IB), The POP is 01/04/17 to 03/14/17, for 10.0 weeks.

Extending equipment on original order; this is not authorization to deliver

1028 15 Week V28 Extend - Temp Cond Coil

FFP

Option Line Item 1028 (UNFUNDED): Extension of (V28) Temperature Conditioning Coil (D1 - TCC [H&C]–L, Alternative IIA), The POP is 06/22/16 to 10/04/16, for 15.0 weeks. Extending equipment on original order; this is not

1029 15 Week V29 Extend - Temp Cond Coil

FFP

Option Line Item 1029 (UNFUNDED): Extension of (V29) Temperature Conditioning Coil (D1 - TCC [H&C]–L, Alternative IIA), The POP is 06/22/16 to 10/04/16, for 15.0 weeks. Extending equipment on original order; this is not

1030 15 Week V30 Extend - Temp Cond Coil

FFP

Option Line Item 1030 (UNFUNDED): Extension of (V30) Temperature Conditioning Coil (D2 - TCC [H&C]–2N, Alternative IIB), The POP is 06/22/16 to 10/04/16, for 15.0 weeks. Extending equipment on original order; this is not

1031 15 Week V31 Extend - Temp Cond Coil

FFP

Option Line Item 1031 (UNFUNDED): Extension of (V31) Temperature Conditioning Coil (D2 - TCC [H&C]–2N, Alternative IIB), The POP is 06/22/16 to 10/04/16, for 15.0 weeks. Extending equipment on original order; this is not

1032 18 Week OPTION V32 Option - Air-Handling Unit

FFP

Option Line Item 1032 (OPTION): Extension of (V32) Air-Handling Unit (E1 - AHU [EXH]–N), The POP is 05/25/16 to 09/27/16, for 18.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1034 14 Week V34 Extend - Air-Handling Unit

FFP

Option Line Item 1034 (UNFUNDED): Extension of (V34) Air-Handling Unit (E1

- AHU [EXH]–N), The POP is 06/29/16 to 10/04/16, for 14.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1035 14 Week V35 Extend - Air-Handling Unit

FFP

Option Line Item 1035 (UNFUNDED): Extension of (V35) Air-Handling Unit (E1

- AHU [EXH]–N), The POP is 06/29/16 to 10/04/16, for 14.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1036 11 Week OPTION V36 Option - Air-Conditioning Unit

FFP

Option Line Item 1036 (OPTION): Extension of (V36) Air-Conditioning Unit (F1 - ACU [H&C]–L), The POP is 07/20/16 to 10/04/16, for 11.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1069 15 Week OPTION V69 Option - Duct Fittings

FFP

Option Line Item 1069 (ELECTIVE): Extension of (V69) Duct Fittings (J1 - DUCT [FTGS]–G), The POP is 06/22/16 to 10/04/16, for 15.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1070 15 Week OPTION V70 Option - Flexible Ducting

FFP

Option Line Item 1070 (ELECTIVE): Extension of (V70) Flexible Ducting (J2 - DUCT [+FLEX]–G), The POP is 06/22/16 to 10/04/16, for 15.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1071 14 Week OPTION V71 Option - Flexible Ducting

FFP

Option Line Item 1071 (ELECTIVE): Extension of (V71) Flexible Ducting (J3 - DUCT [-FLEX]–X), The POP is 06/29/16 to 10/04/16, for 14.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1072 14 Week OPTION V72 Option - Flexible Ducting

FFP

Option Line Item 1072 (ELECTIVE): Extension of (V72) Flexible Ducting (J4 - DUCT [-FLEX]–N), The POP is 06/29/16 to 10/04/16, for 14.0 weeks. Extending equipment on original order; this is not authorization to deliver additional

1074 4 Each V74 Extend - Trouble Call

FFP

Option Line Item 1074 (UNFUNDED): Extension of (V74) Trouble Call (K2 - CALL [=6HR]–16), The POP is 06/15/16 to 03/14/17, for Not to Exceed 4.0 each.

Extending equipment on original order; this is not authorization to deliver

SECTION C

SPECIFICATION:

See Section J, Attachment 1 for Specifications.

DESCRIPTIONS AND SPECIFICATION

MERCURY CONTROL (SUPPLIES) (C7F600) (C500X)

Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.

VENDOR ACCESS TO PORTSMOUTH NAVAL SHIPYARD (C7F518)

Vendor access to Portsmouth Naval Shipyard: No person not known to be an American citizen of good standing and repute shall be eligible for access to Portsmouth Naval Shipyard and adjacent areas. Proof of citizenship may be required. Entrance of foreign nationals requires approval. (Ref: SECNAVINST 5510.34)

SAFETY/SECURITY (C7F519)

SAFETY: All representatives who have a need to enter the Controlled Industrial Area, or other areas specifically designated as safety hazardous, should provide themselves with safety head wear to be worn while in the area.

Vendors and/or subcontractors performing work on vendor-owned or government-owned plant facilities and equipment shall ensure that all OSHA safety regulations are followed. Prior to working on the Portsmouth Naval Shipyard, all vendors shall view the Code 106 safety video.

SECURITY: Commercial vehicles (automobiles) must have conspicuous contractor (company) identification (such as magnetic door-type signs) affixed to the outside of the vehicle if it is to enter the Controlled Industrial Area.

OSHA HEALTH & SAFETY CLAUSE (C7F520)

Vendors preparing specifications, designs or drawings for design, modification or procurement of plant facilities and equipment shall ensure that the appropriate OSHA criteria are included. OSHA regulations must be met except when more stringent Navy requirements apply.

RESTRICTIONS ON USE OF YELLOW MATERIAL (C7F521)

Yellow colored items such as those described below are of special significance within the Shipyard and are subject to strict controls. Accordingly, contractors shall not use yellow or orange-yellow colored materials for the following purposes: protective clothing, hoods, sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding, identification marks on tools, boundary markers, ribbons, vent ducts, etc. Contractor generated yellow colored waste shall be disposed of by the Contractor off-yard. Shipyard refuse containers shall not be used for disposal of yellow colored waste materials. Yellow colored contract generated debris shall be bagged in non-translucent containers, and promptly removed from the Portsmouth Naval Shipyard.

RADIOLOGICAL INDOCTRINATION (C7F522)

All Contractor employees performing work within the Portsmouth Naval Shipyard must view a radiological video.

Contractor employees who are expected to be on the Shipyard for greater than thirty (30) calendar days must attend a one-half hour indoctrination briefing. Attendance at the briefing will be required prior to being issued a permanent Shipyard badge. The indoctrination briefing will provide radiological fundamentals and information on radiological postings and controls at the Portsmouth Naval Shipyard.

RADIOLOGICAL POSTINGS AND INSTRUCTIONS (C7F523)

Any contractor employee who disregards, alters, moves or otherwise tampers with a radiological posting, or who disobeys a radiological instruction, will not be allowed to continue working at the Portsmouth Naval Shipyard.

REMOVAL OF HAZARDOUS MATERIAL (C7F526)

All contractors, vendors or repair personnel shall be responsible for removal from the Portsmouth Naval Shipyard, any appliances, bulbs, lamps or other devices which they replace that contain hazardous chemicals or materials.

SPECIFICATION CHANGES (C7F528)

No changes to specifications or other contract technical requirements are allowed without Contracting Officer approval.

SECTION D

MARKING OF SHIPMENTS (D4F751)

The contractor shall mark all shipments of military packaged items in accordance with MIL-STD-129 (latest revision) “Marking for Shipment and Storage” and all commercially packaged items in accordance with ASTM-D- 3951 (latest revision) “Standard Practice for Commercial Packaging”.

ALL EXTERIOR CONTAINERS/PACKS SHALL AS A MINIMUM BE MARKED AS FOLLOWS:

1. Applicable National Stock Number (NSN), Federal Stock Number (FSN), Local Stock Number (LSN), or

Part Number, when neither NSN nor FSN or LSN are available.

2, Quantity 3, QA Designator: 4

4. Government Contract or Purchase Order Number (incl. Delivery Order No)

5. From: (Contractor’s Name and Address)

6. To: (Shipment Address)

7. Markings may be applied by any means which provide legibility

8. Additional markings required are stated below:

NONE

PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED ITEMS) (D7F752)

Preservation, packaging and packing shall be in accordance with ASTM Designation D-3951(latest revision), “Standard Practice for Commercial Packaging

SECTION E

INSPECTION AND ACCEPTANCE (DESTINATION) (E7F752)

Inspection and acceptance of the supplies or services to be furnished hereunder shall be made at destination by the receiving activity. Receiving activity shall execute acceptance certificate on the applicable inspection and receiving report form (DD Form 1155, Standard Form 44, DD form 250, or the Wide Area Workflow (WAWF) receipt and Acceptance Receiving Report) and the executed payment copy shall be forwarded to the paying office within four

(4) workdays thereafter.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government

0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 0018 Destination Government Destination Government 0019 Destination Government Destination Government 0020 Destination Government Destination Government 0021 Destination Government Destination Government 0022 Destination Government Destination Government 0023 Destination Government Destination Government 0024 Destination Government Destination Government 0025 Destination Government Destination Government 0026 Destination Government Destination Government 0027 Destination Government Destination Government 0028 Destination Government Destination Government 0029 Destination Government Destination Government 0030 Destination Government Destination Government 0030AA Destination Government Destination Government 0030AB Destination Government Destination Government 0030AC Destination Government Destination Government 0031 Destination Government Destination Government 0031AA Destination Government Destination Government 0031AB Destination Government Destination Government 0031AC Destination Government Destination Government 0032 Destination Government Destination Government 0033 Destination Government Destination Government 0034 Destination Government Destination Government 0035 Destination Government Destination Government 0036 Destination Government Destination Government 0037 Destination Government Destination Government 0038 Destination Government Destination Government 0039 Destination Government Destination Government 0040 Destination Government Destination Government 0041 Destination Government Destination Government 0042 Destination Government Destination Government 0043 Destination Government Destination Government 0044 Destination Government Destination Government 0045 Destination Government Destination Government 0046 Destination Government Destination Government 0047 Destination Government Destination Government 0048 Destination Government Destination Government 0049 Destination Government Destination Government 0050 Destination Government Destination Government 0051 Destination Government Destination Government 0052 Destination Government Destination Government 0053 Destination Government Destination Government 0054 Destination Government Destination Government 0055 Destination Government Destination Government 0056 Destination Government Destination Government 0057 Destination Government Destination Government 0058 Destination Government Destination Government 0059 Destination Government Destination Government 0060 Destination Government Destination Government 0061 Destination Government Destination Government

0062 Destination Government Destination Government 0063 Destination Government Destination Government 0064 Destination Government Destination Government 0065 Destination Government Destination Government 0066 Destination Government Destination Government 0067 Destination Government Destination Government 0068 Destination Government Destination Government 0069 Destination Government Destination Government 0070 Destination Government Destination Government 0071 Destination Government Destination Government 0072 Destination Government Destination Government 0073 Destination Government Destination Government 0074 Destination Government Destination Government 0075 Destination Government Destination Government 0076 Destination Government Destination Government 0077 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1017 Destination Government Destination Government 1028 Destination Government Destination Government 1029 Destination Government Destination Government 1030 Destination Government Destination Government 1031 Destination Government Destination Government 1032 Destination Government Destination Government 1034 Destination Government Destination Government 1035 Destination Government Destination Government 1036 Destination Government Destination Government 1069 Destination Government Destination Government 1070 Destination Government Destination Government 1071 Destination Government Destination Government 1072 Destination Government Destination Government 1074 Destination Government Destination Government

SECTION F

CONSIGNMENT INSTRUCTIONS FOR DELIVERIES TO THE PORTSMOUTH NAVAL

SHIPYARD (F7F500)

Consign Parcel Post shipments to Portsmouth, NH 03801.

Consign all truck shipments, and rail shipments of 10,000 lbs and over to Kittery, Maine via Portsmouth, NH.

Consign Air Shipments to Receiving Officer, Portsmouth Naval Shipyard, Kittery, Maine.

Mark shipping documents “Notify Receiving Officer, Portsmouth Naval Shipyard prior to arrival for delivery instructions. Telephone (207) 438-5521/5206”.

NOTICE: CARRIER’S DRIVERS ENTERING PORTSMOUTH NAVAL SHIPYARD MUST BE UNITED

STATES CITIZENS BY BIRTH OR MUST CARRY EVIDENCE OF NATURALIZATION.

Except by special arrangement, shipments will be received only between the hours of 7:30 AM and 3:00 PM local time, Monday through Friday. (Federal Holidays excepted.)

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 16-JUN-2015 TO

14-JUN-2016

N/A PORTSMOUTH NAVAL SHIPYARD

RECEIVING OFFICER

CODE 501.2 RECEIVING OFFICER

BUILDING 170

KITTERY ME 03904

207-438-5206

N39040

0002 POP 16-JUN-2015 TO

14-JUN-2016

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 16-JUN-2015 TO

24-MAY-2016

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 30-JUN-2015 TO

17-MAY-2016

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 23-JUN-2015 TO

10-MAY-2016

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 25-OCT-2016 TO

03-JAN-2017

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 16-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 30-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 23-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 25-OCT-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 16-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 30-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 23-JUN-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 29-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 29-SEP-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

0016…