N3319124R0031 Attach 6 Safety Checklist.docx
DOCX document 18 KB Posted
- Attached to
- N33191-24-R-0031 Design-Build (D-B) Construct Maintenance Facility and Technical Training Center in Djibouti
- Solicitation number
- N3319124R0031
About this file
This document is an attachment to Solicitation N3319124R0031, which is a design-build contract opportunity for constructing a maintenance facility and technical training center in Djibouti. The attachment outlines the safety requirements for the contractor, including:
The contractor must comply with local safety regulations, or the more stringent U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) if it is not in conflict with local regulations. Within 30 days of contract award, the contractor must provide a safety plan and identify a competent safety employee. The contractor must also provide a full-time, on-site Site Safety and Health Officer (SSHO) who meets specific qualifications. The contractor must monitor subcontractor safety performance and provide all necessary personal protective equipment. The contractor's price must include all safety requirements for the project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6 N33191-24-R-0031
Safety Checklist Form
The contractor shall comply with local safety regulations, unless the U.S. Safety Regulations included in the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) are more strict and not in conflict with the local regulations. In this case, U.S Safety Regulations shall apply. The EM 385-1-1 can be downloaded from the following website: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf
Safety Checklist Requirements
Within 30 days of award of the contract, the contractor will provide a safety plan to monitor personnel performance during construction, and identify one competent employee in accordance with EM 385-1-1 to ensure execution of the safety plan.
The contractor will provide a full-time, on-site Site Safety and Health Officer (SSHO) that meets the requirements of the EM 385 Section 01.A.17, specifically:
- Five (5) years of continuous general industry or construction safety experience in supervising/managing general industry or construction (managing safety programs or processes or conducting hazard analyses and developing controls). Documentation for validation is required within 30 days of contract award.
- Completion of 30-hour OSHA Construction Industry safety class (may be web-based training if the student is able to directly ask questions of the instructor by internet or phone). Documentation for validation and proof of completed training is required within 30 days of contract award.
The contractor will provide a plan to monitor all subcontractor performance during construction if subcontractors will be used. The contractor and subcontractors must also comply with EM 385-1-1.
The contractor shall provide all necessary and required Personal Protective Equipment (PPE), which shall be used as required by the specific risk.
Steel toed shoes
Helmets
Vests and gloves
Eye and ear protection
Shoring for excavation, as needed
The use of helmets or "hard hats" is absolutely required for all personnel entering the job site. In addition the contractor shall have a minimum of 5 new hard hats to be used by any authorized visitor to the job site.
The contractor's price shall include the cost for any and all safety requirements for this project.
As a certified agent of this Company, I acknowledge and agree to the safety factor requirements.
Company Name:
Contractor's Printed Name:
Contractor's Signature:
Date: