N3319123R4015 Range Tunisia Attach 1 - PTS.pdf

PDF 7 MB Posted

Attached to
D-B Construct Range Control Facility, Ben Ghilouf, Tunisia Federal contract opportunity
Solicitation number
N3319123R4015
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is a request for proposal for a design-build contract to construct a range control facility in Ben Ghilouf, Tunisia. The scope of work includes designing and building a range operations center, covered training area, improvements to existing viewing stands, new public toilet facilities, a septic system, trailer pads with utilities, and a tactical parking area. The contract is awarded by the Naval Facilities Engineering Command on behalf of the US Embassy Office of Security Cooperation in Tunisia. The contractor will be responsible for both design and construction in compliance with Tunisian codes and regulations. The contractor must submit design packages at conceptual, pre-final, and final stages for approval. The period of performance is 730 calendar days. The contract includes a base bid and three bid options for an overwatch tower, helipad, and electrical grid connection. The contractor must meet administrative, safety, quality control, and closeout requirements and obtain necessary permits.

View the file

Other files for this federal contract opportunity

Other files attached to D-B Construct Range Control Facility, Ben Ghilouf, Tunisia, newest first.
File Type Posted
N3319123R4015 Range Tunisia Attach 5 - 252.229-7001.docx DOCX document
N3319123R4015 Range Tunisia Attach 6 - Data Sheet.docx DOCX document
N3319123R4015 Range Tunisia RFP.pdf PDF
N3319123R4015 Range Tunisia Attach 2 - PPI.docx DOCX document
N3319123R4015 Range Tunisia Attach 7 - Safety Checklist.docx DOCX document
N3319123R4015 Range Tunisia Attach 8 - PPQ.docx DOCX document
N3319123R4015 Range Tunisia Attach 3 - Price Schedule.doc DOC document
N3319123R4015 Range Tunisia Attach 4 - 252.225-7059.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tunisia Institutional Training Capacity Phase II Case 333 – Range Control and Simulator Facility Ben Ghilouf, Tunisia

WON: 1702432

WORK ORDER NO. 1702432

Request For Proposal (RFP) Design-Build

‘Scope of Work’

PROJECT TITLE: Tunisia Institutional Training Capacity Phase II Case 333 – Range Control and Simulator

Facility

At

Ben Ghilouf, Tunisia

FINAL

April 28th, 2023

PREPARED BY:

NAVFAC EURAFCENT

Expeditionary Business Line (EXBL)

Viale Porto 51 Aeroporto Capodichino 80144, Napoli, IT

Project Manager: Morgan Danner, R.A.

Engineer: Fredelix Menez, P.E.

APPROVED BY:

NAVFAC EURAFCENT EXBL: Alexander Dodge, R.A.

Review Date: April 26, 2023

Ben Ghilouf, Tunisia

Table of Contents

1. PROJECT OVERVIEW

1.1 PROJECT LOCATION

1.2 DESIGN-BUILD CONTRACT

1.2.1 Acronyms

1.2.2 Design Phase

1.2.2 Construction Phase

1.3 DESCRIPTION OF BASE-BID AND BID OPTIONS

1.3.1 Summary of Base-Bid

1.3.2 Summary of Bid Option 1

1.3.3 Summary of Bid Option 2

1.3.4 Summary of Bid Option 3

2. GENERAL SCOPE OF WORK

2.1. GENERAL DEMOLITION SCOPE OF WORK

2.2. GENERAL SITE/CIVIL SCOPE OF WORK

2.3. GENERAL STRUCTURAL SCOPE OF WORK

2.4. GENERAL ARCHITECTURAL SCOPE OF WORK

2.5. GENERAL MECHANICAL SCOPE OF WORK

2.6. GENERAL PLUMBING SCOPE OF WORK

2.7. GENERAL ELECTRICAL SCOPE OF WORK

3. DETAILED SCOPE OF WORK

3.1. DETAILED SITE/CIVIL SCOPE OF WORK

3.1.1. Topographic Survey

3.1.2. Geotechnical Report

3.1.3. Clearing and Grubbing

3.1.4. Grading and Compaction

3.1.5. Site Drainage & Stormwater Runoff

3.1.6. Utilities

3.1.7. Construction Contractor’s Laydown Area

3.1.8. Permits

3.1.9. Environmental

3.1.10. Tactical Parking and Staging Area

3.1.11. Existing Conditions and Interference with Construction

Ben Ghilouf, Tunisia

WON: 1702432

3.2. DETAILED STRUCTURAL SCOPE OF WORK

3.2.1. Facility Foundations and Floor Slabs

3.2.2. Building Structural System

3.3. DETAILED ARCHITECTURAL SCOPE OF WORK

3.3.1. Floor Plan

3.3.2. Thermal Facade

3.3.3. Roof System (sandwich panels)

3.3.4. Windows

3.3.5. Interior Doors

3.3.6. Exterior Doors

3.3.7. Ceilings

3.3.8. Flooring

3.3.8. Walls

3.3.9. Fixed Furniture and Equipment

3.3.10. Commemorative Plaque

3.4. DETAILED MECHANICAL SCOPE OF WORK

3.4. Ventilation System

3.5. DETAILED PLUMBING SCOPE OF WORK

3.5.1. Domestic Water Service

3.5.2. Sanitary Sewer Service

3.5.3. Bathroom Requirements

3.6. DETAILED ELECTRICAL SCOPE OF WORK

3.6.1. Electrical Service Connection

3.6.2. Interior Lighting

3.6.3. Exterior Lighting

3.6.4. Electrical Distribution

3.6.5. Fire Alarm System

4. BID OPTIONS

4.1. BID OPTION 1: Overwatch Tower

4.2. BID OPTION 2: Helipad

4.3. BID OPTION 3: Electrical Point of Connection

5. ADMINISTRATIVE REQUIREMENTS

5.1. TAXATION

5.2. LEGAL AND ADMINISTRATIVE REQUIREMENTS

Ben Ghilouf, Tunisia

WON: 1702432

5.2.1 Contract Compliance

5.2.2 Responsibility for Fees

5.2.3 Requirement for Third-Party Services

5.2.4 Period of Performance (730 calendar days)

5.3 OMISSIONS FROM SPECIFICATIONS

5.4 AUTHORITY TO MAKE CONTRACT CHANGES

5.5 MEASUREMENTS AND QUANTITES

5.5.1. Assumptions of Site Conditions

5.6 SCHEDULE OF PRICES

5.7 PAYMENT

5.8 SAFETY REQUIREMENTS

5.8.1 Safety Regulations

5.8.2 Accident Prevention Plan

5.8.3 Tunisian Safety Requirements

5.8.4 Additional Safety Requirements

5.8.5 Scaffolding, Manlifts, and Fall Protection

5.9 CONSTRUCTION SIGN

5.10 QUALITY CONTROL PLAN

5.11 CONTRACT CLOSE-OUT REQUIREMENTS

5.11.1 Contract Close-Out Procedures

5.11.2 Warranties

5.11.3 Training and Operations and Maintenance (O&M) Manuals

5.11.4 Cleaning

5.11.5 Damage to Existing Site & Facilities

5.11.6 Spare Parts and Materials

Attachment 1: Quality Control Plan

Attachment 2: Concept Site Plan

Attachment 3: Concept Drawings

Ben Ghilouf, Tunisia

1. PROJECT OVERVIEW

This Project includes the Design-Build of a military compound to provide a Range Control and Simulator Facility to the Ben Ghilouf Training Area, Tunisia for the Tunisian Army under the Ministry of Defense (MOD) and US Army (under SETAF-AF) partnership exercises. The Contractor shall provide all services necessary to provide a complete and usable facility and staging area, with a maximum period of performance of 730 calendar days after award of the contract. Contract is executed by Naval Facilities Engineering Command (NAVFAC) through the Building Partner Capacity 333 (BPC 333) Defense Security Cooperation Agency program, on behalf of the US Embassy Office of Security Cooperation, Tunisia.

1.1 PROJECT LOCATION

The project site is located on a Tunisian Military facility, approximately 5.5km near the city of Ben Ghilouf, close to Gabes. The figures below provide detailed location information. GPS coordinates are:

N 33.873807, E 9.557308

Note: The Contractor shall conduct a pre-bid site visit to verify existing conditions prior to submission of their offer to the US Government. The Contractor may consult with the Tunisian Ministry of Defense if additional information concerning site conditions are required. The Contractor shall coordinate their site visit and any request for information regarding site conditions with the NAVFAC Project Manager (PM) or other representative from the United States Office of Security Cooperation in Tunis:

NAVFAC PM: Morgan Danner morgan.b.danner.civ@us.navy.mil NAVFAC Civil Engineer: Fredelix Menez fredelix.o.menez.civ@us.navy.mil NAVAF LNO Tunisia: LTJG Jonathan Peck PeckJ@state.gov

Country Location mailto:morgan.b.danner.civ@us.navy.mil mailto:fredelix.o.menez.civ@us.navy.mil mailto:PeckJ@state.gov

Ben Ghilouf, Tunisia

General Site Location in relation to Ben Ghilouf city

Detailed Site Location

Ben Ghilouf, Tunisia

WON: 1702432

1.2 DESIGN-BUILD CONTRACT

The method of completion for this project is Design-Build. The Contractor is responsible for both the design and construction of the facility. The US Government shall only provide conceptual plans, general specifications, and requirements as outlined in this Request for Proposal (RFP) and Scope of Work (SOW). The Design-Build project includes two phases: Design and Construction. Contractor is responsible for all permits associated with proceeding from the design phase to the construction phase and all associated coordination with local authorities and agencies.

1.2.1 Acronyms

NAVFAC Contracting Officer (KO) = official contract authority on contract award document

NAVFAC Contracting Officer Representative (COR) = acts on behalf of the KO to represent the government and support technical decisions on scope, design, engineering, and construction.

Final contract authority is routed from the COR to the KO for official implementation. NAVFAC COR is dual hatted as the NAVFAC Project Manager (PM).

Contractor (KTR) = contracted company awarded this scope of work for execution

Designer of Record (DOR) = works for or with the Contractor to produce the required design phase documents and is the authority for the design to be properly stamped and signed for permit by local authorities

1.2.2 Design Phase

The Contractor shall provide a complete design prepared in compliance with applicable architectural, engineering, planning and construction codes of Tunisia and the local municipality. The Contractor shall utilize services of architects and engineers licensed to practice in Tunisia to act as the Designer of Record (DOR). The Contractor and any Subcontractors employed by the Contractor must be licensed and certified to practice in Tunisia.

The US Government shall only provide conceptual plans, requirements, and specifications as detailed in this document. The Contractor shall develop a design that meets all requirements and specifications contained in this Scope of Work.

In addition to meeting the requirements detailed in this document, the Contractor shall incorporate all design requirements necessary to meet laws, regulations, and codes of Tunisia and the local municipality.

The Contractor shall provide to the US Government not less than three (3) design submissions:

Conceptual Design: The Contractor shall prepare a conceptual design that details an approximate 35% solution to the facility design. This conceptual design shall include all necessary detail to show a feasible design that meets the requirements of the contract. The Contractor shall coordinate with the Beneficiary and NAVFAC Contracting Officer Representative “COR” (note that the NAVFAC COR and the NAVFAC PM for this contract are the same person, from here on the use of NAVFAC COR will be used for duties applicable to that role) to ensure that all user and contractual requirements are met. The Conceptual design should at minimum contain details for:

Ben Ghilouf, Tunisia

WON: 1702432

- Site design

- Conceptual site grading plan

- Architectural floorplans of each facility

- Architectural elevations, including window and door locations of each facility

- Conceptual structural plan

- Conceptual mechanical plan

- Conceptual electrical plan

The NAVFAC COR will accept the Conceptual Design.

Pre-Final Design: The Contractor shall prepare a pre-final design that represents a 95% solution to the facility design. This design shall include everything necessary for the Contractor to submit the design to the relevant Government authorities. The Pre-final design should contain:

- Detailed Site Plan

- Detailed Civil Plan, including grading, drainage, water and sewer plans

- Detailed Architectural floorplans of each facility

- Detailed Architectural Elevations of each facility

- Detailed Architectural Sections of each facility

- Detailed Roof Plan, including drainage features (gutters and downspouts)

- Detailed Structural Plan, including foundation and building structural plans

- Detailed Mechanical Plan (Ventilation, Fans, Air Conditioning)

- Detailed Plumbing Plan

- Detailed Electrical Power Plan

- Detailed Lighting Plan

- Detailed Equipment Plan (if applicable)

The Pre-Final Design shall be submitted to the NAVFAC COR to ensure that the contractual design requirements have been met.

The NAVFAC Contracting Officer Representative’s (NAVFAC Project Manager) approval of the Pre-Final Design does not constitute authority to begin construction work.

Final Design: The Contractor shall prepare a Final, 100% design package. The Contractor shall submit the Final Design Package to the relevant Government of Tunisia Authorities for approval.

Once approved by the relevant Government of Tunisia, the Contractor shall provide to the NAVFAC COR a copy of the Final Design. The Final Design shall be submitted with a copy of the original approval documentation provided by the relevant Tunisian Government Authority.

The NAVFAC Contracting Officer (KO) shall only accept the final design with the required approval documentation to issue a “Notice-to-Proceed” (NTP) to Construction.

1.2.2 Construction Phase

The Contractor is responsible for acquiring all necessary approvals and permits from the competent Tunisian authorities, as required by Tunisian Law. The NAVFAC KO & COR shall issue a Notice-to- Proceed, authorizing the Contractor to begin construction works. The Notice-to-Proceed shall only be issued once the Contractor provides a copy of the construction permit and other approval documentation required by the relevant Tunisian authorities.

Ben Ghilouf, Tunisia

WON: 1702432

All work required under this contract shall meet the laws, regulations, and codes of the Government of Tunisia. The US Government shall not be responsible for authorizing nor approving any construction works.

The Contractor shall coordinate all construction works with the local Tunisia Ministry of Defense Beneficiary. The construction site is located on a Tunisian Military Installation. The Contractor shall comply with specific restrictions regarding construction on the Tunisian Military site.

1.3 DESCRIPTION OF BASE-BID AND BID OPTIONS

This Design-Build Contract is separated into a Base-Bid and three (3) Bid Options. The Contractor shall submit separate pricing for the Base-Bid and each Bid Option. The Scope of Work requirements for the base-bid are listed in Section 2 and Section 3 of this Performance Technical Specification. The Scope of Work requirements for each Bid Option are listed in Section 4.

The award of Contract Bid Options depends on availability of funds, as well as other factors that the US Government will unilaterally consider. Below is a figure showing the locations of the various components described in the Scope of Work.

Concept Site Plan of proposed facilities in project (See Attachment 02).

Ben Ghilouf, Tunisia

WON: 1702432

1.3.1 Summary of Base-Bid

The Base-Bid includes the minimum requirements to construct a Range Control facility, including a Range Operations Center, Covered Training Area, improvements to existing viewing stands, Public Toilets/latrines, sanitary septic system, trailer pads with utility and generator connections, and tactical parking and staging area. Overall facility descriptions and sizes are as follows:

*Note: Square Meters referenced as “SM” or “m2 “, Square Yards as “SY,” Square Feet as “SF,” Feet as

“FT.”

1. Range Operations Center 163 SM (1,758 SF) o Single story, concrete slab and concrete walls, flat roof capable of supporting observation by of the range and hold antenna installation o Lighting, Power, and AC (split units)

2. Covered Training Area o Canopy- new canopy (300 SM) o Roof with concrete walls up to half height to enclose 3 sides to protect against wind and heat o Support 250 personnel o Must contain a terrain model table for mission planning o Concrete bleachers for fixed seating for 250 people o Terrain Model Training Area- open space with compacted and graded site to support 300- 500 people o Uncovered, size pending on space remaining and available next to canopy

3. Improvements to the Existing Viewing Stands- provide concrete and metal repairs, plaster finish, paint, and cleaning to existing viewing stands. Provide concrete and metal repairs, clean, and paint associated railings at viewing stands and stairs leading to and from. Provide repairs, clean, and paint existing viewing stand canopy.

4. Public Toilets (Latrines) and Supporting Systems o Demo existing Water Closet Facility and add new water closet facility 130 SM (1,392 SF)

Provide 15 new toilets, and 15 new sinks (30 fixtures in total) Fixtures to be separated for unisex use, standard European toilet to be used o Sanitary Septic System- septic tank and drain field facility provides sewage treatment for human waste at isolated facilities where an extension of the central sewer collection system would not be economically feasible. The planning of a septic tank and drain field will include a concrete or protected steel tank and a drain field system including headers, laterals, open joint clay or concrete pipe, gravel, ditching, and land acquisition.

The primary unit of measure is tank capacity in gallons per day (GA).

Septic system tank to be 28.3 CM (1,000 CF assume 7.5 gallons of water per each CF, using a 75,000 gallon cast in place concrete septic tank) Drain field to be 232 SM (2,500 SF assume poor soils requiring 1.2 SF per gallon of effluent) o Cistern Tank 49,967 liters (13,200 gallons) supplement existing 10,000 liter tank located near existing latrines Water will be non-potable (future project to construct a well and water treatment facility on-site)

Ben Ghilouf, Tunisia

WON: 1702432

5. Trailer Pad with Utility Connections 90.5 SM (108 SY) o Concrete pad constructed to support a temporary facility or trailer. Utility connections are part of the trailer pad requirements and allow temporary facilities (often Class 3 property) to be easily installed o Support generators o Support electrical equipment o Include enclosed structure for electrical utility termination points and required transformers, allow for space to provide panel connections that will connect the electrical from point of provider to each facility electrical panel o Include enclosure for water utility connections to control water to and from cistern to latrines, and future connection area for a water supply well

6. Tactical Parking/Staging Area 4,000 SM (4,784 SY) o Open space with compacted and graded site to support parking and staging of tactical vehicles

1.3.2 Summary of Bid Option 1

Contract Bid Option #1 includes: Overwatch Tower located near the existing Range Tower and intent is to replace the existing tower with the following size:

- 12.25 M (40 FT) tall

1.3.3 Summary of Bid Option 2

Contract Bid Option #2 includes: Helipad for Emergency Medical Evacuation with the following size:

- 30.5 M x 30.5 M (929 SM)

1.3.4 Summary of Bid Option 3

Contract Bid Option #3 includes: Electrical point of connection to the grid at the city center of Ben Ghilouf, approximately 3km away. Contractor to coordinate with local utility authority to bring the electrical power source to the site and connect the electrical point of connection at the Trailer Pad with Utility connection for use at the site. Electrical point of connection to have proper transformers, switches, switch gear, electrical panels, and electrical meters per Tunisian codes and criteria.

2. GENERAL SCOPE OF WORK

This project includes the design and construction of military facilities and areas at the Ben Ghilouf Training Area, Tunisia. Scope of work includes the previously mentioned facilities, supporting infrastructure, and site work. The purpose of the facilities are to provide the Tunisia Ministry of Defense a strategic training area that can accommodate partner nations for exercises in Army missions. The facilities will provide modern buildings that accommodate more advance user groups and an increase in number of personnel on site.

Type of work in the Range Operations Center facility includes but is not limited to; classroom training, briefs, operational planning, operational offices, area for duty personnel to bunk, area for exercise related personnel to have a break space, area for personnel to escape heat for collaboration and office

Ben Ghilouf, Tunisia

WON: 1702432

type of work. As such, the facility shall be constructed to provide adequate space, functionality and support equipment to accomplish necessary operations. Personnel will use the latrine facility rather than have bathrooms located within the Range Operation Center.

The purpose of the Covered Training Area is to provide an exterior area where a terrain model can be viewed by a large group of military personnel and exercises can be taught and briefed protected from weather. Yet, remain adjacent to the training exterior space to be able to view and observe tactical operations. As such, the facility shall be constructed to provide adequate space, functionality and support equipment to accomplish necessary operations.

2.1. GENERAL DEMOLITION SCOPE OF WORK

Demolition shall include removal of all debris and waste from the site. Removal of existing safety hazards (i.e. debris concrete, rebar, dilapidated parts or pieces of structures, pieces of structures fallen or dislodged by weather). In addition, demolition shall include the removal of any structural overhead roofs deemed unsafe or could potentially fall. Demolition to include the removal of the existing latrine facility to accommodate the new latrine facility. Demolition shall include the removal of the existing Overwatch tower after completed construction of the new Overwatch tower, if Bid Option #1 is awarded with the base bid.

2.2. GENERAL SITE/CIVIL SCOPE OF WORK

The Site/Civil work for this project includes the clearing and grubbing of the areas where the new facilities will be located, areas where existing facilities will be improved, and adjacent areas as described in this document. All required site/civil work must be completed in order to have fully operational facilities. All grading shall be done to facilitate storm water flow away from each facility and promote proper drainage throughout the site. Civil work also includes extending the necessary utilities (power, drainage, water, sewer, etc.) to make each facility complete and usable. Civil work, including grading, will be required for the improvements defined in Section 1.3.

2.3. GENERAL STRUCTURAL SCOPE OF WORK

The Structural work for this project includes providing a building structural system that meets all Tunisian code requirements, considers seismic criteria and local soil conditions, all dead and live loads including rain and wind loads, and is designed to meet specific requirements related to the floor slab, high-bay clear spans at canopies, equipment weights at concrete pads, and vehicle weights at staging areas.

2.4. GENERAL ARCHITECTURAL SCOPE OF WORK

The Architectural work for this project includes providing a functional facility that meets administrative requirements and the unique requirements of the Range Operations Center and Covered Training Area.

Architectural considerations should include adequate space planning, providing doors and windows to allow for efficient movement through the facility and to maximize daylighting, providing efficient interior wall configuration, and appropriate roofing designs at Range Operations Center and the Covered Training Area.

The Interiors work for this project includes both Structural Interior Design and Fixed Furniture and Equipment. Provide finishes as specified for walls, ceilings, and floors. Provide interior finishes for the

Ben Ghilouf, Tunisia

WON: 1702432

Range Operations Center breakroom inclusive of a kitchenette, sink with backsplash, and lunch counter.

Provide interior finishes for the Latrines inclusive of wall mounted sinks, sink mirrors, bathroom partitions, and toilet accessories. The Contractor shall also install permanent affixed furniture as required at the Range Operations Center administrative spaces.

2.5. GENERAL MECHANICAL SCOPE OF WORK

The Mechanical work for this project includes providing a cooling and ventilation system to provide adequate cooling during the summer season for the Range Operations Center. Passive ventilation with the use of ceiling fans, and ventilation exhaust shall be provided at the Latrines. Mechanical work also includes providing passive ventilation with the use of overhead large fans at the Covered Training Area.

2.6. GENERAL PLUMBING SCOPE OF WORK

The Plumbing work for this project includes providing a new cistern at the Latrines connected to a domestic hot and cold water service to provide domestic water at the Latrines and the Range Operations Center breakroom. Sanitary sewer system shall be connected to the Latrine facility and the Range Operations Center breakroom drains and to the septic system. Water system shall include a Grey Water system or a system that reuses water cleans and places it back to the cistern to reduce water consumption on site. Water on site is non-potable. All fixtures to be low flow, energy saving, water saving fixtures. Providing domestic hot and cold water service and a sanitary sewer system to the Range Operations Center breakroom and the Latrines. Storm drainage is required.

2.7. GENERAL ELECTRICAL SCOPE OF WORK

The Electric work for this project includes providing service and distribution equipment, wiring, receptacles and grounding, interior and exterior lighting and controls, emergency lighting, telephone and network access, and fire alarm system (only at the Range Operations Center). Providing electrical service for the breakroom appliances in the Range Operations Center for a refrigerator, microwave, and coffee machine. Consideration shall be given to providing adequate power for equipment to be installed at the Trailer Pad. Consideration shall be given to provide energy saving equipment and appliances, low consumption electrical equipment, and potential for alternative energy sources to reduce electrical demand, i.e. Solar Power.

Ben Ghilouf, Tunisia

WON: 1702432

3. DETAILED SCOPE OF WORK

3.1. DETAILED SITE/CIVIL SCOPE OF WORK

The Site/Civil work for this project includes all activities required to prepare the site for work associated with the project, but is not limited to, the following activities in order to ensure that the new and upgraded facilities are complete and functional.

Prior to starting work, physically verify the location of all existing utilities and obtain additional survey data required to provide a quality final design. Include the topographic survey as needed in all design submittals. Verify the location of all utilities prior to construction.

Minimize the impact of construction activity of operations and neighboring facilities. Identify and obtain permits to comply with host nation regulatory requirements associated with the work. Determine correct permit fees and pay said fees. Perform work in accordance with the obtained permits.

Coordinate and obtain the NAVFAC COR's approval for proposed haul route(s), work site access point(s), employee parking location(s) and material laydown and storage area(s). Refer to Site Analysis for additional site preparation functional program information.

3.1.1. Topographic Survey

It is not anticipated that the Contractor will need to conduct a full topographic survey of the site.

However, the Contractor is responsible for conducting a survey as necessary to assist with the design and construction of the project. Prior to starting work

3.1.2. Geotechnical Report

The Contractor shall conduct subsurface soils exploration, investigation, testing and analysis for the design and construction of the site improvements.

The Contractor-provided Geotechnical Engineer is required to be experienced with soil conditions in the region where the project site is located. The Geotechnical Engineer is required to evaluate the RFP data, obtain and evaluate additional data to support the design and construction, and prepare a Geotechnical Report.

Work done by the Geotechnical Engineer shall be coordinated with the NAVFAC COR so as not to interfere with normal base operations. A minimum of two weeks prior to the Foundation Work Design submittal, provide the Contractor’s Geotechnical Report (searchable Adobe Acrobat PDF version). The report will become the property of the Government. Provide the geotechnical reports generated during construction, such as pile driving results and analysis, to the NAVFAC COR (searchable PDF version).

The Geotechnical Report shall include, but not be limited to, the following:

- Project site description, vicinity map and site map indicating the location of borings and any other sampling locations. Provide notes on any groundwater observations. If groundwater is anticipated or observed, conduct 24-hour groundwater observations for at least 20 percent of the borings.

Ben Ghilouf, Tunisia

WON: 1702432

- Results of field and laboratory testing. Address existing subsurface conditions, selection and design of the foundation and floor slab, underground construction including utility installation and other site specific requirements (such as soil stabilization and slope stability).

- Engineering analysis, discussion and recommendations addressing:

o Settlement analysis o Bearing capacity analysis o Foundation selection (shallow, deep, special) and construction considerations;

dimensions and installation procedures o Site preparation (earthwork procedures and equipment, compaction requirements, building slab preparation, soil sensitivity to weather and equipment, groundwater influence on construction, mitigation of expansive soils or liquefaction potential, and dewatering requirements).

o Sheeting and shoring considerations.

o Pavement design calculations with parameters defined, actual or assumed, and recommended thicknesses and materials.

o Infiltration rate.

o Haul routes and stockpile locations for earthwork.

o Calculations to support conclusions and recommendations.

o Present recommendations on a structure-by-structure basis.

A registered Geotechnical Engineer is required to sign the Geotechnical Report. Accompany the submitted report with a cover letter identifying any report recommendations proposed to be adopted into the design which are interpreted by the Contractor as a changed condition to Geotechnical or Pavement related requirements of the RFP.

The Contractor's final design drawings must include any relevant information presented in the RFP, as well as additional borings and laboratory test result data performed by the Contractor. The data provided is required to include:

- Logs of Borings and related summary of laboratory test results and groundwater observations. Provide 24-hour groundwater observations for at least 20 percent of the borings, minimum one boring. Provide notes explaining any abbreviations or symbols used and describing any special site preparation requirements.

- Indicate the locations of borings on the drawings. Revise the design drawings to reference the Contractor’s Geotechnical Report as being a basis for design.

Ben Ghilouf, Tunisia

WON: 1702432

3.1.3. Clearing and Grubbing

The Contractor shall clear and grub the site for project construction. Vegetation on the project site to be removed as part of clearing and grubbing will become the property of the Contractor and must be disposed off-site.

Clear trees, shrubs, brush, and vegetation for construction of the project. Clearing includes the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared.

Preserve and protect trees, shrubs and vegetation not directly impacted by the construction.

Remove and dispose of trees to a depth of at least 18 inches (450 mm) below ground surface. Fill depressions with satisfactory material and compact. Mound fill 2 inches (50 mm) above adjacent surface to allow for settling when not part of a subbase.

Remove stumps to a depth of at least 18 inches (450 mm) below ground surface. Fill depressions with satisfactory material and compact. Mound fill 2 inches (50 mm) above adjacent surface to allow for settling when not part of a subbase.

Within the clearing limits, remove and dispose of logs, shrubs, brush, matted roots, roots larger than 2 inches (50 mm) in diameter, and other debris to a depth of at least 18 inches (450 mm) below ground surface. Fill depressions made by grubbing with satisfactory material and compact to make the new surface conform to the adjacent surface of the ground.

Demolish the existing Latrines prior to installation of new Latrine facility. Demolish existing Overwatch tower after construction of new Overwatch tower with the Bid Option #1 award. Demolition work includes the demolition, removal and legal disposal of existing construction debris to accommodate the new construction. Take precautions to prevent damages to existing utilities, construction and materials not scheduled for demolition, repair or replacement; repair damages to the construction and materials to the satisfaction of the NAVFAC COR and at no additional cost to the Government. Do not begin demolition until the Demolition Plan has been approved by, and authorization is received from, the

NAVFAC COR.

Remove concrete and asphaltic concrete paving and slabs as required for construction of project.

Remove the existing aggregate base in areas to receive new pavement to the depth of the proposed pavement section below new finish grade. Remove the existing aggregate base in areas not to receive new pavement to a depth of 8 inches (200 mm) below existing adjacent grade and break remaining pavement (if any) to allow drainage. Provide neat saw cuts at limits of pavement removal;

protect saw cuts so that new pavement butts against the existing without feathering.

Ben Ghilouf, Tunisia

Existing latrines and cistern (to be demolished).

Ben Ghilouf, Tunisia

Existing overwatch tower (to be demolished, Bid Option #1).

Ben Ghilouf, Tunisia

Existing overwatch tower (to be demolished, Bid Option #1).

Ben Ghilouf, Tunisia

Location of Range Control Facility, approximately 12% slope.

Ben Ghilouf, Tunisia

3.1.4. Grading and Compaction

Perform site grading in accordance with standard practices.

Prior to excavation, Contractor must contact the host nation. Contractor will be responsible for obtaining dig permits.

If necessary, provide borrow and select fill from acceptable sources in accordance with the Geotechnical Report.

Compact in accordance with ASTM D698 (or Tunisian equivalent) except for roads, airfields, lay-down areas, and other heavily loaded areas, which should use ASTM D1557 (or Tunisian equivalent) compaction; or the recommendations of the Contractor’s Geotechnical Engineer, whichever is greater.

The following methods of soil stabilization will not be allowed: lime, lime slurry, asphalt, and pressure grouting.

Stabilize slopes through appropriate grading and site design for a minimum factor of safety of 1.5 or slope that does not exceed the maximum slope per local code requirements.

Ensure that all designated ground surfaces have the proper compaction necessary for structural foundations, concrete pads, parking areas, etc. and other improvements as necessary.

Perform the work necessary to bring the subgrade material into final shape and compacted condition.

Design and construct the Tactical Parking and Staging area as indicated in this RFP. Grade and compact native material to the greatest extent possible and apply a minimum of 6” of crushed aggregate base

Location of Rotary Landing Zone (Bid Option #2).

Ben Ghilouf, Tunisia

WON: 1702432

course, compacted. Storage area is intended for container and material storage. Maximum vehicle loading requirement is 37,000 lbs. (16,800 kg).

Provide the minimum erosion control necessary to prevent sediment transfer to the proposed landing zone.

3.1.5. Site Drainage & Stormwater Runoff

Grading design must convey stormwater runoff away from each facility and is transported around the facility in a safe manner based on standard practice, preventing standing water. Design must account for offsite drainage if applicable. Identify if any existing drainage problems exist, such as flooding, ponding or erosion, and propose grading and drainage solutions to alleviate this. All calculations are to be provided with the Basis of Design. Provide grading and drainage plan.

3.1.6. Utilities

Extend utilities as necessary per the table below to ensure facilities are complete and functional.

Facility Power Water Sewer

Range Operations Center Connect to electrical utilities, support generators (Bid Option #3 support to electrical grid)

Connect breakroom sink to cistern

Connect breakroom sink to septic system (for food debris)

Covered Training Area Connect to electrical utilities, support generators (Bid Option #3 support to electrical grid)

Public Toilets (Latrines) Connect to electrical utilities, support generators (Bid Option #3 support to electrical grid)

Connect to proposed cistern

Connect to proposed septic system

Trailer Pad with Utility Connections Connections to electrical utilities, support generators, electrical equipment, Bid Option #3 electrical grid connections

Provide hose connection to cistern

3.1.7. Construction Contractor’s Laydown Area

Design drawings shall indicate location and size of Contractor laydown area.

Ben Ghilouf, Tunisia

WON: 1702432

3.1.8. Permits

Obtain required dig and construction permits from local authority as necessary.

3.1.9. Environmental

Ensure the site complies with all Host Nation environmental requirements and perform environmental mitigations as necessary.

3.1.10. Tactical Parking and Staging Area

Design and construct the tactical parking and staging area (35,775 m2). Grade and compact surface to provide optimal slope and compacted surface for parking that maintains adequate drainage.

3.1.11. Existing Conditions and Interference with Construction

Anything interfering with the new construction and extending more than one (1) meter above the new facilities shall be rerouted (if still in use) or demolished by the Contractor if no longer in use. The Contractor shall locate and reroute any potential utility line (cables, piping, etc.) that may interfere with new construction.

The Contractor shall design the construction to minimize the removal of trees. If tree removal is required, the Contractor shall notify the Beneficiary with one (1) month advanced notice. The Beneficiary will remove the tree above grade. The Contractor shall remove what will be left under grade elevation.

The Beneficiary is responsible to move all military vehicles interfering with the new construction activities. The contractor shall notify the Beneficiary with a minimum one (1) month advanced notice of the date in which the military vehicle needs to be moved.

3.2. DETAILED STRUCTURAL SCOPE OF WORK

The Contractor shall provide a structural system that complies with all applicable Tunisian code and meets the requirements below.

3.2.1. Facility Foundations and Floor Slabs

Design and construct Portland Cement Concrete (PCC) slab-on-grade and footings to support the installation of the following structures:

- Range Operations Center, 163 m2 (1,758 ft2), capable of supporting observation of the range and antenna installation.

- Covered Training Area, canopy with half-walls on three sides and bleachers to support 250 personnel, 300 m2.

- Toilet/Latrine facilities with cistern, 130 m2

- Septic system tank, 28.3 m3

Ben Ghilouf, Tunisia

WON: 1702432

- Trailer pad, 90.5 m2

- Overwatch tower (Bid Option #1)

The Contractor shall design foundation systems to meet all building loads. The design and construction must address applicable seismic criteria and soil conditions at the site. The Contractor shall be familiar with typical geotechnical conditions in this area of Tunisia. The site may have unique soil conditions that could warrant the need for special design considerations. The Contractor is responsible for the site conditions of the project.

Note: Contractor must be familiar with the technical requirements for foundations in Tunisia which exceed the technical requirements of neighboring countries. As an example of these technical requirements, for similar building in Tunisia managed by NAVFAC, it was necessary to excavate 4 meters deep and provide 4 meters high of cast-in place reinforced concrete beams and walls under the grade elevation, filling the spaces between these foundation structures with select fill compacted at every 30 cm.

The Contractor shall provide heavy-duty, reinforced concrete floor slabs minimum 16 cm thickness.

3.2.2. Building Structural System

For the Range Operations Center, Covered Training Area, Latrines, the Contractor shall design a structural system using reinforced concrete masonry units. The Overwatch Tower (Bid Option #1) shall be constructed of steel. The designs must meet Tunisian code and be approved by an engineer licensed to practice in Tunisia.

The use of wood for any permanent part of the structures is strictly forbidden.

*See Attachment 03 for sample drawings for conceptual purposes only, layout and foundation types.

Ben Ghilouf, Tunisia

Sample drawing of existing latrines, to be demolished. At new latrines, provide 15 new toilets and 15 new sinks.

Ben Ghilouf, Tunisia

Sample drawing of existing Viewing Stand, to be repaired and improved. Similar design to accommodate the Covered Training Area canopy, must accommodate 250 personnel.

Ben Ghilouf, Tunisia

Sample drawing of existing Overwatch Tower, similar design to accommodate new Overwatch Tower, Bid Option #1.

Ben Ghilouf, Tunisia

WON: 1702432

3.3. DETAILED ARCHITECTURAL SCOPE OF WORK

Building shall be constructed at an elevation higher than the existing grade to provide positive drainage away from the building. Meet all requirements detailed in the sections below.

3.3.1. Floor Plan

The Contractor shall provide each architectural space as indicated in list below. (Note that the areas provide are “Net” or “Usable” areas and do not include space required for walls or circulation.) The Contractor shall provide spaces that include at least the minimum “Useable” area. The Contractor/DOR has design freedom to produce the best possible solution that meets the minimum requirements detailed in this document. (The floorplans provided in Attachment 03 are conceptual in nature to illustrate general layouts and level of design expectation for DOR.)

1. Range Operations Center 163 SM (1,758 SF) o Two (2) private offices 16 SM (174 SF each) o One (1) Conference/Training room for 40 personnel 37 SM (400 SF) o One (1) open administrative office space for 40 personnel 42 SM (448 SF) o One (1) communications equipment storage closet 6.7 SM (72.5 SF) o Two (2) duty bunk rooms 17.5 SM (188.5 SF each) o One (1) Breakroom 10.5 SM (112 SF) o One (1) closet for electrical power and lighting equipment and panels o Space for AC (split units) o Space for circulation

2. Covered Training Area (300 SM) o Canopy- Roof with concrete walls up to half height to enclose 3 sides to protect against wind and heat o Space for one (1) terrain model table for mission planning o Concrete bleachers for fixed seating for 250 people

3. Public Toilets (Latrines) 130 SM (1,392 SF) o Fifteenth (15) new toilets, and Fifteen (15) new sinks (30 fixtures in total) o Fixtures to be separated for unisex use, standard European toilet to be used

Building shall be designed considering gender equality. It shall be an inclusive and productive workplace with same opportunities for women and men. This means among other features, that that building shall be provided with some separate areas for women and men as toilets, or provide the toilet area as unisex spaces with appropriate privacy.

3.3.2. Thermal Facade

Provide impact resistant thermal façade on all exterior walls of the building as shown in the pictures below. Provide minimum 8 cm of rigid thermal insulation (wool rock) and 1 cm of rigid plaster protection (double mesh).

Provide exterior with treatments and colors to match existing installation buildings, or a color designated by the Beneficiary and NAVFAC COR.

Ben Ghilouf, Tunisia

WON: 1702432

Provide with proper flashing and finishes to avoid water, pest or insect intrusion within the thermal insulation.

Provide sealed connection and suitable flashing between the top of the thermal façade and the roof eave. Provide flashing or sealed connection between the bottom of the thermal façade and the new perimeter concrete sidewalks to avoid any possibility of water infiltration.

Ben Ghilouf, Tunisia

WON: 1702432

3.3.3. Roof System (sandwich panels)

Provide pitched standing-seam metal roofing system including eaves around the perimeter of the new roof. Coordinate roof color with Beneficiary and NAVFAC COR.

Provide sandwich panel roof sheets with minimum 8 cm thermal insulation.

The Contractor shall provide gutters and downspouts at roof edges. Route water from roof to downspouts at building corners and then off-site as required. Rain shall not fall from the roof over any doors or windows.

Provide a soffit system at the eave to prevent birds and rodents from nesting/intruding the building.

Roof system shall have a manufacturer-certified warranty for a minimum of ten (10) years.

Ben Ghilouf, Tunisia

WON: 1702432

3.3.4. Windows

Contractor shall provide large windows to all exterior rooms to maximize the use of natural light in the Range Operations Center. The Contractor shall also provide windows in the Latrine facility for passive ventilation and natural light. Provide a number of windows to allow for sufficient daylighting in the areas. Windows shall meet the technical criteria described in this section.

Provide aluminum insect screens in the exterior of all operational panels of all windows in the Range Operations Center and Latrines. The insect screens shall be removable and shall be provided by the manufacturer providing the new windows required by this project. Provide window blinds in all windows of the Range Operation Center, not required at Latrines.

The new exterior windows shall be aluminum profiles with double glazing with SHGC .03% or lower to reflect heat off the windows. They shall be provided with the quality certificate that may be required for the intended use of the windows. Provide with internal PVC sills and external aluminum or ceramic tile, with minimum 5% sloped away from the building. This is very heavy glazing, required not only for thermal insulation but also for physical protection. This heavy glazing will require heavy duty PVC profiles and hinges to support the weight. The use of aluminum profiles is authorized provided that the Contractor shows similar or better thermal insulation characteristics. Any interior windows required by the design shall have a single security 10 mm glazing.

The Contractor shall include non-transparent glazing for the Latrine windows, if those rooms share an exterior wall. The use of film to make the glazing non-transparent is not authorized.

Operational panels of the new windows shall open horizontally and vertically as shown in the picture in this section. At least 50% of the window surfaces shall be made of operational panels.

Provide blinds for all windows similar to those shown in this section, except for at the Latrines.

Ben Ghilouf, Tunisia

Ben Ghilouf, Tunisia

Ben Ghilouf, Tunisia

WON: 1702432

3.3.5. Interior Doors

Provide interior doors of either Glass Reinforced Polyester (GRP) solid doors and frames or solid hard wood construction at the Range Operations Center.

A modern composite laminate, GRP is a versatile and well proven construction material that has been in use for over 50 years in a huge variety of applications. GRP is an inherently dent resistant laminate, able to withstand knocks and blows that would easily permanently deform and damage a traditional steel door. Unlike steel, GRP door panels will not rust or corrode. Unlike wood, GRP door panels will not shrink, swell, warp or twist and do not require the regular attention needed to ensure a wood door retains its good looks.

Solid hard wood requires the doors to be made with solid core hard wood. Hard wood is defined as the wood from a broadleaved tree (such as oak, ash, or beech) as distinguished from that of conifers.

General requirements for interior doors:

- All doors shall be installed without bottom thresholds

- All doors to be installed with heavy duty stainless-steel hinges and stainless-steel handles

- All doors shall be designed to resist a vertical force of 200 kg without any deflection

- All doors to be lockable

- All doors to be provided with professional door signs. Contractor to coordinate door signage with Beneficiary and NAVFAC COR.

Interior doors separating toilets and/or sink areas at the Public Toilets/Latrine facility can either be interior doors with louvers at the bottom for ventilation or HDPE toilet partitions, with properties durable for use in an exterior latrine facility, mold resistant, corrosion resistant, and graffiti resistant.

Hardware for the doors: All doors shall be provided with stainless steel locks, stainless steel handles, stainless-steel heavy-duty hinges, door stops, and all required accessories. The Contractor shall provide a master key system.

Provide Door Signs for each door that identify the room number and use of that room (i.e. Mechanical Room). Coordinate sign type for exterior and interior use based on door signage is adjacent to.

Ben Ghilouf, Tunisia

3.3.6. Exterior Doors

The Contractor shall provide either hollow metal or aluminum doors at each entrance to the Range Operations Center, Public Toilets/Latrine facility, and Covered Training Area. Exterior doors shall be insulated and provided with a lite (window) to allow for viewing into the facility. Door lite shall have a mesh security layer.

The Contractor shall provide either PVC framed or aluminum doors at each entrance to the facility and at each distinct exterior room.

Ben Ghilouf, Tunisia

Example entrance door.

Example entrance door.

The number and size of exterior doors shall be designed by the Contractor’s architect. At a minimum, there shall be a main entrance door to the building and a second door that opens to the rear of the building.

Provide emergency exits to comply with Tunisian code. All entrance and exit doors shall open to the exterior.

Exterior doors shall be designed and built with the following minimum requirements:

- European standard aluminum profiles with break in the thermal bridge with three rubber dust protection seals

- With triple glazing in the upper half, like the ones specified for exterior windows

- With required locks and anti-panic hardware, all made of stainless steel

- Provided with door closers and door stops to avoid damages by users

- Aluminum profiles shall be minimum 8 cm wide and minimum of 1.8 kg/m (heavy duty)

- All exterior doors to be lockable. Coordinate lock system used with Beneficiary to provide compatible system to their existing

3.3.7. Ceilings

Provide white-painted ceilings in Range Operations Center and Public Toilets/Latrines. Provide exposed sandwich panels in Covered Training Area. Paint finish should match that of walls, or selected color by Beneficiary and NAVFAC COR.

3.3.8. Flooring

Stamped colored sealed concrete floor for Range Operation Center.

Ben Ghilouf, Tunisia

WON: 1702432

For the Public Toilets/Latrines, provide new homogeneous porcelain stoneware floors. Porcelain stoneware shall have the following characteristics and be coordinated with the sealed concrete floor:

- Thickness not less than 8mm

- Provide ‘Grès’ Porcelain Stoneware. Grès stoneware is a compact, hard, colored and non-porous body

- Include matching wall base board of same model as flooring tile. Floor tiles may not be cut to be used as base board

- Tiles shall be of homogeneous (non-glazed) material: This means that all the material of the tile is made of the same material. If we cut a tile, there would be no difference between different layers of the tile. The word “grès” means that the ceramic body of the tile is extremely vitrified, that is to say compact, hence the exceptional great resistance. The result is a lean clay body, little refractory, fired in a kiln (at 1200-1400 C°) until it reaches a non-porous vitrification and a complete water-proofing.

- Scratch hardness of surface (Mohs) >8 (according to EN101)

- Resistant to impacts: Complies with ISO 10545-5

- Water Absorption: Tested by ISO 10545 - 3 ≤ 0.5%

- Deep abrasion resistance: Tested by ISO 10545 – 6: Max 175 mm3

- Frost…