N319121R4011 Amend 0002.pdf

PDF 147 KB Posted

Attached to
D-B Renovate Crisis Management Center, Kumanovo, North Macedonia
Solicitation number
N3319121R4011
Issued by

About this file

This modification amends a solicitation for the renovation of a crisis management center in Kumanovo, North Macedonia. The scope of work includes designing, constructing, and renovating the interior spaces to make the ground floor fully operational. The modification changes the response time for exercising the option for additional work from 365 to 120 days from contract award. It also modifies the description and quantity of an uninterruptred power supply to be provided. One 15KVA UPS unit with battery backup for 12 hours is required, along with 10 additional receptacles distributed throughout and marked in red. The pre-proposal inquiry response confirms the UPS specification and quantity stated in the performance work statement.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5789565

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N3319121R4011 D-B Renovate Crisis Management Center, Kumanovo, North Macedonia

See page 2 for description of amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3319121R4011

X 9B. DATED (SEE ITEM 11)

01-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-May-2021

CODE

NAVFAC EUROPE AFRICA CENTRAL

VIALE PORTO CAPODICHINO

NAPOLI 80144

N33191 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3319121R4011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

The purpose of this amendment is to do the following:

1. Change the description of CLIN 0002.

2. Change Clause 52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED

LINE ITEM (MAR 1989) from The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 365 days from date of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause) to The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 120 days from date of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

3. Respond to a Pre-Proposal Inquiry (PPI).

Pre-Proposal Inquiry 2:

2.19 UPS (1 unit – 15 KVA) – page 56

The contractor shall provide 1 Uninterrupted Power Supply (UPS) unit for the E-112 Office with 15KVA capacity, with battery storage for up to 12 hours at full capacity. There shall be 10 additional receptacles, connected to the UPS distributed throughout the E-112 space. These receptacles shall be “red”, similar to the life support receptacles used in life support units of hospitals.

I need a clarification about is this the right description of this item and what is the quantity that is requested since to provide UPS with the same specification for 1 pc the price is 20,000. Euros, so please can you explain how many is the exact quantity.

Pre-Proposal Inquiry 2 Response:

The item quantity and description on page 56 of the PTS is correct.

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0002

The CLIN extended description has changed from:

N3319121R4011

The contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to design, construct, and renovate the interior of the ground floor in order to make these areas fully operational in accordance with Attachment 1 - Performance Technical Specifications (PTS). The Government reserves the right to exercise this option within 365 calendar days from award of the basic contract.

To:

The contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to design, construct, and renovate the interior of the ground floor in order to make these areas fully operational in accordance with Attachment 1 - Performance Technical Specifications (PTS). The Government reserves the right to exercise this option within 120 calendar days from award of the basic contract.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 120 days from date of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .