N3319121R4004 Cahul - Attach 7 - Safety Checklist.docx
DOCX document 20 KB Posted
- Attached to
- D-B Renovate Cahul Hospital, Cahul, Moldova
- Solicitation number
- N3319121R4004
About this file
This document contains an attachment to a solicitation for a design-build renovation project of the Cahul Hospital in Cahul, Moldova. The key requirements include the contractor providing a full-time on-site Site Safety and Health Officer meeting specified experience and training criteria within 30 days of award. The contractor must also provide a safety plan and monitor all subcontractor performance if utilized. Personal protective equipment such as hard hats, steel-toed shoes, vests, gloves, and eye and ear protection must be provided by the contractor and used as required. The contractor's price must include all costs associated with meeting the safety requirements for this project. The solicitation was issued by the Naval Facilities Engineering Command for the Department of the Navy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3319121R4004 Cahul - Attach 2 - PPI.docx | DOCX document | |
| N3319121R4004 Cahul - Attach 4 - 52.204-26.docx | DOCX document | |
| N3319121R4004 Cahul - Attach 8 - PPQ.docx | DOCX document | |
| N3319121R4004 Cahul RFP.pdf | ||
| N3319121R4004 Cahul - Attach 3 - Price Schedule.doc | DOC document | |
| N3319121R4004 Cahul - Attach 5 - 252.229-7001.docx | DOCX document | |
| N3319121R4004 Cahul - Attach 6 - Data Sheet.docx | DOCX document | |
| N3319121R4004 Cahul - Attach 1 - PTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7 Safety Checklist Form
The contractor shall comply with local safety regulations, unless the U.S. Safety Regulations included in the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) are more strict and not in conflict with the local regulations. In this case, U.S Safety Regulations shall apply. The EM 385-1-1 can be downloaded from the following website: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf
Safety Checklist Requirements
Within 30 days of award of the contract, the contractor will provide a safety plan to monitor personnel performance during construction, and identify one competent employee in accordance with EM 385-1-1 to ensure execution of the safety plan.
The contractor will provide a full-time, on-site Site Safety and Health Officer (SSHO) that meets the requirements of the EM 385 Section 01.A.17, specifically:
- Five (5) years of continuous general industry or construction safety experience in supervising/managing general industry or construction (managing safety programs or processes or conducting hazard analyses and developing controls). Documentation for validation is required within 30 days of contract award.
- Completion of 30-hour OSHA Construction Industry safety class (may be web-based training if the student is able to directly ask questions of the instructor by internet or phone). Documentation for validation and proof of completed training is required within 30 days of contract award.
The contractor will provide a plan to monitor all subcontractor performance during construction if subcontractors will be used. The contractor and subcontractors must also comply with EM 385-1-1.
The contractor shall provide all necessary and required Personal Protective Equipment (PPE), which shall be used as required by the specific risk.
Steel toed shoes
Helmets
Vests and gloves
Eye and ear protection
Shoring for excavation, as needed
The use of helmets or "hard hats" is absolutely required for all personnel entering the job site. In addition the contractor shall have a minimum of 5 new hard hats to be used by any authorized visitor to the job site.
The contractor's price shall include the cost for any and all safety requirements for this project.
As a certified agent of this Company, I acknowledge and agree to the safety factor requirements.
Company Name:
Contractor's Printed Name:
Contractor's Signature:
Date: