This document is a performance technical specification for a design-build renovation project at Dnipro School #01 in Ukraine. The project includes thermally insulating the facade, replacing the entrance canopy, installing a new covered walkway, upgrading lighting and basketball equipment, and repaving interior areas. The Navy is seeking offers for the base project and two optional scopes involving the walkway and additional repairs. Offerors must visit the site and account for local permitting requirements. The contractor will design and carry out the work in compliance with Ukrainian and U.S. regulations while obtaining necessary approvals. The performance period is 720 calendar days from award. Safety is a top priority, and the contractor must submit an accident prevention plan.

View the file

Other files

File Type Posted
Attach 3 - Price Schedule.doc DOC document
N3319120R4012 Solicitation.pdf PDF
Attach 4 - Contract Data Sheet.docx DOCX document
Attach 5 - Safety Checklist.docx DOCX document
Attach 6 - PPQ.docx DOCX document
Attach 2 - PPI.docx DOCX document
N3319120R4012 D-B Reno School Pre-Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Façade Thermal Insulation and Improvements OHASIS ID-36768 Dnipro School#01 - Ukraine

VERSION-003

EUCOM Humanitarian Assistance

Program

Façade Thermal Insulation and Improvements in

Dnipro School#01 Ukraine

Dnipro, Ukraine

OHASIS UP-HA-2019-00036768

Oct 2019

Contents

1. TAXATION

2. GENERAL DESCRIPTION OF PROJECT

2.1. GENERAL DESCRIPTION OF WORK

2.2. LOCATION OF PROJECT

2.3. LEGAL AND TECHNICAL REQUIREMENTS

2.4. GENERAL CONTRACT DESCRIPTION

2.5. CONSTRUCTION PERMIT OR AUTHORIZATION

2.6. MEASUREMENTS AND QUANTITIES

2.7. CONSTRUCTION PHASE - GENERAL

3. CLIN0001 - DETAILED SCOPE OF WORK OF BASE-BID

3.1. THERMALLY INSULATED FACADE

3.2. FAÇADE ON GROUND FLOOR FACING THE STREET

3.3. REPLACEMENT OF ENTRANCE CANOPY

3.4. HORIZONTAL EXTENT OF WORKS

3.5. ROOF EXTENT OF WORKS

3.6. REPLACE WOODEN WINDOWS (2 UNITS) AND DOOR (1 UNIT)

3.7. PICTURES - EXISTING CONDITION OF THE FAÇADE AND SOW

3.8. SCAFFOLDING – MANLIFTS – HARNESS – FALL PROTECTION

4. CLIN0002 - DETAILED SCOPE OF WORK OF CONTRACT OPTION-1

4.1. NEW CANOPY FROM STREET TO MAIN ENTRANCE

4.2. REPLACEMENT OF 2 BASKETBALL BOARDS

4.3. REPLACEMENT OF LIGHTING SYSTEM IN THE GYMNASIUM

5. CLIN0003 - DETAILED SCOPE OF WORK OF CONTRACT OPTION-2

6. PROCEDURE AND GENERAL CONTRACT REQUIREMENTS AND GUIDELINES

6.1 PRINCIPLES

6.2 PROHIBITED ITEMS

6.4 START OF CONSTRUCTION

6.5 RESPONSIBILITY FOR NEW MATERIALS

6.6 DESIGN

6.7 DESIGN-BUILD PROCEDURE

6.8 CONSTRUCTION/DESIGN SCHEDULE AND CONTRACTUAL MILESTONES

6.9 CONSTRUCTION SCHEDULE (BAR CHART IS AUTHORIZED)

6.10 SAFETY: ACCIDENT PREVENTION PLAN

6.11 SPECIAL SITE CONDITIONS

6.12 PHASING AND COORDINATION

6.14 SUBMITTALS – TECHNICAL INFORMATION

6.15 DELIVERABLE

6.16 PICTURES

6.17 RESPONSIBILITY AND OWNERSHIP OF REMOVED MATERIALS

6.18 CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC

6.19 QUALITY CONTROL PLAN

6.20 CONSTRUCTION SIGN

6.21 COMMEMORATIVE PLAQUE

6.22 PAYMENT

6.23 SCHEDULE OF PRICES

6.24 DAMAGES/IMPACT TO EXISTING FACILITIES

6.25 CLEANING

6.26 SPACE PARTS

6.27 WARRANTY AND TRAINING

6.28 CLOSE-OUT PROCEDURE

7 ANNEX 1: GUIDELINE TO PREPARE THE QUALITY CONTROL PLAN

1. TAXATION

In Accordance with Article 1 of the "Agreement Between the Government of Ukraine and the Government of the United States of America Regarding Humanitarian and Technical Economic Cooperation" prepared on 7 May 1992, regarding "Taxes and Other Charges", this project which is in connection with the United States assistance program, shall be free from any tariffs, dues, custom duties, import taxes and other similar taxes or charges imposed by Ukraine, or any subdivision thereof.

As such, this project will be awarded exempt from VAT taxes, and consequently the US Government will not pay any VAT taxes to the successful company who will get the award of the contract.

It shall be the contractor's responsibility to work directly with Ukrainian fiscal authorities on the implementation of the applicable tax exemption applicable for this assistance program. The Office of Defense Cooperation in Ukraine will provide the documents that may be requested by the contractor to certify that they are the company selected by the US Government to execute the necessary design and construction works included in this assistance contract. However, it is solely the contractor's responsibility to follow and implement the necessary procedures in strict compliance with Ukrainian regulations to exercise the free taxation agreement.

The US Government will not be responsible, nor will be financially liable for any mistakes or errors in the contractor's procedures for the correct implementation of the tax free agreement that applies to this United States assistance project.

2. GENERAL DESCRIPTION OF PROJECT

2.1. General Description of Work

This contract includes the necessary design and execution of works to improve and modify Dnipro School#01 as detailed in this document. These works are divided into 3 different groups or Contract Line Item Numbers (CLIN’s)

- CLIN0001 - Base-Bid of the contract: This portion of the contract includes the thermal insulation of the façade and other façade improvements.

- CLIN0002 – Contract Option-1: This portion of the contract includes the new canopy from the street to the main entrance as well as minor improvements to the physical education room.

- CLIN0003 – Contract Option-2: This portion of the contract includes a new resurface of pavement for the interior patio.

The detailed scope of work and required basis of design of this design-build contract are detailed in sections 3, 4 and 5.

Note: School#01 is the oldest school in Dnipro. According to the beneficiary, the building was originally designed and built and used as the train Station of Dnipro in 1917. It has gone under countless renovations, expansions, alterations and modifications to become the facility that we can see now. With major renovation taking place in 1966. For this reason, it is necessary that the contractor visits the facility in order to observe its condition and measure the amount of work included in this contract. This project will not change the layout of the building, but it will significantly improve its energy efficiency, while providing it with the appearance of a new facility.

School#01 building in the 1950’s

2.2. Location of project

Project is located in downtown Dnipro, as shown in the following pictures herein:

Location of Dnipro within Ukraine

Location of School#01 within Dnipro

Location of School#01 within Dnipro

2.3. Legal and Technical Requirements

The contract is based on the following general requirements:

- Strict compliance with American Contracting Regulations, including the contracting requirements of the Department of Defense, the US Navy and the US Naval Facilities Engineering Command (NAVFAC).

- Strict compliance with Ukrainian technical and legal regulations for design and construction work, as well for application of tax exemption.

- Strict compliance with Ukrainian Safety regulations, unless the US safety regulations (USACE EM 385-1-1) are more strict and not in conflict with Ukrainian safety regulations, in which case the US safety regulations shall be implemented.

- Compliance with technical and administrative requirements described in this document.

The project is based on the principle of strict compliance with Ukrainian technical and administrative regulations, with US Contracting Regulations and with Ukrainian Safety regulations, unless US regulations are more strict and not in conflict with Ukrainian safety regulations. In case of conflict between Ukrainian and US safety regulations, the contractor shall apply the Ukrainian regulations. If the US regulations are stricter and not contrary to the Ukrainian regulations, then the contractor shall apply the US regulation. The contractor shall inform the Contracting Officer Representative of any conflict between Ukrainian and US safety regulations.

The contractor shall hire the services of licensed architects/engineers in Ukraine to prepare the necessary designs which are required for the scope of work included in this document.

The contractor shall hire the services of a licensed architect in Ukraine to:

- Make any necessary technical projects for the scope of work included in this project, as required by Ukrainian regulations in general and as required by Ukrainian standards for façade alterations and improvements of large public buildings in particular.

- Obtain the necessary construction/renovation permits.

- Obtain formal approval from competent Ukrainian authorities and professionals for all completed works. The professional approval is a process designated as “formal expertise approval” which shall be managed and paid by the contractor, and which shall include all items of work. “Expertise” is a professional licensed in Ukraine to provide technical reviews for very specialized items of work. “Expertise” approval is required for all items of work included in this document, and it is the procedure by which the US Government will obtain formal confirmation of compliance with pertinent Ukrainian regulations.

Provide the final work as a complete and usable facility, including all items which are required by Ukraine regulations and which may not be described in this document. Technical details, items of work, permits or fees that are not explicitly described in this document, but which are necessary to provide fully operational and finished facilities shall be considered part of this contract.

2.4. General Contract Description

All works in the 3 CLIN’s is design-build work, in which the US Government provides the final required product, together with some sketches and general basis of design.

The contractor is responsible to prepare all necessary design drawings and information, as it is required by Ukrainian regulations and as required for the contractor to show the Contracting Officer Representative the details of his proposed works.

This is a design-build contract. This means that the contractor is responsible to:

- Hire the services of licensed architects and engineers and technicians to make necessary design works. All design documents, including shop drawings shall be signed and stamped by the competent and pertinent licensed technical staff.

- Obtain the acceptance of those design works by the Contracting Officer Representative

- Obtain the formal approval of those design works by the competent Ukrainian authorities.

- Obtain the construction permit or authorization from Ukrainian authorities and the “Notice to Proceed” from the Contracting Officer.

- Execute the corresponding construction works.

- Provide supervision of construction activities by their architect/designer, who shall be responsible for their technical projects.

- Coordinates with the beneficiary the supervision of the construction by the designer and by the third party companies (to be paid by the contractor)

- Obtain the acceptance of NAVFAC and the formal approval of the competent and required

Ukrainian authorities for the executed construction works (Act of Acceptance). Obtain “expertise” approval for all items of work performed under this contract.

In order to prepare the contractor’s bid, it is imperative that they visit the site. In order to visit the site, the offerors shall coordinate with the Program Manager of the United States Office of Defense Cooperation (ODC) in Kyiv Ms. Lyudmyla Kyryrenko lyudmyla.v.kyrylenko.ln@mail.mil.

2.5. Construction Permit or Authorization

The contractor shall obtain formal written authorization from the competent Ukrainian authorities to perform the works included in the scope of work of these projects.

The contractor is required, as part of this contract, to prepare all documentation, designs, reports, information, drawings, coordination and approvals by experts or monitoring entities, and everything that may be necessary as required by Ukrainian regulations, in order to obtain these Permits or Authorizations. The contractor is responsible to pay for any third party inspection or expertise that may be required by Ukrainian regulations for the scope of work of this project. The contractor shall be familiar with these requirements in order to prepare their bids, regarding the obligatory administrative and technical procedures in Ukraine for public facilities in general and for renovation of schools in large cities in particular. Formal expertise is required for the façade works.

In addition to the legal requirements that are required because of the scope of work of this contract, the contractor shall provide a certified, signed and approved scaffolding project for any scaffolding system extending over 3 meters height.

2.6. Measurements and Quantities

This contract complies with the US Contracting Regulations, and as such, all measurements and quantities of materials provided shall be verified and measured on site by the contractor. The contractor needs to visit the job site in order to perform the necessary measurements and to observe the existing field conditions in order to prepare their cost proposal. This is very relevant when performing repairs on very old buildings such as the one in this project.

In order to visit the site before award, the contractor shall coordinate with the Program Manager of the United States Office of Defense Cooperation (ODC) in Kyiv Ms. Lyudmyla Kyrylenko lyudmyla.v.kyrylenko.ln@mail.mil

The US Government is not responsible for any mistake in the contractor’s measurements or assumptions of field conditions.

2.7. Construction Phase - General

Once the contractor completes the designs and they show evidence of formal authorization by the competent local authorities, and the contractor shows that they have completed other administrative contract requirements (Accident Prevention Plan, Quality Control Plan, Construction Schedule,…), the Contracting Officer will inform the contractor that they may start the construction phase of this design-build contract. This notification is called Notice to Proceed (or NTP).

The construction shall follow the design and technical projects prepared by the architect hired by the contractor, accepted by the COR and approved by pertinent Ukrainian authorities, and for which the contractor shall obtain the Construction Permit or Formal Authorization.

Under this phase, the contractor shall provide all necessary work in order to provide complete works.

Elements that may not be explicitly included in this document, but which are absolutely necessary to provide complete and usable facilities as required by Ukrainian regulations shall be considered to be an integral part of the project, and therefore, shall be considered to be part of this contract. For example, if during the removal of a window to adjust it to the new façade finishes, the contractor damages the interior window sill or the interior wall, the contractor shall restore all internal surfaces to original conditions without any visual evidence of any construction work on the window or on the façade.

The contractor shall familiarize with the requirements of Ukraine regulations regarding renovations of public schools, as there may be required elements which are not specified in this document.

The architect who signs and certifies the technical projects shall visit the site for every important and relevant phase of work, to partially accept the completed works. Despite the requirements of the Ukrainian regulations for the visits of the designer, once the works start, the architect shall visit the site as a minimum once every week. This includes the initial erection of the scaffolding system to verify compliance with Ukrainian and with contract requirements.

Two days in advance of the site visit, the contractor shall inform ODC Ukraine and the beneficiary of the planned arrival time to the job site.

In addition to these minimum weekly visits, the architect shall visit the site when the COR visits Dnipro, estimated at once every two months.

In addition to these visits, the third party experts that shall be required will visit the site as required by Ukraine regulations, and also when NAVFAC’s PM visits the site.

Work will not be accepted until Final Expertise certificates are provided to certify that the works were performed as required by the project and as required by Ukrainian regulations.

Limitation on equipment under this contract: Tables, desks, chairs, computer, phones, beds, televisions, and other movable equipment are not part of this contract, unless otherwise indicated in these technical specifications. Only those elements that are fixed, permanently attached to the building or considered as an integral part of the facility, and specifically described in these contract specifications are included in this contract, unless otherwise indicated in this document.

Requirement for Ukraine Code and Regulation: The contractor shall request, process and pay for any permits that may be required in accordance with Ukraine Law for this type of construction works. The contractor shall provide a copy of the pertinent construction permit to be issued by the competent local authorities and approval by the Monitoring Entity of the design, before they are authorized to start work.

For each completed phase of work, the contractor shall provide the certificate of the third party monitoring entity and/or “expertise” in order to process payment for that particular phase of work.

Green: Definition of main school building, with façade to be thermally insulated and/or repaired as required herein.

The works also includes the construction over the third floor, which is not shown in this sketch.

Red: Area recently provided with thermal insulation by the School Administration Yellow: The second and third floor shall be provided with thermal insulation and the ground floor repaired, but without thermal insulation

3. CLIN0001 - DETAILED SCOPE OF WORK OF BASE-BID

The project includes the design and construction in order to have a thermally insulated building, with appearance of a new facility and resistant for their intended use. This includes:

- In the yellow highlighted façade:

o In the ground floor: Anti-vandalism façade resurface as described in this document.

o In the second and third floor: Thermal insulation as described in this document

- In the green highlighter façade:

o In the ground floor: Physically protected thermal insulation o In the second and third floor: Thermal insulation as described in this document

- In the red highlighted façade: Only paint

- Replacing the wooden windows (2 large units plus smaller units in the physical education room)

- Replacing a wooden door (1 unit) with new metal one.

Note to clarify the different treatments of the façade:

A. Second and third floor and for the structures above the third floor: Thermally insulated.

B. Ground floor facing the internal patio: Thermally insulated, resistant to impacts.

C. Ground floor facing the streets: Non-thermally insulated, resistant to vandalism.

D. Where indicated in red in the adjacent sketch, only painting over the newly installed thermally insulated façade.

Note: The areas currently occupied by private business (bakery and telephone repair) are planned to be vacated on 30 June 2020 and are part of the scope of work of this contract. Consequently this project includes removing all that will be left in the façade in order to provide the entire façade of the building with a uniform appearance.

3.1. Thermally Insulated Facade

In all exterior surfaces of the building, except as indicated herein, the contractor shall provide a thermally insulated façade with the following basis of design:

- Façade Design: The contractor shall provide a façade design (Façade Passport) in compliance with the basis of design described above, signed and certified by the same licensed architect in Ukraine who shall prepare all other façade designs, to be accepted by the Contracting Officer Representative and approved by the competent Ukrainian authorities after coordination of the design with the beneficiary. This design shall include as a minimum:

Typical section of thermal façade systems

Special cover of the lowest section of thermal facade

Color and finishes or “façade passport” with the new proposed finishes.

Details of finishes of the thermal façade system in the top and bottom. In the top it is required to provide adequate joint with roof to avoid possibility of water infiltration between the existing façade and its new thermal insulation.

Details for special finishes and reinforcements in the corners and around the windows and doors.

- Thermal façade system elements to be provided by same manufacturer or application company and to be applied by the same company:

o Thermal insulation rigid panels o Glue o Fixing elements for thermal insulation on brick surface o Glass nets o Metallic profiles o Plaster layers o Paint

- Thermal insulation material: Mineral wool or equivalent authorized by Ukrainian regulations, providing the required thermal insulation. EPS is authorized if specifically approved by Fire Department, but is provided shall be provided with the necessary wool rock fire barriers.

o Thermal insulation layer: ≥ 100 mm thickness o Thermal conductivity ≤ 0.035 W/mK o Compliance with EN 13162:2008.

o Reaction to fire classification of A1 as defined in EN 13501-1.

- Outer protective plaster layer with minimum 1 cm thickness and minimum 5 layer as in the picture included in this paragraph. There are several systems available in the market to cover the thermal insulation. The contractor shall apply over the rigid thermal insulation a protective plaster, designed to resist physical impacts, with minimum 5 different layers.

- Esthetics: Façade shall be designed by the architect hired by the contractor with the following basis of design:

o Architect to provide several designs for School Director to choose o Municipality of Dnipro to approve design o Combination of maximum of 10 colors o Window frames of different colors than the adjacent façade

- Lowest 3 meters in areas not facing the street (ground floor): The lowest 3 meters or the facade of the ground floor not facing the streets shall be provided with impact resistant layer.

For estimating purposes:

o 50 mm think polyisocyanurate-foam panels o Covered with natural stone cover attached to the building or other solid layer approved by the architect. The masonry protection on the lowest area of the façade shall be removed and replaced with new (see pictures for definition of this particular work) o The weight of this heavy layer shall be supported by the floor and not by the wall.

Consequently, the façade system and design shall include the necessary foundations for this section of wall. Foundations to be designed by the architect hired by the contractor as part of the façade design or façade passport.

- The contractor shall complete a section of 5 m² of each type of thermal façade system for the approval of the architect hired by the contractor and the formal approval of the required Ukrainian “expertise”.

The new works include:

- Repair all façade defects, by removing loose pieces of plaster, ceramic tiles, bricks, and providing leveling mortar as needed for the new thermal façade system. Correct any exposed reinforcing steel by epoxy based product, specifically designed for that purpose.

- Provide complete thermal insulation system.

- Doors: Replacement of doors is not included in this contract (except one), but existing doors may have to be removed and reinstalled, with potential modification required, in order to be properly adjusted to the new façade finishes.

- Installations on the façade: All those installations to remain operational shall be removed and reinstalled in compliance with Ukrainian regulations and with the particular technical requirements of the owner. The cables shall be installed in conduits or channels to be recessed within the new facade surface. This applies to elements such as security cameras, communications and electrical cables, street and building signs, publicity boards, grounding systems,… The building is located in a highly populated area of Dnipro, and there are numerous installations and elements in the façade that need to be considered by the contractor before submission of their bids.

- Replacement of gutters and downspouts from the roof to the ground, or reutilization of existing gutters and downspouts after they are properly modified in order to be adjusted to the new façade surfaces.

- Window replacement: All windows shall remain (except 2 units), but they will need to be removed, modified as necessary and reinstalled for the adjustment of the existing windows to the new façade finishes.

Required exterior LED lighting fixture (this one with motion detection). Provide total of 5 units.

- Window sills: The contractor shall estimate that they will need to replace all existing exterior window sills, or provide new ones, in order to adjust the sills to the new façade width, which will be a minimum of 11 centimeters wider.

- Final certificate: Once the thermal façade is complete, the contractor shall provide a copy of a certificate from the architect and from the “expertise” certifying that the thermal façade has been properly installed in accordance with their recommendations and as required by Ukrainian regulations. Payment for thermal façade over 50% shall not be authorized until the contractor provides such certificate.

- Provide 5 exterior lighting fixtures with new LED technology, rated for exterior use, with 50 watts each, provided with photocell and switch capable of operating the lighting fixtures manually or automatically (starting when there is darkness outside or by a motion detector).

Each one of the exterior lighting fixtures shall be provided with its individual control switch (on-off-automatic), to be located inside of the building, at the location to be indicated by the beneficiary. All exterior lighting fixtures shall be certified for outdoor use and installed with additional protection from the weather

- Repair all elements attached to the façade, such as the concrete canopies.

- Remove, repair, repaint and reinstall all window security bars, as required by Ukrainian regulations.

Typical section of thermally insulated façade – 5 layer protective plaster system

Applying thermal insulation panels

Installing thermal insulation panels

Applying thermal insulation panels

Example of protection for lowest section of façade, with natural stone in the bottom foundation and bricks above, typical for ground floor not facing the streets.

Example for colorful color design for façade (picture from school in Ukraine)

Example of combination of colors for the facade

Potential finishes for lowest portion of façade, from recently NAVFAC completed project in Bulgaria

Example of lowest section of façade with natural stone (picture from NAVFAC project in Ukraine)

Natural stone tiles used in a recently completed NAVFAC project in Bulgaria

Green: Ground floor to be provided with new finishes suitable for intended use. Red:

Ground floor currently occupied by private business, planned to be vacated on 30 June 2020 and consequently to be provided with same finishes as the rest of the façade highlighted in green

3.2. Façade on Ground Floor Facing the Street

The contractor’s architect responsible for the design of the thermal façade, as described in the previous paragraph, shall provide a different design for the areas highlighted in green in the drawing to the right.

These areas, as shown in the pictures included in this document are used for a street market, with some people using the façade as the back wall of their display stand and with thousands of pamphlets stapled to the plaster or brick façade. For these reasons, the priorities in the basis of design shall be different than the rest of the façade system.

In this case, the contractor shall provide a façade with the following basis of design:

- Anti-graffiti certified wall coating or paint

- Resistant outer layer to resist continuous staples and nails without destroying the façade.

- With Esthetics compatible with the rest of the thermally insulated façade.

- Removal of all existing paint and plaster of the existing walls. This requires water blasting the façade. Repair all façade defects, after removal of loose pieces of plaster, ceramic tiles, paint, bricks.

Repair of any cracks on the facade. Providing leveling mortar for new façade system. Correct any exposed reinforcing steel by epoxy based product, specifically designed for that purpose. The contractor shall estimate that 10% of the plaster and 100% of the paint will be removed by water blasting. On in other words, the contractor shall adjust the pressure of the water blasting equipment to remove 100% paint and 10% plaster. This shall be done with high pressure water

- Replacement of attached/adhered plastered brick walls on the lowest section. The volume of removed masonry structures shall be similar to the volume of new required masonry structures. Note: In the lowest portion of the exterior enclosure of the building, there are small masonry construction of approximately 40 cm high and 10 cm thick.

These were designed and built to provide protection for the lowest portion of the wall, to be used as benches or to be used for only esthetics. While the main structural wall of the building is in general good condition. These small masonry construction is in poor condition for which this contract includes their replacement. See picture in page 28 for better explanation.

- Railing and other permanent elements of the street which form part of the façade shall be repaired, as described in the pictures included in this document.

3.3. Replacement of Entrance Canopy

The contractor shall repair by replacement the entrance canopy with the following basis of design:

- Same length as existing one, one meter wider. If for example the existing canopy has 2.5 meters wide by 6.0 meters long, the new one shall be 3.5 x 6.0 meters.

- Replacement of steps and all pavement, steps and ramps under its horizontal projection

- Heavy duty metal structure. Columns minimum HEB200, or equivalent metal tubular profile with minimum 60.0 kg/m. Horizontal beams supporting roof with minimum 16.0 kg/m.

- Exposed metal structure, painted with epoxy coating.

- 2 columns.

- Gutters and downspouts in coordination with the finishes of the façade

- Roof: Preformed metal sheet roofing

- Lights: Provide 2 LED floodlights of 15 watts each, with same controls as the ones specified for the façade.

Typical façade cleaning with high pressure water.

Removing paint.

Typical façade high pressure cleaning. Removing plaster.

3.4. Horizontal Extent of Works

The façade works will damage the pavement and sidewalks which are near the School#01 building. In some areas these horizontal surfaces and in good condition, but in other areas these surfaces are in very poor condition. In the areas not facing the streets the contractor will need to excavate to provide new foundations for the heavy walls. This required excavation for foundations may also be required by the contractor’s solution for the ground level façade facing the street.

It is the intent of this project to provide perfect finishes between the new façade systems and the horizontal ground surfaces, but also to provide the building with a uniform coordinated appearance, which requires the work to be extended on the horizontal pavements.

For these reasons, the contractor’s work shall include a 1 meter wide strip of horizontal surface from the façade of the building. It the building has a perimeter of 300 meters, then the contractor shall estimate that they need to provide 300 m² of new horizontal surfaces.

The contractor’s architect shall propose the pavement solution in coordination with School and Municipal authorities. For estimating purposes the contractor shall estimate that they will use new surfaces similar to the surfaces which shall remain over 1 meter away from the building.

3.5. Roof Extent of Works

The contract does not include roofing repair or replacement, but it does include the replacement of all those elements which are affected by the scope of work of this contract. Therefore, it is included the replacement of the metal cover of the parapets surrounding the roof in some areas, the complete repair and painting of the horizontal eaves around the building, or the replacement of gutters and downspouts.

3.6. Replace Wooden Windows (2 units) and door (1 unit)

In the ground floor of the façade, facing the street, there are 2 windows and 1 door that were not replaced by the School Administration. This was because these elements were part of a section of the building rented to a private business. However, these spaces are being returned to the school and should be provided with the same finishes as the rest of the façade in order to provide an uniform appearance.

The contractor shall provide two new windows and 1 new door with the same technical features as the new exterior doors and windows provided by the School Administration on the rest of the building.

In addition to these two windows, it is also included the small ventilation openings for the physical education facility, as shown in the following pictures.

Note: Any exterior door shall be made with metal elements.

3.7. Pictures to show existing condition of the Façade and to describe elements of the scope of work

The following pictures do not include or describe all requirements of the contract, but all requirements described in the pictures are part of the contract

In green: Areas requiring new thermally insulated façade. In red: Areas requiring new surfaces for the façade, but without thermal insulation to make them more resistant to vandalism

Al roof parapets and metal covers to be replaced with new to be adjusted to the new façade thickness and to provide perfect waterproofing.

Approximate location of new horizontal surfaces / pavement on the highlighted areas. Maximum 290 m² around the building

General condition of façade facing the street

Canopy to be removed in order to provide the façade with an uniform appearance

Details of private businesses. Telephone repair and wooded cover from bakery. The contractor shall remove all repains of these businesses and provide the façade with uniform appearance

Crack to be tuck pointed with mortar prior to application of the new façade cover

Small window or opening for ventilation of gym, to be replaced with new PVC framed unit as part of this contract.

Gutters and downspouts to be replaced or removed, repaired and installed over the new façade system.

All façade to be provided with uniform appearance. All private businesses planned to be vacated by 30 June 2020.

Part of school building facing the street. Ground floor to be designed and built vandal resistant.

Fence not included in the contract

Roof eaves, or overhung, or horizontal extension of the roof deck, to be repaired and provided with similar finishes as the rest of the new façade.

Typical school façade facing the street

Masonry walls attached to the building structure, to be demolished (only outer 10 or 20 cm until the building structure wall is found)

Section of sidewalk in very bad condition.

Estimate 1 meter wide to be removed in order to provide perfect transition between façade and new sidewalk and between new and existing sidewalks to remain

Thermally insulated façade, recently installed by the School Administration. This section of façade is not included in the contract, but only the paint. This section shall be painted in order to have an uniform appearance for the school.

Areas to be repaired as part of the contract, but not requiring thermal insulation

Main school entrance. Canopy to be demolished and replaced with new, provided with finishes coordinated with the finishes of the new façade. Tiles and other façade finishes to be all demolished.

In green, included in the contract. In red: Not in contract.

Example of cables and other elements supported by the wall. All need to be reinstalled on the new façade surface, and in compliance with Ukrainian regulations.

Wood door to be replaced with new metal/steel door and metal railing to be repaired and painted. Steps to be repaired as they are within one meter of the building facade

Large publicity panels and their lights to be removed and reinstalled over the new façade surfaces. Coordinate with the owner of the panels and with the school and Municipality. Metal cover for roof parapet wall to be replaced with new.

Wooden windows to be replaced with new PVC framed windows

Inside the school patio (the façade and first meter of pavement is included in the Base-Bid, and the rest of pavement in the Contract Option-2

Masonry walls attached to the building structure, to be demolished (only outer 10 or 20 cm until the building structure wall is found)

Thermally insulated façade, recently done by the school. This section of façade is not included in the contract, but only the paint. This section shall be painted in order to have a uniform appearance for the school.

Wooden windows to be replaced with new. The contractor shall perform the necessary works, including the window replacement, in order to provide the entire façade with a uniform appearance

Required type of scaffold and main components

3.8. SCAFFOLDING – MANLIFTS – HARNESS – FALL PROTECTION

To perform the works in this contract, the contractor shall be required to install scaffolding or to use manlifts. The contractor is required to provide a scaffolding design to be signed and certified by a licensed Ukrainian engineer or other technician authorized by Ukrainian regulations.

Despite the scaffolds that may be authorized by Ukrainian regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown in pictures below. These scaffolds shall be installed and used in accordance with manufacturer’s recommendations. In case the contractor needs to access the façade at any particular point without the need to install scaffolds, the contractor shall use a CE certified self-propelled man-lift, similar to the one shown in pictures below. The use of other type of scaffolds, other non CE certified man-lifts, or any type of ladders for façade or roof work, IS NOT AUTHORIZED. This is applicable for all works in this contract.

In addition to all other previously described safety requirements, the contractor shall prepare a scaffolding project, to be signed and stamped by a licensed architect or engineer in Ukraine and to be certified by a licensed safety expertise in Ukraine. If this is not required by Ukrainian regulations, it is part of this contract, and consequently no scaffolding shall be installed without this approved and certified project. Additionally, no person shall use the scaffolding until it is certified on site by the expert who approved the project.

To emphasize and strengthen the safety requirements, it is absolutely necessary and included in this contract the preparation of a scaffolding technical project, to be signed and stamped by a licensed architect or engineer in Ukraine and to be certified by a licensed safety expertise in Ukraine

Despite the requirements of Ukrainian Law for Fall Protection, any contractor employee working on the roof shall be protected with an approved harness properly tied to an approved lifeline.

All other requirements of EM385-1-1 (Safety manual of US Army Corps of Engineers) and of Ukrainian Law applies for every work activity included in this project.

Acceptable man-lift

Required type of scaffold

Required type of scaffold

Required harness and lifelines

Required harness and lifeline

Required type of scaffold

4. CLIN0002 - DETAILED SCOPE OF WORK OF CONTRACT

OPTION-1

The work included and described in this paragraph (and its subparagraphs) shall be performed if, and only if, contract option-1 is awarded to the successful offeror by the Contracting Officer. The US Government will unilaterally decide whether to award or not this portion of the contract based on availability of funds, as well as other factors.

The Contract Option-1 includes:

- Covered canopy from street to the main school entrance.

- Replacement of two basketball boards

- Replacement of lighting system in the physical education room

4.1. New Canopy from Street to Main Entrance

The Base-Bid includes the replacement of the canopy over the main entrance. This canopy has approximately 6x2.5 meters and shall be replaced under the Base-Bid by a new one with approximately 6x3.5 meters. If this Contract Option-1 is awarded, the contractor shall extend this entrance canopy, using the same basis of design, using heavy duty metal profiles, to connect the entrance canopy with the guard house school yard from the main street.

Basis of design:

- 56 meters long by 3.5 meters wide

- Supported by the building façade and by new columns

- Columns shall be separated by maximum of 6 meters or maximum number of columns = 8.

- Columns: The contractor shall use rectangular structural hollow sections - HSS of EN 10219, cold formed steel rectangular sections, with minimum weight 60.0 kg/m

- Horizontal members: IPE200 or larger IPE beams. European standard universal I beams (I section) with parallel flanges. Dimensions, specifications, accordance with former standard EU 19-57

- Continuous pavement from the guard shack, including connecting with the entrance to the school with wheelchair.

- 9 LED lights, with minimum 10 Watts each, and rated for outdoor use, coinciding with space between each column

Location of new required covered walkway

For description of work from part of Contract Option-1

New canopy included in Contract Option-2

Canopy included in the Base Bid

New pavement included in the Contract Option-1

New hollow rectangular profile with minimum 60 kg/m included in the Contract Option-2 (Maximum 8 units)

New pavement included in the Base-Bid

New hollow rectangular profile with minimum 60 kg/m included I the Base- Bid

Location of required new roof/canopy

Typical required metal structure with metal preformed roof sheets.

Different concepts for metal canopy attached to a building, similar to the one required by our contract. Typical required standardized metal profiles (IPE, tubular, HEB from above to below)

Designed to support 200 kg of vertical load in the rim

Explanation of “hinged rim)

Typical dimensions for basketball board

4.2. Replacement of 2 basketball boards

The contractor shall remove the two main basketball boards and provide professional type basketball boards with the following characteristics:

- NBA or FIBA certified (with official stamp or logo)

- Methacrylate board at same distance from wall as existing, and same distance for both.

- Installation to be designed and certified by licensed architect and/or engineer

- Designed with adequate support in the walls and including any additional wall reinforcement that may be required. Repair all wall and/or ceiling damages caused by this installation.

- Installed to support 200 kg of weight at the tip of the rim

- Installed at the official height (10 feet rim height)

- Provided with foam protection in the lowest section of the board

- Hinged rim

Typical required basketball board with foam in lowest section of board

Example of wall mounted professional basketball board with foam in lowest sections.

One of the two basketball boards to be replaced with new

4.3. Replacement of lighting system in the physical education room

The contractor shall remove the existing lighting system, including lighting fixtures, cables, switches and electrical protection, in order to provide a new energy efficient lighting system in strict compliance with Ukrainian electrical regulations.

The contractor shall hire the services of a licensed engineer or the official services of the manufacturer in order to design the lighting system, including the number and location of the LED technology lighting fixtures in order to provide the highest possible uniformity in the lighting level of the main gymnasium room (approximately 27 x 12 meters), with a minimum illumination level of 300 lux, as required for Army buildings. See table below:

Partial payment for any component of the new lighting system shall not be authorized until the design is provided to the Contracting Officer. Payment above 60% of the lighting system shall not be authorized until the final test if done and certified in presence of School representatives. Testing shall consist of measuring the lighting level with a light meter at the floor level and in different locations throughout the gymnasium room. All results should show lighting levels at or above 300 lux.

Lighting fixtures shall be LED technology, with each individual lighting fixture with minimum of 100 Watts of capacity and ceiling or wall mounted, as required by the contractor’s lighting design. Lighting fixtures shall be specifically designed to resist typical impacts in a gymnasium room, or they shall be provided with adequate protection.

The contractor shall provide minimum of 4 switches, in order for the beneficiary to choose lighting level or areas of the room to be lit. The requirement of 300 lux is with all lighting circuits connected at the time of acceptance testing with the lighting meter.

It is the intent of the project to provide the lighting circuits (new cables) recessed within the walls.

However, this contract option does not include wall repairs. For that reason, the contractor can choose to recess on the walls the new conduits in which to install the new cables (which would require significant wall repairs to leave them with original appearance), or to provide new heavy duty surface mounted conduits (impact resistant). The installation of the cables without conduits at any location is not authorized. The preferred solution is to install as much as technically possible the new cables on the conduits or electrical canalization that may be available, as long as this complies with Ukrainian electrical regulations.

The minimum 4 switches for the lighting fixtures shall be installed near the main entrance, and they shall be heavy duty industrial switches. The operation of the lighting fixtures with the circuit breakers is not authorized.

The lighting circuits shall be provided with new circuit breakers and shall be connected to an electrical panel in the school with sufficient capacity for the estimated electrical loads.

Typical ceiling mounted lighting fixtures

Typical required lighting fixture (this one is 160 Watts)

Typical required lighting fixture (this one is 160 Watts)

Typical installation of impact resistant conduits on the ceiling.

Acceptable impact resistant wall/ceiling conduits with double wall.

Typical required lighting fixture

Existing lighting system for the physical education room, to be replaced with new

Details of lights for the physical education room and their protection to be removed.

5. CLIN0003 - DETAILED SCOPE OF WORK OF CONTRACT

OPTION-2

The work included and described in this paragraph shall be performed if, and only if, contract option-2 is awarded to the successful offeror by the Contracting Officer. The US Government will unilaterally decide whether to award or not this portion of the contract based on availability of funds, as well as other factors.

The Contract Option-2 includes designing and providing and constructing a hot mix asphalt pavement resurface for the patio areas of the school as indicated in this document.

Hot mix asphalt shall be composed of aggregate bound together into a solid mass by asphalt cement. The aggregates total ninety-three (93) to ninety-seven (97) percent by weight of the total mixture and are mixed with three (3) to seven (7) percent asphalt cement. It is manufactured in a central mixing plant where the asphalt and aggregates are heated, properly proportioned, and mixed. The completed paving mixture is hauled by trucks to the mechanical spreader where it is placed in a smooth layer and compacted by rollers while still hot. (Hot mix asphalt may be placed by hand when it is impractical to use a paver.)

The works includes:

- Providing new hot asphalt resurface o Minimum thickness: 4 cm compacted bituminous pavement.

o Average thickness: 6 cm compacted bituminous pavement.

This typical deviation is to cover the imperfections and minimum ponding in the area. Prior to starting the works, the contractor shall send a topographer to mark the required benchmarks to properly guide the bituminous hot mix mechanical spreader. In some places only 4 cm shall be required, and in other 8 cm or more shall be required, but the average shall not be greater than 6 cm.

- Provide a tack coat of asphalt (usually emulsified asphalt) to ensure bond between the existing surface and the asphalt overlay. It should be applied in an even, thin coat at a rate of application of 0.2 liters per square meter with a tolerance of .03 liters per square meter.

Excessive tack coat can cause slippage or can flush to the surface. All longitudinal and transverse joints shall be properly tacked.

- Mechanically applied with asphalt spreader, with minimum width 4 meters.

- Compact hot mix asphalt with vibrating roller with minimum 5,000 kg

- Raising all manhole rings to the required elevation of the new pavement. Any extension to the existing manholes shall be done with cast-in-place reinforced concrete elements.

- Removing and reinstalling all equipment currently on the pavement, such as benches or sport equipment.

Typical required overlay of hot mix bituminous pavement

- Providing one new basketball board and support fully anchored on the ground. The post, board and rim shall all be provided by the same manufacturer and certified FIBA or NBA. The basketball post shall be fully anchored under the pavement, the rim shall be flexible as the ones described in the Contract Option-1 and provided exactly at 10 feet from the new pavement surface.

- Modifying as necessary the doors facing the areas to be paved, so that they are adjusted to the new elevation of the ground. It was noted that there are several new metal doors which would need to be removed, modified as necessary for the new elevation and reinstalled.

- Removing all asphalt around the trees and providing adequate tree well, with minimum 40 cm of exposed soil between the tree trunk and the asphalt. The edge of asphalt can be provided with concrete curbs or with thicker asphalt, with minimum thickness of 20 cm. The trees shall not be damaged or even affected by any works in this contract.

- Once all works are completed, the contractor shall provide horizontal stripes or marks. The contractor shall provide a design with the proposed patterns for the new pavement, with maximum of 400 meters of horizontal lines or 40 m² of painted areas (whatever is greater).

These lines shall be used for sports (such as basketball field around the new required basketball board) and for ceremonies that take place in the school patio.

See following pictures for explanation and description of the scope of work of the Contract Option-2

Typical required roller (minimum 5,000 kg)

Examples of acceptable anchored basketball boards. One unit to be installed in the yard, within the new paved areas

Definition of “internal patio” of the school.