20R4010 Causeni - Attach 1 - PTS.pdf
PDF 5 MB Posted
- Solicitation number
- N3319120R4010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20R4010 Amend 00001.pdf | ||
| 20R4010 Causeni - Attach 4 - Data Sheet.docx | DOCX document | |
| 20R4010 Causeni - Attach 5 - Safety Checklist.docx | DOCX document | |
| 20R4010 Causeni - Attach 6 - PPQ.docx | DOCX document | |
| 20R4010 Causeni School RFP.pdf | ||
| 20R4010 Causeni - Attach 2 - PPI.docx | DOCX document | |
| 20R4010 Causeni - Attach 3 - Price Schedule.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design and Construction – Alexei Mateevici High School ID-40164 Windows and Sanitation Improvements, CAUSENI, Moldova
Version: 002
EUCOM Humanitarian Assistance Program
DESIGN AND CONSTRUCTION
ALEXEI MATEEVICI HIGH SCHOOL
WINDOWS AND SANITATION
IMPROVEMENTS
CAUSENI - MOLDOVA
Causeni, Moldova
OHASIS MD-HA-2019-00040164
Oct 2019
Design and Construction – Alexei Mateevici High School ID-40164
Contents
1. TAXATION
2. GENERAL DESCRIPTION OF PROJECT
2.1. LOCATION OF PROJECT
2.2. LEGAL AND TECHNICAL REQUIREMENTS
2.3. GENERAL CONTRACT DESCRIPTION
2.4. GENERAL SCOPE OF WORK – STRUCTURE OF THE CONTRACT
2.5. CONSTRUCTION PERMIT OR AUTHORIZATION – CONSTRUCTION PERMIT
2.6 MEASUREMENTS AND QUANTITIES
3. CLIN0001 - GENERAL SCOPE OF WORK OF BASE-BID – WINDOW REPLACEMENT
3.1. NEW WINDOWS
3.2. PICTURES FROM WINDOWS
3.3. SCAFFOLDING – MANLIFTS – HARNESS – FALL PROTECTION
4. CLIN0002 - GENERAL SOW OF OPTION-1 – SANITATION IMPROVEMENTS
4.1 NEW DESIGN FOR BATHROOMS
4.2 SPECIFIC REQUIREMENTS FOR BATHROOMS
4.3 GENERAL REQUIREMENTS FOR BATHROOMS
4.4 PICTURES TO DESCRIBE THE SCOPE OF WORK FOR NEW BATHROOMS
5. OMISSIONS FROM THE PROJECT SPECIFICATIONS
6. PROCEDURE AND GENERAL CONTRACT REQUIREMENTS AND GUIDELINES
6.1. Principles
6.2. Prohibited Items
6.3. Start of Construction
6.4. Responsibility for New Materials
6.5. Design
6.6. Design-Build Procedure
6.7. Construction/Design Schedule and Contractual Milestones
6.8. Construction Schedule (bar chart is authorized)
6.9. SAFETY: Accident Prevention Plan
6.10. Coordination - Phasing
6.11. Special Site Conditions
6.12. Language
6.13. Submittals – Technical Information
6.14. Deliverable
6.15. Pictures
6.16. Certifications, Licenses, Permits, Fees, etc
6.17. Quality Control Plan
6.18. Construction Sign
6.19. Coomemorative Plaque
6.20. Payment
6.21. Schedule of Prices
6.22. Utilities
6.23. Damages/Impact to Existing Facilities
6.24. Cleaning
6.25. Spare Parts and Materials
6.26. Warranty and Training
6.27. Close-Out Procedure
Design and Construction – Alexei Mateevici High School ID-40164
1. TAXATION
This construction/renovation contract is subject to the Moldovan Government Decision No.
246 of 08.04.2010 on the application of the zero rate of VAT on the supply of goods and services in the country and providing tax and customs exemptions for ongoing projects of technical and investment assistance covered under the international treaties to which the Republic of Moldova is part. As such, the US Government will not pay VAT on any invoices related to this construction contract. The contractor is required to coordinate with the US Embassy and with competent Moldova authorities in order to implement the procedures as required by the Moldovan Government in order to obtain the VAT TAX EXEMPTION that applies to this contract as detailed and specified in the referenced Moldovan regulations.
Contractor shall start the tax exemption within 7 days after award of this contract. Contractor is required to make all necessary coordination and to allow for time for approval of the VAT Tax Exception. A minimum of 3 months and a maximum of 5 months are estimated for processing all required documentation after its submission until the name of the Prime Contractor is published on the official Moldovan Government publication "Monitorul Oficial". The contractor should have the tax exemption process finalized before they start actual construction works and before they contract for any service related with this contract.
It is the contractor's responsibility to properly and adequately follow the requirements of the applicable Moldovan regulations in order implement of a tax free contract environment as it may be applicable for the prime contractor, subcontractors and suppliers. Per existing legislation the Moldovan Government will not register for VAT exemption any of the subcontractors, for any of the projects. The US Government SHALL NOT be responsible to pay any taxes for this contract resulting from a contractor's failure to implement the proper procedures or from not complying with the timelines or from not following any other requirements of the Moldovan regulations which guarantee tax exemption exclusively as detailed and in compliance with their regulations.
Design and Construction – Alexei Mateevici High School ID-40164
Location of Causeni in Moldova
2. GENERAL DESCRIPTION OF PROJECT
2.1. Location of project
The project is located in the High School or Lyceum named after Alexei Mateevici, located in the city of Causeni, Moldova. See drawing below for location of the project site.
Design and Construction – Alexei Mateevici High School ID-40164
G
General location of facility to be renovated within Causeni
Specific location of building to be renovated
Design and Construction – Alexei Mateevici High School ID-40164
2.2. Legal and Technical Requirements
The project execution is based on the following principles:
- Strict compliance with US Contracting Regulations, including the requirements of the Department of Defense, the US Navy and Naval Facilities Engineering Command (NAVFAC).
- Strict compliance with Moldovan technical and legal regulations, with special emphasis on the specific technical regulations regarding the design, renovation and construction of schools and other education facilities in Moldova.
- Strict compliance with Moldovan Safety regulations, unless the US safety regulations
(USACE EM 385-1-1) is more strict and not in conflict with the Moldovan safety regulations, in which case, the US safety regulations shall be applied.
- Compliance with technical and administrative requirements described in this document.
2.3. General Contract Description
This document is a Performance Technical Specifications (PTS) for a full Design-Build project.
This PTS includes a description of the required finished work.
This is a design-build contract. This means that the contractor is responsible to:
- Make necessary designs as required by this PTS for the different items of work
- Obtain NAVFAC’s acceptance of the designs and the approval of the beneficiary and all pertinent and competent Moldovan authorities, including the Municipality of Causeni.
- Obtain required formal approvals from competent and required Moldovan authorities, including the necessary expert review by third party company and/or “technical expertise” as required by Moldovan regulations for the scope of work included in this contract, which shall be paid by the contractor.
- Execute the construction works
- Obtain the acceptance of NAVFAC and the partial and final approvals by the competent and required Moldovan authorities and third party experts for the executed construction works.
Note: The contract includes third party and/or “technical expertise” review of all items of work which are required by Moldovan regulations. In case the Moldovan regulations do not allow for the contractor to be the client for this independent review, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Municipality, a representative from the Ministry of Health, or other agency authorized by the Contracting Officer.
Note: The contractor needs to be familiar with the regulations of Moldova, in order to account for the different required permits, reviews and authorizations for new construction works.
Design and Construction – Alexei Mateevici High School ID-40164
REPLACE EXISTING
EXTERIOR ALUMINUM
WINDOWS (85 UNITS)
(paragraph 3)
BUILD NEW BATHROOMS
INSIDE THE SCHOOL
BUILDING (4 UNITS)
(paragraph 4)
BASE-BID
CLIN0001
OPTION-1
CLIN0002
2.4. General Scope of Work – Structure of the Contract
This document includes everything necessary to provide perfectly finished and certified new exterior windows for the school building, as well as new bathrooms for the children.
The work is divided into Base-Bid and 1 contract option. The contract option will be awarded (or not) depending upon availability of funds, as well as other factors that the US Government will unilaterally consider. The contractor shall provide a separate price for the Base-Bid and the contract option, as required by the solicitation documents.
In general terms, the works include the following items of work:
- Base-Bid, replacement of all exterior windows of the school.
- Contract Option-1, provide new bathrooms for children in basement (girls), ground floor (for people on wheelchair) and in second and third floor (boys).
Design and Construction – Alexei Mateevici High School ID-40164
2.5. Construction Permit or Authorization – Construction Permit
The contractor shall obtain formal written authorization from the competent Moldovan authority to perform the works included in the scope of work of this project.
The contractor is required, as part of this contract, to prepare all documentation, designs, reports, information, drawings, coordination and approvals by experts or monitoring entities, and everything that may be necessary as required by Moldovan regulations, in order to obtain these Permits or Authorizations. The contractor is responsible to pay for any third party inspection or expertise that may be required by Moldovan regulations for the scope of work of this project. The contractor shall be familiar with these requirements in order to prepare their bids, regarding the obligatory administrative and technical procedures in Moldova to perform the works included in this contract.
As previously stated, the contract includes third party review of all items of work which are required as per Moldovan regulations. In case the Moldovan regulations do not allow for the contractor to be the client for this independent expert company, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative or other agency authorized by the Contracting Officer.
The contract requires not only the Construction Permit for the items of works in this contract, but also includes other permits by different agencies which could be required, such as for example the electrical supply company when replacing the electric panel in the future girls’ bathroom. This includes paying for any official fee or tariff that these companies or agencies may have for the connection and for preparation of the necessary coordination, reports or technical studies.
No work shall be performed until the contractor shows verifiable evidence that they have obtained all the necessary permits for each element of work included in this contract.
For this particular project, it is estimated that the contractor shall need formal authorization from the Municipality of Causeni.
2.6 Measurements and Quantities
This contract complies with the US Contracting Regulations, and as such, measurements and quantities of materials and work are not provided, and if any are provided, the contractor shall be responsible to verify on site. The contractor needs to visit the job site in order to perform the necessary measurements and to observe the existing field conditions in order to prepare their cost proposal.
The US Government is not responsible for any mistake in the contractor’s measurements or assumptions of field conditions.
Design and Construction – Alexei Mateevici High School ID-40164
3. CLIN0001 - GENERAL SCOPE OF WORK OF BASE-BID – WINDOW
REPLACEMENT
3.1. NEW WINDOWS
The contract includes the complete replacement of all exterior windows of the school with new PVC windows as specified herein. The contractor shall estimate that they need to replace the following windows:
Width Height No. of windows Total m²
2,43 m 1,90 m 58 267,786 m² 1,12 m 1,90 m 14 29, 792 m²
0,86 m 1,90 m 1 1,634 m² 1,21 m 1,90 m 2 4,598 m²
0,82 m 1,90 m 2 3,116 m² 2,42 m 1,39 m 4 13,455 m²
1,14 m 1,39 m 2 3,169 m²
0,90 m 0,82 m 2 2,502 m²
85 326,052 m²
The new windows shall comply with Moldovan regulations for educational facilities of this type. As a minimum the windows shall be manufactured with PVC profile and double thermally insulated glazing. Minimum requirement is PVC profiles with 5 chambers and triple glazing. Each glazing shall have a minimum thickness of 4 mm, except the internal one that shall be 6 mm.
The contractor shall make the required adjustments and repairs to the window opening on the walls before installing the new windows. The contractor is responsible to visit the site, to take note of the existing conditions of the window openings and to make all required measurements to quantify the amount of work required by this contract.
The new windows shall operate similar as the existing ones. In other words: if a window has 2 operational panels, the new windows shall have two operational panels of approximately similar dimensions, but the opening panels/leaves of the windows shall open vertically and horizontally.
For estimating purposes, the contractor shall estimate that 50% of the window surfaces shall be operational (horizontally and vertically)
Design and Construction – Alexei Mateevici High School ID-40164
The new PVC windows shall be perfectly finished inside and outside. The joints between the building and the windows shall be perfectly sealed as seen in pictures below for a typical installation (typical yellow foam cannot be seen). Contractor to provide PVC sill inside as seen in the pictures below and outside sills made of aluminum or other approved material (i.e. natural marble or exterior rated special ceramic tiles).
The internal finishes will be different from window to window, and for that reason it is absolutely necessary for the contractor to visit the site before submission of their offer. This contract not only includes the replacement of the windows, but also the internal window sill, which shall be replaced with a new one. This replacement will involve construction activities that are included in this contract. Additionally, after the new window is installed, the contractor shall paint all surfaces around the windows to hide any evidence of construction.
Once the work is completed, the window and internal sill will be new with perfect finishes with the existing surfaces to remain; and there shall be no evidence of any construction activity.
Materials for New Windows:
New windows are to be made of highly valuable PVC five chamber profiles that must be of certain thickness (min. 3,5 mm) and with reinforced galvanized steel profiles. Profile should be fully in compliance with RALA quality standard.
Coefficient of thermal conductivity of profile package with metal reinforcement (according to DIN EN 12412-2) less than 1.4 W/m2K). Filling should be double layered glass IZO /20 mm/ (double flat transparent glass with a vacuum between, d=4+12+6 mm).
Inner glass is low emission – LOW E – 1,1W/m2K while the outer is classic - FLOAT.
Sealing is to be done with epoxy rubber (in line with EN410 and EN 673 , Ug=do 2.0 W/m2 K).
Joinery to be supplied with high quality replaceable seals, high quality shackles based on nickel and AL alloys, handles, doorknobs and keys.
All PVC joinery is to be done in line with schemes, in white color. The plan is to have natural flow of air when windows are closed, through especially constructed elements in the frame of the window, type Regel Air, or in some other way, in line with DIN and EU norms. Number and size of elements depends on the size of the window - minimum of two units. No elements should be put in fixed windows and over-lights. Windows should be tightened with wall screws depth 50 mm.
Sealing between wall and window frame should be done with polyurethane foam. Quality certified shackle should enable opening in line with the provided scheme. On the outer side, set an outer bench made of prefabricated aluminium profiles. They are set in the whole width of the window and light box in the prescribed bleed around current facade walls, including the intervention on the facade - the bleed should be six cm more than prescribed bleed. When installing exterior window sill, the sides must lean on the wall, and the part of the facade that is damaged must be fixed. The sill should be tightened with at least two screws in the field. They can be direct or indirect. On the interior side, place parapet benches PVC profile in white color, all in line with producer specifications and joinery schemes.
Design and Construction – Alexei Mateevici High School ID-40164
Certificates to be submitted by the bidder for all joinery:
• Systematic testing of windows, 14351-1 and B 5300
• Certificate for air permeability EN 12207 - Class 4
• Certificate for water resistance EN 12208 - Class E 900 A
• Wind resistance EN 12210 - Class C5
• Mechanical requests EN 12400 - Class 2
• Certificate for sound protection up to protection class 5
• Certificate on the coefficient of warmth conductivity DIN EN 12412-2
• Glass certificate EN 673
• Shackles certificate V ENV 1627-1630, resistance class 3
Prior to production of joinery (windows) that is done in a larger series, it is necessary to make and install a complete typical window that will, upon removal of all possible objections, be recorded and certified and accepted by the Contracting Officer Representative.
Existing windows to be removed:
The contractor shall completely remove the exterior windows, including all framing, trims, interior sills, anchors and supports. All removed positions are to be placed in an adequate place on the construction site (facility) for the purpose of:
- Disposal by the beneficiary: After removal of the windows and glazing, the contractor shall store the removed window materials in an area within the school property. The beneficiary will have a maximum of 4 weeks to take ownership of this material. In order to take ownership, the beneficiary needs to provide written notification to the contractor.
- Disposal: In case the beneficiary does not take ownership of the removed materials, these shall be recycled in accordance with Moldovan regulations. This is mandatory for all glass and aluminum. Any construction debris shall be disposed of in accordance with Moldovan regulations.
Phasing:
The contractor shall coordinate the activities with the School Director. It is estimated that the works will be performed during the school year and consequently with an operational school. The contractor shall work in a maximum of 2 classrooms or 6 windows at the same time. This means that if the contractor starts work in 2 classrooms, and the school director needs to move those children to another area of the school, the contractor shall not be authorized to start working on the third classroom until the first classroom:
- Had installed the new windows
- The old windows in this classroom were removed to a safe location within the school complex.
- The contractor cleans the classroom from any signs of construction
- The School Director confirms that the new windows are sealed and confirms that the classroom is safe for the children.
Design and Construction – Alexei Mateevici High School ID-40164
Window leaf opening horizontally and vertically
Typical window profile with double glazing
Typical internal sill required for all windows to be replaced. This includes the removal of the existing sills.
Design and Construction – Alexei Mateevici High School ID-40164
Typical exterior PVC window installation (note removal of interior window sill as required by this contract)
Typical PVC window installation. Seal all areas around the new windows. Foam not exposed.
Typical PVC window installation with new PVC sill inside and aluminum outside.
Typical PVC window installation. PVC sill inside and aluminum outside.
Installation
The contractor shall completely remove the existing wood and/or metal materials from the window openings on the walls. Some of the existing windows may be double windows, therefore in this case the contractor shall repair and prepare the openings in the walls to install one single window with double glazing.
The new required exterior window sills shall be properly sloped away from the building in order to drain the rain water away from the building. Minimum 5% slope. The lower window frames/profiles shall be properly provided with water drains.
Security Bars: Where there are security bars/grid, the contractor shall remove them, repair them as necessary, paint and reinstall them in the same location.
Opaque/frosted glazing: The contractor shall provide all bathroom windows with non-transparent glazing. The use of film to make them non-transparent or opaque is not authorized.
Design and Construction – Alexei Mateevici High School ID-40164
3.2. PICTURES FROM WINDOWS
The following pictures do not include or describe all requirements of the contract, but all requirements described in the pictures are part of the contract
School building – All windows to be replaced with new. All windows to be provided with new exterior window sills
Design and Construction – Alexei Mateevici High School ID-40164
Window bars to be removed, repaired, painted and reinstalled in the same locations. All windows to be provided with new exterior window sills.
Backside of the façade with all windows to be replaced with new. All windows to be provided with new window sills.
Front entrance of the school
Design and Construction – Alexei Mateevici High School ID-40164
Provide new windows sills in all windows. Replace the wooden cover of the radiators with new one in coordination with the finishes of the new PVC window sill. Prior to any work under the window sills or around the radiator, the contractor shall clean this space with compressed air.
Wooden window sill, also covering the radiators. All be removed and replaced with new.
Damaged window sill to be removed and replaced with new.
Design and Construction – Alexei Mateevici High School ID-40164
Masonry window sill to be removed and replaced with new PVC window sill.
Interior of window to be replaced with new.
Design and Construction – Alexei Mateevici High School ID-40164
Typical window to be replaced, including all wooden structures and materials from the floor to the window.
Design and Construction – Alexei Mateevici High School ID-40164
Typical interior of window to be replaced with new. (From auditorium)
Typical interior of window to be replaced with new
Typical interior of window to be replaced with new
Design and Construction – Alexei Mateevici High School ID-40164
Acceptable man-lift
Required type of scaffold
Required type of scaffold
Required harness and lifelines
Required harness and lifeline
3.3. SCAFFOLDING – MANLIFTS – HARNESS – FALL PROTECTION
In order to perform some of the works in this contract, the contractor may be required to install scaffolding or to use manlifts. For any scaffolding system to be used, the contractor is required to provide a scaffolding design signed and certified by a licensed Moldovan engineer or other technician authorized by Moldovan regulations following the requirements of this paragraph.
Despite the scaffolds that may be authorized by Moldovan regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown in pictures below.
These scaffolds shall be installed and used in accordance with manufacturer’s recommendations.
In case the contractor needs to access the façade at any particular point without the need to install scaffolds, the contractor shall use a CE certified self-propelled man-lift, similar to the one shown in pictures below. The use of other type of scaffolds, other non CE certified man-lifts, or any type of ladders for façade or roof work, IS NOT AUTHORIZED. This applies to all works in this contract.
All other requirements of EM385-1-1 (Safety manual of US Army Corps of Engineers) and of Moldovan Law applies for every work activity included in this project.
Design and Construction – Alexei Mateevici High School ID-40164
4. CLIN0002 - GENERAL SCOPE OF WORK OF CONTRACT OPTION-1
– SANITATION IMPROVEMENTS
The work included and described in this paragraph (and its subparagraphs) shall be performed if, and only if, contract option-1 is awarded to the successful offeror by the Contracting Officer. The US Government will unilaterally decide whether to award or not this portion of the contract based on availability of funds, as well as other factors.
This Contract Option-1 includes:
- Renovating a small area of approximately 2.5 x 1.8 meters in the ground floor to be converted into a bathroom rated and certified for people with limited mobility (wheelchairs)
- Renovating a small area of approximately 2.5 x 1.8 meters in the second floor to be converted into a bathroom for boys
- Renovating a small area of approximately 2.5 x 1.8 meters in the third floor to be converted into a bathroom for boys
- Renovating an area of approximately 7.5 x 4.2 meters in the basement to be converted into a bathroom for girls
Design and Construction – Alexei Mateevici High School ID-40164
4.1 New Design for Bathrooms
The school building does not have any bathroom facilities for children. This contract includes converting 4 rooms into fully operational bathroom facilities as described herein.
IN ORANGE BELOW: EXISTING SPACES
TO BE RENOVATED.
IN GREEN ABOVE: NEW PROPOSED
LAYOUT
Design and Construction – Alexei Mateevici High School ID-40164
In previous page there is a potential conceptual design. The contract requirement is to provide the basement area for girls, the ground floor on wheelchair and the second and third floor for boys.
This requires changing the existing layout by demolishing existing partitions and providing new ones as required by the design. It shall be the contractor’s hired architect the one to provide the optimal layout and distribution of these spaces, in compliance with contract requirements and with the requirements of Moldova regulations.
4.2 Specific Requirements for Bathrooms
Each bathroom shall be provided with the following appliances and special installations and basis of design:
Girls’ bathroom (1 unit in basement):
- Designed with masonry partition wall in the entrance to provide complete privacy when door is open.
- Remove all internal masonry partitions to make it a larger rectangular room before start building new enclosed area for new electric panel.
- Provided with internal enclosed area for new electrical panel and for storage
- Replace the metal electric panel with new one
- Remove concrete foundation in the floor
- Provide new small window and forced ventilation to the exterior, all in the area occupied by the existing window.
- 4 toilets separated by phenolic partitions (Turkish or European standards, as required by
Moldovan regulations)
- 4 sinks over continuous artificial stone countertop
- Mirror over the countertops
- Floor drain
- 2 hand driers hardwired to the wall
- Hot and cold water for all faucets
Adult and children with disabilities (1 unit in ground floor)
- Wall mounted sink with hot and cold water
- Wall mounted European Style toilet
- Floor drain
- Hinged mirror over sink
- 1 hand drier
Design and Construction – Alexei Mateevici High School ID-40164
Boys’ bathroom (2 units in 2nd and 3rd floors): Provide for each bathroom
- 1 urinal separated by wall mounted partitions
- 1 toilet separated by partitions (Turkish/Squat or European/Seat standards, as required by
Moldovan regulations)
- 1 wall mounted sink with hot and cold water
- Mirror over the sink
- Wall mounted faucet for janitorial purposes
- Floor drain
- 1 hand driers hardwired to the wall
The contractor shall provide separate systems for drainage of sinks and sewer from toilets.
Sewage management described in separate paragraph.
4.3 General Requirements for Bathrooms
Design: Prior to performing any works on the bathrooms, the contractor shall hire the services of a licensed architect in Moldova to perform the design of the bathrooms, including the interior design (i.e. combination of colors for the tiles). No work shall be authorized to start until the contractor’s design is accepted by the Contracting Officer Representative.
The work includes:
- Demolitions: Complete demolition of all areas to be renovated, including heating systems, plumbing appliances, electrical installations, internal partitions, wall tiles, paint and plaster, and everything else within the bathroom areas.
- Floor: Provide new floors at the same height as the adjacent room. This means that the contractor shall remove the existing flooring surface before applying the new one. The installation of the new floor tiles over the existing flooring is not acceptable. The contractor shall also remove as necessary the existing concrete foundation in the area to become the girls’ bathroom in order to provide the floors properly leveled or sloped towards the new floor drains.
All new floor surfaces shall be provided with new grès tiles of minimum dimension 40x40 cm, sloped towards new floor drains. Install floor tiles diagonally with respect to the walls.
Provide supporting mortar base as necessary and recommended by the floor tile manufacturer. Provide non slippery tiles. Color and pattern to be selected by the beneficiary among ample selection to be provided by the contractor.
The floors shall be sloped towards the floor drain. Testing of the slopes shall be done by pouring one bucket of water in those rooms with water supply and waiting 5 minutes. After this period there shall be no sitting water on any surface of the new floor tiles (except the entrance tiled ramp).
Design and Construction – Alexei Mateevici High School ID-40164
Floor Material: Minimum size 40x40 cm. Porcelain stoneware (non-glazed) floor tiles of grès porcelain stoneware, laser cut, with water resistant joints. Grès Porcelain stoneware is a ceramic with a compact, hard, colored and non-porous body. The word “grès” means that the ceramic body of the tile is extremely vitrified, that is to say compact, hence the exceptional great resistance. The result is a lean clay body, little refractory, fired in a kiln (at 1200-1400 C°) until it reaches a non-porous vitrification and a complete water-proofing.
Provide wall base along all walls, with special wall trim pieces similar to the floor tiles.
Cutting floor tiles to be used as wall base is not acceptable.
- Floor drains: Provide minimum of one floor drain per bathroom room. Provide stainless steel floor drain with integral p-trap to avoid bad smells.
- Walls: Provide ceramic tiles from floor wall base to new ceiling surface. New walls shall be perfectly leveled. For that reason, the contractor shall estimate that they will need to remove all plaster on all walls in order to provide perfectly leveled plaster surface on which to attach the new wall tiles. The use of gypsum board to level the walls is not authorized.
The contractor shall also repair any cracks of structural defects before leveling the walls with the new plaster.
For the interior of the bathrooms, the contractor shall provide ceramic tiles from the floor (wall base ceramic tile) to the new ceiling surfaces. Ceramic tiles shall with minimum dimension 20x30 cm. Provide combinations of 3 colors and patterns per room, to be selected by beneficiary among ample selection to be provided by the contractor.
The edges of the ceramic tiles shall all be protected by exposed metal corner guard as shown in pictures in the following pages. Plastic corner protection is not authorized. No edge of any tile shall be exposed to the view. Provide non-glazed ceramic tiles (for walls) with water resistant joints, glued onto the surface of the wall. Provide with metal corner guards embedded in the wall tiles.
All installations except heating (electrical, water, sewer, drainage, vent,…) shall be covered under the new wall surfaces. No installations shall be visible once the project is finished, but they shall be provided with the necessary hatches for inspection and maintenance.
Provide perfect connection between piping and wall tiles by the use of properly attached stainless steel escutcheons.
- Masonry Partitions for New Layouts: New partitions required by new layout shall be made of thin masonry wall, not wider than 20 cm. Cover all surfaces with new ceramic tiles as with the rest of the walls.
Design and Construction – Alexei Mateevici High School ID-40164
- Ceiling: Provide acoustic suspended metal ceiling system over all internal areas of the bathrooms.
Prior to the installation of the new false ceiling surfaces, the contract includes removing the defective plaster, fixing any structural defects, and covering all ceiling surfaces with new reinforcing plaster
- Ventilation: As required by Moldovan regulations, including forced ventilation for the girls’ bathroom area in the semi-basement. This will require to share the existing opening to the exterior for a small window and for the piping or ductwork from the forced ventilation.
- Windows: All windows are replaced as part of the Base-Bid of this contract. The bathroom windows shall be provided with non-transparent, frosted or opaque glazing and with removable mosquito screens.
- Doors: All entrance doors of the bathrooms shall be replaced with new. Provide new PVC doors without bottom threshold and without locks. The doors shall be installed without bottom threshold to avoid tripping hazards and to allow for proper ventilation. Provide stainless steel threshold to connect the new floor and the existing floor if necessary. Doors and frames to be delivered by the manufacturer as one complete unit, not to be assembled by the contractor on site. Provide PVC door trims. Do not use any wood material for the new doors.
Note: The width of the doors shall be minimum 90 cm of free opening.
Note: The location and width of the doors may be modified as a result of the contractor’s architect design.
- Heating: Provide new heating radiators, bimetal type. Provide new heating piping within the renovated areas recessed within the new walls or floors. Provide each radiator with isolation and control valves. Size and location of radiators shall be designed by the architect hired by the contractor, but as a minimum they shall be provided under each window. The radiators shall be supported by the walls, without any contact with the floor.
- Electrical: Provide complete new electrical installation for all new bathrooms. To supply electricity to the renovated areas, the contractor shall provide a new electric panel in the renovated areas, to be connected with the main electric panel of the school, immediately after the electric meter. This is to guarantee that 100% of the electrical installation for the renovated areas shall comply with European/Moldovan standards, even if the rest of the school does not. All electrical installation in the renovated areas to be recessed along the walls, ceilings, floors, so that no electrical cables or conduits are visible, including conduits, junction boxes, lighting fixtures, switches, electric panels, etc. The electrical installation shall include:
o Designed and installed in accordance with European standards.
o New electric circuit from main school electric panel to be installed along the walls of the school, and covered by standard PVC channel for hiding cables.
o All electrical equipment to be CE certified.
Design and Construction – Alexei Mateevici High School ID-40164 o Provide differential protection of maximum 30 mA for each one of the bathrooms.
o All electrical installation within the areas to be renovated to be done in conduits recessed within the walls. Electric panels, cables, junction boxes, boxes for the switches, receptacle boxes,… shall all be installed recessed within the new walls, which are to be covered with ceramic tiles or above the suspended ceiling. Direct installation of the cables under the plaster is not acceptable. All cables to be installed under electric conduit, even above the false ceiling.
o New recessed LED lighting fixtures, provided with individual switches for each one of the rooms. One of the reasons to install false ceiling is to recess all lighting fixtures. Lighting fixtures to be provided with washable diffuser. Provide illumination levels as required by Moldova regulations.
o Automatic start hand driers. Provide stainless steel automatic hand driers. Hardwire to the walls, so that the cables are not exposed to the view. Provide two units per bathroom, one for the teacher’s bathroom and one for the handwashing area at the required height for children. Total of 6 units required.
o Provide individual circuits for lighting and power, so that when all hand driers are operating, there is no dimming in the lighting of the rooms. Voltage drop to be less than 3%. This will be tested for acceptance of electrical installation.
For any electrical installation that may be required outside the areas to be renovated, the contractor shall provide new cables installed under PVC channels properly attached to the existing walls and ceiling surfaces in order not to damage the existing walls.
- Water supply within the renovated areas: All water lines for the bathrooms shall be provided using water piping rated for domestic water use, or other material authorized by Moldovan regulations for such use. Within the renovated areas, the contractor shall design the size of the piping in order to provide proper flow and pressure when all toilets valves and faucets are open. Provide all water pipes inside of the bathroom areas recessed within the walls and floors, so that they are not exposed to the view. Provide standard stainless steel faucets single lever for cold and hot water control.
Connect water supply line from water meter or to another point within the school that meets Moldovan standards. Once the work is completed, the water installation shall comply with Moldovan standards. It is required that the contractor provides a certificate of compliance with Moldovan regulations for all works in this project in general, and with the water supply system in particular.
- Valves: Provide shut off valves for each individual plumbing appliance (sink, toilet,…) and for each bathroom.
- Hot water: Provide one single electric hot water heater of minimum 50 liters capacity for the three small bathrooms and another one for the girls’ bathroom.
- Janitorial faucet: Provide one wall mounted water faucet in each bathroom with cold and hot water (or each floor) for janitorial purposes (filling water buckets).
Design and Construction – Alexei Mateevici High School ID-40164
- Sewer/drainage/vent inside the building: The contract includes new sewer/drainage/ventilation PVC piping for the bathrooms connected with the roof of the building and with the nearest manhole outside the school building. If this requires breaking through the roof deck, or other building enclosures, in order to install the new pipes, the contractor shall be responsible to repair as necessary the roof waterproofing in those affected areas. All sewer pipes in the renovated areas to be covered by masonry wall or partitions so that the sewer lines are not exposed to the view in the renovated areas. This includes the drainage pipes of the floor drains and sewer lines from toilets which shall be covered by the new false ceiling. Provide access points for maintenance of the lines.
Connect sewer lines to existing concrete manholes outside the school.
- Connection of sewer lines: Under the 3 small bathrooms there is basement in which all piping is easily accessible. The contractor shall provide the new sewer piping connected with the first manhole outside the school. All trenching and replacement must be coordinated to maintain operational functionality of teachers’ toilets at all times. See pictures in this paragraph for explanation. For the girls’ bathroom, there is no basement, but there is a sewer manhole within 10 meters of the future bathroom outer wall to which the contractor shall connect the new sewer lines. For this girls’ bathroom the contractor shall also provide a vent piping connected to the exterior of the building, as required by Moldovan regulations.
- Phenolic Toilet Partitions for Bathroom (design as provided by the contractor’s architect). The use of shop made toilet partitions is not authorized. The contractor shall use standard manufacturer’s phenolic product. Phenolic toilet partitions are comprised of a melamine sheet and then multiple layers of resin impregnated kraft paper. The toilet partitions shall be heavy-duty and specifically designed and installed by a specialized company. The partitions shall be designed with minimum contact with the floor for hygienic reasons. The contractor shall submit for approval the standard catalog information of the phenolic toilet partitions. The use of shop made toilet partitions, or partitions not included in a commercial catalog, is not authorized. The use of any wooden, aluminum, plastic, metal or any other material that is not phenolic panels, is not authorized.
- Mirrors: To be provided over the sinks. Mirror to be recessed within the new ceramic wall tiles of minimum size 0.6 meter high and with the same length as the countertops. Mirrors shall be surrounded by metal profile as shown in picture in following pages. The mirror shall be minimum 8 mm thickness for security reasons. This is required for all the bathrooms.
- Toilets: Provide Eastern or Western style toilets, as requested by School Director, except the handicapped rated bathroom that shall have a wall mounted Western type. All materials shall be ceramic. The use of plastic water tanks is not authorized.
- Sinks: Sinks to be ceramic provided with faucets with hot and cold water. Use monoblock faucet with single lever to adjust the water temperature. Provide the required sinks over continuous countertops. No drainage piping from the sinks shall be visible, and if the design requires them to be visible, they shall be stainless steel. The use of visible plastic piping for the drainage of the sinks is not authorized.
Design and Construction – Alexei Mateevici High School ID-40164
Minimum required dimensions for bathroom for children with disabilities, according to US standards.
- Countertop (for girls’ bathroom): The sinks shall be installed recessed on continuous artificial stone countertop with rounded edges and designed to support the load of people standing on top of the countertop. Testing of the countertop will be done by sitting 2 adults on the worst area of the countertop (approximately 200 kg). The use of wood for the countertop is not authorized. The countertop shall be made of artificial compound made of minimum 94% natural quartz with anti-bacterial protection. Provide with bright colors (orange, blue, red of yellow), to be selected by the beneficiary among ample selection provided by the contractor. All exposed drainage piping from the sinks shall be stainless steel, provided with p-trap to avoid bad smell.
- Accessories: Provide all required accessories made of stainless steel, in order to have a perfectly finished and operational bathroom facility. This includes toilet paper holder, soap holder, wall hanger or door and window stops.
Design and Construction – Alexei Mateevici High School ID-40164
Typical wall mounted toilet for handicapped, as required in the ground floor
Typical electrical conduits within walls
Typical electric conduit
Design and Construction – Alexei Mateevici High School ID-40164
Typical squat or Eastern toilet with recessed water tank with water saving control. Western or Eastern to be selected by School Director.
Typical aluminum with anodized finish corner protection
Typical stainless steel corner protection for tiled corners.
Typical automatic hand drier, to be hardwired (with electrical wires not visible)
All electrical mechanisms to be recessed in the new walls. Provide wide mechanisms as shown.
Design and Construction – Alexei Mateevici High School ID-40164
LED lighting fixture to be recessed
Water saving flush valve
Cutting homogeneous porcelain stoneware tiles
Homogeneous characteristic of the porcelain stoneware in comparison with standard ceramic tile (not acceptable in this project)
Design and Construction – Alexei Mateevici High School ID-40164
Typical toilet partitions
Typical toilet and urinal partitions
Typical pre-manufactured toilet partitions pieces. Toilet partitions shall be standard product, and contractor shall show the catalog’s information prior to purchase of the materials.
Typical PVC channels for cable installation outside areas to be renovated, as to bring electricity from main panel to renovated bathrooms through the school building.
Design and Construction – Alexei Mateevici High School ID-40164
Recessed mirror with stainless steel framing as required by this contract.
Typical wall hanger
Typical required recessed mirror
Typical support for suspended ceiling
Design and Construction – Alexei Mateevici High School ID-40164
Typical wall mounted sink
Typical required phenolic toilet partitions, from recently completed
NAVFAC project in Bulgaria
Typical required door for the bathrooms)
Typical required phenolic urinal partitions, from recently completed NAVFAC project in Bulgaria
Design and Construction – Alexei Mateevici High School ID-40164
Typical required bathroom finishes. Picture from recently completed NAVFAC project in Bulgaria
Typical required finishes fro bathroom for people with disabilities, including special sink and hinged mirror and stainless stell bars. Picture, from recently completed NAVFAC project in Bulgaria
Design and Construction – Alexei Mateevici High School ID-40164
Typical suspended ceiling using metal tiles, as the one required for the toilet areas
Typical metal ceiling tiles for suspended ceiling
Design and Construction – Alexei Mateevici High School ID-40164
4.4 Pictures to Describe the Scope of Work for New Bathrooms
The following pictures do not include or describe all requirements of the contract, but all requirements described in the pictures are part of the contract
Semi-basement. From room to become girls’ bathroom. All partitions to be demolished and replaced as per the contractor’s design with phenolic toilet partitions.
Design and Construction – Alexei Mateevici High School ID-40164
Semi-basement. From room to become girls’ bathroom. Electric panel to be removed and replaced with new in new enclosure within these areas.
Semi-basement. From room to become girls’ bathroom. All piping and ducts to be removed and replaced with new as per the contractor’s design.
Semi-basement. From room to become girls’ bathroom. All to be demolished
Design and Construction – Alexei Mateevici High School ID-40164
Semi-basement. From room to become girls’ bathroom. Concrete foundation to be demolished as necessary to provide leveled floor surfaces
Window opening to be repaired and leveled with concrete repair grout. Area to be used by new window for natural light and ventilation and for the ductwork for the new required forced ventilation
Semi-basement. From room to become girls’ bathroom. All to be demolished.
Design and Construction – Alexei Mateevici High School ID-40164
Manhole to which to connect the sewage and drainage from girls’ bathroom
Semi-basement. From room to become girls’ bathroom. Window to be replaced and modified as per the contractor’s design.
Window for future girls’ bathroom in the semi-basement.
Forced ventilation to use this existing opening in the building structure.
Design and Construction – Alexei Mateevici High School ID-40164
Area to become bathroom for children
Room to become bathroom for children
Room to become bathroom for children
Design and Construction – Alexei Mateevici High School ID-40164
Room to become bathroom for children. All to be demolished, including the interior masonry partition
Cover of old sewer piping to be removed as everything else in the rooms to become new bathroom for boys.
Actual old piping to be removed
Design and Construction – Alexei Mateevici High School ID-40164
Basement under areas to become bathroom for boys. PVC pipe is from teacher’s bathroom. This piping shall not be modified, but a new pipe shall be connected to the nearest manhole outside the building. No work shall be performed in the teachers’ bathrooms. The new water line for the new bathrooms shall be connected immediately after the water meter and not to the one shown in this picture.
Basement where to install the new sewer pipes
Design and Construction – Alexei Mateevici High School ID-40164
5. OMISSIONS FROM THE PROJECT SPECIFICATIONS
The design shall be based upon the requirements described in the previous pages. If any installation is not specified in this section, but it is required for the formal acceptance of the renovated, improved or rebuilt areas and/or works, the contractor shall consider this installation to be part of the contract, and they shall use commercial grade materials and equipment in compliance with Moldova Code and common construction practice.
Additional Requirements
The work shall meet all requirements of this Request For Proposal (RFP) package. Drawings to be as required in this RFP and with sufficient detail to communicate the design to the US Government, Moldova authorities, final beneficiary, contractor’s staff and sub-contractors. Material selection, specifications and installation to be as described in these technical specifications and in strict compliance with Moldova regulations. The Performance Technical Specification (PTS) are a guideline for the design package. If an item in the project design is included in these technical specifications, the requirements of the PTS and applicable local codes shall govern. If an item in the project design is NOT included in the ESR/PTS, the requirements of applicable local codes shall govern.
Provide the Final work as a complete and usable facility including technical details, items of work, permits or fees that are not explicitly described in this RFP, but which are necessary to provide a fully operational and finished windows and bathroom shall be considered part of this contract.
The beneficiary will participate in the development of the design and construction, and their expertise and deep knowledge of the requirements shall be considered during the design stage.
However, they shall be limited by the requirements of these technical specifications.
If Moldova regulations…