19R0415-_Attach_1_-_Haskovo_and_Vidin_PTS.pdf

PDF 8 MB Posted

Attached to
D-B Renovate Haskovo and Vidin Kindergartens, Bulgaria
Solicitation number
N3319119R0415
Issued by

View the file

Other files

File Type Posted
19R0415_-_Attach_3_-_Price_Schedule.doc DOC document
19R0415__-_Attach_2_-_PPI.docx DOCX document
19R0415_Haskovo_and_Vidin_RFP.pdf PDF
N3319119R0415_19R0415_Haskovo_and_Vidin_-_Pre_sol.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EUCOM Humanitarian Assistance Program

Haskovo Kindergarten – (Yan Bibyan)

Vidin Kindergarten – (Happy Childhood)

DESIGN & BUILD RENOVATIONS

BULGARIA

BU-HA-2018-00035177

BU-HA-2018-00035182

Apr 2019 Ver-001

Renovation to Haskovo kindergarten (Yan Bibyan).

Renovation to Vidin Kindergarten (Happy Childhood) BULGARIA

OHASIS ID 35177 - 35182 Page 2 of 106 Version: 001

Contents

1. TAXATION

2. GENERAL DESCRIPTION OF THE PROJECTS

2.1 LOCATION OF PROJECTS

2.2 LEGAL AND TECHNICAL REQUIREMENTS

2.3 GENERAL CONTRACT DESCRIPTION

2.4 GENERAL PROJECT DESCRIPTION AND SCOPE OF WORK

2.5 CONSTRUCTION PERMIT OR AUTHORIZATION – CONSTRUCTION PERMIT

2.6 MEASUREMENTS AND QUANTITIES

2.7 Design Phase - General

2.8 Construction Phase - General

2.9 APPLICABLE REQUIREMENTS / STANDARDS

3 GENERAL SCOPE OF WORK OF IN HASKOVO KINDERGARTEN – YAN BIBYAN – BASE BID 11

3.1 Location

3.2 Thermally Insulated Facade

3.3 Exterior Windows

3.4 Exterior Doors

3.5 Pictures to show existing condition of the Facade

3.6 Bathroom renovation

3.7 Kitchenette renovation (4 units)

3.8 Commemorative Plaque

3.9 Scaffolding

4 GENERAL SCOPE OF WORK OF IN HASKOVO KINDERGARTEN – YAN BIBYAN – CONTRACT

OPTION-1

4.1 ADDITIONAL EXTERIOR IMPROVEMENTS

4.2 NEW ELECTRICAL INSTALLATION

5 GENERAL SCOPE OF WORK OF IN VIDIN KINDERGARTEN – BASE BID

5.1 Location

5.2 Bathroom and Kitchenette reconstruction

5.3 Kitchen Repairs

5.4 Façade Repairs

5.5 Commemorative Plaque

OHASIS ID 35177 - 35182 Page 3 of 106 Version: 001

6 GENERAL SCOPE OF WORK OF IN VIDIN KINDERGARTEN – CONTRACT OPTION-2

6.1 GENERAL KITCHEN REPAIRS – CAPITAL REPAIRS

6.2 NEW STAINLESS STEEL FURNITURE FOR THE KITCHEN

6.3 NEW STOVE AND OVENS

7. PROCEDURE AND GENERAL CONTRACT REQUIREMENTS AND GUIDELINES ...89

7.1 PRINCIPLES

7.2 PROHIBITED ITEMS

7.3 START OF CONSTRUCTION

7.4 RESPONSIBILITY FOR NEW MATERIALS

7.5 DESIGN

7.6 DESIGN-BUILD PROCEDURE

7.7 CONSTRUCTION/DESIGN SCHEDULE AND CONTRACTUAL MILESTONES

7.8 CONSTRUCTION SCHEDULE (BAR CHART IS AUTHORIZED)

7.9 SAFETY: ACCIDENT PREVENTION PLAN

7.10 COORDINATION AND PHASING

7.11 LANGUAGE

7.12 SPECIAL SITE CONDITIONS

7.13 SUBMITTALS – TECHNICAL INFORMATION

7.14 DELIVERABLE

7.15 PICTURES

7.16 RESPONSIBILITY AND OWNERSHIP OF REMOVED MATERIALS

7.17 CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC

7.18 QUALITY CONTROL PLAN

7.19 CONSTRUCTION SIGN

7.20 PAYMENT

7.21 SCHEDULE OF PRICES

7.22 DAMAGES/IMPACT TO EXISTING FACILITIES

7.23 CLEANING

7.24 SPACE PARTS

7.25 WARRANTY AND TRAINING

7.26 CLOSE-OUT PROCEDURE

OHASIS ID 35177 - 35182 Page 4 of 106 Version: 001

1. TAXATION

In accordance with Agreement between the Government of USA and the Government of BU on Defense Cooperation this contract is exempt from VAT. The contractor shall be responsible to prepare and process all required documentation to obtain the VAT exception from the Government of Bulgaria. For this reason, the contractor shall work directly with the corresponding authorities from Bulgaria, US Forces and the US Embassy".

2. GENERAL DESCRIPTION OF THE PROJECTS

2.1 Location of projects

This contract includes the described renovation works for two separate kindergartens, one in Haskovo and the other one in Vidin. These two facilities are physically separated by 5 hours driving.

However, they are bundled together in the same contract due to its similarity in scope and beneficiary.

Location of Haskovo and Vidin within Bulgaria

OHASIS ID 35177 - 35182 Page 5 of 106 Version: 001

2.2 Legal and Technical Requirements

The project execution is based on the following principles:

- Strict compliance with American Contracting Regulations, including the contracting requirements of the Department of Defense, the US Navy and the US Naval Facilities Engineering Command (NAVFAC).

- Strict compliance with Bulgarian Technical, Legal and Administrative requirements, which are applicable for the scope of work described in this PTS.

- Compliance with Bulgarian safety regulations, unless the US Safety Regulations described in the EM385-1-1 are more stringent and not in conflict with the Bulgarian regulations, in which case, the U. S. safety regulations shall apply.

- Compliance with technical and administrative requirements described in this document.

This is one single contract to include 2 different and separated projects. The technical requirements are similar for the 2 projects unless explicitly stated otherwise in this document. If for example, a type of ceramic floor is specified for the kindergarten in Haskovo Kindergarten, and this document states that ceramic tiles are also required in Vidin kindergarten, but this type of flooring is not detailed for the Vidin kindergarten, then the details specified for Haskovo kindergarten are also contractually required for the Vidin kindergarten.

OHASIS ID 35177 - 35182 Page 6 of 106 Version: 001

2.3 General Contract Description

This document is a Performance Technical Specifications (PTS) for a full Design-Build project. This PTS includes a description of the required finished work.

This is a design-build contract. This means that the contractor is responsible to:

- Make necessary designs or shop drawings as required by this PTS for the different items of work

- Obtain NAVFAC’s acceptance of the designs and the approval of the corresponding beneficiary and Municipality.

- Obtain required formal approvals from competent and required Bulgarian authorities, including the necessary expert review by third party company as required by Bulgarian regulations, which shall be paid by the contractor.

- Execute the construction works

- Obtain the acceptance of NAVFAC and the partial and final approval by the competent and required Bulgarian authorities and third party experts for the executed construction works.

Note: The contract includes third party review of all items of work which are required by Bulgarian regulations. In case the Bulgarian regulations do not allow for the contractor to be the client for this independent review, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative or other agency authorized by the Contracting Officer (i.e. the Municipality of Haskovo or Vidin).

Note: The contractor needs to be familiar with the regulations of Bulgaria, in order to account for the different required permits, reviews and authorizations for energy efficiency projects, for renovation and for new construction works.

OHASIS ID 35177 - 35182 Page 7 of 106 Version: 001

2.4 General Project Description and Scope of Work (Base-Bid and Contract Options)

This document includes everything necessary to provide perfectly finished, certified and operational facilities, as described in this document.

This contract includes 2 separate projects, each one with one contract option. In very general terms, the works include the following items of work:

- Haskovo Kindergarten Base-Bid:

o Thermally Insulated Facade o Bathroom renovation o Kitchenette renovation

- Haskovo Kindergarten Contract Option-1 o Additional exterior improvements o New electrical installation

- Vidin Kindergarten Base-Bid o Bathrooms and kitchenette repairs o Kitchen repairs o Façade repairs

- Vidin Kindergarten Contract Option-2 o Kitchen capital repairs and equipment

OHASIS ID 35177 - 35182 Page 8 of 106 Version: 001

2.5 Construction Permit or Authorization – Construction Permit

The contractor shall obtain formal written authorization from the competent Bulgarian authority to perform the works included in the scope of work of this project.

Some items of work, require a formal Construction Permit from the competent Bulgarian authority, and some others, do not require any formal permit. For those items of work that do not require a formal construction permit, the contractor shall obtain the written authority from the beneficiary to perform the works. This authority shall be signed at least one step above the corresponding Director of the Kindergarten.

For those items of work requiring a formal construction permit, it is absolutely necessary that the contractor is familiar with the Bulgarian bureaucratic procedures to obtain such permits.

The contractor shall hire the services of an architectural firm or architect, specialized, experienced and licensed in Bulgaria to perform all the designs, shop drawings and to facilitate the procedures to obtain the construction permits that are required by the scope of work of this document.

The contractor is required, as part of this contract, to prepare all documentation, designs, reports, information, drawings, coordination and approvals by experts or monitoring entities, and everything that may be necessary as required by Bulgarian regulations, in order to obtain the necessary Construction Permit or authorization. The contractor is responsible to pay for any third party inspection or expertise that may be required by Bulgarian regulations for the scope of work of this project. The contractor shall be familiar with these requirements in order to prepare their bids, regarding the obligatory administrative and technical procedures in Bulgaria for new construction.

As previously stated, the contract includes third party review of all items of work which are required as per Bulgarian regulations. In case the Bulgarian regulations do not allow for the contractor to be the client for this independent expert company, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative or other agency authorized by the Contracting Officer Representative.

No work shall be performed until the contractor shows verifiable evidence that they have obtained all the necessary permits or authorizations for each element of work included in this contract.

2.6 Measurements and Quantities

This contract complies with the US Contracting Regulations, and as such, measurements and quantities of materials and work are not provided, and if any are provided, the contractor shall be responsible to verify on site. The contractor needs to visit the job site in order to perform the necessary measurements and to observe the existing field conditions in order to prepare their cost proposal.

OHASIS ID 35177 - 35182 Page 9 of 106 Version: 001

2.7 Design Phase - General

The contractor shall familiarize with the requirements of the Bulgarian regulations for children with special needs. The designs shall be prepared in compliance with applicable construction codes, applicable urban planning and construction practices in Bulgaria. The contractor shall hire the services of an architect (or architectural firm) licensed in Bulgaria to design all works, as detailed in this document. At the same time, after obligatory coordination with the corresponding Municipality, the contractor shall hire (and pay for) the services of a “Revision Entity - Expertise” authorized by the Government of Bulgaria to supervise and approve each phase of the design and the construction, including final commissioning and acceptance of the facility. This company shall report directly to the US Government representative and the beneficiary if required by the Bulgarian regulations, but all their services shall be paid by the contractor.

The design shall comply with all applicable regulations in Bulgaria for the scope of work of this contract.

The contractor’s final designs shall be signed, stamped and certified by a licensed architect in Bulgaria, it shall be approved by an authorized “Revision Entity - Expertise” and it shall be approved by the competent Bulgarian authorities for construction projects in public property before its construction is authorized to start. The level of detail of the design (extent of specifications, number and size of drawings, calculations, …) shall be sufficient to verify the compliance with the requirements of this contract and as required by the regulations of Bulgaria and of the competent Bulgarian authorities for this particular project.

2.8 Construction Phase - General

Once the contractor completes the design and they show evidence of formal authorization by the competent local authorities and Monitoring Entity, and the contractor shows that they have completed other administrative contract requirements (Accident Prevention Plan, Quality Control Plan, Schedule,…), the Contracting Officer will inform the contractor that they may start the construction phase of this design-build contract. This notification is called Notice to Proceed or NTP. NTP is required prior to beginning construction.

The construction shall follow the design and technical projects or shop drawing prepared by the architect and for which the contractor shall obtain the Construction Permit or authorization.

The architect who prepares the design shall visit the site for every important and relevant phase of work, to partially accept the completed works. In addition to the requirements of the Bulgarian regulations for the visits of the designer, once the works start, the architect shall visit the site at a minimum once every week.

Two days in advance of the site visit, the contractor shall inform ODC Bulgaria and the beneficiaries of the planned arrival time to the job site. In addition to these minimum weekly visits, the architect shall visit the site when NAVFAC’s PM visits the job sites, estimated to occur once every two months.

In addition to these visits, the third party experts that may be required will visit the site as required by Bulgarian regulations, and also when NAVFAC’s PM visits the site.

Work will not be accepted until Final Act of Acceptance is provided.

OHASIS ID 35177 - 35182 Page 10 of 106 Version: 001

2.9 Applicable Requirements / Standards

The project is based on the principle of strict compliance with Bulgarian technical and administrative regulations, with US Contracting Regulations and with Bulgarian Safety regulations unless EM 385- 1-1 has more strict requirements. In case of conflict between Bulgarian and US safety regulations, the contractor shall apply Bulgarian regulations.

The work shall meet all requirements of this Request for Proposal (RFP) package. Drawings to be as required in these PTS and with the necessary details and previous approvals (experts or monitoring entities) to submit the designs to the US Government, Local Bulgarian Administration, final users, contractor’s staff and sub-contractors. Material selection, specifications and installation to be as described in these Performance Technical Specifications (PTS). The Performance Technical Specifications (PTS) are a guideline for the design package:

- If an item in the project design is included in the PTS, the requirements of the PTS, applicable local Bulgarian codes and regulations, and international codes shall govern.

- If an item in the project design is NOT included in the PTS, the requirements of applicable local Bulgarian codes and regulations, and international codes shall govern.

Provide the final work as a complete and usable facility including all required items not described in this RFP. Technical details, items of work, permits or fees that are not explicitly described in this RFP, but which are necessary to provide a fully operational and finished facility shall be considered part of this contract.

Any work not explicitly included in the scope of work of this project, but which is absolutely necessary to have a perfectly operational facility, as required by Bulgarian regulations, shall be considered and treated as part of the requirements of this contract.

Limitation on equipment under this contract

Tables, desks, chairs, computer, phones, washing machines, refrigerator, beds, televisions, and other movable equipment are not part of this contract, unless otherwise indicated in these technical specifications. Only those elements that are fixed, permanently attached to the building or considered as an integral part of the facility, and specifically described in these contract specifications or in the applicable Bulgarian regulations, are included in this contract, unless otherwise indicated in this document.

Requirement for Bulgaria Code and Regulation

The contractor shall request, process and pay for any permits that may be required in accordance with Bulgaria Law for the construction activities described in this document. The contractor shall hire and pay for the services of a “Revision Entity” (or expertise) authorized by the Government of Bulgaria as required by Bulgaria Regulations for this type of construction. If it is not allowed for the contractor to hire this third party inspection company, the contractor shall pay but assign the beneficiary or NAVFAC as the client. The contractor shall provide a copy of the pertinent construction permit to be issued by the competent local authorities and approval by the Monitoring Entity of the design, before they are authorized to start work.

OHASIS ID 35177 - 35182 Page 11 of 106

3 GENERAL SCOPE OF WORK OF IN HASKOVO KINDERGARTEN –

YAN BIBYAN – BASE BID

The works in the Base-Bid include in general terms: thermally insulated façade, replacement of wooden or metal windows, replacement of metal exterior doors, and complete renovation of bathrooms and kitchenettes.

3.1 Location

The kindergarten is located in Haskovo, as shown in the images below

Location of kindergarten within Haskovo

OHASIS ID 35177 - 35182 Page 12 of 106

Kindergarten within Haskovo

Main Kindergarten in Haskovo, subject to renovation

OHASIS ID 35177 - 35182 Page 13 of 106

3.2 Thermally Insulated Facade

The contractor shall hire the services of specialized and licensed technicians in Bulgaria to design the new thermal façade system for the main kindergarten building shown in the previous page.

Contractor shall provide a new thermal façade system on all exterior surfaces of the kindergarten building. This contract includes all exterior masonry sections of the building, as the sides of the main entrance steps or the sides of the terraces (which do not need thermal insulation but shall be provided with the same esthetic finishes). Only those areas described under the scope of work of Contract Option-3 are not included in the Base-Bid.

This is a design-build contract and therefore the contractor shall be responsible for the design and for the execution of the works.

Façade Design: The contractor shall provide a façade design (Façade Passport), signed and certified by a licensed architect in Bulgaria, to be accepted by the Contracting Officer Representative (COR) and approved by the competent Bulgaria authorities after coordination of the design with the beneficiary. This design shall include as a minimum:

Typical section of thermal façade system

Special cover of the lowest section of thermal façade (natural stone for estimating purposes)

Color and finishes or “façade passport” with the new proposed finishes. Provide pattern and color as approved by competent local authorities and after coordination with beneficiary. The contractor’s architect shall provide several designs for the exterior appearance of the façade for the approval of the competent Bulgarian authorities. The design shall consist of a minimum combination of 3 colors, in addition to the different finishes required for the lowest section of the façade, which shall be provided with special exterior façade ceramic or natural stone tiles

Details of finishes of the thermal façade system in the top and bottom. In the top it is required to provide adequate finish with new roof.

Details for special finishes and reinforcements in the corners and around the windows and doors.

The new thermal façade system shall include, but shall not be limited to:

- Water blasting the façade. Repair all façade defects, after removal of loose pieces of plaster, ceramic tiles, paint, bricks. Repair of any cracks on the facade. Providing leveling mortar as needed for the new thermal façade system. Correct any exposed reinforcing steel by epoxy based product, specifically designed for that purpose. Note that the façade has important defects in several very localized areas (as noted in the pictures) and consequently the contractor shall estimate that by the use of water blasting at minimum 100 bars, a significant portion of the plaster will be removed. The contractor shall estimate that 30% of the plaster and 100% of the paint will be removed by water blasting.

- Provide thermal insulation panels, minimum of 8 cm thickness of wool rock (or any other thermal insulation product permitted by Bulgarian regulations with similar thermal insulation

OHASIS ID 35177 - 35182 Page 14 of 106

Lowest natural stone over the thermal insulation, from a

NAVFAC project in Western Ukraine.

properties as 8 cm thick wool rock sheet), properly attached to the existing repaired and leveled façade, in accordance with manufacturer’s recommendations. Follow Bulgarian Fire Code. The use of Styrofoam may not be allowed in some (or in all) locations. The contractor shall consult the latest Bulgarian regulations prior to submission of their bids. Only materials and installations in accordance with Bulgarian regulations in effect at the time of submission of the offers shall be authorized.

- Doors: Most existing exterior doors have been recently replaced. The contract includes removing them, modifying them as necessary and reinstallation, to provide perfect finishes, adjustments, and sealing between the doors and the new façade finishes. Only painted metal framed doors shall be replaced as part of this contract, which is described in separate paragraph.

- Windows: Similarly to the exterior doors, most exterior windows are new and consequently they do not need to be replaced as part of this contract. For these new existing windows, the contractor shall have to remove, modify as necessary and reinstall them properly attached and sealed to the new thermally insulated façade system. The replacement of exterior sills is these windows is necessary to allow for the new thickness of the exterior enclosure. The wooden and painted metal windows to be replaced are covered in separate paragraph.

- Protective plaster. There are several systems available in the market to cover the thermal insulation. The contractor shall apply over the rigid thermal insulation a protective plaster, designed to resist impact. Minimum of 1 cm thickness. This may require double netting prior to the application of the final coat of plaster. Apply in accordance with manufacturer’s recommendations. Testing shall be done by letting children play against one finished wall with a ball, tennis and basketball, for one week. After one week the wall shall not have any evidence of any damage.

- Natural stone: The lowest section of the façade, currently with plastered finish shall be provided with a different cover over the thermal insulation. The height of this lowest section varies in different areas of the kindergarten building, but the contractor shall estimate an average height of 1.2 meters. This lowest section shall be provided with new leveled plaster covered with natural stone.

- Paint thermal façade system with 3 coats of paint rated for exterior use and recommended by the manufacturer of the thermal façade system. Provide artistic design with combination of colors for a kindergarten building.

- Final certificate: Once the thermal façade is complete, the contractor shall provide a copy of a certificate from the architect certifying that the thermal façade has been properly installed in accordance with their recommendations. Payment for thermal façade shall not be authorized until the contractor provides such certificate.

OHASIS ID 35177 - 35182 Page 15 of 106

Typical thermal facade

Typical installation of thermal facade

Typical installation of thermal facade

OHASIS ID 35177 - 35182 Page 16 of 106

Lowest section with natural stone cover for vandal protection.

Average 1.2 meters around all facility. Picture from NAVFAC project in central Ukraine.

Façade Installations, Extensions and Other Exterior Surfaces

The contractor shall be responsible to reroute, remove and reinstall any of the accessories or installations that are currently anchored or supported by the existing façade which are to remain, including electrical poles, electric cables or conduits, road signs, building sign, grounding cables, security cameras, water pipes, telephone cables, gas pipes, ventilation ductwork, downspouts, and any other installation that may exist on the façade to be provided with new thermal insulation and new finishes. All works to be done in compliance with Bulgarian regulations and with approval or permit of the owner, in case it is owned by a third party. For example: if the electrical cable is owned by the electrical utility company, the contractor shall obtain the approval, or the assistance of the electrical company to remove and reinstall this cable. The contractor is responsible for all coordination and for all costs associated with this necessary work. Those installations on the façade that are not be reutilized shall be removed and disposed of by the contractor.

Canopy: The contract includes replacing the small metal canopy attached to the façade in one lateral of the building with one with twice the area. The contractor shall provide a new canopy with columns to support its weight on the pavement..

It is the intent of this contract, and it is the scope of work of this contract, to provide the building with the exterior appearance of a new kindergarten building. For that reason, the contract includes the repairs of other exterior surfaces, which require repairs, but which do not require thermal insulation.

These are defined in the pictures included in this document. All these surfaces shall be provided with finishes coordinated with the finishes of the new thermal façade system.

Railing and window metal bars:

Repair and paint all metal railing and bars permanently attached to the building exterior enclosure. This includes the railing for the balconies, entrance steps or the window security bars. These shall all be removed, repaired and reinstalled on the new wall surfaces.

OHASIS ID 35177 - 35182 Page 17 of 106

Typical façade cleaning with high pressure water.

Removing paint. Use minimum 100 bars.

Typical façade high pressure cleaning. Removing plaster.

Typical required “colorful” color combination for the kindergarten. The contractor’s architect shall propose several façade designs for the selection of the beneficiary and the acceptance of the Contracting Officer Representative.

OHASIS ID 35177 - 35182 Page 18 of 106

Sidewalks: Provide a 1.2 meter wide reinforced concrete sidewalk around the perimeter of the kindergarten, where there is pavement or where vegetation is growing around worn out tiles. See pictures for definition of these areas.

Grounding: The contractor shall replace the grounding cables from the roof to the ground. The contract includes testing the ground resistance and providing new grounding if required in order to comply with minimum ground resistance as per Bulgarian Electric Code.

Downspouts: The contractor shall completely remove and provide new PVC downspouts from the roof to the ground level. The old downspouts shall be completely removed.

Balcony Repair:

The contract includes all necessary works for the balcony decks to be certified as in compliance with Bulgarian regulations. This will require structural repairs. The contractor shall remove all poorly attached concrete by the use of the water blasting equipment to minimum of 200 bars.

The contractor needs to remove and cure the source of the concrete spalling and cracking and not just to repair the spalling and cracking. This includes removing all cracked or not solidly adhered concrete surface from the balconies, repairing the reinforcing steel that surfaces and providing adequate concrete repair product in their corresponding formworks. Before the contractor is authorized to start works, they will need to submit for approval a concrete repair method, including the construction practice and concrete repair products proposed to be used. Only materials specifically designed and certified to be used to repair structural concrete shall be authorized.

In some cases, the contractor shall estimate that they will need to remove part of the balcony deck.

For estimating purpose, the contractor shall estimate a maximum of 2 m² of balcony deck replacement.

Exterior Lights:

The contract includes removing all exterior electrical lights and providing minimum 4 new exterior LED lighting fixtures of minimum 30 Watts, with photocell and motion detection with switches inside the kindergarten building to discriminate between: on, off and automatic. All rated for exterior use but covered with an additional structure to provide the lighting fixtures with double protection from inclement weather.

OHASIS ID 35177 - 35182 Page 19 of 106

Example of lowest section of façade using natural stone.

All pictures in this page correspond to NAVFAC completed project in Klikach - Bulgaria in 2019, using similar contract specifications as those included in this document. Project can be visited at any time prior coordination with Bulgaria ODC staff.

Similar recently completed NAVFAC project in Bulgaria

Similar recently completed NAVFAC project in Bulgaria

OHASIS ID 35177 - 35182 Page 20 of 106

Typical minor concrete repair

Typical major repair to the balconies.

Major repairs to the balcony after removal of all cracked and spalled concrete. This situation is slightly worse than in Haskovo.

OHASIS ID 35177 - 35182 Page 21 of 106

Balconies with minor repairs being executed, similar to the ones in Haskovo

Major repairs to the balcony after removal of all cracked and spalled concrete. This situation should be an exception for the Haskovo kindergarten balconies.

OHASIS ID 35177 - 35182 Page 22 of 106

Typical internal sill required for all windows

Typical required external sill for all windows

3.3 Exterior Windows

Most windows were recently replaced and therefore they should be reutilized. The contractor shall remove them as necessary in order to adjust them to the new wall surfaces and reinstall them, as well as the metal security bars.

The contractor shall replace all remaining steel framed and wooden framed windows.

The new exterior windows shall be minimum of 5 chambered PVC profile with double glazing. Each glazing pane shall be minimum 6 mm. They shall be provided with the quality certificate. Provide with internal PVC sills and external aluminum or ceramic tile, with minimum 5% sloped away from the building. This is heavy glazing, required not only for thermal insulation but also for physical protection. The use of aluminum profiles is authorized given that the contractor shows similar of better thermal insulation characteristics.

Operational panels of the new windows shall open horizontally and vertically as shown in the picture in this paragraph. At least 50% of the window surfaces shall be made of operational panels.

The material for the doors of the balconies shall be similar to the windows and provided by the same manufacturer. These larger window partition walls shall be designed and installed with the necessary structural strength to avoid any visual deflection when a physical person applies physical manual force at any location.

OHASIS ID 35177 - 35182 Page 23 of 106

Window operational leaves / panels to open horizontally and vertically

Typical required PVC window profile with double glazing

Acceptable aluminum window profile with double glazing

Non-transparent double glazing, as the ones required in the project for bathroom areas.

OHASIS ID 35177 - 35182 Page 24 of 106

Potential design of new main entrance door with anti-panic hardware and glass on the upper half.

Minimum elements of the stainless steel anti-panic hardware Typical required anti-panic hardware

3.4 Exterior Doors

All steel framed exterior doors shall be replaced as part of this contract.

This include 4 exterior doors, plus the ones included within the balcony partition window wall.

The contractor shall replace these doors with new heavy duty aluminum door, with glazing in the upper half. This exterior door shall be designed and built with the minimum requirements specified herein:

- European standard aluminum profiles with break in the thermal bridge, and must have three rubber dust protection seals.

- With double glazing in the upper half, with 8-16-8 mm thickness for double glazing.

- With required locks and anti-panic hardware, all made of stainless steel.

- Provided with door closers and door stops to avoid damages by users.

- Aluminum profiles shall be minimum 8 cm wide and minimum of

1.8 kg/m (heavy duty)

- Fire rated as required by Bulgarian regulations

- Same shape as the existing doors to be removed.

All doors to be provided without bottom threshold, to avoid tripping hazards and movement of equipment on wheels.

OHASIS ID 35177 - 35182 Page 25 of 106

3.5 Pictures to show existing condition of the Facade

The following pictures do not include or describe all requirements of the contract, but all requirements described in the pictures are part of the contract

General condition of back façade:

In blue are structures which are part of Contract Option-3. All other building areas shown in this picture are part of the Base-Bid.

The contractor shall remove and reinstall all façade mounted air conditioning units so that they are properly supported on the new façade surface. The metal doors are highlighted in red. These two doors shall be replaced. Basement windows shall also be replaced if they are wooden framed. Downspouts to be replaced with new to be installed over the new façade surfaces.

OHASIS ID 35177 - 35182 Page 26 of 106

Typical PVC channels for cable installation in areas not under the scope of work

Building signs to be reinstalled

Façade area with most defective plaster

Balcony deck to be structurally repaired. The contractor can provide vertical metal columns if recommended by the contractor’s architect. The balcony metal railing shall be removed, repaired and coated with epoxy products and reinstalled. Exterior lights to be removed and replaced with new LED lighting fixtures. All metal windows and doors as the large exterior partitions for the balconies shall be completely removed.

In contract option-1

In Base-Bid

In contract option-1

In Base-Bid

OHASIS ID 35177 - 35182 Page 27 of 106

Front façade. Downspouts to be completely removed. All cables to be installed under new PVC channels so that they are not visible. No cable shall be visible on the façade surface.

In blue it is the steel partition window wall to be removed, to be replaced with sigle aluminum/PVC thermally insulated window partition wall with door.

Same as to the lrft, with example of top floor of required work.

OHASIS ID 35177 - 35182 Page 28 of 106

Lateral façade: Remove the wall mounted canopy and replace it with a new one with columns to the floor and with twice its surface. All air conditionings shall be removed and reinstalled on the new façade surfaces. This may require recharging the refrigerant lines. All cables to be reinstalled on new PVC channels or conduits, rated for exterior use, and attached to the new façade surfaces. Any piping shall also be reinstalled on the new façade surface, after proper repair and painting.

Lateral facade. Note openings for basement with windows to be replaced.

OHASIS ID 35177 - 35182 Page 29 of 106

Detail of façade damages. The contractor shall also replace the roof metal cover for the parapets in order to be adjusted to the new façade thickness. Grounding cable to be replaced in compliance with Bulgarian regulations

Pavement areas to have new sidewalks. Façade areas to have natural stone or similar approved.

Areas requiring new sidewalks

Metal parapet cover to be replaced with new

OHASIS ID 35177 - 35182 Page 30 of 106

Typical window wall to be replaced. The exterior one is metal and the interior one is wood. The contractor shall remove both and replace them with a thermally insulated and structurally sound new partition window wall with similar operation as the existing one (including door – but also openable windows). The contractor shall be responsible for properly finishing all internal surfaces, including the floor which shall be continuous, with approved joint cover where the wooden partition is located.

Typical metal door in the back side of the building to be r4eplaced with new one

Detail of window security bars/mesh to be repaired and reused.

OHASIS ID 35177 - 35182 Page 31 of 106

3.6 Bathroom renovation

It is the intent and the requirement of this contract, as detailed in the following paragraphs, to reconstruct the bathroom facilities, with 3 main goals:

- To provide them with the optimal sanitation conditions, by replacing all water and sewer lines, as well as all plumbing appliances. All sewer lines shall be replaced in bathrooms and kitchenettes from the plumbing appliance to the nearest manhole outside the kindergarten building.

- To make them esthetically pleasant, with all new finishes. All exposed surfaces shall be new: floors, walls, ceiling, lights or phenolic partitions.

- To certify them as in compliance with all applicable Bulgarian/European regulations.

Any work, which shall be necessary to make the 3 items above, which may not be explicitly described in the following paragraphs, shall be considered an integral part of this contract.

The works include the complete reconstruction of the bathroom facilities. This includes 4 bathroom areas for the children and one for the kindergarten staff.

This is a design build. Each bathroom is slightly different, with general overall sizes similar for all children bathrooms, as shown in the sketches included in this document.

Each bathroom shall be designed in compliance with Bulgarian regulations for kindergartens. This means that as a minimum each bathroom shall be provided with:

- 3 toilet seats sized for young children with phenolic partitions

- 4 sinks over continuous countertop

- Mirrors over the sinks

- One shower area (with pebbled floor)

- 2 electric hand driers (air blowers)

- Special kindergarten bathroom furniture

- Floor drain

- Faucet for janitorial purposes.

The contractor’s architect or design team shall provide sketches for each of the bathrooms to be renovated. The design shall be certified by the contractor’s design team or responsible individual, and it shall be formally and officially approved by competent Bulgarian authorities.

OHASIS ID 35177 - 35182 Page 32 of 106

Sketch showing general layout of the children’s bathroom. Please, note that there are 4 with slightly different layouts, but similar overall dimensions. The contractor is responsible to visit the site and to take note of the actual layout of each of the 4 bathrooms before submitting their offer.

Sketch showing general teachers’ bathroom before and after

OHASIS ID 35177 - 35182 Page 33 of 106

General requirements for bathrooms

Design: Prior to performing any works on the bathrooms, the contractor shall hire the services of a licensed architect in Bulgaria to perform the design of the bathrooms, including the interior design (i.e. combination of colors for the tiles). No work shall be authorized to start until the contractor’s design is accepted by the Contracting Officer Representative.

The work includes:

- Demolitions: Complete demolition of all areas to be renovated, including heating systems, plumbing appliances, electrical installations, internal partitions, wall tiles, paint and plaster, and everything else within the bathroom areas.

- Floor: Provide new floors at the same height as the adjacent room (or rooms depending on the layout of the bathroom). This means that the contractor shall remove the existing flooring surface before applying the new one. The installation of the new floor tiles over the existing flooring is not acceptable.

Provide new grès tiles of minimum dimension 40x40 cm, sloped towards new floor drains.

Install floor tiles diagonally with respect to the walls. Provide supporting mortar base as necessary and recommended by the floor tile manufacturer. Provide non slippery tiles. Color and pattern to be selected by the beneficiary among ample selection to be provided by the contractor.

The floors shall be sloped towards the floor drain. Testing of the slopes shall be done by pouring one bucket of water in those rooms with water supply and waiting 5 minutes. After this period there shall be no sitting water on any surface of the new floor tiles

Floor Material: Minimum size 40x40 cm. Porcelain stoneware (non-glazed) floor tiles of grès porcelain stoneware, laser cut, with water resistant joints. Grès Porcelain stoneware is a ceramic with a compact, hard, colored and non-porous body. The word “grès” means that the ceramic body of the tile is extremely vitrified, that is to say compact, hence the exceptional great resistance. The result is a lean clay body, little refractory, fired in a kiln (at 1200-1400 C°) until it reaches a non-porous vitrification and a complete water-proofing.

Provide wall base along all walls, with special wall trim pieces similar to the floor tiles.

Cutting floor tiles to be used as wall base is not acceptable.

- Floor drains: Provide minimum of one floor drain per bathroom room. Provide stainless steel floor drain with integral p-trap to avoid bad smells.

- Walls: Provide ceramic tiles from floor wall base to new ceiling surface. New walls shall be perfectly leveled. For that reason, the contractor shall estimate that they will need to remove all plaster on all walls in order to provide perfectly leveled plaster surface on which to attach the new wall tiles. The use of gypsum board to level the walls is not authorized. The contractor shall also repair any cracks of structural defects before leveling the walls with the new plaster.

For the interior of the bathrooms, the contractor shall provide ceramic tiles from the floor (wall base ceramic tile) to the new ceiling surfaces. Ceramic tiles shall with minimum dimension 20x30 cm. Provide combinations of 3 colors and patterns per room, to be selected by beneficiary among ample selection to be provided by the contractor.

OHASIS ID 35177 - 35182 Page 34 of 106

The edges of the ceramic tiles shall all be protected by exposed metal corner guard as shown in pictures in the following pages. Plastic corner protection is not authorized. No edge of any tile shall be exposed to the view. Provide non-glazed ceramic tiles (for walls) with water resistant joints, glued onto the surface of the wall. Provide with metal corner guards embedded in the wall tiles.

All installations (electrical, water, sewer, drainage, vent,…) shall be covered under the new wall surfaces. No installations shall be visible once the project is finished, but they shall be provided with the necessary hatches for inspection and maintenance. Only the heating pipe is authorized to be installed on the wall surfaces.

Provide perfect connection between piping and wall tiles by the use of properly attached stainless steel escutcheons.

- Masonry Partitions: All internal masonry partitions shall be removed. All new partitions shall be made of phenolic material.

- Ceiling: Provide acoustic suspended ceiling system (Armstrong type) over all internal areas of the bathrooms.

Prior to the installation of the new false ceiling surfaces, the contract includes removing the defective plaster, fixing any structural defects, and covering all ceiling surfaces with new reinforcing plaster

- Ventilation: As required by Bulgarian regulations.

- Windows (internal and external): Most windows were replaced by the beneficiary. The contract only includes replacing any remaining wooden doors and removing and reinstalling the existing PVC windows in order to provide a perfect connection between the existing windows and the new wall surfaces. For those windows to be replaced, the contractor shall provide new windows with similar quality as the ones replaced by the beneficiary.

- Doors: All entrance doors of the bathrooms shall be replaced with new. Provide new PVC doors without bottom threshold and without locks. The doors shall be installed without bottom threshold to avoid tripping hazards and to allow for proper ventilation. Provide stainless steel threshold to connect the new floor and the existing floor if necessary. Doors and frames to be delivered by the manufacturer as one complete unit, not to be assembled by the contractor on site. Provide PVC door trims. Do not use any wood material for the new doors.

Note: The width of the doors shall be minimum 90 cm of free opening.

Note: The location and width of the doors may be modified as a result of the contractor’s architect design.

OHASIS ID 35177 - 35182 Page 35 of 106

- Heating: Provide new heating radiators, bimetal type. Provide new heating piping within the renovated areas exposed on the new walls, but protected as required by Bulgarian regulations. Provide each radiator with isolation and control valves. Size and location of radiators shall be designed by the architect hired by the contractor, but as a minimum they shall be provided under each window. The radiators shall be supported by the walls, without any contact with the floor.

- Electrical: Provide complete new electrical installation for all new bathrooms. To supply electricity to the renovated areas, the contractor shall provide a new electric panel in the renovated areas, to be connected with the main electric panel of the kindergarten, immediately after the electric meter. This is to guarantee that 100% of the electrical installation for the renovated areas shall comply with European/Bulgarian standards, even if the rest of the kindergarten does not. All electrical installation in the renovated areas to be recessed along the walls, ceilings, floors, so that no electrical cables or conduits are visible, including conduits, junction boxes, lighting fixtures, switches, electric panels, etc. The electrical installation shall include:

o Designed and installed in accordance with European standards.

o New electric circuit from main kindergarten electric panel to be installed along the walls of the kindergarten, and covered by standard PVC channel for hiding cables.

o All electrical equipment to be CE certified.

o Provide differential protection of maximum 30 mA for each one of the bathrooms.

o All electrical installation within the areas to be renovated to be done in conduits recessed within the walls. Electric panels, cables, junction boxes, boxes for the switches, receptacle boxes,… shall all be installed recessed within the new walls, which are to be covered with ceramic tiles or above the suspended ceiling. Direct installation of the cables under the plaster is not acceptable. All cables to be installed under electric conduit, even above the false ceiling.

o New recessed LED lighting fixtures, provided with individual switches for each one of the rooms. One of the reasons to install false ceiling is to recess all lighting fixtures.

Lighting fixtures to be provided with washable diffuser. Provide illumination levels as required by Bulgarian/European regulations.

o Automatic start hand driers. Provide stainless steel automatic hand driers. Hardwire to the walls, so that the cables are not exposed to the view. Provide two units per bathroom, one for the teacher’s bathroom. Total of 9 units required.

o Provide individual circuits for lighting and power, so that when all hand driers are operating, there is no dimming in the lighting of the rooms. Voltage drop to be less than 3%. This will be tested for acceptance of electrical installation.

For any electrical installation that may be required outside the areas to be renovated, the contractor shall provide new cables installed under PVC channels properly attached to the existing walls and ceiling surfaces in order not to damage the existing walls.

OHASIS ID 35177 - 35182 Page 36 of 106

- Water supply within the renovated areas: All water lines for the bathrooms shall be provided using water piping rated for domestic water use, or other material authorized by Bulgarian regulations for such use. Within the renovated areas, the contractor shall design the size of the piping in order to provide proper flow and pressure when all toilets valves and faucets are open. Provide all water pipes inside of the bathroom areas recessed within the walls and floors, so that they are not exposed to the view. Provide standard stainless steel faucets single lever for cold and hot water control.

Connect water supply line from water meter or to another point within the kindergarten that meets Bulgarian standards. Once the work is completed, the water installation shall comply with Bulgarian standards. It is required that the contractor provides a certificate of compliance with Bulgarian regulations for all works in this project in general, and with the water supply system in particular.

- Valves: Provide shut off valves for each individual plumbing appliance (sink, toilet,…) and for each room.

- Hot water: Provide three single electric hot water heater. 2 units for children bathrooms and kitchenettes of minimum 75 liters capacity each and smallest available in the market for the teachers’ bathrooms.

- Janitorial faucet: Provide one wall mounted water faucet in each teacher’s bathroom with cold and hot water for janitorial purposes (filling is water buckets).

- Sewer/drainage/vent inside and outside the building: The contract includes new sewer/drainage/ventilation PVC piping for the bathrooms connected with the roof of the building. If this requires breaking through the roof deck in order to install the new pipes, the contractor shall be responsible to repair as necessary the roof waterproofing in those affected roof areas. All sewer pipes in the renovated areas to be covered by masonry wall or partitions so that the sewer lines are not exposed to the view in the renovated areas. This includes the drainage pipes of the floor drains and sewer lines from toilets which shall be covered by the new false ceiling. Provide access points for maintenance of the lines.

Connect sewer lines to existing concrete manholes outside the…