19R0412_-_Attach_1_-_PTS.pdf

PDF 9 MB Posted

Attached to
D-B Renovate Four Schools, Kolasin, Lubnice, Rozaje, Ravna Rijeka, Montenegro
Solicitation number
N3319119R0412
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EUROPE AFRICA SOUTH WEST ASIA

CONTINGENCY ENGINEERING BUSININESS LINE

EUCOM Humanitarian Assistance Program

SCHOOLS RENOVATION IN:

KOLASIN

BERANE (LUBNICE)

ROZAJE

BIJELO POLJE (RAVNA RIJEKA)

MONTENEGRO

OHASIS: 35139, 35137, 35140 AND 35133

Apr 2019 Ver-002

Design and Build repairs to 4 schools in Northern Montenegro, located in Kolasin, in the village of Lubnice (Berane Municipality), in Rozaje and in Ravna Rijeka (Bijelo Polje Municipality).

Version: 002

Contents

1. TAXATION

2. GENERAL DESCRIPTION OF PROJECTS

2.1. GENERAL DESCRIPTION OF WORK

2.2. LOCATION OF PROJECTS

2.3. LEGAL AND TECHNICAL REQUIREMENTS

2.4. GENERAL CONTRACT DESCRIPTION

2.5. GENERAL PROJECT DESCRIPTION (BASE-BID AND CONTRACT OPTIONS) ... 10

2.6. CONSTRUCTION PERMIT OR AUTHORIZATION

2.7. MEASUREMENTS AND QUANTITIES

2.8. DESIGN PHASE - GENERAL

2.9. CONSTRUCTION PHASE - GENERAL

3. GENERAL SCOPE OF WORK OF BASE-BID - KOLASIN

3.1. Replacement of all wooden windows (PVC – double glazing)

3.2. Glass/Metal Partition at the Main School Entrance

3.3. Repair Damaged Reinforced Concrete – Paint all concrete

3.4. Replacement of all Roof Cornice Metal Cover

3.5. Clean and Repair and Seal all exterior exposed bricks surface

3.6. Replacement of Downspouts and Cleaning of Gutters

3.7. Pictures of Façade and other elements related with the scope of work

3.8. Elevated Working Platform and Scaffolding

3.9. Commemorative Plaque

4. GENERAL SCOPE OF WORK OF BASE-BID – BERANE (LUBNICE)

4.1. General Scope of Work

4.2. Elevated Working Platform and Scaffolding

4.3. Commemorative Plaque

4.4. Pictures

5. GENERAL SCOPE OF WORK OF BASE-BID – ROZAJE (ELEMENTARY SCHOOL 25 MAJ) 59

5.1. Scope of Work

5.2. Commemorative Plaque

5.3. Scaffolding and Fall Protection – Safety Engineer/Expert

6. GENERAL SCOPE OF WORK OF BASE-BID – BIJELO POLJE (RAVNA RIJEKA)

6.1. General Scope of Work

6.2. New Roof

6.3. New Ceilings on Second Floor

6.4. New Ceilings on Ground Floor

6.5. Electrical Installation

6.6. Complete Renovation of Multipurpose Room

6.7. Replacement of Metal Door

6.8. Replacement of Wooden Windows (30 units)

6.9. Façade Restoration - Sidewalk

6.10. Multipurpose Room Entrance Canopy

6.11. Replacement of Interior Doors (13 units)

6.12. Paint all interior walls

6.13. Fire Control Panel

6.14. Cooled water fountain

6.15. Pictures of Facility to be renovated

6.16. Elevated Working Platform and Scaffolding

6.17. Commemorative Plaque

7. CONTRACT OPTION-1, KOLASIN SCHOOL – NEW LIGHTING GROUND FLOOR

8. CONTRACT OPTION-2, KOLASIN SCHOOL – INSULATED FACADE

9. CONTRACT OPTION-3, ROZAJE SCHOOL – RENOVATED BATHROOMS

10. CONTRACT OPTION-4, BIJELO POLJE CHOOL – HEATING SYSTEM and FACADE

10.1. New Construction for Mechanical Room – Basis of Design

10.2. New Boiler

10.3. Heating System - Basis of Design

10.4. Thermally Insulated Facade

8 PROCEDURE AND GENERAL CONTRACT REQUIREMENTS AND GUIDELINES

8.1 PRINCIPLES

8.2 PROHIBITED ITEMS

8.3 START OF CONSTRUCTION

8.4 RESPONSIBILITY FOR NEW MATERIALS

8.5 DESIGN

8.6 DESIGN-BUILD PROCEDURE

8.7 CONSTRUCTION/DESIGN SCHEDULE AND CONTRACTUAL MILESTONES

8.8 CONSTRUCTION SCHEDULE (BAR CHART IS AUTHORIZED)

8.9 SAFETY: ACCIDENT PREVENTION PLAN

8.10 COORDINATION

8.11 SPECIAL SITE CONDITIONS

8.13 SUBMITTALS – TECHNICAL INFORMATION

8.14 DELIVERABLE

8.15 PICTURES

8.16 RESPONSIBILITY AND OWNERSHIP OF REMOVED MATERIALS

8.17 CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC

8.18 QUALITY CONTROL PLAN

8.19 CONSTRUCTION SIGN (2 UNITS REQUIRED)

8.20 PAYMENT

8.21 SCHEDULE OF PRICES

8.22 UTILITIES

8.23 DAMAGES/IMPACT TO EXISTING FACILITIES

8.24 CLEANING

8.25 SPACE PARTS

8.26 WARRANTY AND TRAINING

8.27 CLOSE-OUT PROCEDURE

9 ANNEX 1: GUIDELINE TO PREPARE THE QUALITY CONTROL PLAN

1. TAXATION

In accordance with Paragraph 12 of Article 25 of Montenegro Law on Value Added Tax published in the "Official Gazette of RM" No. 16/07, and in accordance with US Embassy contracting, this project is exempt from VAT. The contractor shall comply with all requirements of the Montenegrin regulations regarding the tax exemption, for the project to be exempt from VAT tax.

2. GENERAL DESCRIPTION OF PROJECTS

2.1. General Description of Work

This contract includes 4 independent and separately funded projects: Kolasin school, Berane School (located in village of Lubnice), Rozaje and in Bijelo Polje (located in the village of Ravna Rijeka).

All improvements, alterations and modification shall be as required by Montenegro regulations and as outlined in this document.

This is one single contract to include 4 different and separated projects, where the technical requirements are similar for all 4 projects unless explicitly stated otherwise. If for example, a type of thermally insulated façade is specified for the school in Kolasin, and this document states thermally insulated façade is also required in Bijelo Polje, but this work is not detailed for Bijelo Polje school, then the details specified for Kolasin school are also contractually required for the school in Bijelo Polje.

2.2. Location of projects

The projects are located as shown herein:

Location of projects within Montenegro

BERANE

(LUBNICE)

BIJELO POLJE

(RAVNA RIJEKA)

BERANE

(LUBNICE)

BIJELO POLJE

(RAVNA RIJEKA)

43 Km – 44 Min

32 Km – 1h16Min

44 Km – 50 Min

44 Km – 47 Min

2.3. Legal and Technical Requirements

The contract is based on the following general requirements:

- Strict compliance with American Contracting Regulations, including the contracting requirements of the Department of Defense, the US Navy and the US Naval Facilities Engineering Command (NAVFAC).

- Strict compliance with Montenegrin technical and legal regulations.

- Strict compliance with Montenegrin Safety regulations, unless the US safety regulations

(USACE EM 385-1-1) are more strict and not in conflict with the Montenegrin safety regulations, in which case the contractor shall apply US Safety Regulations.

- Compliance with technical and administrative requirements described in this document.

The project is based on the principle of strict compliance with Montenegrin technical and administrative regulations, with US Contracting Regulations and with Montenegrin Safety regulations, unless US regulations are more strict and not in conflict with Montenegrin safety regulations. In case of conflict between Montenegrin and US safety regulations, the contractor shall apply the Montenegrin regulations. If the US regulations are stricter and not contrary to the Montenegrin regulations, then the contractor shall apply the US regulation. The contractor shall inform the Contracting Officer Representative of any conflict between Montenegrin and US safety regulations.

The contractor shall hire the services of licensed architects/engineers in Montenegro to prepare the necessary designs and technical projects which are required for the scope of work included in this document. It must be noted that the US Government already provides the technical project for the work included in Berane School. However, it is the contractor’s responsibility to hire the services of a licensed architect in Montenegro to verify all information provided (this is explained in paragraph 3)

Provide the final work as a complete and usable facility, including all items which are required by Montenegro regulations and which may not be described in this document. Technical details, items of work, permits or fees that are not explicitly described in this document, but which are necessary to provide fully operational and finished facilities shall be considered part of this contract.

2.4. General Contract Description

This document is a Performance Technical Specifications (PTS) for a Design-Build project. This PTS includes a description of the required finished work. This means that the contractor is responsible to:

- Make necessary designs as required by this PTS for the different items of work (or accept the design for Berane School available at the job site for consultation)

- Obtain NAVFAC’s acceptance of the designs and the approval of the beneficiary and pertinent Montenegrin authorities.

- Obtain required formal approvals from competent and required Montenegrin authorities, including the necessary expert review by third party company as required by Montenegrin regulations, which shall be paid by the contractor.

- Execute the construction works

- Obtain the acceptance of NAVFAC and the partial and final approval by the competent and required Montenegrin authorities and third party experts for the executed construction works.

Note: The contract includes third party review of all items of work which are required by Montenegrin regulations. In case the Montenegrin regulations do not allow for the contractor to be the client for this independent review, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative or other agency authorized by the Contracting Officer.

Note: The contractor needs to be familiar with the regulations of Montenegro, in order to account for the different required permits, reviews and authorizations for new construction works.

2.5. General Project Description (Base-Bid and Contract Options)

The Base-Bid is the minimum part of the project that will be awarded to a construction firm. The contract options will be awarded (or not) depending upon availability of funds, as well as other factors that the US Government will unilaterally consider. The contractor shall provide a separate price for the Base-Bid and for the contract options as required by the solicitation documents. In general terms, the works include the following items of work:

- Base-Bid:

o Kolasin School: Exterior windows and doors and general exterior improvements.

o Lubnice School (Berane Municipality): School complete renovation o Rozaje School: Roof Repair o Ravna Rijeka (Municipality of Bijelo Polje): Exterior windows, doors, roof and general exterior improvements.

- Contract Option-1:

o Kolasin School: Replace interior lighting of ground floor

- Contract Option-2:

o Kolasin School: Thermally insulated facade

- Contract Option-3:

o Rozaje School: Bathrooms for handicapped

- Contract Option-4:

o Ravna Rijeka (Municipality of Bijelo Polje): Central heating

2.6. Construction Permit or Authorization

The contractor shall obtain formal written authorization from the competent Montenegrin authorities to perform the works included in the scope of work of these projects.

The contractor is required, as part of this contract, to prepare all documentation, designs, reports, information, drawings, coordination and approvals by experts or monitoring entities, and everything that may be necessary as required by Montenegrin regulations, in order to obtain these Permits or Authorizations. The contractor is responsible to pay for any third party inspection or expertise that may be required by Montenegrin regulations for the scope of work of this project.

The contractor shall be familiar with these requirements in order to prepare their bids, regarding the obligatory administrative and technical procedures in Montenegro for new construction.

No work shall be performed until the contractor shows verifiable evidence that they have obtained all the necessary permits for each element of work included in this contract. This shall be certified by the third party independent monitoring entity.

2.7. Measurements and Quantities

This contract complies with the US Contracting Regulations, and as such, all measurements and quantities of materials provided shall be verified and measured on site by the contractor. The contractor needs to visit the job site in order to perform the necessary measurements and to observe the existing field conditions in order to prepare their cost proposal.

The US Government is not responsible for any mistake in the contractor’s measurements or assumptions of field conditions.

2.8. Design Phase - General

The project is based on the principle of strict compliance with Montenegrin technical and administrative regulations, with US Contracting Regulations and with Montenegro Safety regulations (unless the US safety regulations are more strict and not in conflict with local standards).

The work shall meet all requirements of this Request For Proposal (RFP) package. Drawings are to be as required in this RFP and with the necessary details and previous approvals (experts or monitoring entities) to submit the designs to the US Government, Local Montenegro Administration, final beneficiary, contractor’s staff and sub-contractors. Material selection, specifications and installation to be as described in this Performance Technical Specification (PTS) document. The Performance Technical Specification (PTS) are a guideline for the design package:

- If an item in the project design is included in the PTS, the requirements of the PTS, applicable local Montenegrin codes and regulations, and international codes shall govern.

- If an item in the project design is NOT included in the PTS, the requirements of applicable local Montenegrin codes and regulations, and international codes shall govern.

Provide the final work as a complete and usable facility including all required items not described in this RFP. Technical details, items of work, permits and fees that are not explicitly described in this RFP, but which are necessary to provide a fully operational and finished facility shall be considered part of this contract.

Any work not explicitly included in the scope of work of this project, but which is absolutely necessary to have a perfectly operational facility, as required by Montenegro regulations, shall be considered to be part of this contract.

2.9. Construction Phase - General

Once the contractor completes (or accepts) the design and they show evidence of formal authorization by the competent local authorities, and the contractor shows that they have completed other administrative contract requirements (Accident Prevention Plan, Quality Control Plan, Schedule,…), the Contracting Officer Representative will inform the contractor that they may start the construction phase of this design-build contract. This notification is called Notice to Proceed or NTP.

The construction shall follow the design and technical projects prepared by the architect and for which the contractor shall obtain the Construction Permit.

Under this phase, the contractor shall provide all necessary work in order to provide complete and usable facilities. Elements that may not be explicitly included in this document, but which are absolutely necessary to provide complete and usable facilities as required by Montenegrin regulations shall be considered to be an integral part of the project, and therefore, shall be considered to be part of this contract.

The contractor shall familiarize with the requirements of the Montenegrin regulations regarding educational facilities, as there may be required elements which are not specified in this document.

The architect who prepares the design shall visit the site for every important and relevant phase of work, to partially accept the completed works. Despite the requirements of the Montenegrin regulations for the visits of the designer, once the works start, the architect shall visit the site as a minimum once every week.

Two days in advance of the site visit, the contractor shall inform ODC Montenegro and the beneficiary of the planned arrival time to the job site.

In addition to these minimum weekly visits, the architect shall visit the site when the COR visits Montenegro, estimated at once every two months.

In addition to these visits, the third party experts that may be required will visit the site as required by Montenegrin regulations, and also when NAVFAC’s PM visits the site. Work will not be accepted until Final Act of Acceptance is provided.

Limitation on equipment under this contract: Tables, desks, chairs, computer, phones, beds, televisions, and other movable equipment are not part of this contract, unless otherwise indicated in these technical specifications. Only those elements that are fixed, permanently attached to the building or considered as an integral part of the facility, and specifically described in these contract specifications or in the applicable Montenegrin regulations, are included in this contract, unless otherwise indicated in this document.

Requirement for Montenegrin Code and Regulation: The contractor shall request, process and pay for any permits that may be required in accordance with Montenegro Law for this type of construction works. The contractor shall provide a copy of the pertinent construction permit to be issued by the competent local authorities and approval by the Monitoring Entity of the design, before they are authorized to start work.

For each completed phase of work, as required by Montenegro regulations, the contractor shall provide the certificate of the third party monitoring entity in order to process payment for that particular phase of work.

3. GENERAL SCOPE OF WORK OF BASE-BID - KOLASIN

This is the scope of work for the Base Bid portion of the project at the Kolasin School.

The works include general exterior repairs and improvements, which include:

- Replacement of all wooden windows

- Replacement of main entrance doors

- Replacement of all roof cornice metal cover

- Replacement of downspouts and cleaning and repairing gutters

- Repair of damaged reinforced concrete

- Clean and paint facade

Kolasin school from main street

Kolasin school

3.1. Replacement of all wooden windows (PVC – double glazing)

The contract includes the replacement of all exterior wooden windows.

The windows shall comply with Montenegro regulations for public educational facilities. As a minimum the windows shall be manufactured with PVC profile and triple thermally insulated glazing. Minimum requirement is PVC profiles with 5 chambers and double glazing. Each glazing shall have a minimum thickness of 6 mm.

The contractor shall completely remove all wooden windows, including the wooden anchors and the wooden sills and trims. All wood from existing wooden windows shall be removed as part of this contract. The contractor shall make the required adjustments and repairs to the window opening on the walls before installing the new windows. The contractor is responsible to visit the site, to take note of the existing conditions of the window openings and to make all required measurements to quantify the amount of work required by this contract. The contractor is responsible to repair all internal surfaces damaged by the replacement of the wooden windows.

This will be significantly relevant when removing the existing window internal sills. The contractor shall completely remove the exterior wood windows, including all framing, trims, anchors and supports.

The new windows shall operate similar as the existing ones. In other words: if a window has 2 operational panels, the new windows shall have two operational panels of approximately similar dimensions, but the opening panels/leaves of the windows shall open vertically and horizontally.

For estimating purposes, the contractor shall estimate that 50% of the window surfaces shall be operational (horizontally and vertically)

The new PVC windows shall be perfectly finished inside and outside. The joints between the building and the windows shall be perfectly sealed as seen in pictures below for a typical installation (typical “yellow” foam cannot be visible). Contractor to provide PVC sill inside as seen in the pictures below and new outside sills made of aluminum or other approved material (i.e.

natural marble or exterior rated special ceramic tiles or galvanize metal sheet).

The contractor shall estimate that 5 windows need to be provided with non-transparent glazing.

The use of a film to make the glass non-transparent is not authorized, but at least 1 of the 2 panes shall be manufactured as non-transparent.

The beneficiary has stated that they existing security bars can be removed and there is no need to have them reinstalled as part of this contract, and therefore the contractor shall assume that they will remove and dispose of all existing security bars (with the exception of windows in one room that shall be removed, repaired and repainted as necessary)

During dismantling of existing windows, special care needs to be taken so that jambs are not damaged and later installment of joinery is made easier. All removed positions are to be placed in an adequate place on the construction site (facility) for the purpose of easier loading and removal to a city landfill 15 km in distance.

New windows and doors are to be made of highly valuable PVC five chamber profiles that must be of certain thickness (min. 3,5 mm) and with reinforced galvanized steel profiles. Profile should be fully in compliance with RALA quality standard.

Coefficient of thermal conductivity of profile package with metal reinforcement (according to DIN EN 12412-2) less than 1.4 W/m2K). Filling should be double layered glass IZO /20 mm/ (double flat transparent glass with a vacuum between, d=6+12+6 mm).

Inner glass is low emission – LOW E – 1,1W/m2K while the outer is classic - FLOAT.

Sealing is to be done with epoxy rubber (in line with EN410 and EN 673 , Ug=do 2.0 W/m2 K).

Joinery to be supplied with high quality replaceable seals, high quality shackles based on nickel and AL alloys, handles, doorknobs and keys.

All PVC joinery is to be done in line with schemes, in white color. The plan is to have natural flow of air when windows are closed, through especially constructed elements in the frame of the window, type Regel Air, or in some other way, in line with DIN and EU norms. Number and size of elements depends on the size of the window - minimum of two units. No elements should be put in fixed windows and over-lights. Windows should be tightened with wall screws depth 50 mm.

Sealing between wall and window frame should be done with polyurethane foam. Quality certified shackle should enable opening in line with the provided scheme. On the outer side, set an outer bench made of prefabricated aluminium profiles. They are set in the whole width of the window and light box in the prescribed bleed around current facade walls, including the intervention on the facade - construction of thermally insulated facade - the bleed should be six cm more than prescribed bleed. When installing exterior window sill, the sides must lean on the wall, and the part of the facade that is damaged must be fixed. The sill should be tightened with at least two screws in the field. They can be direct or indirect. On the interior side, place parapet benches PVC profile in white color, all in line with producer specifications and joinery schemes. Investor or supervision body (with agreement from investor or contracting authority) can chose to change the color of facade joinery.

Certificates to be submitted by the bidder for all joinery:

• Systematic testing of windows, 14351-1 and B 5300

• Certificate for air permeability EN 12207 - Class 4

• Certificate for water resistance EN 12208 - Class E 900 A

• Wind resistance EN 12210 - Class C5

• Mechanical requests EN 12400 - Class 2

• Certificate for sound protection up to protection class 5

• Certificate on the coefficient of warmth conductivity DIN EN 12412-2

• Glass certificate EN 673

• Shackles certificate V ENV 1627-1630, resistance class 3

Prior to production of joinery (windows) that is done in a larger series, it is necessary to make and install a complete typical window that will, upon removal of all possible objections, be recorded and certified and accepted by the Contracting Officer Representative.

Window leaf opening horizontally and vertically

Typical window profile with double glazing

Typical internal sill required for all windows to be replaced. This includes the removal of the existing sills.

Typical exterior PVC window installation

Typical PVC window installation. Seal all areas around the new windows. Foam not exposed.

Typical PVC window installation with new PVC sill inside and aluminum outside.

Typical PVC window installation. PVC sill inside and aluminum outside.

Installation

The contractor shall completely remove the existing wood and/or metal materials from the window openings on the walls. Some of the existing windows may be double windows, therefore in this case the contractor shall repair and prepare the openings in the walls to install one single window with double glazing.

The new required exterior window sills shall be properly sloped away from the building in order to drain the rain water away from the building. Minimum 5% slope. The lower window frames/profiles shall be properly provided with water drains.

Potential design of new main entrance door with anti-panic hardware and glass on the upper half.

3.2. Glass/Metal Partition at the Main School Entrance

The school entrance is made by two large metal frames glass partition. There are two similar partitions, connected by another similar partition. Each partition is 7.15 x 4.2 meters, and they are separated by approximately 5 meters. This means that the contractor shall estimate a total of approximately:

7.15 x 4.2 x 2 + 4.2 x 5 ≈ 80 m²

The contract includes the replacement of all these metal framed partitions at the main entrance of the school building, as shown in the pictures.

The basis of design is the following:

- Remove all metal and glass partition from main entrance.

- Provide new structure to support the new partition. New structure to be thermally insulated aluminum or reinforced PVC.

- Provide new enclosure. This structure shall be transparent glazing in at least 75% of the areas and with thermally insulated PVC the rest. For estimating purposes, the contractor may estimate 60 m² of double glazing and 20 m² of thermally insulated PVC panels.

- Provide double glazing similar to the ones specified for the new windows, but with the following minimum thicknesses for the doors:

o 8 mm exterior (facing the street) o 8 mm exterior (facing the interior of the building)

This results in a very heavy glazing of minimum 40 kg/m², which the structure shall be designed to hold by the architect.

The new entrance partition wall with double glazing shall be very stable and strongly anchored into the building structure by professional experienced workers.

For testing purposes, the contractor shall apply a horizontal force of 50 kg at any location of the partition without any visible deflection of the panels.

Doors shall be provided with the necessary standard hardware, such as door stops, door openers, anti-panic hardware or heavy duty hinges.

The panel frames, the door hardware and accessories and the double glazing shall all be provided and assembled by the same company or supplier.

Typical anti-panic hardware

Typical anti-panic hardware

Typical double door system with anti-panic hardware on aluminum profiles with glazing and solid thermally insulated aluminum panels, as acceptable for our school

Repairing similar concrete with epoxy two compound mortar

3.3. Repair Damaged Reinforced Concrete – Paint all concrete

The school façade is made up of exposed bricks and exposed reinforced concrete structure and elements. These structures and elements are in overall good condition, but in some very localized areas, the concrete is cracked or with exposed rusted reinforcing steel. The basis of design is the following:

- Clean with waterblasting high pressure equipment all the concrete façade. This will remove any piece of concrete not solidly adhered to the building structure.

- Waterblasting to remove all paint.

- In all areas with cracked or defective concrete, and in all areas with concrete removed by the contractor because it was not solidly adhered to the building structure, the contractor shall repair the concrete using a two component epoxy concrete repair product. Before the contractor is authorized to start works, they will need to submit for approval a concrete repair method, including the construction practice and concrete repair products proposed to be used. Only materials specifically designed and certified to be used to repair structural concrete shall be authorized. Repair method shall include:

o Repairing the rusted reinforcing steel o Providing nbew epoxy mortar to cover the concrete

- Once the concrete is repaired, the contractor shall apply 3 coats of paint to the exposed concrete surface. The contractor shall use color different from the existing one to verify new painting of all exposed concrete surfaces.

- Once the work is completed, there shall be no visual difference between the repaired and the non-repaired concrete.

This proposed method shall be designed and certified by a locally licensed architect. The concrete repair method, the pressure of the water-blasting equipment, the products to repair the reinforcing steel, shall all be reviewed and approved by a locally licensed architect.

Typical required repairs in the concrete along the façade of the school

Typical minor concrete repair

Water blasting façade to remove all defective concrete and to expose reinforcing steel

Typical minor concrete repair using 2 component epoxy mortar

3.4. Replacement of all Roof Cornice Metal Cover

The school roof is surrounded by a cornice with rusted metal cover. This metal cover serves as a physical barrier to protect the outer walls from inclement weather, but also serve as an esthetic element of the school building.

For that reason, the contractor shall remove all exposed cover of these parapets and replace them with new galvanized metal ones. The contractor shall provide hot-dip galvanized metal sheets, with similar thickness to the existing ones to be removed, and provided with highest commercial coating available in Montenegro of hot dip galvanization. See pictures herein for better description of work included in this contract.

3.5. Clean and Repair and Seal all exterior exposed bricks surface

The school façade is made up of exposed bricks and exposed reinforced concrete structure and elements. The repairs to the exposed concrete is covered in a separate paragraph.

The contractor shall use the same water-blasting equipment and shall use it to remove all paint and defective elements of the exposed brick façade. The contractor shall remove all graffiti. After the water blasting and adequate drying of the brick façade, the contractor shall repair all brick surfaces.

Once all the surfaces are repaired, the contractor shall apply a penetrating brick sealer to avoid water infiltration and to make it easier for future cleaning of future graffiti.

This proposed method shall be designed and certified by a locally licensed architect. The repair method to the bricks, the pressure of the water-blasting equipment, the penetrating sealant, shall all be reviewed and approved by a locally licensed architect.

Applying masonry protective cream to avoid biological growth

Difference between treated and non-treated exposed bricks

Applying water repellent sealant to the exposed bricks

3.6. Replacement of Downspouts and Cleaning of Gutters

In order to complete the façade repair, and to provide the exterior of the building with the appearance of a new facility, it is necessary to complete the cleaning of the gutters and the replacement of the downspouts. The contractor shall provide new downspouts of similar quality and dimensions as the existing ones, reaching the ground surface. The contractor can reutilize any of the existing materials after they are properly removed and repaired in order to be provided with the appearance of new materials.

See the following pictures to better description of the scope of work.

3.7. Pictures of Façade and other elements related with the scope of work

The following pictures are not the full description of the scope of work, but all descriptions in the pictures are part of the scope of work. These pictures are not included to describe all the elements of the scope of work but they are included to clarify and to be able to transmit to the contractor the scope of work of the contract.

Front façade of the building

Gutter to be cleaned and repaired as needed

Gutter to be cleaned and repaired as needed

Main Entrance metal partitions to be replaced with New

Main entrance door system on a metal and glass partition to be removed. Note that there are 3 similar walls: The one in the picture, one parallel with same dimensions 5 meters inside and one perpendicular one connecting both. All to be replaced.

Typical windows and downspout to be replaced with new

Security Bars to be removed and not replaced (except in one room)

Typical façade: Replace all windows, repair concrete, provide missing downspouts, repair and paint concrete, repair and seal bricks. The cameras shall be removed and reinstalled by the contractor or properly protected by the contractor during façade works. Note that all façade shall be water-blasted.

Typical façade.

All wooden windows facing the outside shall be replaced with new, even the ones facing the hallways. The wooden doors shall also be replaced with new ones with similar features as the new windows.

Typical windows and sills, to be completely removed.

Typical concrete damages to be repaired

Concrete to be repaired

Area with typical worst concrete damages, right over the main entrance canopy.

Typical condition of front façade to be completely repaired

New door to remain. Wooden doors in these hallways can be replaced using similar quality doors. All wooden windows and doors to be replaced with new.

Main entrance

Other side of main entrance canopy with worst concrete damages. Contractor to provide new downspout to the ground along the building façade or to provide 2 columns.

Typical condition of interior of windows to be replaced. It is estimated significant amount of interior works to restore all internal surfaces to existing or better conditions.

Acceptable man-lift

Required type of scaffold

Required type of scaffold

3.8. Elevated Working Platform and Scaffolding

In order to work at heights (roof, facade, ceilings,…), the contractor will be required to install and use scaffolding and/or elevated working platforms.

Despite the scaffolds that may be authorized by Montenegro regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown in pictures below.

These scaffolds shall be installed and used in accordance with manufacturer’s recommendations.

In case the contractor needs to access the façade at any particular point without the need to install scaffolds, the contractor shall use a CE certified self-propelled man-lift, similar to the one shown in picture below. The use of other type of scaffolds, other non CE certified man-lifts, or any type of ladders for façade or roof work, IS NOT AUTHORIZED.

Some typical components of European scaffolding

Typical similar plaque provided in a renovation project in Bulgaria.

3.9. Commemorative Plaque

The contractor shall provide and install 1 commemorative plaque at the entrance of the school.

The plaques shall have the following information engraved on it:

Colored Flag of Montenegro Colored Flag of the United States of America EUCOM logo This text: “The general repairs to this school were made possible through a donation from the people of the United States of America to the People of Montenegro with the support of the Office of Defense Cooperation and US Embassy in Podgorica – Date”

Same text as above in Montenegrin.

- Minimum thickness 8 millimeters

- Minimum dimensions 75 centimeters wide by 50 centimeters high.

- Resistant to outdoor weather and UV radiation.

- Plaque to be manufactured by specialized company.

- Before purchasing the plaque, the contractor shall submit the design to the Contracting

Officer Representative for approval.

4. GENERAL SCOPE OF WORK OF BASE-BID – BERANE (LUBNICE)

This is the description of the scope of work for the Base Bid portion of the contract at the Lubnice School, located in the village of Lubnice within the Municipality of Berane. For the purposes of this document, from this point, this school will be referred as the Berane School, although it is located in a village within the Muncipality.

The school is in poor general conditions, requiring complete reconstruction as described in the “MAIN RECONSTRUCTION PROJECT” prepared by the Ministry of Education of Montenegro and signed by Architect LJUBIŠA ARMUŠ on 2017, The Ministry of Education of Montenegro has prepared a project for its reconstruction that the contractor can use, in coordination with the general requirements described herein

School in Berane

Berane School

4.1. General Scope of Work

The existing facility is a rural school with 604.53 m² of total built area and 488.08 m² of usable area. This large difference is due to the width of the load bearing walls of the facility.

The facility is located in the cadaster parcel in the Municipality of Berane, cadaster parcel number 22 KO Lubnice, Berane. In the current state, the location is surrounded by a fence and physically separated from other parcels in contact.

In the current state, a part of the toilets that are not subject to reconstruction is to be kept, due to the fact they were recently reconstructed. As such, they are to be kept through this reconstruction.

Ceilings in the toilets are to be reconstructed as part of the reconstruction of ceilings in the whole facility.

Facade and inner walls of facility are made of full brick thickness of 50 cm plastered with gauged plaster.

The roof is classical wooden roof covered with ceramic tiles.

The general distribution of the school is in the following table.

No. ROOM AREA (m²) FLOOR MATERIAL WALL MATERIAL

1 CLASSROOM 56,52 PVC FLOOR COVER SEMI-PERISHABLE PAINT

2 CLASSROOM 55,58 PVC FLOOR COVER SEMI-PERISHABLE PAINT

3 CLASSROOM 21,62 PVC FLOOR COVER SEMI-PERISHABLE PAINT

4 CLASSROOM 33,59 PVC FLOOR COVER SEMI-PERISHABLE PAINT

5 CLASSROOM 48,96 PVC FLOOR COVER SEMI-PERISHABLE PAINT

6 P.E. HALL 55,39 PVC FLOOR COVER SEMI-PERISHABLE PAINT

7 HALLWAY 156,13 PVC FLOOR COVER SEMI-PERISHABLE PAINT

8 OFFICE 19,71 THREE LAYER PARQUETTE SEMI-PERISHABLE PAINT

9 OFFICE 4,68 THREE LAYER PARQUETTE SEMI-PERISHABLE PAINT

10 OFFICE 18,44 THREE LAYER PARQUETTE SEMI-PERISHABLE PAINT

11 TOILETTES 17,46 FLOOR CERAMICS CERAMICS/SEMI-PERISHABLE PAINT

TOTAL usable 488,08 m2 TOTAL built 604,53 m2

The definition of each room and the general dimensions of the existing facility is found in the drawing in the following page.

Berane School (existing)

The volume of the facility shall remain after the renovation works are completed. The size of the repaired building shall remain unchanged, vertically and horizontally.

The roof and ceiling is made up of wooden structure, and it is severely damaged/rotten. The entire roof structure and ceiling needs to be removed. The entire wooden structure of the facility needs to be replaced. Reconstruction pertains to complete replacement of roof construction, ceiling and roof cover. Currently the cover is made of tiles, and in the new state it is planned for it to be made of steel plasticized TR sheets thickness of 0.60 mm in the color RAL 6028. All elements of roof construction shall be certified for construction in Montenegro.

The electrical installation is not built to Montenegro code and requires to be completely replaced with new electrical installation in compliance with Montenegro Code and using LED technology lighting system.

The plaster is defective and is falling down in some areas, especially in the exterior of the building.

Most of the walls are wooden with broken windows and damaged frames. All wooden windows need to be removed and replaced with new. All exterior wooden doors need to be replaced.

The facility is of massive construction and in the available technical project, all elements below the roof are to remain as they are before reconstruction.

However, the wall plaster is defective and inevitably the floor surfaces shall be damaged during reconstruction of the ceiling and roof. The new roof structure requires reinforcement of the walls.

The electrical installation will also damage the walls to remain.

For all these reasons, the scope of work includes implementing the available technical project, but with complete reconstruction of the entire building. The contractor shall:

- Demolish roof

- Demolish ceiling

- Demolish all wooden structure of the building

- Water-blast all wall surfaces to remove paint together with all defective plaster. The contractor shall estimate 50% plaster removal and 100% of paint removal. The existing walls are very uneven. The contract includes leveling all interior and exterior walls. The use of gypsum board to level the walls is not authorized.

- Remove and replace all electrical installation. New electrical installation to be recessed within the walls, and installed in CE certified cable conduits.

- Remove and replace all wooden windows and exterior wooden doors

- Remove and replace all wooden interior doors

- Remove and replace all floor surfaces

- Provide new porcelain stoneware flooring

- Provide new wall plaster where needed and paint, interior and exterior.

- Provide new electrical installation with LED technology for lighting

- Provide new stoves or furnaces to replace the existing ones.

- Provide new roof structure over new reinforced concrete perimeter beam around the upper sections of all load bearing walls. Provide roof as described in the available technical project.

- Provide new suspended ceiling with recessed LED lighting throughout the entire building

- Provide new fire control panel as required by Montenegro for this public education building. This includes fire detector, smoke detectors, horns, strobe lights, automatic communication with ire department, and everything that is mandatory by Montenegro regulations for this type of building.

In summary, the contract includes the complete reconstruction of the existing facility, demolishing everything except the foundations and walls structure, and demolishing the minimum absolutely necessary to perform the scope of work in the areas recently renovated by the beneficiary, such as the Director’s Office or bathrooms, and reconstructing the school providing new floors, wall finishes and ceiling surfaces, new windows and doors and electrical installation, new heating and ventilation system, and providing everything necessary to have a perfectly operational school facility with the same layout as the existing one.

Note: Due to the extent of the required repairs to the existing building, as a completely technical alternative, the contractor can propose the repair by replacement of the existing school. In this case, the contractor shall completely demolish the existing school building, including its foundations. And provide a new rural school building within the same footprint, but with approximately 35% less surface. If this technical alternative is chosen, the contractor shall design and build a new facility, with the following technical characteristics:

- Built area ≥370 m²

- Usable area ≥310 m²

- Layout as coordinated with the beneficiary, including:

o Classrooms (≥3) o Office (1) o Break room (1) with small kitchenette o Multipurpose area (1) o Bathrooms for boys and girls o Mechanical room

- Reinforced concrete foundations, structure and ceiling deck

- Roof as specified in the existing technical project

Homogeneous characteristic of the porcelain stoneware in comparison with standard ceramic tile (not acceptable in this project)

- Building thermally insulated, with thermally insulated walls and roof. Thermal insulation to be protected against physical impacts.

- Provided with perimeter sidewalk around new building of 1 meter wide

- Provided with entrance covered canopy with reinforced concrete structure ≥10 m²

- Provided with central heating with closed loop radiator system. Boiler in the mechanical room using wood or other solid fuel as the source of energy. Radiators with valves to be able to control the temperature in each room.

- Provide new blackboards on each room

- Provide new electrical installation, with new meter, in coordination with electrical utility company

- Provide new LED lighting system in compliance with EN 12464-1.

- Connect water and sewer system where they are currently connected.

- Provide suspended acoustic ceiling.

- Provide porcelain stoneware flooring at all locations, including matching wall base (except in the mechanical room where it shall be exposed concrete flooring)

- Provide plastered and painted walls, with washable paint in lowest 1.2 meters.

- Provide ceramic tiles on the lowest 1.2 meters along all hallways

- Provide new windows similar to the ones specified for Kolasin school, with mosquito nets for bathrooms. Design windows to maximize use of natural light.

4.2. Elevated Working Platform and Scaffolding

In order to work at heights (roof, facade, ceilings,…), the contractor will be required to install and use scaffolding and/or elevated working platforms. Despite the scaffolds that may be authorized by Montenegro regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown for Kolasin school renovation.

Cutting homogeneous porcelain stoneware tiles

4.3. Commemorative Plaque

The contractor shall provide and install 1 commemorative plaque at the entrance of the school.

The plaques shall have the following information engraved on it:

Colored Flag of Montenegro Colored Flag of the United States of America EUCOM logo This text: “The general repair to this school (or the construction of this school) was made possible through a donation from the people of the United States of America to the People of Montenegro with the support of the Office of Defense Cooperation and US Embassy in Podgorica – Date”

Same text as above in Montenegrin.

- Minimum thickness 8 millimeters

- Minimum dimensions 75 centimeters wide by 50 centimeters high.

- Resistant to outdoor weather and UV radiation.

- Plaque to be manufactured by specialized company.

- Before purchasing the plaque, the contractor shall submit the design to the Contracting

Officer Representative for approval.

4.4. Pictures

This pictures are included to show some general requirements of the exiting technical project to repair the Berane School and to show the general conditions of the school. Not all requirements of the scope of work or of the technical project are described in these pictures, but all descriptions of these pictures are considered an integral part of the scope of work.

Information from technical project

NORTH

Information from technical project

From technical project

Detail from technical project

Detail of building with new roof

Typical construction details, showing required perimeter beam (with reinforced concrete) and ceiling finishes.

General condition of exterior facade

Satellite dish to be removed and reinstalled in the new renovated facility (or in the new facility). Note defective plaster on exterior façade. Newly replaced windows (not wooden) can be removed and reinstalled on the newly renovated façade.

General condition of exterior façade and roof

Plaque to be reinstalled exactly on same location

General exterior façade with all wooden windows to be replaced with new, similar to the ones specified for Kolasin school renovation

Plaque to be reinstalled exactly on same location

Defective plaster in the exterior facade

Defective walls along the hallways

Section of main hallway. Tiles to be removed and replaced with new porcelain stoneware tiles. Doors to be replaced with new ones. All walls to be perfectly leveled. Most plaster to be removed by water blasting

Typical electrical lighting to be replaced with new LED technology

Stoves to be replaced with new

Typical stove to be replaced with new. Wooden flooring to be replaced with porcelain stoneware. The contractor shall remove all wooden structures and their support, and provide a reinforced concrete slab over all areas with wooden floors.

Then a leveling layer and the new homogeneous porcelain stoneware tiles. Provide new doors.

Typical classroom

Existing break room. Provide minimum repairs absolutely necessary for the scope of work

Typical stove to be replaced with new. Provide minimum repairs in this area of the school, which was recently partially renovated. The ceiling all needs to be replaced as it is rotten.

Newly installed concrete masonry unit walls not properly finished. All exterior walls of the school shall be provided with same finishes once the work is completed.

Front of building with two plaques to remain

Typical classroom.

Typical damages on the interior plaster

5. GENERAL SCOPE OF WORK OF BASE-BID – ROZAJE

(ELEMENTARY SCHOOL 25 MAJ)

This is the description of the scope of work for the Base Bid portion of the contract at the Rozaje School.

The school is in good general conditions, and this project in the base-Bid includes the following repairs and improvements to its roof. All these repairs were extracted from a technical project provided by the Ministry of Education of Montenegro, and prepared by the company “V PROJEKT

D.O.O. NIKSIC”

School in Rozaje – Main Entrance

Berane School

5.1. Scope of Work

The works in the Base-Bid includes the execution of the works in the previously mentioned technical project as outlined herein:

The roof has a complex geometry, with several roof skylights -dormers, roof windows are also present. The slope of the roof is about 27 degrees - measured on site.

The total gross area of the facility at the terrain level is 2015 m2, and the horizontal projection of the roof is 2271 m2. The roof cover of the building has been changed over the previous period.

The on-site inspection found that the larger part of the roof is covered with tegola (bituminous tiles), and one smaller part - sports hall and roof surface that has a common valley with this part of the hall is covered with trapezoidal sheets.

The horizontal internal gutters, are replaced with galvanized external gutters that are deformed, and the vertical pipes are damaged and largely missing. Reinforced concrete and wall bricks are partly broken by this intervention, the works are not completed so, functionally and aesthetically this represents a big problem. In some places the parts of the roof coverings and dormer’s walls bricks are missing or damaged.