Text version
FEAD BAHRAIN
PSC 851 BOX 510
FPO AE 09834-0510
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See SF-30, Block 14, Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3319118R1603
X 9B. DATED (SEE ITEM 11)
13-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Mar-2018
CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE N33191
FACILITY CODECODE
EMAIL:TEL:
N3319118R1603
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
The purpose of Amendment 0003 is as follows:
1. Provide Government responses to four (4) Pre-Proposal Inquiries.
2. Revise sub-paragraph 1.6.1 Proposal Format, SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS. Price
Proposals are not required for Phase I. Changes are highlighted in red font.
3. All other terms and conditions remain unchanged.
PRE-PROPOSAL INQUIRIES
1. Question: Can you please share copy of the Geo‐technical report as indicated in the specifications?
The Dwgs provided have discrepancy for the available space i.e. scale for 3.05 Meters.... At this instant we are assuming size options for the tank i.e. Option 1: 15.5m for diameter and 15.5m height while Option 2:20m for diameter and 10m height. Please confirm the exact space available for installation of the tank. In addition to that, please advise on the following notes in order to proceed with the design.
1. Kindly advise on the corrosion allowance to be used in design; we assumed 1mm. Please confirm if this is correct.
2. According to the scope of work received, the tank required is a welded steel two‐cell water tank. Kindly advise on the required partition type.
3. As for the roof, Kindly advise which option of the following two you prefer:
• Supported cone roof with external structure (to prevent corrosion)
• Self‐Supported cone roof with an approximate slope 5:12 without structure
4. According to AWWA D102 section 4.3 and 4.4, several inside and outside coating systems can be used. We assumed ICS‐3 for internal painting cycle and OCS‐5 for external painting cycle. Please confirm.
Answer: Tank to be designed in accordance with AWWA D100. These questions and attachments are not necessary for Phase I and will be provided during Phase II.
2. Question: Page 9, 1.7 PROPOSAL SUBMISSION REQUIREMENTS Could you please clarify the no of original, copies and electronic copy required for Volume II – Price Proposal?
Is the requirement same as Volume I – Non-Price Proposal?
Please confirm.
Answer: See Subparagraph 1.6.1, Proposal Format, SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS.
3. Question: Specification section Part 3/ Chapter 6 / G301005 FIRE PROTECTION WATER STORAGE requires design with UFC 3-230-01, whereas UFC 3-230-01 in section 3-5.2 provides the option of for bolted tank in accordance with AWWA Standard D103, Factory Coated Bolted Steel Tanks For Water Storage.
Please advise if we propose a value engineered option of Bolted Storage Tank rather than welded tank?
Answer: See Part 3 Section 1.0 of RFP.
N3319118R1603
4. Question: N3319118R1603SPECS - Part Three - Project Program
6. ENGINEERING SYSTEMS REQUIREMENTS
B20 EXTERIOR ENCLOSURE
In lieu of the specified welded steel tank, will the government accept bolted steel tank as allowed in UFC 3-230- 01 Water Storage, Distribution and Transmission and per AWWA Standard D103, Factory-Coated Bolted Steel Tanks for Water Storage. There are significant cost savings in the supply and installation of such tanks.
Answer: See Part 3 Section 1.0 of RFP.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
1.6 INSTRUCTIONS FOR THE SUBMISSION OF OFFERS
1.6.1 PROPOSAL FORMAT
The price proposal and non-price (technical) proposal shall be submitted in separated volumes. Volume I, as described below, shall be appropriately tabbed and present a clear, concise offer.
VOLUME I –NON-PRICE PROPOSAL
Proposals in response to this RFP must be submitted in hard copy; and in the format and number of copies as follows:
1. One (1) original Non-Price Proposal in three-ring binder
2. Three (3) copies of the Non-Price Proposal in separate three-ring binders
3. One (1) electronic copy of the Non-Price Proposal in Adobe Acrobat ,PDF format provided on compact disc
(CD).
(End of Summary of Changes)