Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

BU-HA-2017-32422 Version: 001

EUCOM Humanitarian Assistance Program

PROLET KINDERGARTEN IN KLIKACH

VILLAGE – CENTRAL HEATING AND

IMPROVEMENTS TO ENERGY

EFFICIENCY - BULGARIA

BU-HA-2017-32422

May 2018

Version: 001

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Contents

1. TAXATION

2. PROJECT DESCRIPTION

2.1. LOCATION OF THE PROJECT

2.2. LEGAL AND TECHNICAL REQUIREMENTS

2.3. GENERAL CONTRACT DESCRIPTION

2.4. GENERAL PROJECT DESCRIPTION AND SCOPE OF WORK

2.5. CONSTRUCTION PERMIT OR AUTHORIZATION – CONSTRUCTION PERMIT

2.6. DESIGN PHASE - GENERAL

2.7. CONSTRUCTION PHASE - GENERAL

2.8. APPLICABLE REQUIREMENTS / STANDARDS

3. DETAILED SCOPE OF WORK OF BASE BID

3.1. New Construction for Mechanical Room – Basis of Design

3.2. Heating System - Basis of Design

3.3. Thermal Facade

3.4. Roof Insulation

3.5. Pictures to show description of scope of work

3.6. Commemorative Plaque

3.7. Scaffolding

4. GENERAL SCOPE OF WORK OF CONTRACT OPTION-1

5. GENERAL SCOPE OF WORK OF CONTRACT OPTION-1

6. PROCEDURE AND GENERAL CONTRACT REQUIREMENTS AND GUIDELINES

6.1 START OF CONSTRUCTION

6.2 RESPONSIBILITY FOR NEW MATERIALS

6.3 DESIGN

6.4 DESIGN-BUILD PROCEDURE

6.5 CONSTRUCTION/DESIGN SCHEDULE AND CONTRACTUAL MILESTONES

6.6 CONSTRUCTION SCHEDULE (BAR CHART IS AUTHORIZED)

6.7 SAFETY: ACCIDENT PREVENTION PLAN

6.8 COORDINATION AND PHASING

6.9 LANGUAGE

6.10 SPECIAL SITE CONDITIONS

6.11 SUBMITTALS – TECHNICAL INFORMATION

6.12 DELIVERABLE

6.13 PICTURES

6.14 RESPONSIBILITY AND OWNERSHIP OF REMOVED MATERIALS

6.15 CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC

6.16 QUALITY CONTROL PLAN

6.17 CONSTRUCTION SIGN

6.18 PAYMENT

6.19 SCHEDULE OF PRICES

6.20 DAMAGES/IMPACT TO EXISTING FACILITIES

6.21 CLEANING

6.22 SPACE PARTS

6.23 WARRANTY AND TRAINING

6.24 CLOSE-OUT PROCEDURE

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

1. TAXATION

In accordance with Agreement between the Government of USA and the Government of BU on Defense Cooperation this contract is exempt from VAT. The contractor shall be responsible to prepare and process all required documentation to obtain the VAT exception from the Government of Bulgaria. For this reason, the contractor shall work directly with the corresponding authorities from Bulgaria, US Forces and the US Embassy".

2. PROJECT DESCRIPTION

This is a design-build contract in which the contractor shall provide the necessary design, permitting and construction work in order to provide:

- Central heating for all internal areas of the kindergarten building

- Thermal insulation for the façade

- Thermal insulation for the roof

- Under contract option: New pitched metal sheet roof (or ceramic tiles) over the existing flat roof

- Under contract option: Replacement of all lighting in the kindergarten with LED technology lights

THE CONTRACTOR SHALL PROVIDE A COPY OF CONSTRUCTION PERMITS TO BE

PROVIDED BY THE COMPETENT LOCAL AUTHORITIES BEFORE WORK IS AUTHORIZED TO

START. CONTRACTOR WILL COORDINATE WITH LOCAL AUTHORITIES AND WILL PROVIDE

ALL REQUIRED DOCUMENTATION IN ORDER TO OBTAIN THE CONSTRUCTION PERMIT

THAT IS REQUIRED FOR THE SCOPE OF WORK INCLUDED IN THIS PROJECT.

CONTRACTOR SHALL FOLLOW BULGARIAN REGUALTIONS FOR PREPARATION AND

SUBMISSION OR ALL NECESSARY DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR

ALL TECHNICAL AND ADMINISTRATIVE WORK, AS WELL AS FOR ALL COSTS, FOR THE

PREPARATION AND SUBMISSION OF DOCUMENTS NECESSARY TO OBTAIN THE

REQUIRED CONSTRUCTION PERMITS FROM THE COMPETENT LOCAL AUTHORITIES.

It is necessary that the bidders visit the project site before they submit their bids in order to verify existing conditions, and to measure and quantify the work required to complete this project in accordance with these PTS.

Note: There are numerous pictures in this contract to better describe the scope of work.

These pictures were taken at the beginning of 2018. The pictures do not guarantee the existing conditions of the facility at the time to prepare the bid for the contract, and they are only a tool to describe the responsibilities of the contractor. The contractor is responsible to visit the site in order to measure and quantify the required work, as well as to verify the existing conditions, prior to the submission of their proposal.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Location of the project site

2.1. Location of the project

The project is located in the kindergarten of the Klikach village, which administratively forms part of the Municipality of Karnobat, located in South East Bulgaria.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

2.2. Legal and Technical Requirements

The project execution is based on the following principles:

- Strict compliance with American Contracting Regulations, including the contracting requirements of the Department of Defense, the US Navy and the US Naval Facilities Engineering Command (NAVFAC).

- Strict compliance with Bulgarian Technical, Legal and Administrative requirements, which are applicable for the scope of work described in this PTS.

- Compliance with Bulgarian safety regulations, unless the US Safety Regulations described in the EM385-1-1 are more stringent and not in conflict with the Bulgarian regulations, in which case, the U. S. safety regulations shall apply.

- Compliance with technical and administrative requirements described in this document.

2.3. General Contract Description

This document is a Performance Technical Specifications (PTS) for a full Design-Build project. This PTS includes a description of the required finished work.

This is a design-build contract. This means that the contractor is responsible to:

- Make necessary designs or shop drawings as required by this PTS for the different items of work

- Obtain NAVFAC’s acceptance of the designs and the approval of the corresponding beneficiary and Municipality (Karnobat).

- Obtain required formal approvals from competent and required Bulgarian authorities, including the necessary expert review by third party company as required by Bulgarian regulations, which shall be paid by the contractor.

- Execute the construction works

- Obtain the acceptance of NAVFAC and the partial and final approval by the competent and required Bulgarian authorities and third party experts for the executed construction works.

Note: The contract includes third party review of all items of work which are required by Bulgarian regulations. In case the Bulgarian regulations do not allow for the contractor to be the client for this independent review, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative (COR) or other agency authorized by the Contracting Officer (i.e. the Municipality of Karnobat).

Note: The contractor needs to be familiar with the regulations of Bulgaria, in order to account for the different required permits, reviews and authorizations for capital repair works.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

2.4. General Project Description and Scope of Work

This document includes everything necessary to provide perfectly finished, certified and operational facilities, as described in this document.

The contract is divided into a Base-Bid and 2 Contract Options. In very general terms, the works include the following items of work:

- Base-Bid:

o New central heating system with solid fuel boiler in new construction annexed to the existing building and closed circuit heating radiators.

o New 8 cm thick thermal façade.

o New roof thermal insulation, with similar insulation as the one used for the façade.

o Commemorative Plaque

- Contract Option-1:

o New pitched roof over thermally insulated flat roof, with all weight supported by new beams to be resting over existing roof perimeter parapet.

- Contract Option-2:

o Replacement of all lights in the building with new LED technology fixtures, in compliance with EN 12464-1

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

2.5. Construction Permit or Authorization – Construction Permit

The contractor shall obtain formal written authorization from the competent Bulgarian authority to perform the works included in the scope of work of this project, which includes the Municipality of Karnobat.

It is absolutely necessary that the contractor is familiar with the Bulgarian bureaucratic procedures to obtain Construction Permits for renovation and new construction of public buildings. In our case, the Municipality will act as the official assigner of the project, although the works will be paid by the US Navy Facilities Engineering Command (NAVFAC).

The contractor shall hire the services of an architectural firm or architect, specialized, experienced and licensed in Bulgaria to perform all the designs, shop drawings and to facilitate the procedures to obtain the necessary construction permits.

The contractor is required, as part of this contract, to prepare all documentation, designs, reports, information, drawings, coordination and approvals by experts or monitoring entities, and everything that may be necessary as required by Bulgarian regulations, in order to obtain the necessary Construction Permit. The contractor is responsible to pay for any third party inspection or expertise that may be required by Bulgarian regulations for the scope of work of this project. The contractor shall be familiar with these requirements in order to prepare their bids, regarding the obligatory administrative and technical procedures in Bulgaria for new construction.

The contract includes third party review of all items of work which are required as per Bulgarian regulations. In case the Bulgarian regulations do not allow for the contractor to be the client for this independent expert company, the contractor shall pay for the third party review and assign a different party as the client for this independent company, which could be the Contracting Officer Representative or other agency authorized by the Contracting Officer Representative.

No work shall be performed until the contractor shows verifiable evidence that they have obtained all the necessary permits or authorizations for each element of work included in this contract.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Two sample pages of the existing design or technical project, with the required signatures and stamps

2.6. Design Phase - General

The contractor shall be familiar with the requirements of the Bulgarian technical regulations. The designs shall be prepared in compliance with applicable construction codes and construction practices in Bulgaria, as well as with Urban Planning requirements of the city of Karnobat. The contractor shall hire the services of an architect (or architectural firm) licensed in Bulgaria to design all works, as detailed in this document. At the same time, after obligatory coordination with the Municipality of Karnobat, the contractor shall hire (and pay for) the services of a “Revision Entity - Expertise” authorized by the Government of Bulgaria to supervise and approve each phase of the design and the construction, including final commissioning and acceptance of the facility, as required by Bulgarian regulations. This company shall report directly to the US Government representative and the beneficiary if required by the Bulgarian regulations, but all their services shall be paid by the contractor.

The contractor’s final designs shall be signed, stamped and certified by a licensed architect in Bulgaria, it shall be approved by an authorized “Revision Entity - Expertise” and it shall be approved by the competent Bulgarian authorities for construction projects in public property before its construction is authorized to start. The level of detail of the design (extent of specifications, number and size of drawings, calculations, …) shall be sufficient to verify the compliance with the requirements of this contract and as required by the regulations of Bulgaria and of the competent Bulgarian authorities for this particular project.

Note: EXISTING DESIGN: The beneficiary has prepared an energy efficiency design or technical project, which includes the central heating and thermal façade, which are the main elements of this design/build contract. The contractor can choose to take ownership of this design, or to modify it as necessary. The US Government shall not be responsible for any mistakes in the calculations or dimensions or measurements of such existing design. This design or technical project is available at the job site for consultation only. The technical requirements included in this document shall take precedence over the technical requirement of the existing project. This means that all technical requirements described in the existing technical project are considered to be part of this contract, but not all parts of this contract are included in the existing technical project. In case the contractor decides to take ownership of the existing design or technical project, this shall be amended as necessary with the additional works included in this contract, and recertified by the contractor in order for them to be responsible for the design portion of this contract.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

2.7. Construction Phase - General

Once the contractor completes the design and they show evidence of formal authorization by the competent local authorities and Monitoring Entity, and the contractor shows that they have completed other administrative contract requirements (Accident Prevention Plan, Quality Control Plan, Schedule,…), the Contracting Officer Representative will inform the contractor that they may start the construction phase of this design-build contract. This notification is called Notice to Proceed or NTP. NTP is required prior to beginning construction. The construction shall follow the design and technical projects or shop drawing prepared by the architect and for which the contractor shall obtain the Construction Permit or authorization.

The architect who prepares the design shall visit the site for every important and relevant phase of work, to partially accept the completed works. In addition to the requirements of the Bulgarian regulations for the visits of the designer, once the works start, the architect shall visit the site at a minimum once every week.

Two days in advance of the site visit, the contractor shall inform ODC Bulgaria and the beneficiaries of the planned arrival time to the job site.

In addition to these minimum weekly visits, the architect shall visit the site when NAVFAC’s PM visits the job sites, estimated to occur once every two months.

In addition to these visits, the third party experts that may be required will visit the site as required by Bulgarian regulations, and also when NAVFAC’s PM visits the site.

Work will not be accepted until Final Act of Acceptance is provided.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

2.8. Applicable Requirements / Standards

The project is based on the principle of strict compliance with Bulgarian technical and administrative regulations, with US Contracting Regulations and with Bulgarian Safety regulations unless EM 385- 1-1 has more strict requirements. In case of conflict between Bulgarian and US safety regulations, the contractor shall apply Bulgarian regulations.

The work shall meet all requirements of this Request For Proposal (RFP) package. Drawings to be as required in these PTS and with the necessary details and previous approvals (experts or monitoring entities) to submit the designs to the US Government, Local Bulgarian Administration, final users, contractor’s staff and sub-contractors. Material selection, specifications and installation to be as described in these Performance Technical Specifications (PTS). The Performance Technical Specifications (PTS) are a guideline for the design package:

- If an item in the project design is included in the PTS, the requirements of the PTS, applicable local Bulgarian codes and regulations, and international codes shall govern.

- If an item in the project design is NOT included in the PTS, the requirements of applicable local Bulgarian codes and regulations, and international codes shall govern.

Provide the final work as a complete and usable facility including all required items not described in this RFP. Technical details, items of work, permits or fees that are not explicitly described in this RFP, but which are necessary to provide a fully operational and finished facility shall be considered part of this contract.

Any work not explicitly included in the scope of work of this project, but which is absolutely necessary to have a perfectly operational facility, as required by Bulgarian regulations, shall be considered and treated as part of the requirements of this contract.

Limitation on equipment under this contract

Tables, desks, chairs, computer, phones, washing machines, refrigerator, beds, televisions, and other movable equipment are not part of this contract, unless otherwise indicated in these technical specifications. Only those elements that are fixed, permanently attached to the building or considered as an integral part of the facility, and specifically described in these contract specifications or in the applicable Bulgarian regulations, are included in this contract, unless otherwise indicated in this document.

Requirement for Bulgaria Code and Regulation

The contractor shall request, process and pay for any permits that may be required in accordance with Bulgaria Law for the construction activities described in this document. The contractor shall hire and pay for the services of a “Revision Entity” (or expertise) authorized by the Government of Bulgaria as required by Bulgaria Regulations for this type of construction. If it is not allowed for the contractor to hire this third party inspection company, the contractor shall pay but assign the beneficiary or NAVFAC as the client. The contractor shall provide a copy of the pertinent construction permit to be issued by the competent local authorities and approval by the Monitoring Entity of the design, before they are authorized to start work.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

3. DETAILED SCOPE OF WORK OF BASE BID

The contract includes all the necessary works, including obtaining the required and necessary permits, in order to provide the Prolet kindergarten with a Central Heating System and thermal insulation on the façade and roof.

3.1. New Construction for Mechanical Room – Basis of Design

The contractor shall hire the services of an architect licensed to design mechanical rooms in Bulgaria. Note that some of these requirements are stricter that those described in the existing technical project. The contractor shall follow the following basis of design:

- Location: Where indicated by the existing design (East side of the building)

- Size: in the existing technical project this room is 3 x 4 m. The boiler room shall be minimum 3 x 4 m.

- Elevation: Internal floors to be minimum 30 cm higher than existing grade elevation.

- Seismic criteria: As required by Bulgarian regulations for this location within Bulgaria.

- Layout: The new construction shall have 2 separate areas:

o Boiler room: Sized as recommended by the manufacturer of the boiler to be selected by the designer, with minimum dimension 3 x 4 m.

o Pellet storage: Properly separated by fire rated walls from the boiler room. Minimum 8 m². The contractor shall note that this area is not included in the existing technical project and therefore shall be added as required in order to obtain the necessary permits.

- Structure: Reinforced concrete foundations, columns and ceiling deck.

- Roof: Ceramic tiles on metal structure. The use of wood for the roof structure is not authorized. Provide 0.8 meter wide roof eave around the new facility. This means that the horizontal projection of the roof shall be 0.8 meters wider than the horizontal projection of the external enclosure of the new facility.

- Floors: Exposed concrete.

- Walls and ceilings: Plastered and paint.

THIS IS A DESIGN BUILD PROJECT

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Proposed location of boiler room (without storage area)

- Electrical: In compliance with Bulgarian and European standards. LED lights. Electrical installation recessed within the walls. All cables to be installed within electrical conduits.

Receptacles as needed for the intended use of the areas.

- Windows: Aluminum framed. Opening vertically and horizontally. Double glazing (6-24-6).

Minimum thickness of glazing to be 6 millimeters.

- Doors: Aluminum doors. Without bottom frame. Provided with aluminum louver in the lowest section of minimum 20x40 cm. The exterior doors shall be minimum 90 cm wide. Aluminum can be substituted for galvanized steel for the exterior doors only.

- Heating radiators: Not required in these areas.

- Water and Sewer/Drainage: As required by the mechanical design

- Exterior: Plaster and paint finish.

- Sidewalks: Provide 1 meter wide sidewalks around the new facility.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Drawings of the boiler room in the existing design, which shall be modified as necessary to fulfil the requirements of this basis of design

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

3.2. Heating System - Basis of Design

The contractor can take ownership of the existing technical project for the heating system with the notes and additional requirements outlined herein.

- Heating Boiler: The new heating boiler shall have the following technical characteristics:

o Minimum 80 KW (or 70,000 Kcal/h) of capacity.

o Fuel: Biomass. Designed to burn all sort of coal, olive pomace, corn, wooden pellet, or wood shavings that has 25 mm diameter or smaller.

o Automatic Fuel-Feeding: Provided with automatic bottom fuel feeding, o Fuel silo: With sufficient capacity for minimum of 3 days of usage at 75% capacity.

o Provided with automatic ash removal: The system shall put out the ashes automatically out of the machine or to ash boxes by combing the both sides of burning crucibles with double-spirals.

o Fuel-Feeding and Temperature Control: Provided with adjustable controls in LCD monitor. Boiler thermostat to enable the boiler to work according to desired and adjusted temperature.

o Security Arrangement: Temperature control to be provided by two different thermostats.

o Uncovering the fire, Coal Spreading and Mixing System: To enables %100 continuous burning with front-rear moving and full automatic mechanization.

- Heating boiler stack: Provide and install a stainless steel stack, to extend 1 meter higher than the highest elevation of the roof of the adjacent kindergarten building. This will require additional supports and structural reinforcement of the stack structure.

- Hot water circulation pumps: To be sized and designed by the licensed specialist hired by the contractor. Provide dual pump system. This means that for any pump provided, the contractor shall install another one in parallel to be used in case the first one does not work.

Under normal operating conditions, only one pump of every two provided shall be operational.

- Heating sectors for the kindergarten: The kindergarten internal heating distribution system shall be divided into minimum 2 separate heating loops. This means that if there is any malfunction in any of the heating distribution piping or radiators, the Kindergarten Administration shall be capable of shutting down that loop of the heating system in order to make the necessary repairs, while the other loop remaining fully operational.

- Heating accessories: Provide all the necessary filters, valves, expansion tanks, pressure relief security valves, water connections, drainages, and everything necessary, as required by regulations and as included in the existing technical project, in order to provide a perfectly operational central heating system throughout the kindergarten building.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

- Interior temperature design: As required by Bulgarian regulations for kindergartens It is not acceptable if by increasing the output of the boiler in order to obtain the minimum temperature in the worst location, the temperature in the most favorable location goes above that required by Bulgarian regulations. The whole system shall be balanced in order to obtain uniform interior temperatures.

- Piping: Sized as required by the design. Piping shall be certified by the manufacturer to be used in central heating systems.

- Piping installation: The piping shall be installed along the walls of the kindergarten. It is not authorized to install the heating laying piping on the floors, especially where it can cause tripping hazards. The installation of the piping shall require multiple wall and floor penetrations. All wall and floor penetrations shall be done through pipes sleeves, in order for rapid replacement of piping in the future in case it is needed. The contract includes restoring all floors and walls to their original condition. This will require patching and painting walls and floors. When piping is installed along the walls, these shall be installed with the necessary supports in order to install them perfectly vertical or horizontal, without any visual deflection. Additionally, the contractor will find other installations in the walls where they will need to install the heating radiators. The contractor is responsible to modify, alter or reroute any existing installation within the kindergarten building, which interferes with the installation of the new central heating system.

- Radiators: Provide bimetal type heating radiators. Sized as required by the existing technical project. Provide each radiator with its individual control valves.

- Radiator and piping physical protection: In areas where the heating system will be subject to potential physical impacts, the contractor shall design a protection system for the radiators and piping. These protection systems shall comply with the Bulgarian Fire Code and shall be approved in writing by the radiator manufacturer.

- Installation and Commissioning of New Boiler: To be done and/or certified in writing by the manufacturer representative.

- Provide new domestic water heater as required by the existing technical project.

- Testing: All piping systems shall be tested at minimum 3 times the maximum operating pressure, with no noticeable drop in pressure after 48 hours. Pressure test to be certified by third party inspection company licensed in Bulgaria.

- Acceptance: Final acceptance will be determined by measuring the temperature in worst winter conditions in Klikach in each room (when outside temperature is maximum -10 degrees Celsius). Temperature test will be conducted by a third party inspection company licensed in Bulgaria. Duration of the contract is longer than the time required to make all necessary works. This is because payment over 80% will not be authorized until temperature test results are provided to the Contracting Officer Representative. In case the contractor finishes the works in April, only 80% payment will be authorized until January or February of the following year, when the outside temperatures are expected to be -10 degrees or colder.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Typical required layout for mechanical systems as described in the existing technical project

Extract from existing design or technical project indicating the required size for radiators in the basement

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Extract from existing technical project indicating: Radiators in the ground floor and general building dimensions

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Typical required new boiler with storage silo.

Typical required new boiler with storage silo.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Definition of bimetal type radiator

Definition of bimetal type radiator. Each one to be provided with its own and separate control valves

Definition of bimetal type radiator

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Definition of “pipe sleeve” as required for all wall and ceiling penetrations.

Definition of “pipe sleeve” as required for all wall and ceiling penetrations.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

3.3. Thermal Facade

The contractor shall hire the services of specialized and licensed technicians in Bulgaria to design the new thermal façade system.

Contractor shall provide a new thermal façade system on all exterior surfaces of the kindergarten building. This contract includes all exterior masonry sections of the building, as the sides of the main entrance steps (which do not need thermal insulation but shall be provided with the same esthetic finishes)

This is a design-build contract and therefore the contractor shall be responsible for the design and for the execution of the works.

Façade Design: The contractor shall provide a façade design (Façade Passport), signed and certified by a licensed architect in Bulgaria, to be accepted by the Contracting Officer Representative (COR) and approved by the competent Bulgaria authorities after coordination of the design with the beneficiary. This design shall include as a minimum:

Typical section of thermal façade system

Special cover of the lowest section of thermal façade (following pattern of existing building)

Color and finishes or “façade passport” with the new proposed finishes. Provide pattern and color as approved by competent local authorities and after coordination with beneficiary. The contractor’s architect shall provide several designs for the exterior appearance of the façade for the approval of the competent Bulgarian authorities. The design shall consist of a minimum combination of 3 colors, in addition to the different finishes required for the lowest section of the façade, which shall be provided with special exterior façade ceramic or natural stone tiles

Details of finishes of the thermal façade system in the top and bottom. In the top it is required to provide adequate finish with new roof.

Details for special finishes and reinforcements in the corners and around the windows and doors.

The new thermal façade system shall include, but shall not be limited to:

- Water blasting the façade. Repair all façade defects, after removal of loose pieces of plaster, ceramic tiles, paint, bricks. Repair of any cracks on the facade. Providing leveling mortar as needed for the new thermal façade system. Correct any exposed reinforcing steel by epoxy based product, specifically designed for that purpose.

- Provide thermal insulation panels, minimum of 8 cm thickness of wool rock (or any other thermal insulation product permitted by Bulgarian regulations with similar thermal insulation properties as 8 cm thick wool rock sheet), properly attached to the existing repaired and leveled façade, in accordance with manufacturer’s recommendations. Follow Bulgarian Fire Code. The use of Styrofoam may not be allowed in some (or in all) locations. The contractor shall consult the latest Bulgarian regulations prior to submission of their bids. Only materials and installations in accordance with Bulgarian regulations in effect at the time of submission of the offers shall be authorized.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Lowest natural stone over the thermal insulation, from a

NAVFAC project in Western Ukraine.

- Doors: All existing exterior doors have been recently replaced. The contract includes removing them, modifying them as necessary and reinstallation, to provide perfect finishes, adjustments, and sealing between the doors and the new façade finishes.

- Window adjustment and sills. Similarly to the exterior doors, the contractor shall have to remove, modify as necessary and reinstall all the existing windows. The replacement of exterior sills is necessary to allow for the new thickness of the exterior enclosure.

- Protective plaster. There are several systems available in the market to cover the thermal insulation. The contractor shall apply over the rigid thermal insulation a protective plaster, designed to resist impact. Minimum of 1 cm thickness. This may require double netting prior to the application of the final coat of plaster. Apply in accordance with manufacturer’s recommendations.

- Natural stone: The lowest section of the façade, currently with plastered finish shall be provided with a different cover over the thermal insulation. The height of this lowest section varies in different areas of the kindergarten building, but the contractor shall estimate an average height of 2 meters. This lowest section shall be provided with new perfectly leveled plaster covered with natural stone.

- Paint thermal façade system with 3 coats of paint rated for exterior use and recommended by the manufacturer of the thermal façade system.

- Final certificate: Once the thermal façade is complete, the contractor shall provide a copy of a certificate from the architect certifying that the thermal façade has been properly installed in accordance with their recommendations. Payment for thermal façade shall not be authorized until the contractor provides such certificate.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Typical thermal facade

Typical installation of thermal facade

Typical installation of thermal facade

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Lowest section with natural stone cover for vandal protection.

Average 1.5 meters around all facility. Picture from NAVFAC project in central Ukraine.

Façade Installations, Extensions and Other Exterior Surfaces

The contractor shall be responsible to reroute, remove and reinstall any of the accessories or installations that are currently anchored or supported by the existing façade which are to remain, including electrical poles, electric cables or conduits, road signs, building sign, grounding cables, security cameras, water pipes, telephone cables, gas pipes, ventilation ductwork, downspouts, and any other installation that may exist on the façade to be provided with new thermal insulation and new finishes. All works to be done in compliance with Bulgarian regulations and with approval or permit of the owner, in case it is owned by a third party. For example: if the electrical cable is owned by the electrical utility company, the contractor shall obtain the approval, or the assistance of the electrical company to remove and reinstall this cable. The contractor is responsible for all coordination and for all costs associated with this necessary work. Those installations on the façade that are not be reutilized shall be removed and disposed of by the contractor.

It is the intent of this contract, and it is the scope of work of this contract, to provide the building with the exterior appearance of a new kindergarten building. For that reason, the contract includes the repairs of other exterior surfaces, which require repairs, but which do not require thermal insulation.

These are defined in the pictures included in this document. All these surfaces shall be provided with finishes coordinated with the finishes of the new thermal façade system.

Railing and window metal bars:

Repair and paint all metal railing and bars permanently attached to the building exterior enclosure. This includes the railing for the balconies, entrance steps or the window security bars.

3.4. Roof Insulation

The contract includes the thermal insulation on the roof deck. The contractor shall hire the services of an specialized engineer, architect or technician to design a roofing system to comply with the following basis of design:

- In strict compliance with Bulgarian regulations

- With thermal insulation equivalent to 8 cm of wool rock thermal insulation

- With new metal parapet covers

- With perfectly walkable roofing surface

- With waterproofing warranted for 10 years

In order to perform the roof insulation works, it is estimated that the contractor shall need to completely remove the existing waterproofing asphalt sheets, and to provide new thermal insulation, new mortar plaster to provide adequate slopes, and new asphalt waterproofing layers.

The contractor’s design team shall design a complete new roofing system, to provide thermal insulation and waterproofing warranted for 10 years against any water infiltration.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Back of the building. Downspouts to be removed and reinstalled over new thermal façade surface

3.5. Pictures to show description of scope of work

The following pictures include some general comments about the required work. All description of work included in the picture comments are part of this contract and the contractor shall execute them as if explicitly described in the corresponding paragraph; but not all requirements of the contract are described in the pictures.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Front of the building. Metal bars on windows to be repaired as needed and painted in coordination with the colors of the new façade. Lowest section to be covered with natural stone.

East side of building where the new addition for the boiler room shall be built.

Details of façade installations to be rerouted

LOWEST SECTION TO

BE COVRED WITH

NATURAL STONE

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Details of the front facade

Building sign

Metal window cover to be repaired as needed and painted similarly as the rest of metal structures attached to the building enclosure.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Stairway railing to be repaired and painted. Sides of the steps to be provided with same finishes as the lowest section of the thermal façade, which includes finishes with natural stone.

Window railing to be repaired and painted

Two metal doors to be painted. Railing to be repaired and painted

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Roof. The installation of the new thermal insulation and waterproofing shall be coordinated with the equipment which is installed on the roof deck. Equipment no longer in use may be removed by the contractor.

Roof conditions

Roof conditions

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Metal covers of the parapets to be replaced with new stainless steel or galvanized metal sheet covers.

Grounding cables/installation to be removed, repaired as necessary and reinstalled, in order to have a roof grounding and lighting system in full compliance with Bulgarian regulations. This may include the replacement of the grounding cables/rods or the replacement of the grounding system on the ground.

Metal parapet cover

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Typical similar plaque provided in a completed project in Bulgaria

3.6. Commemorative Plaque

At the end of the construction works, the contractor shall provide and install 1 commemorative plaque at the entrance of the building, at the location to be indicated by the Contracting Officer Representative (COR). The plaque shall have the following information engraved on it:

Colored Flag of Bulgaria Colored Flag of the United States of America EUCOM logo This text: “The heating and energy efficiency improvements of this kindergarten was accomplished as a partnership between the people of the United States of America and the people of Bulgaria, through the combined efforts of the United States European Command, Office of Defense Cooperation, US Embassy in Bulgaria and the Municipality of Karnobat – Date”

Same text as above in Bulgarian.

- Minimum thickness 6 millimeters

- Minimum dimensions 75 centimeters wide by 50 centimeters high.

- Resistant to outdoor weather and UV radiation.

- Plaque to be manufactured by specialized company.

- Before purchasing the plaque, the contractor shall submit the design to the Contracting

Officer for approval.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Acceptable man-lift

Required type of scaffold

Required type of scaffold

3.7. Scaffolding

In order to execute the works included in this project, the contractor shall be required to use scaffolding and/or elevating working platforms.

Despite the scaffolds that may be authorized by Bulgarian regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown in pictures below.

These scaffolds shall be installed and used in accordance with manufacturer’s recommendations. In case the contractor needs to access the façade at any particular point without the need to install scaffolds, the contractor shall use a CE certified (European Community) self-propelled man-lift, similar to the one shown in picture below. The use of other type of scaffolds, other non CE certified man-lifts, or any type of ladders for façade or roof work, IS NOT AUTHORIZED.

Some components of European scaffolding

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

4. GENERAL SCOPE OF WORK OF CONTRACT OPTION-1

PITCHED OR SLOPED METAL SHEET ROOFING

The work included and described in this paragraph shall be performed if, and only if, contract option-1 is awarded to the successful offeror by the Contracting Officer. The US Government will unilaterally decide whether to award or not this portion of the contract based on availability of funds, as well as other factors.

The Contract Option-1 includes designing and providing a new preformed metal sheet roofing over the roof deck of the kindergarten building, with the following basis of design:

- Perform a design for the new roof. This design shall be properly certified as required by Bulgarian regulations.

- Provide new perimeter beam of reinforced concrete or metal above the exterior perimeter walls of the facility, where currently there is a metal cover to cover the parapet. All the weight of the new roof shall be supported by this perimeter beam, which shall evenly distribute the vertical forces on the exterior walls of the building.

- The slope of the new roof shall be the minimum of 30 degrees (57.73% slope).

- Design and provide a minimum of 2 windows or dormers on the new roof. Provide for ventilation of the roof and for esthetics of the building, but provide with metal screens to avoid birds from getting inside the roof when windows are opened.

- Provide metal eave of minimum 0.8 meters wide.

- Provide new metal roof structure. The wood for the roof structure is not authorized.

- Provide new traditional flat ceramic roof tiles or preformed metal sheet for roofing.

- Provide vapor barrier under the new roof system.

- Thermal insulation is already part of the contract. If this contract option is awarded, the contractor can decide to install the thermal insulation on the roof deck as described in the base-bid, or they can decide to install it under the inclined roof included in this contract option. However, with or without this contract option awarded, all areas under the roof shall be provided as a general storage area and therefore it shall be “walkable”.

- Provide snow stops.

- Install a new lighting protection for the roof in strict compliance with applicable Bulgarian

Electric Code, if required, given the existence of higher buildings in the area. Provide a new grounding system (<5Ω).

- Remove existing downspouts and provide new gutters and downspouts. Use non-ferrous material, of cooper, PVC or PVC coated aluminum.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

- Provide area under the new roof to be used for general storage.

- Provide electrical lighting under the roof. Due to the limited and restricted use of this area, fluorescent lighting system is authorized.

- Provide a 10 year written warranty against any water infiltration or evidence of humidity in the ceilings of the building. Warranty letter shall be provided from the contractor to the Municipality with a copy to the Contracting Officer.

Definition of roof “dormer”. Use typical “gable dormer”. Include minimum of 2 units in the roof design for natural light and ventilation.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Sketch of new required roofing, with all weight supported by perimeter of the building. Provide with minimum 2 dormers (not shown in the sketch)

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

5. GENERAL SCOPE OF WORK OF CONTRACT OPTION-1

REPLACE ALL LIGHTING OF THE FACILITY WITH LED LIGHTS

The work included and described in this paragraph shall be performed if, and only if, contract option-2 is awarded to the successful offeror by the Contracting Officer. The US Government will unilaterally decide whether to award or not this portion of the contract based on availability of funds, as well as other factors.

The Contract Option-2 includes the design and installation or a new interior lighting system for the kindergarten building.

If this contract option is awarded, the contractor shall hire the services of a lighting system specialist to perform a full technical illumination project, including all necessary electrical works in order to have the interior of the kindergarten building 100% compliant with EN 12464-1 (from November 2011).

Basis of design and contract requirements:

- Hire the services of a lighting system specialist

- Prepare a technical project with all necessary electrical works required to have the interior of the kindergarten building compliant with EN 12464-1

- Replace all interior lighting systems with new lighting system using exclusively LED technology

- Perform the necessary electrical works in order to install the new lighting fixtures, which will vary from the existing number and location

- Certify that the interior of the kindergarten complies 100% with EN 12464-1

The contractor shall provide a lighting design for the interior of the kindergarten, showing the illumination design pattern for each room in compliance with EN 12464-1. In each room, the design shall include the number and location of specific LED lighting fixtures, to show that they meet the minimum lighting levels required by standard EN 12464-1. These designs are normally done by the manufacturer of the proposed lighting fixtures. For the final inspection and acceptance the contractor shall provide the services of a certified third party inspection company with a lighting meter to test the illumination levels. This test shall be done in presence of the lighting system specialist, the beneficiary representative and the Contracting Officer Representative (COR).

The lighting fixture model shall be selected by the contractor in compliance with Bulgarian regulations and using LED technology. It must be noted that this contract option does not simply includes the replacement of the lighting fixtures. In some rooms, the contractor may simply remove the existing lighting fixtures and replace them with new LED technology lighting system. However, in most (if not in all) of the rooms, the contractor shall have to provide a larger number of lighting fixtures and/or provide the lighting fixtures at a different location. This will require the contractor to have to perform cabling electrical works, which shall all be covered under certified CE cable channels. The contractor shall reutilize as much as technically possible the existing cabling and switches. However, it is estimated that the contractor shall have to perform some minor electrical works, as required in order to have the interior of the kindergarten full compliant with EN 12464-1.

Use 3,000 to 5,000 K color temperature for new LED lighting fixtures.

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Professional 3D lighting design

Standard lighting design.

Example of lighting design software

Example of lighting design software

LED lighting fixture to be recessed

Larger power surface mounted LED lighting fixture

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

Typical required illumination levels for each type of facility

Example of lighting design software (similar shall be used for our project)

Klikach Kindergarten – Energy Efficiency improvements Klikach - Karnobat (Bulgaria)

6. PROCEDURE AND GENERAL CONTRACT REQUIREMENTS AND GUIDELINES

6.1 Start of Construction

The Contracting Officer Representative shall authorize the start of construction. This authorization to start will not be given until the contractor:

- Provides written evidence that they comply with all legal requirements in Bulgaria in order to perform the works described in these PTS.

- Provides copy of the required Construction Permit or authorizations from the competent

Bulgarian authority authorizing the execution of the works.

- Provides technical information and technical projects for the designs, including proposed materials and equipment to be used for the project. Only materials and equipment previously accepted by the Contracting Officer Representative shall be brought to the site.

- The Contracting Officer Representative accepts their Accident Prevention Plan. See the guidelines for preparation of the APP attached to the solicitation package.

- The Contracting Officer Representative accepts their Quality…