Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amend_01_SF1442.pdf | ||
| Solicitation_N33191-14-R-1005-0001.pdf | ||
| Solicitation_Attachments.doc | DOC document | |
| Solicitation_N33191-13-R-1005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N33191-14-R-1005, DESIGN-BUILD/DESIGN-BID-BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR NEW CONSTRUCTION, RENOVATION, ALTERATION AND REPAIR PROJECTS, NSA BAHRAIN, KINGDOM OF BAHRAIN
Amendment 0002 is continued on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Dec-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-14-R-1005
X 9B. DATED (SEE ITEM 11)
05-Dec-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Dec-2013
CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N33191-14-R-1005
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
PRE-PROPOSAL INQUIRIES
The following Pre-proposal Inquiries are answered:
14. As stated in the RFP “1.1 GENERAL OVERVIEW OF MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)” Construction projects to be performed will primarily consist of general building type projects (new construction, renovations, alterations, demolition, repair work, and any necessary design) including: waterfront, pier, quay, industrial, airfield, aircraft hangar, infrastructure, administrative, training, retail, food service, dormitory, community support facilities and both vertical and horizontal construction for Department of Defense activities in the Bahrain and UAE areas managed by NAVFAC EURAFSWA.
While in “2.2 EVALUATION FACTORS FOR AWARD” Factor 2, a relevant project is further defined as vertical construction projects with a value equal to or exceeding $500,000 (or the equivalent foreign currency) with multiple construction trades to construct a complete and usable facility.
Does this mean that any project which is not vertical construction will be considered as non-relevant project even if executed in Bahrain or UAE? Examples such as: renovation, infrastructure, demolition, horizontal construction, electrical distribution and generation, water supply or sanitary sewer systems? Please advise.
Answer: Projects not meeting the solicitation definition of a relevant project will be evaluated as not relevant.
15. Please advise if we may submit PPQs from past projects of similar nature and in similar format?
Answer: Per the solicitation, please provide past performance information for each project submitted under Factor 2 – Experience.
16. Reference to SF1442, item 10 and “Instructions to Offerors”, paragraph 1.1, it is stated that the construction projects to be performed will include both vertical and horizontal construction.
However, under Factor 2 “Experience”, it is stated that “…a relevant project is further defined as vertical construction projects…” which seems to be in contradiction with the project description that include both horizontal and vertical construction.
Please review the RFP documents and modify accordingly.
Answer: The solicitation definition of a relevant project remains unchanged.
17. Reference to “Instructions to Offerors”, paragraph 1.10, please confirm that the information required from the Contractor for the Pre-award survey/Responsibility Determination is to be submitted with Phase II.
Answer: Correct – further information for this requirement will be provided in Phase II of the solicitation.
18. Can we in our capacity as prime contractor make a subcontract with a local Bahraini firms & include subcontractor’s past performance and technical details in the Non Price Proposal?
Answer: Yes. Please see Factor 2 – Experience.
N33191-14-R-1005
19. Please explain the USG’s view on the difference between a subcontract and JV.
Answer: See Document 00100 Instructions to Offerors, Paragraph 1.4
(End of Summary of Changes)