Attachment_1_-_Performance_Technical_Specification.pdf

PDF 2 MB Posted

Attached to
RENOVATION OF SOCIAL CENTER FOR DISABLED, VRATSA, BULGARIA
Solicitation number
N33191-14-R-0622
Issued by

About this file

Attachment 1 - Performance Technical Specification

View the file

Other files

File Type Posted
Attachment_3_-_PPQ.doc DOC document
Attachment_2_-_Contract_Data_Sheet.doc DOC document
Solicitation_N33191-14-R-0622.pdf PDF
Attachment_4_-_Submittal_Checklist.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovation of Social Center for the Disabled Vratsa (Bulgaria)

BU-HA-2013-20302 Version: 001

EUCOM Humanitarian Assistance Program

Renovation of Social Center for Disabled in

Vratsa

BU-HA-2013-0020302

Vratsa, Bulgaria

January 2014

1. TAXATION

In accordance with Agreement between the Government of USA and the Government of BU on Defense Cooperation this contract is exempt from VAT. The contractor shall be responsible to prepare and process all required documentation to obtain the VAT exception from the Government of Bulgaria. For this reason, the contractor shall work directly with the corresponding authorities from Bulgaria, US Forces and the US Embassy".

2. PROJECT DESCRIPTION

THE CONTRACTOR SHALL PROVIDE A COPY OF CONSTRUCTION PERMITS TO BE PROVIDED BY

THE COMPETENT LOCAL AUTHORITIES BEFORE WORK IS AUTHORIZED TO START. CONTRACTOR

WILL COORDINATE WITH LOCAL AUTHORITIES AND WILL PROVIDE ALL REQUIRED

DOCUMENTATION IN ORDER TO OBTAIN THE CONSTRUCTION PERMIT THAT MAY BE REQUIRED

FOR THE SCOPE OF WORK INCLUDED IN THIS PROJECT.

GENERAL SCOPE OF WORK

The Work included under this contract includes the necessary designs and the construction for the repairs and improvements to the interior and exterior of the Social Center for the Disabled in Vratsa, as required in these Performance Technical Specifications (PTS) (see pictures #1-3 for location of the project). All work to be performed as required by these PTS. It is necessary that the bidders visit the Social Center before they submit their bids in order to measure and quantify the work required to complete this project in accordance with these PTS.

Note: There are numerous pictures in this contract to better describe the scope of work.

These pictures were taken on November 2013. The pictures do not guarantee the existing conditions of the buildings at the time to prepare the bid for the contract, and they are only a tool to describe the responsibilities of the contractor. The contractor is responsible to visit the sites in order to measure and quantify the required work, as well as to verify the existing conditions, prior to the submission of their proposal.

LOCATION OF THE PROJECT

The project is located downtown Vratsa, in Boulevard “Mito Orozov”, number 16 (булевард Мито Орозов 16)

Picture#1: Location of Vratsa in Bulgaria

Picture#2 : Location of Social Center for Disabled

Picture#3 :Exact location of facility

Picture#4: Layout of Social Center for Disabled

3. DETAILED SCOPE OF WORK

The works included in this construction contract include the following internal and external renovations and improvements:

- Replacement of all heating radiators in the facility

- Installation of new suspended ceiling in Office Room and Bathroom

- New lighting in Office Room and Bathroom

- New curved shaped kitchenette counter

- New window in bathroom

- New Thermal Facade

- Commemorative plaque

All works shall be design and executed in strict compliance with Bulgarian Technical Regulations.

Any work that is not explicitly described in this scope of work, but which is required in order to obtain the final acceptance of works by the competent Municipal authority, shall be considered part of this project, as if perfectly detailed in these technical specifications.

Picture#5:Typical new radiator. Bimetal type

3.1. HEATING SYSTEM

The project includes replacing all existing heating radiators and heating piping in the Social Center for Disabled. The work includes, but is not limited to:

- Removal of the old radiators

- Connection of new radiators to the central heating pipes. Modify as necessary the central heating piping in order to install the new radiators in compliance with Bulgarian regulations.

- Design and installation of new heating radiators in compliance with Bulgarian technical regulations. The new heating piping shall be connected with the existing heating piping.

- Provide new aluminum bimetal radiators, similar to the one in pictures#5-7, and provide each radiator with individual control and isolation valves. Size of new radiators, shall be similar to the size of the existing ones to be removed.

- Note: Radiators for the Main Room shall be placed where the current ones to be removed are currently located. These areas are very narrow. New heating radiators shall be bimetal type to fit into the available wall space. This may require providing bimetal type radiators of special size (not standard)

Picture#6:Typical new radiator. Bimetal type

Picture#7:Typical new radiator. Bimetal type

Picture#8: Radiators to be removed from Main Room.

Note the available height of wall where to install the new bimetal type radiators.

Picture#9: Radiators to be removed and available wall.

Central heating piping going to floor above.

Picture#10:Typical existing radiator in Office Room.

Picture#11: Radiators to be replaced with new bimetal type ones. Possibility of requiring special sized radiators.

Picture#14: Areas to receive new suspended ceiling highlighted in blue.

Picture#12: Ceiling and lighting on Office Room

Picture#13: Windows, central heating piping and ceiling in Office Room.

3.2. SUSPENDED CEILING

The project includes providing new acoustical suspended ceiling in the Office Room and Bathroom areas. All ceilings to be provided with acoustical suspended ceiling (Armstrong type) over galvanized metal structure.

Coordinate with the Municipality the height of the new ceiling. This height shall be coordinated with the top elevation of the windows and leaving the necessary space above the suspended ceiling for the installation of the recessed lighting fixtures.

Picture#15: Typical installation of suspended acoustical ceiling with recessed lighting fixtures.

Picture#16: Typical installation of suspended

Picture#20: Typical suspended ceiling.

Picture#17: Typical installation of suspended

Picture#19: Typical drop suspended ceiling

Picture#18: Typical galvanized steel support for suspended ceiling

3.3. NEW LIGHTING IN OFFICE ROOM AND BATHROOM

The project includes removing the existing lighting fixtures and all accessories, including cables and switches, and providing a new rapid start fluorescent lighting fixture system in the bathroom and Office Room.

New lighting fixtures shall be recessed within the new suspended ceiling system, and shall be capable of providing 300 lux at one meter elevation or the minimum required illumination by Bulgaria regulations (whatever is higher). Lighting fixtures shall be recessed within the new suspended ceiling. The contractor shall use the services of a manufacturer or authorized supplier of the manufacturer of the lighting fixtures to design the type, quantity and location of the lighting fixtures in order to provide the lighting levels required.

The contractor shall replace the switches. The contractor shall reutilize the existing electrical conduits to the maximum extent technically possible. Along the walls, if the existing conduits are not suitable for the new cables, the contractor shall utilize CE certified (European Community) PVC electric channels. Over the suspended ceiling, all cables shall be installed over approved electric conduits.

Only the electrical installation to provide new lighting for the two areas under the scope of work is included in this contract.

Picture#21: Schematic plan of recessed lights in suspended acoustic ceiling

Picture#23: Typical installation of recessed lighting fixtures Picture#22: Typical installation of recessed lighting fixtures.

Picture#25: Typical recessed lighting fixtures

Picture#24: Typical recessed lighting fixtures.

Picture#28: Approximate dimensions of existing and new required kitchenette counter

Picture#27: Double rounded edge of granite countertop

Picture#26: Widened edge of granite countertop

3.4. NEW CURVED SHAPED KITCHENETTE COUNTER

The project includes removing the existing kitchenette furniture and replacing with new one as shown in the sketch included in picture#28.

The new furniture shall consist of:

- Approximate size and location as shown in picture#28

- Same countertop elevation as the existing one.

- Made of solid wood. The use of laminate or composite wood is NOT AUTHORIZED

- Countertop of granite or other approved natural stone with double rounded edge as shown in picture#27 or widened edge as shown in picture#26.

- Countertop to be provided with wall base made of the same material. Countertop material shall cover 12 cm of wall above the countertop surface. See pictures #29-30.

- Volume under the countertop to be used for standard kitchen cabinetry (cabinets and drawers). All made of solid natural wood.

- Design to be accepted by NAVFAC PM and approved by beneficiary prior to purchase and installation. Reinstall electrical installation for the water heater as necessary.

- Reinstall existing shelves at the new height demanded by the new counter installation

- Provide new stainless steel sink.

- Provide new hot and cold water faucet for the new stainless steel sink.

- Reinstall water heater and reuse existing piping to the maximum extent possible.

- Anchor all counter assembly to the wall so that it cannot be moved.

Picture#30: Typical installation of countertop material along the wall, similar to wall base material.

Picture#29: Typical installation of granite countertop on the walls over the countertop.

Picture#32: Existing furniture to be removed

Picture#31: Existing furniture to be removed

Picture#34: Sink and furniture to be removed. Reuse water piping and heater to the maximum extent technically possible.

Picture#33: Typical installation of countertop along the walls

Picture#36: Typical exterior PVC window installation

Picture#37:Typical PVC window installation. Seal all areas around new windows. Foam not exposed.

Picture#35: Typical window profile (5 chambered)

3.5. NEW WINDOW IN BATHROOM

The project includes replacing only the window of the bathroom.

The new window shall be minimum of 5 chambered PVC profile with double glazing 4-16-4 provided with mosquito net. Mosquito nets to be removable and provided by the window manufacturer.

The operation of the window shall be similar to the existing ones to be replaced. However, opening or operational window panels shall open horizontally and vertically.

The contractor shall make the required adjustments and repairs to the window wall opening before installing the new windows.

The contractor shall completely remove all the exterior wood, including all framing, trims, anchors and supports. The contractor shall replace the wooden and metal windows with new PVC framed windows (minimum 5 chamber profiles) with double glazing of minimum (4-16-4). The new PVC windows shall be perfectly finished inside and outside. The joints between the building and the windows shall be perfectly sealed as seen in pictures below for a typical installation. Contractor to provide PVC sill inside as seen in the pictures below and outside sills made of aluminum or other approved material (i.e.

natural marble or exterior rated special ceramic tiles).

Security Bars: The contractor shall remove these bars, repair as necessary, provide new anchor bars as necessary, paint them, and reinstall them in the same locations where they were found.

The contractor shall repair, patch and paint as necessary in order to restore everything to the original conditions. There shall be no difference between the existing walls and the repaired surfaces.

Picture#43: Window to be replaced from the outside

Picture#42: Window to be replaced from inside

Picture#38: Typical PVC window installation with new PVC sill inside and aluminum outside.

Picture#39: PVC sill inside and aluminum outside.

Picture#41: Window leaf opening horizontally and vertically

Picture#40: Typical required external sill

Picture#45: Typical installation of thermal facade

Picture#44: Typical installation of

3.6. NEW THERMAL FACADE

The Municipality repaired the façade in the front and in a section of the lateral. The building where the Social Center for Disabled people is located is already provided with a thermal façade system, with the exception of the ground floor. The project includes providing thermal façade for the lateral and back of the Social Center for Disabled people.

Contractor shall provide a new thermal façade system where indicated. The finishes of the new thermal façade shall be similar to the finishes of the building thermal façade. The new thermal façade system shall include:

- Repair any façade imperfection, by removing loose pieces of plaster and providing leveling mortar as needed for proper adherence of thermal insulation.

Correct any exposed reinforcing steel by epoxy based product, specifically designed for that purpose.

- Removing the exterior window sills and installing them with at least 5% slope. There are currently humidity problems due to their poor installation.

- Provide rigid thermal insulation panels, minimum of 8 cm thickness, properly attached to the existing repaired façade, in accordance with manufacturer’s recommendations. Follow Bulgaria Romania Fire Code. Insulation around windows shall be fire proof material.

- Protective plaster. The contractor shall apply over the rigid thermal insulation a protective plaster, designed to resist impact. Minimum of 1 cm thickness. Apply in accordance with manufacturer’s recommendations.

- In the lowest section (approximately 1.4 meters) the contractor shall provide special masonry cover or special plaster to resist heavier impacts. The lowest portion of the façade shall be vandal resistant, capable of resisting the impact of a hammer.

Physical protection of the façade is more important than thermal insulation.

- Provide pattern and color as approved by competent local authorities and similarly to the existing thermal façade of the building

The contractor shall be responsible to reroute and reinstall any of the accessories that are currently anchored or supported by the existing façade, including air conditioning condenser unit and downspout, or any other installation that there may be.

Contractor to repair other façade surfaces not requiring thermal treatment, such as the entire lateral of the Social Center for Disabled.

Picture#46: Façade to receive thermal treatment and protection in the lowest section

Picture#47: Are to receive thermal treatment and/or wall protection

Picture#48: Detail of façade and installations

Picture#49: Existing thermal insulation on rest of building

Picture#50: Remove and reinstall properly the exterior window sills.

Picture#51: Façade details

Picture#52: Back façade

Picture#53:Typical protection on lowest section of

Picture#56: Acceptable man-lift

Picture#54: Required type of scaffold

Picture#55: Required type of scaffold

3.7. SCAFFOLDING

In order to execute the works included in this project, the contractor shall be required to use scaffolding and/or elevating working platforms.

Despite the scaffolds that may be authorized by Bulgarian regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown in pictures below.

These scaffolds shall be installed and used in accordance with manufacturer’s recommendations. In case the contractor needs to access the façade at any particular point without the need to install scaffolds, the contractor shall use a CE certified (European Community) self-propelled man-lift, similar to the one shown in picture below. The use of other type of scaffolds, other non CE certified man-lifts, or any type of ladders for façade or roof work, IS NOT AUTHORIZED.

Picture#57: some components of European scaffolding

Picture#58: Typical similar plaque provided in a different renovation project.

3.8. COMMEMORATIVE PLAQUE

At the end of the construction works, the contractor shall provide and install 1 commemorative plaque at the entrance of the Social Center for Disabled People, at the location to be indicated by the beneficiary. The plaque shall have the following information engraved on it:

Colored Flag of Bulgaria

Colored Flag of the United States of America

This text: “The renovation of this Social Center was made possible through a donation from the people of the United States of America to the People of Bulgaria with the support of the Office of Defense Cooperation and US Embassy in Bulgaria – Date”

Same text as above in Bulgarian.

The plaque shall have the following characteristics:

- Minimum thickness 8 millimeters

- Minimum dimensions 60 centimeters wide by 40 centimeters high.

- Resistant to outdoor weather and UV radiation.

- Plaque to be manufactured by specialized company.

- Before purchasing the plaques, the contractor shall submit the design to the Contracting

Officer for approval.

4. PROCEDURE

4.1. Taxation

In accordance with Agreement between the Government of USA and the Government of BU on Defense Cooperation this contract is exempt from VAT. The contractor shall be responsible to prepare and process all required documentation to obtain the VAT exception from the Government of Bulgaria. For this reason, the contractor shall work directly with the corresponding authorities from Bulgaria, US Forces and the US Embassy".

4.2. Principles

This construction contract is based on 4 principles:

1. Strict compliance with Bulgarian technical regulations

2. Strict compliance with United States of America contracting regulations (Federal Acquisition

Regulations)

3. Compliance with the most stringent of US and Bulgarian Safety regulations

4. Compliance with technical requirements of this document.

4.3. Design Requirements

The contractor shall perform the work in strict compliance with the construction codes and regulations of Bulgaria. The contractor is responsible to provide a copy of a Construction Permit issued by the corresponding local authority for those portions of the project that require a Construction Permit as required by applicable Bulgarian regulations. The contractor is responsible to prepare any required documentation and/or designs that will be required in order to obtain these permits. In case any portion of the scope of work of this project does not require a specific construction permit, the contractor shall provide a document from the Municipality stating that they authorize the start of construction. No work shall start until the corresponding construction permit or alternative document is issued by the competent Municipal authority, and a copy provided to the Contracting Officer.

For those items required by the Scope of Work, which are not specified herein, the contractor shall follow the applicable Bulgarian Codes and Regulations.

4.4. Start of Construction

The Project Manager (PM) or Authorized Representative of the Contracting Officer shall authorize the start of construction. This authorization to start will not be given until the contractor:

- Provides copy of official Municipal document authorizing the works to be performed.

- Provides accepted copy of the Safety Plan

- Provides accepted copy of the Quality Control

- Provides copy of the Construction Schedule

- Provides technical information of materials and equipment to be used

4.5. Scheduling and Coordination Requirements

The Social Center will remain in use during the execution of the works. The contractor shall closely coordinate with the Director of the Social Center and/or the Municipality representative the daily work.

4.6. Construction Schedule (bar chart is authorized).

All work shall be completed within 250 calendar days after project award.

Within 15 days after contract award, the contractor shall provide a construction schedule including a minimum of 10 activities.

4.7. Accident Prevention Plan / Safety Plan

SAFETY SHALL BE THE FIRST PRIORITY OF THE CONTRACTOR. SAFETY OF THE USERS

OF THE SOCIAL CENTER, WORKERS, STAFF OF THE FACILITIES, AND GENERAL PUBLIC,

SHALL TAKE PRECEDENCE OVER ANY OTHER FACTOR.

The contractor shall use the format included in Annex 1 to prepare the Safety Plan or Accident Prevention Plan

Within the timeframe allowed for the final design submission, the Contractor will prepare and submit a Safety Plan (Accident Prevention Plan) describing procedures they plan to perform to ensure the safety of the users of the facility, workers, the staff of the facilities, the general public, and the equipment on the job site. The Plan shall clearly define the safety personnel assigned to this project and the measurements that the contractor will implement to guarantee that nobody will be exposed to any hazards as a result of this construction contract.

Additionally, the safety plan must address types of personnel protective equipment to be used by personnel, types and frequencies of safety inspections, hazard analysis plan to prevent safety incidents, and training utilized to familiarize employees with safety policies and practices. The contractor shall comply with the US Army Corps of Engineers Safety Manual EM385-1-1 wherever the requirements of this manual are more stringent than the requirements of the Bulgaria Safety Law.

No work shall start at the job site until the Safety Plan is received and accepted by the US Government.

Bulgarian Safety Code must be strictly followed. The contractor is responsible for the safety of the workers, the safety of the users of the facility and the general public.

Additional safety requirements for NAVFAC project can be found in Section 01525, which can be found here:

http://www.aed.usace.army.mil/contracting/0093/01525%20Safety%20and%20Occupational% 20Health%20Rqmnts.pdf

The contractor shall propose a Site Health and Safety Officer (SSHO). This person, must have completed the 30-hour OSHA Construction safety class or as an equivalent, this person must have completed 30 hours of formal construction safety and health training in other accredited institution, covering the subjects of the OSHA 30-hour course (see Appendix A, paragraph 4.b) applicable to the work to be performed and given by qualified instructors. The SSHO is also required to have five

(5) years of construction industry safety experience or three (3) years if he possesses a Certified Safety Professional (CSP) or safety and health degree. In Appendix 1, it allows equivalent certificate issued and acknowledged by local authorities. This means that the SSHO would meet the requirements is he/she shows evidence of having completed a safety course of at least 30 hours, covering general construction safety; given that the training was conducted by an authorized official institution, such as an University, or European certified safety agency. This is in addition to the required 5 or 3 years of experience in the construction sector.

4.8. Technical Documentation

The contractor shall provide technical information on all equipment to be incorporated to the job site. This information must be sent to and accepted by the Project Manager before they are purchased by the contractor. This includes countertop material for the kitchen counter, lighting fixtures, paint, thermal façade system, window, radiators or suspended ceiling

4.9. Language

All communication and correspondence between the contractor and the Government personnel shall be in English. It shall be the responsibility of the Contractor to prepare proposals, invoices, shop drawings and submittals, quality control reports, computations, and all correspondence pertaining to this contract, in the English language; but the Contractor may, for his own record purposes, prepare them in the local language. All correspondence to and from the Contracting Officer shall be in the English language. In case of dispute or claim, the English version will govern.

Immediately after award, the contractor shall appoint an English speaking representative, with cellular phone and e-mail address.

For the visits of the Contracting Officer, the PM or their authorized representative to the job site, the contractor shall provide somebody capable of representing the construction company who can communicate in English language or the contractor shall provide a translator to translate from English to Bulgarian language.

4.10. Pictures

The contractor shall send weekly and representative digital pictures of their construction by e-mail once construction starts, showing construction progress. These pictures shall be used to monitor the contractor’s performance and to validate the invoices.

Failure to provide updated pictures will impact the ability of the Contracting Officer to validate and therefore to pay for the invoices.

4.11. Quality Control Plan

Within the timeframe allowed for the submission of documentation before starting the works, the Contractor will prepare and submit a Quality Control Plan describing personnel, procedures, tests and installation techniques that he plans to perform to ensure the quality required by these Technical Requirements and his design is obtained.

The Quality Control Plan shall include the name and qualifications of the person responsible for the quality of the works

Example of typical construction sign in Moldova

Example of typical construction sign in Ukraine

4.12. CONSTRUCTION SIGN

Immediately after award the contractor shall prepare and install, at a very visible location, a construction sign with the following characteristics and information on it:

- Wood sign with minimum dimensions 2 meters wide by 1 meter high

- Letters and logos prepared by an specialized company and designed for outdoor installation

- Flags of Bulgaria and the United States of America

- The following text: THE RENOVATION OF THIS SOCIAL CENTER IS FUNDED BY THE

UNITED STATES EUROPEAN COMMAND AND PROVIDED TO THE PEOPLE OF

BULGARIA IN COOPERATION WITH THE ADMINISTRATION OF VRATSA. EXECUTIVE

AGENT: US EMBASSY IN BULGARIA. CUSTOMER: US NAVAL FACILITIES

ENGINEERING COMMAND. PRIME CONTRACTOR:?

- Logo of NAVFAC

- Start and completion dates.

- Same text in Bulgarian.

4.13. PAYMENT

Payment shall be performed as required by US Administrative Requirements. See Contract Clauses pertinent to Payment procedures.

** NO ADVANCE PAYMENT IS AUTHORIZED **

Payment shall be perform following the principle of payment for completed work. Payment shall be phased as detailed herein:

- Partial payments as agreed with the US Representative, as work is being completed and accepted

- Maximum of 80% (cumulative) is authorized until the final inspection is completed and all potential deficiencies are corrected. No payment over 80% is authorized until all work included in the contract is completed.

- Final invoice (100%) shall be paid once final inspection is completed and all potential defects identified in the final inspection are properly corrected.

Together with each invoice, the contractor shall provide:

- Official invoice

- Cost breakdown justifying the requested amount for payment.

- Filled Contractor’s Safety Self Evaluation Form

- Invoice Statement: With the text below signed by a responsible person from the company

(ideally the one that signed the contract):

I hereby certify, to the best of my knowledge and belief, that:

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and legal requirements of Bulgaria;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.

Progress payment shall only be authorized if NAVFAC representative verifies on site the amount of work performed, or if the contractor proves with sufficient pictures and documentation that the work was actually performed as required by the contract. NAVFAC representative will disallow from the requested amount those portions of the invoice that the contractor does not prove that they were performed as required by the contract.

5. GENERAL TECHNICAL SPECIFICATION

5.1. NARRATIVE

All Technical Specification (TS) sections must be used in conjunction with all parts of the Request for Proposal (RFP) to determine the full requirements of this solicitation. This TS section provides general requirements for the other TS sections of this RFP and is used in conjunction with the other TS sections.

5.2. CONSTRUCTION GUIDANCE

Construction shall be in accordance with sound construction practices, and shall conform to the latest revision/edition of the codes, criteria, and standards referenced below except as otherwise indicated by this Request for Proposal. Construction shall also comply with applicable codes, ordinances and regulations of Bulgaria governing life/safety, fire protection, building construction, HVAC (heating ventilation and air conditioning) systems, plumbing systems, electrical systems, roofing or sanitation systems in effect during this contract, except where specifically stated herein. Any material installed that does not meet the requirements of this Technical Specification (TS) and/or applicable codes, ordinances and regulations will be removed and reinstalled at Contractor’s expense.

5.3. CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC.

The Contractor shall be responsible for determining, processing and requesting and paying all fees associated with, and obtaining any required permits for this project including, but not necessarily limited to Bulgarian design and construction licenses (as required for the scope of work of this contract), permits for on-site and off-site hauling, demolition/disposal, construction activity, construction permits, utilities, road improvements, communications, etc. The contractor is responsible for acquiring any required certifications (licensing). Coordinate all permit requirements with the Contracting Officer. Submit all completed permit application material, and associated back-up material, required to operate facilities, to the Contracting Officer for approval prior to agency submission. Contractor shall be responsible for complying with environmental laws, regulations and requirements.

5.4. PROHIBITED ITEMS

Use of the following items in this construction project is prohibited:

- Use of aluminum for electrical conductors.

- Embedding aluminum conduit in concrete.

- Use of fluorescent light ballasts and other products containing PCB's.

- Use of urea-formaldehyde foam insulation products.

- Use of any paint/coatings having a lead content of over 0.06 percent by weight of non-volatile content. The use of ozone depleting chemicals is prohibited. The use of zinc-chromate is prohibited.

- The use of materials containing asbestos is prohibited.

5.5. RESPONSIBILITY OF MATERIALS

All materials delivered to the construction site shall remain in the ownership and responsibility of Contractor. Contractor will be responsible to safeguard the procession and condition of the material until US Government takes procession of the finalized project.

Material that is not intended to become part of the project shall not be delivered, placed, retained nor stored on the project site.

All refuse or salvaged materials shall become the property of the Contractor and shall be disposed of, off-site, in accordance with applicable Bulgaria regulations. The Contracting Officer may ask for receipts of proper disposal of debris, removed roof materials, or excess materials.

5.6. SAFETY AND PROTECTION

5.6.1. Safety of the users of the facility, of the workers, of the staff of the buildings, the visitors, and the general public shall be the highest priority of the contractor.

5.6.2. The contractor shall provide a copy of their Accident Prevention Plan, to be accepted by the Contracting Officer, before any work is authorized to start.

5.6.3. The contractor is responsible for the safety of the contractors employees, subcontractors, visitors and general public, as they could be affected by this construction project

5.6.4. The contractor is responsible to comply with Bulgaria Safety Code. All costs of compliance with safety and with Bulgarian safety regulations are the responsibility of the contractor. Any costs related with safety inspections, safety monitoring, or anything else required to comply with the Safety regulations shall be the responsibility of the contractor. Where the Safety Manual of the US Army Corps of Engineers (EM385-1-1) has more stringent requirements, these shall apply.

5.6.5. The construction areas shall be securely separated from those areas of free access to the general public.

5.6.6. Within the context of his responsibilities, the contractor shall take the necessary actions to protect the safety and health of the employees, including the prevention of occupational risks, information and training measures, and measures for the organization of the health and safety at work and its necessary means as required by Bulgaria Code. The following general prevention principles shall be taken into account for the adoption and implementation of the measures provided above:

a. avoiding risks;

b. evaluating the risks which cannot be avoided;

c. combating the risks at the source;

d. adapting the work to the individual, in particular as regards the design of the workplace and the choice of work and production equipment and methods, with a view, in particular, to alleviating monotonous and repetitive work, and its effects on health;

e. adapting to technical progress;

f. replacing the dangerous by the non-dangerous;

g. prevention planning;

h. giving collective protective measures priority over individual protective measures;

i. giving appropriate instructions to the employees.

An employer shall insure all employees against occupational accident and disease risks, under the terms of Bulgaria law. The contractor shall verify that all employees of the prime contractor or any subcontractor employed in this project meet the legal requirements of Bulgarian Law.

The contractor shall organize the employee training in the field of health and safety at work.

This training must be provided to new employees, those changing the workplace or type of work and those resuming their activity after a break longer than 6 months. In all such cases, the training shall take place before the actual beginning of the activity. The contractor shall be responsible for the facilities related to the provision of first aid in case of occupational accidents, for fire prevention and the evacuation of the employees in special situations and imminent danger.

The contractor shall be responsible for a safe and hygienic work environment both on the project site and at off-site locations where work is done in conjunction with this project.

5.6.7. The contractor shall be responsible for the protection of all grounds, vegetation and improvements that exist and are to remain after the project is complete; with-in the project work areas, adjacent to the project work areas and along the common route of access to the site, outside of the work areas. The Contractor shall be responsible to have any damage caused by Contractor’s employees, equipment or sub-contractors repaired and restored to pre-damage condition, as approved by the PM or Contracting Officer Representative (COR), at no cost to the Government.

5.6.8. The contractor shall be responsible for adequate and safe traffic control in work areas and along the common route of access to the site outside of the work areas.

Traffic control shall include; Contractor’s workforce traffic, vehicular traffic interfacing with Contractor’s traffic and pedestrian traffic interfacing with Contractor’s traffic. Traffic controls shall include; signage, barriers, pavement markings and traffic control personnel. Additionally, the contractor shall also be responsible for the safety of the general public. The work will take place in an occupied building, and the contractor shall be responsible to provide proper fencing or other adequate mean to separate the general public from their construction site.

5.6.9. The Contractor shall comply with all applicable safety regulations of Bulgaria, including all required record keeping.

5.6.10. The Contractor shall provide and maintain in working order during the entire construction period, such fire protective equipment and devices as required by applicable safety standards and as deemed necessary and suitable for any possible class or type of fires. Extinguishers shall be non-freeze type of not less than ten pound (5KG) capacity each.

5.6.11. Provide protection against rain, wind, or heat so as to maintain all work, materials, apparatus, and fixtures, incorporated in the work or stored on the site, free from injury or damage. At the end of the day’s work, cover all new work likely to be damaged.

5.6.12. Contractor shall acquaint themselves with the location of utilities, which may be encountered or be affected by work, and shall be responsible for damage caused by neglect to provide proper precautions or protection. If needed, the contractor shall contact any local authorities or utility companies to locate any utility service, (and pay for their services if needed).

5.6.13. Provide, erect and maintain all required barricades, of sufficient size and strength necessary for protection of material storage, as well as to prevent accidents to the public and the workmen at the job site.

5.6.14. Special precautions shall be taken to maintain the area around the facility clean for its intended service to the Community.

5.6.15. The Army Corps of Engineers Safety Manual (EM385-1-1) is required where it is more stringent that the corresponding Bulgarian safety requirements. A digital copy of this manual can be found here: http://140.194.76.129/publications/eng-manuals/em385-1-1/2008_English/toc.html. Specific safety requirements for NAVFAC project can be found in Section 01525, which can be accessed here:

http://www.aed.usace.army.mil/contracting/0093/01525%20Safety%20and%20Occupat ional%20Health%20Rqmnts.pdf

5.6.16. Special precaution shall be taken to perform the roof work to avoid falls of personnel and/or construction materials and equipment that could provide injuries to other personnel. All personnel working on scaffolds (or any other elevated working platform) or working on the roof shall be properly tied to a lifeline (or other firm anchor point) using a full body harness.

5.6.17. Injuries to any person and damage to any property not belonging to the Contractor shall be reported immediately to the PM or COR (Contracting Officer Representative).

Compensation to any third party affected by the construction activities (such as damage to private property) shall be the exclusive responsibility of the contractor.

5.7. COORDINATION.

All coordination with the municipal, regional and national authorities shall be the responsibility of the contractor. The Contracting Officer shall be notified of any disputes between agencies or approvals that will affect Contract duration or Contract Price.

5.8. SPECIAL SITE CONDITIONS

Confine all operations, equipment, apparatus and storage of materials, to the immediate area of work to the greatest possible extent. Contractor shall ascertain, observe and comply with all rules and regulations in effect on the project site, including, but not limited to parking and traffic regulations, use of walks, security restrictions or hours of allowable ingress and egress.

5.9. CLEANING

Contractor shall keep premises free of accumulations of surplus materials and rubbish caused by their operations. Combustible rubbish shall be removed from the premises each day. Burning of rubbish on premises is not permitted. In addition, the Contractor shall perform final cleaning to remove all foreign matter, spots, soil and construction dust, so as to put the project in a complete and finished condition ready for acceptance and use intended.

Any garbage of debris to stay at the job site for more than one day will be stored in proper approved containers. Stockpiling debris and garbage directly on the ground is not acceptable.

All waste areas and storage areas will be cleaned up to the satisfaction of the representative of the Contracting Officer. All excess materials will be removed from the site and the Contractor will leave the premises free of debris and excess waste materials.

5.10. WARRANTY AND ACCEPTANCE

All works performed by the contractor shall have one year warranty. The contractor shall provide the warranty letter to the Municipality of Vratsa with a copy to the Contracting Officer. The start date for the warranty is the day when all works are accepted by the US Government, not when the different tasks are completed.

The contractor shall notify the US Government representative at least two months in advance of the proposed final inspection date.

For final acceptance of the facility, the contractor shall provide to the Contracting Officer representative:

- Warranty letter

- 2 books, packages or boxes containing all technical, maintenance and administrative documentation of the contract. One box to remain in the municipality and the other to be sent to the US Embassy in Sofia.

- Certificate of occupancy by the Municipality of Vratsa

-/-/-/-/-/ end of technical specifications /-/-/-/-/

Annex 1

Annex 1: Guideline to Prepare the Safety Plan / Accident Prevention Plan

Immediately after award, the contractor shall prepare a Safety Plan / Accident Prevention Plan following the guideline and format provided in this Annex. This is in addition to any safety plan of safety documentation that may be required by Bulgarian regulations for this type of construction activity. The Plan shall be accepted by the Contracting Officer before works are authorized to start at the job site.

NAVFAC EURAFSWA Contingency Engineering

ACCIDENT PREVENTION PLAN [APP]

Minimum Basic Outline

This first page is NOT to be included in the APP you’re going to submit.

This document shall be customized in agreement to the instructions below, pages not applicable shall be removed, and the signed final document shall be submitted in pdf format.

Instructions

A. The contractor is required, at a minimum, to type-in information called for in areas denoted with a RED arrow and put a checkmark in the appropriate box or boxes corresponding to that section (to check a box, double click on it, then select checked in the pop up window). By signing this plan, the contractor is agreeing to all checked information herein and the checkmark will signify:

a) Contractor selected one or more items from a list of items

b) Contractor agrees with the corresponding information,

c) Contractor agrees to follow the requirement(s) listed herein and those contained in EM 385-1-1 dated 15 September 2008

d) Contractor agrees to develop written plans based on the requirements listed herein when required by this accident prevention plan.

B. The plan must consist of the following 10 sections:

1. Signature Sheet

2. Background Information

3. Statement of Safety and Health Policy

4. Responsibilities and Lines of Authority

5. Subcontractors and Suppliers

6. Training

7. Safety and Health Inspections

8. Accident Reporting

9. Plans (Programs, Procedures)

10. Risk Management Processes (AHA – Activity Hazard

Analysis)

C. In addition to completing each section listed above several sections require certain supporting documents (resumes, certificates of training, organization chart, specific plans (crane lift plan medical support plan, etc.)). The supporting documents and plans must be attached / inserted in the appendices listed below.

Appendix Title Required Contents

I Signature Sheet As required per Section 1 II Background Information Area map III Statement of Health Policy. Copy of signed company Safety Policy if not using generic one IV Responsibilities and Lines of

Authority Resume' and NAVFAC online Construction Safety Course certificate for SSHO (http://cst.wbdg.org/start.html); Proof of competency / qualification (Resumes and certificates) for persons listed in Section 4; Organization Chart (with names) for Key Corporate and Project personnel.

V Subcontractors and Suppliers As required per Section 5 VI Training As required per Section 6 VII Safety and Health Inspection As required per Section 7 VIII Accident Reporting As required per Section 8 IX Plans Area map showing site location;

Site layout map; Acknowledgement of applicable plan key elements or NA.

X Risk Management Processes

(AHA – Activity Hazard Analysis) AHA form for each feature of work

The reviewer of the Accident Prevention Plan shall use this checklist. The preparer of the APP shall use it to verify that all necessary information was included in the APP.

CONTRACTOR:

DATE:

CONTRACT:

SIGNATURE:

A qualified reviewer shall check to assure submitted copies of the following items applicable from EM 385-1-1 Appendix A are included in the APP.

YES

NO

REMARKS

1 SIGNATURE SHEET: Plan Preparer, Approval, Concurrence.

BACKGROUND INFO: Contractor, Contract #, Project Name, Brief Project Description, Contractor Accident Experience (EMR, OSHA) Corp. Trend Analysis, list of activities requiring AHA.

STATEMENT OF SAFETY & HEALTH POLICY.

RESPONSIBILITIES & LINES OF AUTHORITY: Identification of personnel responsible for safety (Corp. & Project Level).

SUBCONTRACTOR & SUPPLIERS: Identification of Subs and Suppliers; means for controlling & coordinating; safety responsibilities.

TRAINING: List subjects in safety indoctrination; mandatory training & certification, emergency response, outline requirements for supv and employee safety meetings.

SAFETY & HEALTH INSPECTIONS: Identify who will conduct inspections, when & how it will be conducted & recorded, deficiency tracking sys and follow-up procedures. Any external inspections/certifications (e.g., Coast Guard etc).

SAFETY & HEALTH EXPECTATIONS, INCENTIVE PROGRAMS AND

COMPLIANCE: Company’s written safety program goals, objectives, and accident experience goals; description of company’s safety incentive program; policy/procedures for non-compliance with safety requirements; written company procedures for holding mgr. /supvs accountable for safety.

ACCIDENT REPORTING: Identify person who completes the following, how, and when; exposure data (m/hrs worked); accident investigations, reports & logs; immediate notification of major accidents.

MEDICAL SUPPORT: Outline on-site medical support and off-site medical arrangements.

PERSONAL PROTECTIVE EQUIPMENT: Outline procedures (who, when, how) for conducting hazard assessments & written certifications for use of personal protective equipment.

PLANS (PROGRAMS, PROCEDURES) REQUIRED BY THE SAFETY

MANUAL: a) Hazard Communication; b) emergency response plans; c) layout plans; d) respiratory protection plan; e) health hazard control program; f) lead/asbestos abatement plan; g) abrasive blasting; h) confined space; i.e.) hazardous energy control plan; j) critical lift procedures; k) contingency plan for severe weather; l) access/haul road plan; m) demolition plan (engineering and asbestos surveys); n) compressed air plan; o) formwork and shoring erection and removal plans; p) lift slab plans; q) SHP/SSHP (for HTRW work); r) diving plan;

s) alcohol drug abuse prevention plan; t) fall protection plan.

a) k)

b) l)

c) m)

d) n)

e) o)

f) p)

g) q)

h) r) I) s)

j) t)

Information on how the contractor will meet the requirements of the major sections of EM 385-1-1 in the accident prevention plan.

Particular attention shall be paid to a) excavations; b) scaffolding; c) medical/first aid requirements; d) sanitation; e) PPE; f) fire prevention;

g) machinery and mechanized equipment; h) electrical safety; I) chemical, physical agent, and biological occupational exposure prevention requirements. Detailed site specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation. A list of anticipated AHAs should be submitted with the APP.

a) b) c) d) e) f) g) h) i.e.)

14 Plans for maintaining job cleanup and safe access

Public safety requirements (e.g., fencing, signs)

LANT Form 385-APP

ACCIDENT PREVENTION PLAN [APP]

Contract No.: Error! Reference source not found.

Project Name:

Location:

1. SIGNATURE SHEET

a. Plan preparer (Safety manager, site safety and health officer (SSHO), or quality control representative will fill this role).

Name: Title:

Phone no.: Date:

Signature:

b. Plan approval (Company owner or Company / corporate officer authorized to obligate the company).

Name: Title:

c. Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC).

Name: Title:

2. BACKGROUND INFORMATION

Prime Contractor:

Project name:

Contract no.:

a. Project description and location. Prime contractor will provide a brief description of the project to include its location.

b. A map of the project site general location and site plan – Insert in Appendix IX.

c. Prime contractor accident experience. Prime contractor will provide accident experience information, if available, on how many accidents he or she has experienced in the last two years and what type of accidents have occurred.

d. Phases of work / Definable Features of Work. (Examples: Grading, excavation, formwork & shoring, steel erection, etc). NOTE: Section 10 requires an AHA for each of these phases

Mobilization / General Construction Demolition Scaffolding / Fall Protection Excavation / Trenching Electrical

3. STATEMENT OF SAFETY AND HEALTH

POLICY

3. STATEMENT OF SAFETY AND HEALTH POLICY. Prime contractor will provide a safe and healthful project site which is free from recognized and anticipated hazards that could cause injury or death. The prime contractor and his subcontractor(s) and supplier(s), and visitor(s), will comply with the policies set forth in EM 385-1-1 ‘Safety and Health Requirements Manual’ dated 15 September 2008. Include a copy of Company’s Safety Policy at Appendix III.

4. RESPONSIBILITIES AND LINES OF

AUTHORITY

a. Resumes. Prime contractor will provide resumes for safety and industrial hygiene personnel if the contract requires these positions. Competent person qualifications for the Site Safety and Health Officer (SSHO) will also be provided.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .