Attachment_1_-_Technical_Specifications_School__5.pdf
PDF 4 MB Posted
- Attached to
- Renovation of Sevastopol School #5, Ukraine
- Solicitation number
- N33191-13-R-1240
About this file
Attachment 1 - Technical Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N33191-13-R-1240-0002.pdf | ||
| Attachment_1_-_Technical_Specifications_School__5_-_Ver002.pdf | ||
| N33191-13-R-1240-0001.pdf | ||
| N33191-13-R-1240.pdf | ||
| Attachment_4_-_Submittal_Checklist.pdf | ||
| Attachment_2_-_Contract_Data_Sheet.doc | DOC document | |
| Attachment_3_-_PPQ.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EUCOM Humanitarian Assistance
Program
Renovations to School#05 - Sevastopol
Sevastopol, Ukraine
OHASIS ID-20420
June 2013
VERSION 001
Renovation of School#05 OHASIS ID-20420
VERSION-001
Picture#01: Location of School#05 in Sevastopol
1. PROJECT DESCRIPTION
1.1. GENERAL
Provide all material, equipment and labor to renovate School#05 in Sevastopol (Ukraine), as identified herein.
1.2. GENERAL SCOPE OF WORK
The work is divided into a BASE-BID and 4 CONTRACT OPTIONS. The Government reserves the right to unilaterally award, or not to award, the contract options. The contractor will provide separate pricing for the Base-Bid and the 4 contract options as required in the solicitation documents.
Base Bid:
Repair of a section of the roof (Central Wing) Repair of bathrooms (total 8 units) Repair of gymnasium and locker rooms Commemorative plaque
Option-1: Repair of sewer system
Option-2: Renovate front façade, including entrance
Option-3: Additional window replacement (Central Wing)
Option-4: Additional roof repair (West Wing and Hallway)
Picture#02: School#05 in Sevastopol
Picture#03: School#05 sign
It is absolutely necessary for the contractor to visit the site in order to verify existing conditions and quantify the amount of work, prior to the submission of their offers to the Contracting Officer. These Performance Technical Specifications (PTS) does not include measurement. The US Government is not responsible for any mistakes or omissions that the contractor may have made during preparation of their offers.
For the purposes of this PTS, the school under renovation is called “School#05”. However, the official name of the school is “Gymnasium Number 5” as seen in Picture#03. For the purposes of this PTS, “School#05” is the name of the school, and the “gymnasium” corresponds to the indoors physical education area
Picture#04: Area requiring roof repair (Base-Bid)
1.3. DETAILED SCOPE OF WORK (BASE BID)
This portion of the contract described in paragraph 1.3 and all its subparagraphs corresponds to the minimum portion of the contract that will be awarded to the successful offeror.
1.3.1. Repair of a Section of the Roof (Central Wing)
The contractor shall repair the indicated sections of roof in order to provide 10 year warranty against any water or humidity infiltration. The works include all the roof surfaces of the Central wing, as well as the roof of the entrance canopy.
Picture#06: Stone and concrete parapets to be repaired under the roof repair portion of the PTS
Complete Replacement of the roof waterproofing system: In the green highlighted areas of picture#04, the contractor shall remove the existing roof waterproofing system and shall provide a two-ply modified bitumen roof system.
Repairs include the replacement of the metal covering of the building joints and the covers of the ventilation system.
Provide top layer with granular surface. Color of the finished surface to be green unless otherwise selected by the School Director.
General Requirements for Roof Repairs: The contractor shall provide a 10 year warranty in the “green” highlighted areas of the school building as indicated in picture#04. The contractor shall choose the roof repair method to be accepted by the Contracting Officer Representative. A minimum of 2 layers of modified bituminous with granular finish is required for the “green” areas. The contractor shall repair the flashing and metal covers of the parapets in the roof and reinforce the connection between the horizontal and vertical surfaces. The contractor shall repair the stone or concrete parapets of the roof.
The contractor shall verify proper slopes of the roof surface to avoid any accumulation of water. Any area with accumulation of water shall be provided with proper slopes. In order to accomplish this, the contractor may have to provide light mortar layer after the removal of the existing waterproofing system, and prior to the application of the new waterproofing system.
All openings for ventilation shall be repaired and provided with new painted metal cover, extending a minimum of 30 cm over the perimeter of the opening.
There are no detailed pictures available of the existing roofing surfaces. For this reason, it is imperative that the contractor visits and inspects the site before submitting their offers.
Payment for the roof repair shall not be authorized until this item of work is completed, certified and provided with the official 10 year warranty against any water infiltration in the areas under renovation.
Picture#05: Typical two-ply modified bitumen roof waterproofing
Picture#07: Reinforce the edges of the roof surfaces
Picture#09: Typical required finish
Picture#08: Typical roofing work
Picture#10: Roofing area to be repaired
Picture#11: Roofing area to be repaired.
Picture#12: West Wing drawing showing location of bathrooms to be renovated. All 3 floors are similar.
Red: Girls and teachers Blue: Boys
Picture#13: Location of bathrooms to be renovated in Central Wing
1.3.2. Repair of Bathrooms (Central and West Wings)
The contract includes in the Base-Bid the complete renovation the following existing bathroom/toilet facilities:
- West Wing: (6 bathrooms). This includes 2 separate bathrooms on each floor. Boys bathroom and combined girls/teachers bathroom. Some of these rooms, originally designed and built to be used as bathrooms, have not been used in many years, and they are currently used as storage or they have a different use. The contractor shall visit the site in order to see the condition of each one of the 6 areas to be converted into modern bathroom facilities.
- Central Wing: (2 bathrooms). This includes one for boys and one for girls, adjacent to the gymnasium area.
Once the project is completed, the 8 renovated bathrooms under the scope of work of this project shall have the appearance of completely new and high quality bathroom facilities. The work includes, but is not limited to the following:
Picture#14: Typical heavy use hinge
Note: Prior to start of renovation works, the contractor shall provide a sketch to the Contracting Officer Representative for acceptance. In previous projects, there has been problems such as: improper selection of toilet fixtures (too large for reduced space), improper ventilation, improper mirrors, improper aluminum partitions, or improper ceramic tiles. The contractor shall provide to the Contracting Officer representative a clear sketch or draft design indicating their proposed design meeting the requirements of this contract and the requirements of the Ukrainian regulations.
- Demolitions: Remove everything inside of the bathrooms, including but not limited to floor and wall tiles, plumbing fixtures, some masonry partitions, electrical installation, windows, doors, water and sewage plumbing, ventilation, heating and everything within the areas to be renovated.
- Exterior Windows (for West Wing): New windows to be 5-chambered PVC framed double glazing
(4-16-4) windows. Glazing to be non transparent. New windows shall be provided with PVC sills in the inside and coated aluminum in the outside, draining away from the windows and provided with mosquito screens. See paragraph 2.1 with requirements for new windows.
- Doors: Replace existing doors with new PVC doors. PVC door shall be manufactured to be used as doors (not windows), and therefore they have be provided by the manufacturer with 3 frames (2 laterals and top). There shall be an air gap for proper ventilation. Provide the PVC doors with heavy use hinges installed by the manufacturer. The doors shall not be provided with bottom frame. Provide door stops for all doors in the contract.
- Floors: After removal of the existing floor tiles, provide slopes towards the floor drains (one per room) and install new non slippery ceramic floor tiles, diagonally with respect to the walls. New ceramic tiles to be of minimum size 40x40
cm. Provide matching ceramic base board tiles along the bottom of all walls.
- Walls: Remove existing tiles, paint and plaster. Repair any structural damages and cracks exposed after removing the plaster. Provide new leveling plaster to provide new perfectly leveled surfaces, and cover all vertical surfaces with new ceramic tiles. Minimum size of tiles to be 30x30 cm. Provide decorative tiles (friso) at intermediate and higher section of the walls. Provide metal corner beads at all corners of tiles surfaces. Edge of ceramic tiles shall not be exposed to the view.
- Ceiling: Repair ceiling damages and provide new gypsum board (green – rated for humidity atmospheres) over all ceiling surfaces. Support the ceiling with new galvanized metal profiles, supporting the weight of the new ceiling on the walls (not on the existing ceiling). Size the metal profiles in order to avoid any deflection on the ceiling surfaces. Provide access gates in all rooms for maintenance purposes. Provide as high as technically possible. Cover all drainage piping from floors above under the new drop ceiling. Cover ventilation system under new drop ceiling. Provide lighting fixtures recessed within the new drop ceiling.
- Water Piping: Remove all the water piping from the main water line in the basement. Provide new cooper of high density polypropylene piping, rated for the intended use. Do not provide hot water in the bathrooms. Design water piping in order to have sufficient pressure and flow for the correct operation of the fluxometers required for the new toilets. If there is no sufficient pressure and flow in the water line in the basement, provide the toilets with water tank made of porcelain with water saving flushing controls. Install the water piping recessed inside the new walls and behind the new ceramic tiles. Water piping shall not be exposed at any location. Provide valves as required to have a fully operational water system and to be able to isolate each room and each plumbing fixture. Provide pressure test for 48 hours at minimum of 10 bars before covering the piping within the walls.
Picture#15:Typical new required radiator
- Sewage/Drainage/Vent piping: Remove all the sewage, vent and drainage piping inside of the bathrooms under the scope of work of this project. The intent is to connect to the sewer piping in the basement and to provide all new sewage/drainage/ventilation piping from the basement to the roof.
Within the renovated areas, all sewage/ventilation piping shall be installed recessed behind the walls, but they shall be provided with the necessary access points to be able to maintain every single portion of the sewage/drainage piping.
- Floor drains: Provide two per bathroom in the West Wing and one per bathroom in the Central Wing.
Total of 14 floor drains required. Connect the piping with the existing sewage system in the basement. Provide integrated P-trap in all floor drains to eliminate bad smell.
- Hot Water: Not required.
- Heating System: Provide a complete new heating system in the renovated bathroom facilities, consisting of radiators, piping and valves. Provide new aluminum radiators, with all required valves and accessories and connect with existing hot water heating system in the building. Design as required to obtain adequate temperature in all areas. All heating piping within the renovated areas shall be recessed with the walls/ceilings.
- Ventilation: Provide a ventilation system in accordance with Ukrainian regulations. This is most important for the bathrooms in the Central Wing, and the teacher’s toilets, which are not provided with exterior windows. The contractor shall design the ventilation system, but it is estimated that it should include:
o Removing the existing louvers and air ducts.
o Replacing with new aluminum louvers the openings over the doors of the West Wing bathrooms.
o Cleaning and repairing as required the existing ventilation from each bathroom to the roof of the building.
o Connecting all rooms in the bathrooms to the ventilation system going to the roof.
o Providing a forced (electric fan) air ventilation system, designed as required by Ukrainian
Code.
- Masonry Partitions: The scope of work requires removing some existing masonry partitions and providing new partitions. This is required by the scope of work in the girls’ bathrooms of the West Wing, to make the teacher’s toilets larger. The contractor can choose to remove all masonry partitions and provide new ones in the bathrooms in the Central Wing. New partitions shall be made of masonry work, as thin as technically possible to allow for covering the new piping and/or wiring.
- Layout of Girls/Teacher’s Bathrooms in the West Wing: The contractor shall modify the existing layout as indicated in the sketch in picture#16. The intent is to provide larger room for teachers.
- Layout for Boy’s Bathroom in West Wing: The contractor shall modify the existing layout as indicated in the sketch in picture#18.
- Layout for Boy’s and Girls Bathroom in Central Wing: No modifications are required, but the contractor can choose to demolish all internal partitions and build new internal partitions, meeting plumbing fixtures requirements for each bathroom. See sketch in picture#17.
Picture#17: Central Wing bathrooms, with approximate overall dimensions
Picture#16:New layout for girls and teachers bathroom
Picture#18:New layout for boy’s bathroom
Picture#17-b: Central Wing girl toilet
- Electrical: Removal and replacement of complete existing electrical system. Provide a new electrical installation connected with the main electric panel of the building (or nearby electric panel with sufficient capacity for the new electric loads). Provide a properly sized circuit breaker at the connection point to protect the electric line feeding the bathrooms. The electrical installation shall include new conduit recessed in the walls (not exposed), new junction boxes, new circuit breakers, new ground fault protection, new switches, new cables, new receptacles (in the hand washing rooms only), new lighting fixtures with energy efficient lighting and minimum protection rated IP54, and everything necessary to have a fully operational electrical system in accordance with Ukrainian Code.
Provide lighting fixtures recessed within the new drop ceiling. All electrical installation be embedded in the walls, installed behind the new ceramic tiled wall.
- Aluminum Partitions: New toilets in the girls and boys bathrooms in the West Wing shall be made of aluminum pre-manufactured standard toilet partitions (McDonald’s type). These partitions shall not touch the floor for easy cleaning of the floors (except the metal supports). They shall be provided with all required accessories, as heavy duty use hinges, door stops, locks, hangers and toilet paper holders. The 2 toilets in the girls’ bathroom in the Central Wing can be separated by similar type partitions if existing masonry partitions are removed.
- Fixtures and bathroom elements for the girls’ bathrooms in the West Wing: There are 3 girls’ bathrooms to be renovated in the West Wing. Provide the following for each:
o 3 European Standard WC with stainless steel fluxometer (see picture#19) if there is sufficient water pressure and flow in the basement. If not, provide ceramic type water tank. Selection of the toilets shall be coordinated with the design of the aluminum toilet partitions to allow for sufficient space.
o Enclosed in aluminum partitions for the 3 toilets per bathroom. To be provided with locks and ample space.
o 2 wall mounted sinks with only cold water and automatic self closing faucets (not electric control with photocell). Drainage piping to be covered or to be made of stainless steel. No PVC drainage piping shall be exposed to the view.
o 2 stainless steel automatic hand driers of minimum 2 KW power (see picture#20) o Soap dispensers for each sink o Toilet paper holder o One mirror of minimum 1.0 m², to be recessed within the new ceramic tiles and surrounded by decorative friso.
- Fixtures and bathroom elements for the teachers’ bathrooms: There are 3 teachers’ bathroom to be renovated enclosed within the girls toilets of the West Wing. Provide the following for each:
o 1 European Standard WC as described above.
o 1 wall mounted sink as described above.
o 1 automatic hand driers of minimum 2 KW power.
o Soap dispenser o Hanger o Toilet paper holder
- Fixtures and bathroom elements for the boys’ bathrooms in the West Wing: There are 3 girls’ bathrooms to be renovated in the West Wing. Provide the following for each:
o 3 European Standard WC with stainless steel fluxometer as described above.
o Enclosed in aluminum partitions for the 3 toilets per bathroom. To be provided with locks and ample space.
o 2 wall mounted urinals with pre-manufactured standard separating wall mounted partition.
Drainage piping of urinals to be covered or to be made of stainless steel. No PVC drainage piping shall be exposed to the view.
o 2 wall mounted sinks with only cold water and self closing faucets. Drainage piping to be covered or to be made of stainless steel. No PVC drainage piping shall be exposed to the view.
o 2 stainless steel automatic hand driers of minimum 2 KW power o Soap dispensers for each sink
- Fixtures and bathroom elements for the girls’ bathrooms in the Central Wing: There is one girls’ bathrooms to be renovated in the Central Wing. Provide the following:
o 2 European Standard WC with stainless steel fluxometer as described above.
o Enclosed in aluminum partitions for the 2 toilets per bathroom if the contractor chooses to remove the existing masonry partition. To be provided with locks and ample space.
o 1 wall mounted sinks with only cold water and self closing faucets. Drainage piping to be covered or to be made of stainless steel. No PVC drainage piping shall be exposed to the view.
o 1 stainless steel automatic hand driers of minimum 2 KW power o Soap dispenser o Toilet paper holder o One mirror of minimum 0.5 m², to be recessed within the new ceramic tiles and surrounded by decorative friso.
Picture#19:Typical toilet
Picture#20:Typical hand dryer
- Fixtures and bathroom elements for the boys’ bathrooms in the Central Wing: There is one boys’ bathrooms to be renovated in the Central Wing. Provide the following:
o 1 European Standard WC with stainless steel fluxometer as described in previous page.
o 1 wall mounted sinks with only cold water and self closing faucets. Drainage piping to be covered or to be made of stainless steel. No PVC drainage piping shall be exposed to the view.
o 1 wall mounted urinal. Drainage piping to be covered or to be made of stainless steel. No PVC drainage piping shall be exposed to the view.
o 1 stainless steel automatic hand driers of minimum 2 KW power o Soap dispenser
Picture#21: Typical required urinal partition, and installation of urinals and toilet partitions.
Picture#22:Provide urinals at different height and with the required partitions.
Picture#23:Typical wall supported sink
Picture#25: Sinks and mirror
Picture#26: Typical required partitions
Picture#24:Typical required wall supported sink with automatic faucets for cold water
Picture#27: Mirror with ceramic tiles friso, as required in girls’ bathrooms
Picture#28:Typical aluminum with anodized finish corner protection. This is required in all corners of new ceramic tiles vertical walls.
Picture#29: Typical stainless steel corner protection for tiled corners.
Picture#30: Old bathroom converted into storage room
Picture#31: Replace ventilation system and put under new drop ceiling
Picture#32: Typical drainage piping from floor above to be replaced with new PVC piping and covered under drop ceiling and new wall surfaces. No piping to be seen in bathrooms after renovation is complete.
Picture#33: Condition of existing bathrooms
Picture#34: Typical sink in boy’s bathroom of West
Wing. Everything see in the pictures is to be replaced with new.
Picture#35: Typical girls’ toilets in West Wing. All to be replaced with new.
Picture#36: Replace door and louver for ventilation over the doors of the 6 bathrooms in West Wing
Picture#37:Typical condition of boys’ toilets in West
Wing
Picture#38: All piping to be removed and replaced with new to be recessed within the new wall surfaces.
Picture#39: Old bathroom converted into storage room.
Picture#40: Area in orange to be renovated. Area in green is covered in separate section of the contract. Area in white is not included in the contract. Approximate dimensions.
1.3.3. Repair of Gymnasium and Locker Rooms
The contract includes in its base-bid the repair of the Gymnasium and locker rooms as detailed herein. The works included in paragraph 1.3.3. and its subparagraphs pertain exclusively for the areas highlighted in orange in picture#40 below.
The project includes the complete renovation of the gymnasium and locker rooms located in the central wing of the school, including the locker rooms, bathrooms, showers, and main gymnasium room (see picture#40 above)
The contractor shall provide a new electrical feeder (circuit) from the main electric panel of the building or from the nearest electric panel with sufficient capacity for the intended loads. This new electric circuit shall be provided with the required electrical protection and shall be routed with channels so that the cables are not exposed to the view. The contractor shall design and install a new electric panel (wall recessed) for all the electric loads of the gymnasium area. From this new panel, the contractor will provide electric circuits to all the renovated rooms. The contractor shall provide electrical connections from the new panel to other areas of the gymnasium and the school affected by this project but not included in the scope of work of the project.
Once the project is finished, the large gymnasium and its locker rooms (with showers) will have the appearance of a completely new facility.
The work includes, but is not limited to the following:
Picture#41: Required benches
1.3.3.1. Repairs to the Main Gymnasium Room
As described in picture#40, this area includes the main gymnasium room (approximately 11.51 x 23.50), plus the small hall connecting this area with the main entrance hall of the school. The project includes the complete renovation of the main gymnasium area, including, but not limited to:
- Walls: Remove paint from walls by manual or mechanical means, level and repair all surfaces and provide 3 coats of paint. In order to level the wall surfaces, new plaster will be required in some areas. In some areas the reinforcing is exposed, or the cover of metal structural members is insufficient. The exposed reinforcement shall be repaired by epoxy based mortar and the loose plaster removed and properly repaired. It must be noted that part of the heating piping and electrical conduits need to be recessed along the walls, and therefore this will require repair works along the walls. Provide new surfaces resistant to impacts. Provide washable paint (combination of 3 colors to be selected by School Director). Once the work is completed, there shall be no visual difference between the repaired and non-repaired areas. Provide wall protection in lowest 2 meters (see bullet on wall protection)
- Ceiling: Remove the paint by manual or mechanical means. Repair structural damages as on the walls.
Level all surfaces and provide 3 coats of paint.
- Heating: Design and install a heating system as required for the new flooring to be installed and in coordination with the new required ventilation system (see bullet about ventilation).
Remove all heating piping, radiators and wooden protection system. Provide and install new heating system connected with the building heating system. Connect heating piping with the school heating piping, at a location where the piping has sufficient capacity to provide the required heat in the room, considering the additional heat losses caused by the new required ventilation. Provide proper physical protection for the new aluminum radiators for a sports facility (see paragraph below on benches). Piping for heating system to be recessed along the walls or floors or otherwise not exposed to the view by approved shield. Heating piping shall not be seen.
- Benches: Provide benches to protect the heating system as shown in picture#41. The contractor shall remove all existing wood from the gymnasium and provide new benches in coordination with the protection of the new heating radiators as in picture#30. Provide along the 2 main walls. Material to be in accordance with recommendations of the manufacturer of the radiators and in accordance with Ukrainian Fire Code.
- Electrical: Replacement of the entire electrical installation. The contractor shall completely remove the electrical installation in this room (including lighting fixtures on the ceiling). All loads to be connected to the new electric panel described in the third paragraph of paragraph
1.3.3. The new electrical installation for the gymnasium shall be provided with new wall mounted receptacles (4 units) protected against impacts and a new lighting system. The lighting fixtures shall be halogen sports type lighting fixtures, protected against impacts, and capable of providing 500 lux at any location of the room. The lighting fixtures shall be controlled by individual switches to be located at the entrance of the room, and they shall not be controlled by the circuit breakers of the main electric panel. A minimum of 8 new lighting fixtures are required, to be installed at different locations. Control lighting by 4 different switches to be able to regulate the amount of lighting. All electrical conduits to be PVC recessed along the walls. No electrical conduit shall be exposed to the view. Provide 4 electrical wall receptacles, at the locations to be indicated by the School Director. Provide emergency exit lights.
Picture#44: Provide new similar wood racks
Picture#43:Typical new door Picture#42:Typical new door
Picture#45:Typical professional door sign
- External Windows: Replace all external windows with 5 chamber PVC profile windows. 25% of the window surfaces shall be operable (horizontally and vertically). New windows shall be double glazing with minimum 4-16-4. Windows shall be provided with an internal metal net protection, properly sized, so that a tennis ball cannot go through (see picture#42). These protections shall be hinged so that they can be opened for cleaning and maintenance of the windows.
- Doors: Remove the existing doors (4 units) and replace with new solid wood flush doors of similar size
(see picture#43). Remove all existing wood from the door openings, including frames, anchors and trims.
The doors shall be minimum 4 cm thick and provided with the required locks and hardware. Provide see through window with 8 mm glazing. Protected against impacts. This includes the door connecting the main gymnasium room with the entrance lobby of the school. Finishes in the areas not included in the contract shall be restored to original conditions after replacement of the doors (i.e. school entrance lobby). Provide doors with professional door signs in English and Ukrainian indicating:
From main school entrance lobby to gymnasium: Gymnasium
From hallway to gymnasium:
Gymnasium
From main gymnasium to boys locker room: Boys Locker Room
From main gymnasium to girls locker room: Girls Locker Room
- Wood racks/volleyball support: Replacement of “wood racks” in the gym. Remove existing wooden racks and provide new ones of similar size in the same location. Provide 2 new volleyball support poles (with one volleyball net) anchored to the walls (see picture#51)
Picture#47: Provide similar wall hung professional basketball with break-away rim.
Picture#46: “regular” basketball board
Picture#51:
Volleyball pole
Picture#50: Wall protection in recently completed School#22 in Sevastopol
Picture#49: Provide similar wall hung professional basketball with break-away rim. Picture from recently renovated gymnasium in Sevastopol.
Picture#48: “regular” basketball board recently installed in School#22 in
Sevastopol
- Basketball boards: Remove existing basketball boards. Provide 2 new professional basketball boards (2 units) and 4 “regular” basketball boards with rim at 3.05 m from finished floor surface. Professional basketball boards shall be installed at both ends of the gymnasium and shall be made of methacrylate backboards of 10 mm thickness (with foam protection in the bottom) properly anchored to the walls, and with break-away basketball rims (see picture #47). The “regular” basketball boards shall simpler basketball boards as shown in picture#46. All basketball rims to be installed at the official distance from finished floor elevation.
- Wall Protection: Provide wall wainscot in lowest 2 meters of walls. Material to be natural wood, linoleum or other similar approved material (not plastic). Material to comply with Ukrainian Fire Code. See Pic#50.
- Floor: New flooring surface shall be completely new. The existing flooring is in poor condition. However, its installation is apparently solid and it could be utilized as a support for the new flooring surface if preferred by the contractor. For this reason, the contractor can choose between these two alternatives:
Utilization of the existing flooring system as the support for the new flooring surface. If this alternative is chosen, the contractor shall correct any supporting deficiency of the new floor, and then install the new flooring system as required by the manufacturer over the existing one, but it shall include as a minimum over the existing flooring: Leveling wood with rubber shock absorbent, 2 layers of plywood of minimum thickness of 12 millimeters and a final wearing hard wood layer of 22 millimeters thickness. In this case, the floor elevation would be higher than the existing. The contractor would be responsible to make all adjustments with the adjacent areas in order to provide a solid transition between flooring surfaces with minimum trip hazards.
Complete removal of the existing wood flooring and its supporting structure. Installation of a new sports rated natural wood flooring surface. The contractor shall remove the existing wood flooring and support system and provide new sports rated solid natural wood flooring. Once the existing floor is removed, the contractor shall perform any modification that may be necessary to install the new flooring system (i.e. reroute heating lines or leveling). Leveling shall be done with wood, and following manufacturer’s recommendations. Finished floor elevation shall be similar to the existing one to match the elevation of adjacent areas.
Flooring system shall be specifically designed to be used in indoor sport facilities, such as basketball courts, and the contractor shall show evidence of previous use of this flooring system for similar use. Finish material shall be 22mm strip made of oak, beech or similar resistance hard wood. Base shall have 2 layers of minimum 12 mm plywood, resilient polyurethane pads, vapor barrier, and required leveling wood material.
Floor shall be varnished following manufacturer’s recommendations. Floor to be installed by experienced workers following manufacturer’s recommendations and striped for basketball and volleyball. Hollow sound of any portion of the finished floor when bounced with a basketball shall be justification for non acceptance of the floor. Manufacturer representative shall certify surface preparation, installation and finishes before any payment is authorized for the sports rated wood flooring.
At least one of the site visit of the manufacturer technical representative shall be coordinated with the Contracting Officer Representative to meet and inspect the work together on site.
Picture#52: Typical composition of a typical sports rated basketball flooring
Picture#53: Typical composition of a typical sports rated basketball flooring
Picture#54: Required floor finishes
Picture#55: Typical top wood assembly
The 4 pictures above show a typical floor installation for an indoor wooden basketball court. The contractor does not need to follow these specific designs for the floor, except the thickness of the surface wood boards that shall be minimum of 22 mm and provided with tight joints (not similar to existing flooring to be removed) and other requirements described in the paragraphs above.
No payment will be authorized for any wood flooring until the manufacturer technical representative certifies the correct surface preparation and the correct installation of the new flooring.
- Ventilation: The gymnasium used to have ceiling openings that were covered by the school administration long ago to avoid water infiltration problems. This makes the ventilation of the gymnasium inadequate. The contract includes the design of a new ventilation system in coordination with the heating system. The work shall include the following:
Exhaust: Natural ventilation. Provide new natural ventilation as required by Ukrainian Code for gymnasiums of this type. The work includes providing sufficient opening to the outside. It is estimated that new manually operated openings will be required in the ceiling. If ceiling openings are made, these shall be provided with a metal cover in the exterior wide enough to avoid any possibility of rain/snow getting into the gymnasium. The openings shall be capable of being manually opened, closed, and fully regulated from the floor level (i.e. 10% open or 60% open)
Supply: In coordination with the exhaust, the contractor shall design and install an natural air supply system. Any existing ventilation systems to remain shall be professionally cleaned.
Existing wall louvers: There are several wall louver that shall be removed and replaced with new metal ones.
Heating: The heating capacity of the new heating system shall be properly calculated by a licensed engineer and calculations shown to the Contracting Officer for approval. Heating shall be done by new radiators connected with the school heating system. Electrical power for heating is not authorized. The contractor shall connect to the building heating system at a location with proper and sufficient capacity.
Picture#56:Door to be replaced.
Picture#57: Gymnasium room
Picture#58: Gymnasium Room
Picture#59: Basketball board and ventilation wall louvers to be replaced
Picture#60: Existing wood racks and secondary basketball board to be replaced with new.
Picture#61: Gymnasium room with door to be replaced connecting with school entrance lobby
Picture#62: Area in green corresponds to the locker rooms
1.3.3.2. Repairs to Locker Rooms
The project includes the complete renovation of the 2 locker rooms. Each locker room has approximately 14 m². This includes 2 separate rooms, one for boys and one for girls.
The work includes everything necessary to provide these areas with high quality and modern finishes, including, but not limited to:
- Floors: Remove existing floor tiles and the necessary fill material under these tiles in order to provide a new leveling layer. Provide new non-slippery gres floor tiles of minimum dimensions 40x40 cm. Install the floor tiles with joints at 45 degrees with respect to the walls (diagonally).
- Walls: Remove wall tiles and paint from walls by manual or mechanical means. Repair any structural damages and cracks exposed after removing the plaster. Do not use gypsum board to level the walls.
Provide new leveling plaster, and cover all vertical surfaces with new ceramic tiles (from wall to new drop ceiling). Minimum size of tiles to be 30x30 cm. Provide decorative tiles (friso) at intermediate and higher section of the walls. Provide wall base in coordination with new ceramic floor tiles. Provide corner beads at all corners of tiles surfaces. Edge of ceramic tiles shall not be exposed to the view. See requirements for wall tiles for bathrooms to be renovated.
- Ceiling: Provide new gypsum board (green – rated for humidity atmospheres) over all ceiling surfaces.
Support the ceiling with new galvanized metal profiles, supporting the weight of the new ceiling on the walls (not on the existing ceiling). Size the metal profiles in order to avoid any deflection on the ceiling surfaces. Provide access gates in all rooms for maintenance purposes. Provide lighting fixtures recessed within the new drop ceiling. Provide new drop ceiling as high as technically possible.
- Doors: Remove all existing doors (4 in each locker room). Provide new solid wood doors of 4 cm thickness to the hallway and to the main gymnasium area. Provide new PVC doors towards the showers as detailed in paragraph 1.3.3.3. Provide a room sign for boys and another for girls. Provide door stops.
- Lockers: Provide and install 15 small metal lockers in each changing room. Provide lockers with large openings for ventilation, rated for athletic use.
Picture#64: Typical recessed lighting fixture for the rooms with new drop ceiling
- Bench: Provide wooden benches along the walls for each changing room. Minimum length 6 meters long in each locker room. Provide with hangers to hang the clothing.
- Heating: Replace the entire heating system. Provide new bimetal type aluminum radiators. Replace all heating piping and provide recessed along the walls or provided with physical protection so that it is not exposed to the view. Connect with building existing heating system.
- Ventilation: Provide forced ventilation in accordance with Ukrainian regulations to the exterior of the building. This is very important in this room to avoid bad smell. The exhaust system shall be coordinated with the air supply, which shall be done through the doors or other means designed by the contractor.
- Electrical: Replacement of the entire electrical installation. Connect all electrical loads with the new electric panel provided by the contractor for the gymnasium area. The contractor shall completely remove the electrical installation in these room and provide a new lighting system. Use rapid start fluorescent lighting fixtures recessed on the new gypsum board ceiling. Lighting fixtures shall be rated for humid atmospheres. Design the lights in order to provide the minimum illumination required by Ukrainian standards. The lighting fixtures shall be controlled by 2 toggle switches for each locker room to be located at the entrances of the rooms. All electrical conduits to be PVC recessed along the walls and over the ceiling. No electrical conduit shall be exposed to the view.
Picture#63: Required benches along the walls. Picture from school#22 in Sevastopol.
Picture#65: Interior of locker rooms
Picture#66: Interior of locker rooms. Replace radiators.
Provide new ventilation to the exterior of the facility to avoid bad smell.
Picture#68: Interior of the locker room. Door to the left is the door connecting with the hallway, also to be replaced as part of this contract.
Picture#67: New required metal lockers
1.3.3.3. Repairs and Modifications to Showers and Toilets in Locker Rooms
The project includes the modification to the existing area as stated herein:
- Layout: Remove existing partitions and provide necessary brick partitions to build the conceptual design outlines above. The basis of design is to convert the existing spaces into a larger diaphanous area with two showers and two sinks each, providing privacy to the users. It must be noted that the toilet/sink/shower areas have not been used in a long time, and they are completely in an abandoned condition, with non operational fixtures and even with broken walls. The purpose and requirement of this project is to convert these spaces into fully modern operational areas, as outlined in the conceptual sketch shown in picture#69 above.
Picture#69: Orange represents the existing layout. Green represents the new conceptual layout
- Floors: Remove existing floor tiles and the necessary fill material under these tiles in order to provide a new leveling layer. Provide new non-slippery gres floor tiles of minimum dimensions 40x40 cm. Install the floor tiles with joints at 45 degrees with respect to the walls (diagonally). Slope all floor surfaces towards the new floor drains.
- Walls: Remove wall tiles and paint from walls by manual or mechanical means. Repair any structural damages and cracks exposed after removing the plaster. Do not use gypsum board to level the walls.
Provide new leveling plaster, and cover all vertical surfaces with new ceramic tiles (from wall to new drop ceiling). Minimum size of tiles to be 30x30 cm. Provide decorative tiles (friso) at intermediate and higher section of the walls. Provide wall base in coordination with new ceramic floor tiles. Provide corner beads at all corners of tiles surfaces. Edge of ceramic tiles shall not be exposed to the view.
- Ceiling: Provide new gypsum board (green – rated for humidity atmospheres) over all ceiling surfaces.
Support the ceiling with new galvanized metal profiles, supporting the weight of the new ceiling on the walls (not on the existing ceiling). Size the metal profiles in order to avoid any deflection on the ceiling surfaces. Provide access gates in all rooms for maintenance purposes. Provide new drop ceiling as high as technically possible.
- Ventilation: The contractor shall provide forced ventilation from the new shower rooms to the exterior of the building. The forced ventilation shall be capable of removing the air volume of the room in minimum of 3 minutes.
- Sewage piping: Remove and replace all the sewage and drainage piping up to the main line in the basement in accordance with Ukrainian regulations. The intent is to connect to the sewer piping in the basement and to provide all new sewage/drainage/ventilation piping from the basement to the roof. All sewage/ventilation piping shall be installed recessed behind the walls, but they shall be provided with the necessary access points to be able to maintain every single portion of the sewage piping.
- Water Piping: Remove all water piping. Connect the new water piping with the main water line in the basement. Provide new cooper of high density polypropylene piping, rated for the intended use for cold potable water. Install the water piping recessed inside the new walls and behind the new ceramic tiles.
Water piping shall not be exposed. Provide valves as required to have a fully operational water system and to be able to isolate each room and plumbing fixture. Provide pressure test for 48 hours at minimum of 10 bars before covering the piping.
- Hot Water: The contractor shall reutilize the existing electric hot water heater for one of the shower rooms. Only the water heater shall be reutilized. All existing piping shall be removed and replaced with new. Provide one new hot water heater in the other shower room, with similar characteristics as the existing one.
- Doors: PVC doors without bottom threshold. There shall be air gap to allow for ventilation or air intake.
- Electrical: Replacement of the entire electrical installation. Connect all electrical loads with the new electric panel provided by the contractor for the gymnasium area. The contractor shall completely remove the electrical installation in these areas and provide a new lighting system. Use rapid start fluorescent lighting fixtures recessed on the new gypsum board ceiling rated for humid atmospheres.
Lighting fixtures shall be rated for humid atmospheres. Design the lights in order to provide the minimum illumination required by Ukrainian standards. All electrical conduits to be PVC recessed along the walls and over the ceiling. No electrical conduit shall be exposed to the view. No wall receptacles shall be installed in these areas.
- Plumbing fixtures and accessories: The project includes the removal of all existing plumbing fixtures and accessories and their replacement with new ones as outlines in the sketches in the previous page.
Provide the following in each shower room:
Picture#71:Existing conditions in current shower/toilet/sink areas of the existing locker rooms.
Everything to be removed, including internal partitions.
Shower: 2 showers with curtains. Provide individual shower plates for each shower. Design to provide privacy to the users.
Sinks: Similarly to the toilets to be renovated under this project, provide 2 wall hung sinks without pedestals supporting the weight on the floor (2 in each room – total of 4 units). Provide with only cold water and automatic closing faucet.
Toilet: Not required
Floor drains: Provide one floor drain per shower room.
Mirror: Provide one in the girls shower room, recessed on the wall tiles of minimum dimension 0.5 m², surrounded by decorative ceramic friso.
Hand drier: Provide one electric hand drier similar to the ones to be provided for the toilets to be renovated under this project.
Bench: Provide one wooden bench in each shower room.
Accessories: Provide the required soap dispenser or holder, wall hangers, and everything necessary to have a perfectly finished and operational shower room.
Picture#70: Existing water heater to be reutilized and supplemented with a new one.
Picture#73: Gymnasium Hallway. Replace doors to the locker rooms and restore all conditions as they were before the door replacement.
Picture#72: Gymnasium Entrance door from the main school entrance lobby. Provide new solid wood door with see through window and professional door sign. Restore all surfaces of the entrance lobby to original conditions after the door replacement.
1.3.3.4. Repairs to the Hallway and School Main Entrance Lobby
The project includes only the replacement of the doors of the locker rooms (see picture #54) and the door to the main entrance lobby of the school. Remove all existing doors connecting with area under renovation in paragraph 1.3.3. and all its subparagraphs and replace with new solid wood doors. This includes 4 doors connecting with areas not to be renovated under this project. It also includes the doors of the Central Wing bathrooms covered under a different paragraph.
Picture#74: Typical similar plaque provided in a renovation project in Bulgaria
Picture#74-b: Typical similar plaque provided in School#22 Renovation in
Sevastopol
1.3.4. Commemorative Plaques (BASE BID)
The contractor shall provide and install 2 commemorative plaque at location to be indicated by the Contracting Officer. The plaques shall have the following information engraved on it:
Colored Flag of Ukraine Colored Flag of the United States of America This text (or similar): “The renovation of this school was made possible through a donation from the people of the United States of America to the People of Sevastopol with the support of the Office of Defense Cooperation and US Embassy in Ukraine – Date”
Same text as above in Ukrainian.
- Minimum thickness 8 millimeters
- Minimum dimensions 50 centimeters wide by 35 centimeters high.
- Resistant to outdoor weather and UV radiation.
- Plaque to be manufactured by specialized company.
- One of the plaques located in the exterior shall be provided with a 1 inch methacrylate covering or other protection against vandalism.
- Before purchasing the plaque, the contractor shall submit the design to the Contracting Officer for approval.
Picture#78: Acceptable man-lift
Picture#77: Required type of scaffold
Picture#75: Required type of scaffold
Picture#76: Required harness and lifelines
Picture#79: Required harness and lifeline
1.3.5. Scaffolding – Manlifts – Harness for Fall Protection
In order to renovate the roof, or to work on the ceilings or walls, or to execute any other work from working platforms, the contractor shall be required to install scaffolding or to use manlifts.
Despite the scaffolds that may be authorized by Ukrainian regulations, the contractor is only authorized to utilize European Standard scaffolds similar to the ones shown in pictures #75 and #77. These scaffolds shall be installed and used in accordance with manufacturer’s recommendations. In case the contractor needs to access the façade at any particular point without the need to install scaffolds, the contractor shall use a CE certified self-propelled man-lift, similar to the one shown in picture #78. The use of other type of scaffolds, other non CE certified man-lifts, or any type of ladders for façade or roof work, IS NOT AUTHORIZED.
Despite the requirements of Ukrainian Law for Fall Protection, any contractor employee working on the roof shall be protected with an approved harness properly tied to an approved lifeline. See pictures #76 and #79.
All other requirements of EM385-1-1 (Safety manual of US Army Corps of Engineers) and of Ukrainian Law applies for every work activity included in this project.
Picture#80
Red: New sewer pipe; Green: Clean existing sewer pipe; Manholes: Seal the bottom and reutilize. Blue:
New underground sewer line.
DESCRIPTION OF CONTRACT OPTIONS
1.4. REPAIR OF SEWER SYSTEM (OPTION-1)
The work included in this contract option shall only be executed if, and only if, Option-1 is awarded. The scope of the project includes all necessary work, alterations and modifications to have a perfectly new sewer system in the basement of the West Wing until the point indicated in the sketch below, all in strict compliance with Ukrainian regulations. Currently the sewer lines are in very poor condition, with leaking sewer and sewer sitting on the floor of the basement.
The work includes 5 different elements:
1.4.1. New Connections from basement ceiling to main sewer line
The connections from the plumbing fixtures in the West Wing to the main sewer line in the basement are corroded. They need to be removed and replaced with new PVC piping rated for gravity sewer lines. Diameter of the new piping shall be similar or greater than the existing ones to be replaced. Provide access for maintenance of the sewer lines. This corresponds to ALL the sewer connections in the basement, including where they connect with the exposed piping described in 1.4.2 and where they connect with the non-exposed piping described in 1.4.3. This includes the drainage lines from the renovated bathrooms, and other drainage lines from other areas not to be renovated as part of this contract, such as the sink in the central lobby of the West Wing or the sink in some classrooms of the West Wing.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .