IT_EV_A00007.pdf
PDF 28 KB Posted
- Solicitation number
- N3319113R0851
About this file
Amendment 0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Accreditation_-_Summary_Worksheet.xls | XLS spreadsheet | |
| N33191-13-R-0851_Amd_06.pdf | ||
| 0851_Amend_05.pdf | ||
| 0851_Amend_0004.pdf | ||
| Amend_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amnd_01.pdf | ||
| PPQ_word.doc | DOC document | |
| PPI_word.doc | DOC document | |
| J-1800000-03_IDIQ_ELINS__-_Final_-_PH.xls | XLS spreadsheet | |
| 0851_EV_test.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR3102861
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Answ er Pre-proposal inquiries, provide certif ication summary sheet, and change the period of performance.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Dec-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-13-R-0851
X 9B. DATED (SEE ITEM 11)
06-Aug-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Dec-2013
CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N33191-13-R-0851
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0007
Question:
Provided that the referenced Amendment has changed the Drinking Water parameters to be analyzed (from 100% to 70%), can new prospective offerors who HAVE NOT PREVIOUSLY SUBMITTED a complete proposal on 13 September 2013 participate in this new/revised competition?
Answer:
Yes. Contractors that have not previously submitted proposals MAY submit proposals. Contractors that have previously submitted proposals MAY also submit revised proposals. In the absence of a new proposal the Government will consider the previously provided proposal. All contractors must acknowledge all amendments and provide proposals in accordance with any amentments.
Question:
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT n. 006 of 22nd November 2013 – page 29/36, Annex 18 - par. 4.1 “LABORATORY ANALYTICAL SERVICES”
AND
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT n. 006 of 22nd November 2013 – page 18/36, Annex 2 - par. 2.10 “ENVIRONMENTAL PROTECTION”
AND
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT n. 006 of 22nd November 2013 – page 18/36, Annex 18 - par. 2.3 “SPECIAL REQUIREMENTS”
Amendment n. 0002 of 14th August 2013 clarified that DoD Laboratory Accreditation Program is not required.
Notwithstanding the foregoing, par. 2.10 – Annex 2 - of the Solicitation states as follows “the Contractor shall comply with all applicable italian national, regional and local laws and regulations, and standards listed in U.S. DoD Environmental Final Governing Standards for Italy”; par. 4.1 – Annex 18 – requires the compliance with the “US DoD and US Navy environmental criteria” and par. 2.3 – Annex 18 – requires the compliance with “US DoD health, safety and environmental policies”.
We kindly ask to clarify which are the US DoD legal criteria to be met and which are the specific certifications or authorizations required in this solicitation.
Answer:
Section 1800000 Environmental, Item 2.3.1 - Laboratory Accreditation and Certification, outlines the SINAL/ACCREDIA-accreditation or equivalent accreditation that laboratories must have to perform testing services under this upcoming contract. Further, Section 1800000 Environmental, Item 2.4 - References and Technical Documents, lists few US documents containing applicable US DoD and Navy environmental, health, and safety policies. In this regard, compliance with these policies when providing routine sampling and testing services is normally met by ensuring compliance with applicable Italian/European regulatory and/or UNI/ISO/USEPA technical standards. However,specific task orders may require the preparation of safety documents (e.g.: APP, as per Section 0200000 Management and Administration, Item 2.9.1; AHA, as per Section 0200000 Management and Administration, Item 2.9.2), which are more or less equivalent to the safety documents required under the applicable Italian/European regulatory drivers.
The following change is hereby incorporated into the solicitation:
Section L.6 5252.215-9300 Content of Proposal (JAN 2003), paragraph (1), subparagraph (X) is changed from:
Documentation of the laboratory's accreditation issued by a national body recognized under the International Laboratory Accreditation Cooperation-Mutual Recognition Arrangemently (ILAC-MRA), such as SINAL/ACCREDIA (i.e.: Sistema Nazionale Accreditamento Laboratori/Ente Italiano di Accreditamento) for Italy, etc.
To:
Documentation of the laboratory's accreditation issued by a national body recognized under the International Laboratory Accreditation Cooperation-Mutual Recognition Arrangemently (ILAC-MRA), such as SINAL/ACCREDIA (i.e.: Sistema Nazionale Accreditamento Laboratori/Ente Italiano di Accreditamento) for Italy, etc.
The attached summary worksheet sheet shall also be submitted by the offeror. The offeror shall include the following:
a. The indication if the testing is accredited and self-performed,
b. The indication if the testing is accredited and subcontracted, and if subcontracted the name of the accredited subcontractor,
c. The indication of the proposed accredited Subcontractor(s) per each testing service;
d. The page outlined in the accreditation documentation supporting the above mentioned indications.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy.
Period of performance: 01OCT2013-30SEPT2014 to Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy. Period of performance: 01FEB2014-31JAN2015.
CLIN 0002
The CLIN extended description has changed from Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy.
Period of performance: 01OCT2014-30SEPT2015. to Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy. Period of performance: 01FEB2015-31JAN2016..
CLIN 0003
The CLIN extended description has changed from Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy.
Period of performance: 01OCT2015-30SEPT2016 to Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy. Period of performance: 01FEB2016-31JAN2017.
CLIN 0004
The CLIN extended description has changed from Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy.
Period of performance: 01OCT2016-30SEPT2017 to Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy. Period of performance: 01FEB2017-31JAN2018.
CLIN 0005
The CLIN extended description has changed from Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy.
Period of performance: 01OCT2017-30SEPT2018 to Contractor shall provide all tools, supplies, equipment, labor, applicable licenses, and permits necessary to provide various types of evironmental testing throughout Italy. Period of performance: 01FEB2018-31JAN2019.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .