This document is a Questions and Answers (Q&A) file for a federal solicitation by Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY&IMF) for Keel Block Disposal, Solicitation Number N32253-25-Q-1031. The Q&A document addresses eight contractor inquiries regarding the project, covering key details such as wage requirements, work hours, project specifications, and material conditions. Specifically, the document reveals that the project involves disposing of stainless steel rod and re-bar keel blocks that are very corroded, with blocks dating from around 2015-2017. The project's normal working hours are 0630 to 1500 hours, Monday through Friday, excluding federal holidays, and any work outside these hours requires prior coordination and approval. The project is not subject to Davis-Bacon wage requirements, and staging areas will be available at the worksite location, with flexibility based on staging needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY&IMF)

Solicitation – N32253-25-Q-1031

Keel Block Disposal

RESPONSES TO QUESTIONS (6/23/2025)

1. Question: Could you please confirm if this project is subject to Davis-Bacon wage requirements

Answer: The project is not subject to Davis-Bacon wage requirements.

2. Question: Would it be possible to get some pictures of the keel block items and the surrounding area?

Answer: The Government is working on providing photos per the request.

3. Question: Is there a designated staging area available for trucks and equipment?

Answer: Available staging area can be at worksite location unless told otherwise or the staging area will be dependent on how much staging will be needed.

4. Question: Finally, what are the expected working hours for this project?

Answer: Please refer to the Performance Work Statement as listed in the solicitation:

8.1 NORMAL HOURS: Work shall be performed during the normal working hours of 0630 to 1500 hours, daily Monday through Friday, excluding Federal Holidays.

8.2 Any work performed outside normal hours shall be coordinated and approved by the COR or designee prior to start of work.

5. Question: What is the exact composition of the steel/what kind is it? (Stainless, high grade, mid grade, etc.)

Answer: Stainless steel rod and re-bar

6. Question: What condition is the steel in? (Very eroded, mildly eroded, barely eroded).

Answer: Very Corroded

7. Question: How many years has the steel been in place?

Answer: We have keel blocks that were cast around 2015-2017 as well as before and after those initial years. It is difficult to determine the years due to not having any mounting plate on the keel blocks to provide this kind of information.

8. Question: I see pictures have been requested but cannot find them attached, can you provide a reference of where these can be found?

Answer: The Government is working on providing photos per the request.