QA_1.pdf
PDF 531 KB Posted
- Solicitation number
- N32253-24-Q-0081
About this file
This document contains questions and answers related to a federal contract opportunity for blown optical fiber cable troubleshoot and repair. The key details are:
The Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) is issuing a Request for Quote (RFQ) for a Firm Fixed Price contract to perform work in accordance with work package HRMC-517-24. The tentative start date is September 9, 2024 with a delivery date of October 4, 2024. Proposals are due on August 26, 2024 at 0900 HST and must be submitted via email to the designated points of contact. This is a full and open competition with no set-asides. The applicable NAICS code is 336611 with a size standard of 1,300 employees. The Product Service Code is J020 - Maintenance, Repair, and Rebuilding of Ship and Marine Equipment. Vendors must be registered in SAM.gov by the award date. The government provided responses to questions related to requesting certain work items and drawings, as well as the inability to extend the proposal due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blown Optical Fiber Cable Troubleshoot Questions and Answers
As of 8/20/2024
Question 1: Can we request the following work items and associated drawings for the following:
Answer:
References will be sent via DoD Safe.
o 460-00-001, R-FS111 Blown Optical Fiber Troubleshoot and Repair o 2.2 8217193 Rev XC, FIBER OPTIC CABLE SYSTEM CABLING DIAGRAM
WIRING TABLE
o 2.6 DFS, SSN-788-1011-2020(FS250, Tube 1 of R-FS111) o 2.7 DFS, SSN-788-1012-2020 (FS212, Tube 2 of R-FS111) o 2.8 LAR, NIWCL-0428-20 (FS250, Tube 1 of R-FS111) with Enclosure 1 o 2.9 LAR, NIWCL-0431-20 (FS212, Tube 2 of R-FS111) with Enclosure 1 o 460-00-002, R-FS134 Blown Optical Fiber Troubleshoot and Repair o 2.7 DFS, SSN-788-1013-2020 o 2.8 LAR, NIWCL-0430-20 with Enclosure 1 o 8216900 Rev C, METHODS FIBER OPTIC o 8217193 Rev XC, FIBER OPTIC CABLE SYSTEM CABLING DIAGRAM o 460-00-003, R-FS114 Blown Optical Fiber Troubleshoot and Repair o 2.7 DFS, SSN-788-1014-2020 o 2.8 LAR, NIWCL-0429-20 with Enclosure 1 o 8216900 Rev C, METHODS FIBER OPTIC o 8217193 Rev XC, FIBER OPTIC CABLE SYSTEM CABLING DIAGRAM
Question 2: Can the due date for proposals be extended?
Answer:
No. The deadline will remain 8/26/2024 at 0900 HST in order to meet the Period of Performance start date 9/9/2024.