Attachment_1_HRMC-517-24_Redacted.pdf
PDF 353 KB Posted
- Solicitation number
- N32253-24-Q-0081
About this file
This document is a government file containing the technical specifications and work requirements for contract HRMC-517-24 related to troubleshooting and repairing blown optical fiber cable R-FS111, R-FS134, and R-FS114 aboard a Navy vessel.
The key details include: the specific cable runs and locations of the work; requirements to inspect, troubleshoot, and repair the fiber optic cables; operational testing required; and an estimate of hazardous waste that may be generated during performance. The work is to be performed at the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility. There is a related federal contract opportunity solicitation, N32253-24-Q-0081, with a proposal due date of 26 August 2024 and a tentative start date of 9 September 2024. The contract is for a Firm Fixed Price type and the applicable NAICS code is 336611 with a size standard of 1,300 employees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
HRMC (NMD)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: HRMC-517-24
INCLUDES ALL CHANGES THROUGH 7/28/2024
SHIP: HRMC-517-24
INDEX
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-24 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 09/27/2022 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 09/27/2022 Original
009 03 Toxic and Hazardous Substance; control 09/27/2022 Original
009-04 Quality Management System; provide 09/27/2022 Original
009-05 Temporary Access; accomplish 09/27/2022 Original
009 06 Maintaining Protection and Cleanliness from Non Radioactive Operations; 09/27/2022 Original
009-07 accomplish Confined Space Entry, and Certification; accomplish
09/27/2022
Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 02/28/2023 CH-1
009 10 Asbestos Containing Material (ACM); control 09/27/2022 Original
009 18 Mine Warfare Ships Magnetic Material; control 09/29/2022 Original
009-19 Provisioning Technical Documentation (PTD); provide 09/27/2022 Original
009-20 Government Property; control 09/27/2022 Original
009-21 Logistics and Technical Data; provide 09/27/2022 Original
009-23 Interference; remove and install 09/29/2022 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/27/2022 Original
009 34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/27/2022 Original
009 39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for 09/27/2022 Original
009 40
Commercial Equipment/Component; accomplish Contractor Crane, Multi Purpose Machine and Material Handling Equipment at a
009 60
Naval Facility; provide Schedule and Associated Reports for CNO Availabilities; provide and manage
09/30/2022
009-61 Shipboard Use of Fluorocarbons; control 09/27/2022 Original
009 67 Integrated Total Ship Testing; manage 09/27/2022 Original
009 69 Heavy Weather/Mooring Plan; provide 09/27/2022 Original
009 70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and 09/27/2022 Original
009 72
Housekeeping for Unmanned Vessels; accomplish Physical Security at a Private Contractor Facility; accomplish
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, 09/30/2022 Original
009-74 and repair Occupational, Safety and Health Plan; accomplish
009-80 Ship Facilities; maintain 09/27/2022 Original
009-81 Compartment Closeout; accomplish 09/30/2022 Original
009-82 Installation of Equal Component Vice Specified Component; report 09/27/2022 Original
009-84 Threaded Fastener Requirements; accomplish 09/30/2022 Original
009 88
009 93
Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS Contaminated Tanks, Spaces, and Piping; certify Emergency Planning and Community Right to Know Act (EPCRA) and Pollution
009 99
Prevention Act (PPA) Information; provide Ship Departure Report; provide
009 100 Ship's Stability; maintain 09/30/2022 Original
009 101 Ship Transit and Berthing; accomplish 09/27/2022 Original
009 106 Work Authorization Form Coordinator (WAFCOR); provide 09/27/2022 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/27/2022 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/27/2022 Original
009 111 Schedule and Associated Reports for non CNO Availabilities; provide and 09/30/2022 Original
009 117 manage Combat Systems, Light Off Suport; provide
009 118 CG Deck Loading; accomplish 09/27/2022 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/30/2022 Original
009 122 Temporary Padeye; install and remove 09/30/2022 Original
009 125 Boats Less Than 65 Feet Long; accomplish 10/25/2022 Original
99-01 PH
99-02 PH
Waste Generated on Government Property, including Satellite Accumulation area (SAA), Managing and Disposing of Hazardous Waste (HW) and non-HW;
accomplish Dry Dock Requirement; accomplish
01/20/2023
01/20/2023
099-03PH Additional Environmental Requirements; accomplish 01/20/2023 Original
099 04PH Industrial Wastewater/Oily Wastewater Disposal; accomplish 01/20/2023 Original
099 007PH Radiological Fallout Controls; accomplish 07/13/2023 CH 3
099 08PH Safety of Ship Requirement; provide 04/17/2024 CH 7
099 40PH Additional Requirements for Contractor Cranes, Multi Purpose machine, and 01/17/2023 Original
099 69PH
Material Handling Equipment at Joint Base Pearl Harbor Hawaii; accomplish Pier Laydown for Pearl Harbor Naval Shipyard & IMF (PHNSY & IMF)
10/20/2023
CH 4
Availability; accomplish
CATEGORY II. FY-24 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
009-123 Fiber Optic Component;inspect, install, repair, remove, and test
09/30/2022 Original
ITEM NO. TITLE
077-00-001 Hazardous Waste Produced on Naval Vessels; control
460-00-001 R-FS111 Blown Optical Fiber Troubleshoot and Repair; accomplish
460-00-002 R-FS134 Blown Optical Fiber Troubleshoot and Repair; accomplish
460-00-003 R-FS114 Blown Optical Fiber Troubleshoot and Repair; accomplish
SSP: HRMC-517-24 1 of 5 ITEM NO: 077-00-001
SHIP: ITEM NO: 077-00-001
COAR: 26 PCN: SERV-L007
CMP: NONE
PLANNER:
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or
SHIP:
SSP: HRMC-517-24 2 of 5 ITEM NO: 077-00-001 structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze)
Sodium Hydroxide
Cleaning Solvents
SSP: HRMC-517-24 3 of 5 ITEM NO: 077-00-001
Sodium Phosphates (Tri, Bi, or Mono)
Fluorocarbons
Morpholine
Sodium Chromates
Hydrazine
Methyl Ethyl Ketone
Spent Abrasive Blast Material
(contaminated with a known hazardous waste)
Trichloroethane
Miscellaneous Chemicals
(Rust Preventative)
Miscellaneous Chemicals
(Corrosive)
Miscellaneous Chemicals
(TCLP Toxic)
Miscellaneous Chemicals
(Reactive)
Oil (Synthetic)
Paints (Enamel, Latex, Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, cadmium, or chrome)
Paint Strippers (phenols, lead, chromium)
Sludges (Contaminated with a known hazardous waste)
Wool Felt (contaminated with chromium and PCB's)
Lube/Fuel Oil Soaked Rags
Paint/Flakes (Pressure Washing
Ext Hull Surfaces)
Fuel Oil(Residual)
Bilge Water
SSP: HRMC-517-24 4 of 5 ITEM NO: 077-00-001
Oil/Water
AFFF/Water
MEK Contaminated Rags
3.5.1 Provide zero dollars for managing and disposing of all
hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.
3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
SSP: HRMC-517-24 5 of 5 ITEM NO: 077-00-001
4.2.2 Reference to a Material Safety Data Sheet (MSDS), or
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
5.3 KITTED MATERIAL:
SHIP: ITEM NO: 460-00-001
SSP: HRMC-517-24 1 of 3 ITEM NO: 460-00-001
COAR: 26 PCN: OCMC-L023
1.1 Title: R-FS111 Blown Optical Fiber Troubleshoot and Repair;
accomplish
1.2 Location of Work:
1.2.1 Throughout
1.3 Identification:
1.3.1 Blown Optical Fiber (BOF) R-FS111
1.3.2 Blown Fiber Path FS250
1.3.3 Blown Fiber Path FS212
2. REFERENCES:
2.1 Standard Items, (FY-24)
2.2 8217193 Rev XC, FIBER OPTIC CABLE SYSTEM CABLING DIAGRAM
2.3 8217195 Rev XC, FIBER OPTIC CABLE SYSTEM BLOWN FIBER INTERCONNECTION
WIRING TABLE
2.4 ECI FOCS0005, FIBER OPTIC CABLE SYSTEM CHANGE INSTRUCTION FOR CANES
HW 1.2
2.5 MIL-STD-2042, PART 6 Rev C, FIBER OPTIC CABLE TOPOLOGY INSTALLATION
STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES
2.6 DFS, SSN-788-1011-2020(FS250, Tube 1 of R-FS111)
2.7 DFS, SSN-788-1012-2020 (FS212, Tube 2 of R-FS111)
2.8 LAR, NIWCL-0428-20 (FS250, Tube 1 of R-FS111)
2.9 LAR, NIWCL-0431-20 (FS212, Tube 2 of R-FS111)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-123 of 2.1 for the cable listed in 1.3 and located in 1.2.
3.2 Accomplish an inspection of cable listed in 1.3, located in 1.2, in accordance with 2.2 through 2.5 and vendor proprietary drawings and specifications.
3.2.1 Verify length of run in accordance with applicable methods of
2.5 prior to starting work to ensure adequate material is on hand if cable replacement is required.
3.2.2 Acceptance tests must be conducted on all components. Pre-installation tests shall be performed just prior to installation of the components on the ship in accordance with 2.5.
3.2.3 Disconnect/reconnect fiber connections as required in
accordance with 2.5.
3.2.4 Test all disconnected/reconnected/disturbed fiber
connections/paths in accordance with 2.5 following work completion.
SSP: HRMC-517-24 2 of 3 ITEM NO: 460-00-001
3.3 Troubleshoot, clear and repair blown optical fiber (BOF) tubes 5 and 7 of cable R-FS111, using 2.2 through 2.4 for guidance.
3.3.1 Tubes were reported as failed per 2.6 through 2.9.
3.3.2 Cable R-FS111 runs from the Hub Assembly Network Unit 3984 in the Auxiliary Machine Room (AMR)(3rd platform) to Fiber Optic Interconnection Box No. 4 in the AMR Habitability Passageway (3rd platform).
3.4 If able to clear obstructions or repair BOF tubes 5 and 7, accomplish the following in accordance with 2.5:
3.4.1 Verify that BOF tubes 5 and 7 are both able to pass “Method 6H1 BOF cable BB test” and “Method 6I1 BOF cable pressurization test” in accordance with 2.5.
3.4.2 Remove blown fiber path FS250 from its current position in spare tube one of cable R-FS111, in accordance with 2.2 through 2.4.
3.4.3 Install blown fiber path FS250 into tube 5 of cable R-FS111.
3.4.4 Verify spare tube one of cable R-FS111 is unobstructed, in accordance with 2.5.
3.4.5 Remove blown fiber path FS212 from its current position in spare tube 2 of cable R-FS111, in accordance with 2.2 through 2.4.
3.4.6 Install blown fiber path FS212 into tube 7 of cable R-FS111.
3.4.7 Verify spare tube 2 of cable R-FS111 is unobstructed in accordance with 2.5.
3.4.8 Perform phase 3 and 4 installation testing in accordance with 2.5, to verify workmanship.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of new and disturbed fiber optic circuits of cable listed in 1.3 and in accordance with the requirements of 2.5. Record results.
3.5.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
4. NOTES:
4.1 Known Source:
4.2 All material to be provided by Contractor.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
SSP: HRMC-517-24 3 of 3 ITEM NO: 460-00-001
SHIP: ITEM NO: 460-00-002
SSP: HRMC-517-24 1 of 3 ITEM NO: 460-00-002
COAR: 26 PCN: OCMC-L024
1.1 Title: R-FS134 Blown Optical Fiber Troubleshoot and Repair;
accomplish
1.2 Location of Work:
1.2.1 Throughout
1.3 Identification:
1.3.1 Blown Optical Fiber (BOF) R-FS134
1.3.2 Blown Optical Fiber (BOF) R-FS134-S2
1.3.3 Blown Fiber Path FS285
2. REFERENCES:
2.1 Standard Items, (FY-24)
2.2 8217193 Rev XC, FIBER OPTIC CABLE SYSTEM CABLING DIAGRAM
2.3 8217195 Rev XC, FIBER OPTIC CABLE SYSTEM BLOWN FIBER INTERCONNECTION
WIRING TABLE
2.4 ECI FOCS0005, FIBER OPTIC CABLE SYSTEM CHANGE INSTRUCTION FOR CANES
HW 1.2
2.5 MIL-STD-2042, PART 6 Rev C, FIBER OPTIC CABLE TOPOLOGY INSTALLATION
STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES
2.6 8216900 Rev C, METHODS FIBER OPTIC
2.7 DFS, SSN-788-1013-2020
2.8 LAR, NIWCL-0430-20
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-123 of 2.1 for the cable listed in 1.3 and located in 1.2.
3.2 Accomplish an inspection of cable listed in 1.3, located in 1.2, in accordance with 2.2 through 2.5 and vendor proprietary drawings and specifications.
3.2.1 Verify length of run in accordance with applicable methods of
2.5 prior to starting work to ensure adequate material is on hand if cable replacement is required.
3.2.2 Acceptance tests must be conducted on all components. Pre-installation tests shall be performed just prior to installation of the components on the ship in accordance with 2.5.
3.2.3 Disconnect/reconnect fiber connections as required in
accordance with 2.5.
3.2.4 Test all disconnected/reconnected/disturbed fiber
3.3 Troubleshoot, clear and repair blown optical fiber (BOF) tube 6 of
SSP: HRMC-517-24 2 of 3 ITEM NO: 460-00-002 cable R-FS134, using 2.2 through 2.4.
3.3.1 Tubes were reported as failed per 2.7 through 2.8.
3.3.2 Cable R-FS134 is broken up into two parts, R-FS134-S1 and R- FS134-S2. R-FS134-S1 runs from the Fiber Optic Interconnection Box No. One in Command and Control Center (CACC)(2nd platform) to Combat Systems Electronic Space No. One (CSES-1)(1st Platform) and is spliced with BOF Cable R-FS134-S2. R-FS134-S2 runs from the splice to the Electrical Equipment Space (1st platform) and terminates in the Fiber Optic Interconnection Box No. 3.
3.4 If able to clear obstructions or repair BOF tube 6, accomplish the following in accordance with 2.5:
3.4.1 Verify that BOF tube 6 is able to pass “Method 6H1 BOF cable BB test” and “Method 6I1 BOF cable pressurization test” per 2.5.
3.4.2 Remove blown fiber path FS285 from its current position in spare tube one of cable R-FS134 , in accordance with 2.2 through 2.4.
3.4.3 Install blown fiber path FS285 into tube 6 of cable R-FS134.
3.4.4 Verify spare tube one of cable R-FS134 is unobstructed, in accordance with 2.5.
3.4.5 Perform phase 3 and 4 installation testing in accordance with
2.5 to verify workmanship.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of new and disturbed fiber optic circuits of cable listed in 1.3 and in accordance with the requirements of 2.5. Record results.
3.5.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
SSP: HRMC-517-24 3 of 3 ITEM NO: 460-00-002
SHIP: ITEM NO: 460-00-003
SSP: HRMC-517-24 1 of 3 ITEM NO: 460-00-003
COAR: 26 PCN: OCMC-L025
1.1 Title: R-FS114 Blown Optical Fiber Troubleshoot and Repair;
accomplish
1.2 Location of Work:
1.2.1 Throughout
1.3 Identification:
1.3.1 Blown Optical Fiber (BOF) R-FS114-S1
1.3.2 Blown Optical Fiber (BOF) R-FS114-S1
1.3.3 Blown Fiber Path FS281
2. REFERENCES:
2.1 Standard Items, (FY-24)
2.2 8217193 Rev XC, FIBER OPTIC CABLE SYSTEM CABLING DIAGRAM
2.3 8217195 Rev XC, FIBER OPTIC CABLE SYSTEM BLOWN FIBER INTERCONNECTION
WIRING TABLE
2.4 ECI FOCS0005, FIBER OPTIC CABLE SYSTEM CHANGE INSTRUCTION FOR CANES
HW 1.2
2.5 MIL-STD-2042, PART 6 Rev C, FIBER OPTIC CABLE TOPOLOGY INSTALLATION
STANDARD METHODS FOR SURFACE SHIPS AND SUBMARINES
2.6 8216900 Rev C, METHODS FIBER OPTIC
2.7 DFS, SSN-788-1014-2020
2.8 LAR, NIWCL-0429-20
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-123 of 2.1 for the cable listed in 1.3 and located in 1.2.
3.2 Accomplish an inspection of cable listed in 1.3, located in 1.2, in accordance with 2.2 through 2.5 and vendor proprietary drawings and specifications.
3.2.1 Verify length of run in accordance with applicable methods of
2.5 prior to starting work to ensure adequate material is on hand if cable replacement is required.
3.2.2 Acceptance tests must be conducted on all components. Pre-installation tests shall be performed just prior to installation of the components on the ship in accordance with 2.5.
3.2.3 Disconnect/reconnect fiber connections as required in
accordance with 2.5.
3.2.4 Test all disconnected/reconnected/disturbed fiber
3.3 Troubleshoot, clear and repair blown optical fiber (BOF) tube 2 of
SSP: HRMC-517-24 2 of 3 ITEM NO: 460-00-003 cable R FS1114, using 2.2 through 2.4.
3.3.1 Tubes were reported as failed per 2.6 through 2.8.
3.3.2 Cable R-FS114 is broken up into two parts, R-FS114-S1 and R- FS114-S2. R-FS114-S1 runs from Fiber Optic Interconnection Box (FIB) No. 2 in Combat Systems Electronic Space No. 2 (CSES-2)(2nd Platform) through the Electronic Support Measures Room (ESM) (2nd Platform) to Command and Control Center (CACC)(2nd platform) and is spliced with BOF Cable R-FS114-S2. R-FS114-S2 runs from the splice to the AMR Habitability passageway (3rd platform) and terminates in FIB No. 4 In accordance with reference 2.2, sheet 8.
3.4 If able to clear obstructions or repair BOF tube 2 of R-FS114, accomplish the following in accordance with 2.5:
3.4.1 Verify that BOF tube 2 is able to pass “Method 6H1 BOF cable BB test” and “Method 6I1 BOF cable pressurization test” per 2.5.
3.4.2 Remove blown fiber path FS281 from its current position in spare tube 4 of cable R-FS110 , in accordance with 2.2 through 2.4.
3.4.3 Verify spare tube 4 of Cable R-FS110 is unobstructed in accordance with 2.5.
3.4.4 Install blown fiber path FS281 into tube 2 of cable R-FS114.
3.4.5 Perform phase 3 and 4 installation testing in accordance with
2.5 to verify workmanship.
(V)(G) "OPERATIONAL TEST"
3.5 Accomplish an operational test of new and disturbed fiber optic circuits of cable listed in 1.3 and in accordance with the requirements of 2.5. Record results.
3.5.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
SSP: HRMC-517-24 3 of 3 ITEM NO: 460-00-003
File details come from the government source that posted it. Updated .