A4_Cranes_on_Base.pdf

PDF 199 KB Posted

Attached to
Dry Dock Construction Hoist Dismantle and Erection Federal contract opportunity
Solicitation number
N32253-24-Q-0058
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a set of requirements and instructions for the use of contractor cranes and rigging equipment at the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNS&IMF).

The key details are:

  • Contractors must notify the Contracting Officer and Accident Prevention team at least 5 days in advance of bringing cranes, forklifts, or other equipment onto the shipyard that will be used for lifting operations. The contractor must provide a detailed package of information about the equipment, operators, and lift plans.
  • PHNS&IMF has specific ground loading and access restrictions that contractors must follow. A Certificate of Compliance must be posted on each piece of equipment, which will be stamped by the Accident Prevention team after review.
  • Detailed requirements are provided for crane and rigging safety, such as operator qualifications, use of load charts, critical lift planning, and procedures in the event of an accident or incident. Contractors must comply with applicable OSHA, ASME, and other federal standards.
  • The document includes reporting requirements and forms for crane and rigging accidents, near misses, and unplanned occurrences. Activities are required to investigate all such incidents and report them to the Navy Crane Center.

View the file

Other files for this federal contract opportunity

Other files attached to Dry Dock Construction Hoist Dismantle and Erection, newest first.
File Type Posted
70_N3225324Q0058_AMD3.pdf PDF
70_N32253-24-Q0058_AMD2.pdf PDF
70_N32253-24-Q0058_AMD1.pdf PDF
OPSEC.pdf PDF
N32253-24-Q-0058 Solicitation.pdf PDF
A3_Contractor_Security.pdf PDF
A2_Environmental_Protection.pdf PDF
A1_Safety_and_Health.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR CRANES ON BASE

(Rev. July 19, 2021)

Ref: (a) NAVFAC P-307, Management of Weight Handling Equipment, June 2016

(b) Corporate Lifting and Handling Manual, Rev E Volume I – Chapter 8

(c) Command NAVY Region Instruction 11260.1C

Encl: (1) Waterfront Crane/Vehicle Usage Request

(2) Figure P-1, Certificate of Compliance & Figure P-2, Contractor Crane and Rigging Operation Checklist

(3) Crane and Rigging Accident Report, Near Miss and Unplanned Occurrence Report

1 NAVFAC P-307 provides maintenance and operational requirements for cranes and other weight handling equipment (WHE) at Navy activities. Section 11 of reference (a), and reference (b) contains specific requirements that must be included in any agreement for work involving (or work which may involve) contractor operated cranes (including multi-purpose machines, material handling equipment (forklifts), and construction equipment when used as cranes to lift suspended loads) and rigging equipment used at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNS&IMF), referred to herein as the Shipyard. This equipment is referred to herein as lifting and handling (L&H) equipment.

2 Shipyard and Corporate Lifting and Handling requirements:

a. Require the contractor to notify the Contracting Officer and Accident Prevention, no less than 5 normal working days in advance of crane (including multipurpose machines, material handling equipment (forklifts), newly certified shop cranes, A-frames with permanently attached hoist and construction equipment when used as cranes to lift suspended loads) arrival at PHNS&IMF. The Contracting Officer and AP Team will provide oversight of the contracting official's handling of the oversight plan of the contractor L&H equipment prior to being allowed to operate at PHNS&IMF.

b. Require the contractor to designate their point of contact (POC) with appropriate telephone numbers.

c. Inform the contractor that PHNS&IMF L&H personnel may perform surveillances of their L&H operations within the PHNS&IMF boundary and notify the contractor’s POC of any deficiencies or points of concerns.

d. Provide the Contracting officer and AP Team [(808) 473-8000-ext. 3780, 2815, or 3782 (phone) with a Contractor Mobile Crane Entry Package:

(1) Name of contractor and POC to resolve problems/concerns identified during surveillances by PHNS&IMF L&H Department personnel.

(2) Description of contractor L&H operation(s).

(3) Date, duration, and location of contractor L&H operation(s).

(4) Name and phone number of Shipyard's Contracting Officer assigned to oversight the contract.

(5) Weight handling equipment (WHE) or multi-purpose handling equipment (MHE) annual and quadrennial inspection records.

(6) Copies of operator’s medical certificate and qualifications by a source that qualifies Crane Operators.

(7) Personnel designated and qualified by the Crane Contractor conducting weight handling operations to perform rigger in charge duties as identified in NAVFAC P-307. The personnel designated to perform as the rigger in charge shall be qualified as defined per 29 CFR 1926.32(m).

(8) Copy of the load chart for the specific crane or MHE.

(9) Crane Data sheet with but not limited to axle load and axle spacing.

(10) Job site ground loading conditions, outrigger load and cribbing plan.

(11) Waterfront Crane/Vehicle Usage Request, Enclosure 1

(12) Crane Certificate of Compliance, Enclosure 2

(13) Waterfront operational permit, if applicable.

(14) Critical lift Plan(s) when critical lift is to be performed. This plan shall include a list of rigging gear to be used.

e. After the Contracting Officer provides approval of the submitted Contractor Mobile Crane Entry Package, the Contractor must submit the request at AP Team for mobile crane entry no less than 3 normal working days prior to desired entry.

f. PHNS&IMF implemented a policy to facilitate enforcement of reference (a) contractor L&H equipment requirements within PHNS&IMF’s Controlled Industrial Areas (CIA) and PHNSY&IMF contract work performed on Navy Region piers/property. Contractor L&H equipment will not be allowed into the CIA without a PHNS&IMF CODE 700 CIA Access Stamp on the contractor's Certificate of Compliance [Enclosure 2, Figure P-1]. This stamp will be placed on the certificate of compliance by the PHNS&IMF AP Team after an acceptable oversight by the AP Team of the contracting official's initial oversight of the L&H equipment. The Certificate of Compliance is valid of 90 days. This policy is in addition to the Commander Navy Region Hawaii (CNRH) entry requirements per reference (c) and PHNS&IMF entry requirements. To preclude the contractor from being denied entry into the CIA or onto Navy Region property, Contracting Officers are requested to adhere to the requirements of this agreement.

g. Section 11 of reference (a) requires that Contracting Officers and contractors comply with specific PHNS&IMF regulations pertaining to crane safety and operations. PHNS&IMF issued ground-loading restrictions for mobile truck cranes. Ground loading restrictions for PHNS&IMF and Navy Region property were developed in conjunction with PHNS&IMF Codes 710 and 980 and NAVFAC Engineering Systems Command. The contractor shall contact Code 710 at 808 473-8000 ext. 2831 to obtain the latest ground loading restriction for the specific area they are working at.

h. The Contractor shall comply with the following requirements pertaining to crane safety and operations:

(1) The crane operator will not leave the crane cab with a load suspended.

(2) The crane hook must be positioned directly over the load. Side loading of the crane is prohibited.

(3) A barricade must be positioned to prevent personnel from entering the tail swing area.

(4) “Lift-off” of tires when working on rubber or lift off of outriggers when used will not be permitted.

(5) Ground loading limitations must be adhered to at all times.

(6) Certificate of Compliance shall be posted in a conspicuous place on or in the cab of the crane/vehicle to which it pertains.

(7) Crane Records “summary sheet” of all pertinent documentation, such as inspection records; crane manufacturer operating manual, including crane equipped operator aids; crane log book that records operating hours; and all crane inspections, tests, maintenance, and repair records shall be located at the contractor’s job-site office. A copy of the crane’s load rating chart shall be located in the cab.

(8) Rigging Certification. Provide written certification that the contractor provided rigging gear used at the job-site meets all applicable 29 CFR 1926 regulations.

3 Navy Crane Center requirements as specified by Section 11 of reference (a):

a. Require the contractor to comply with specific activity regulations pertaining to crane safety and operation (including allowable access routes and ground loading limitations), and to notify the contracting officer, in advance, of any cranes entering the activity or of any multi-purpose machines, MHE, or construction equipment that may be used in a crane-like application to lift suspended loads. Require the contractor to comply with applicable ANSI or ASME standards (e.g., ASME B30.5 for mobile cranes, ASME B30.22 for articulating boom cranes, ASME B30.3 for tower cranes, and ASME B30.8 for floating cranes, ASME B30.9 for slings, ASME B30.16 for overhead hoists, ASME B30.20 for below-the-hook lifting devices, ASME B30.21 for manually lever-operated hoists, ASME B30.26 for rigging hardware, ASME B30. ANSI/ITSDF B56.6 for rough terrain forklifts, ANSI A10.31 for digger derricks, ANSI A92.2 for aerial lifts/platforms with hoists or “sign trucks”, ASSE A10.22 for personnel hoists). For cranes, machines, and rigging equipment at naval activities in foreign countries, the cranes, machines, and rigging equipment shall comply with the appropriate host nation safety standards. For floating cranes and barge-mounted mobile cranes, require a third party certification from an OSHA accredited organization (or a third party certification from a state accredited organization for those states with OSHA approved state plans), a load indicating device, a wind speed indicating device, and a marine type list and trim indicator readable in one-half degree increments. Third party certification is not required for floating cranes and barge-mounted mobile cranes at Navy activities in foreign countries.’

b. Require a certificate of compliance from the contractor (Enclosure 2, figure P-1) that the crane (or other machine if used to lift suspended loads) and the rigging equipment meet applicable OSHA and ANSI/ASME regulations (with the contractor citing which OSHA and ANSI/ASME regulations are applicable, e.g., cranes/multi-purpose machines used in cargo transfer shall comply with 29 CFR 1917; cranes/multi-purpose machines used in construction, demolition, or maintenance shall comply with 29 CFR 1926; cranes/multi-purpose machines used in shipbuilding, ship repair, or shipbreaking shall comply with 29 CFR 1915; aerial lifts/platforms (sign trucks) with hoists shall comply with 29 CFR 1926.453 and ANSI A92.2; personnel hoists shall comply with 29 CFR 1926.552 and ASSE A10.22; slings shall comply with ASME B30.9; rigging hardware shall comply with ASME B30.26). For cranes (or other machines used to lift suspended loads) and rigging equipment at naval activities in foreign countries, the contractor shall certify that the crane (or other machine) and the rigging equipment conform to the appropriate host nation safety standards. The contractor shall also certify that all of its crane (or other machine) safety devices are enabled and functioning properly, that all personnel working on the naval activity job site have been trained to not stand under or in the fall zone of a suspended load unless specifically allowed by USACE EM 385-1-1, and that operators have been trained to not bypass safety devices (e.g., anti-two block devices, LMI’s) during lifting operations. Require that the certifications be available on the crane or in the contractor’s on-site office for rigging operations.

c. For mobile cranes, commercial truck mounted cranes, and articulating boom cranes with OEM rated capacities of greater than 2000 pounds, require that the crane operator be designated as qualified by a source that qualifies crane operators (i.e., a union, a government agency, or an organization that tests and qualifies crane operators). Proof of current qualification shall be provided. Operators of cranes used in construction at activities under US jurisdiction shall follow the qualification and certification requirements of 29 CFR 1926.1427. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR.

d. Require the contractor to certify (Enclosure 2, figure P-1) that the operator is qualified and trained for the operation of the crane or machine to be used.

e. For multi-purpose machines, MHE, and construction equipment used to lift loads suspended by rigging equipment, require proof of authorization from the machine OEM that the machine is capable of making lifts of loads suspended by rigging equipment. Written approval from a qualified registered professional engineer, after a safety analysis is performed, is allowed in lieu of the OEM’s approval. Require the contractor to demonstrate that the equipment is properly configured to make such lifts and is equipped with a load chart.

Note: MHE attachments covered by and used in accordance with NAVSEA SW023-AH-WHM-010 have been pre-approved for use with all MHE. These attachments are exempt from the OEM authorization requirement above.

f. Require that all hooks used on cranes, hoists, other machines, and rigging gear shall have self-closing latches or the throat opening shall be "moused" (secured with wire, rope, heavy tape, etc.) or otherwise secured to prevent the attached item from coming free of the hook under a slack condition. The following exceptions apply and shall be approved by the contractor’s technical organization: items where the hook throat is fully obstructed and not available for manual securing; and lifts where securing the hook throat increases the danger to personnel, such as forge shop, dip tank, or underwater work.

g. Require a critical lift plan for each of the following lifts: lifts over 75 percent of the capacity of the crane, hoist, or other machine (lifts over 50 percent of the capacity of a barge-mounted mobile crane’s hoists) at any radius of lift; lifts involving more than one crane, hoist, or other machine; lifts of personnel (lifts of personnel suspended by rigging equipment from multi-purpose machines, MHE, or construction equipment shall not be permitted);

lifts made in the vicinity of overhead power lines (see subparagraph (7); erection of cranes; lifts of submerged or partially submerged objects (see exceptions in paragraph 10.4.1.e); lifts involving binding conditions; lifts of hazardous materials (see exceptions in paragraph 10.4.1.a); and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks. The plan shall include the following as applicable:

(1) The size and weight of the load to be lifted, including crane (or other machine) equipment and rigging equipment that add to the weight. The OEM's maximum load capacities for the entire range of the lift shall also be provided.

(2) The lift geometry, including the crane (or other machine) position, boom length and angle, height of lift, and radius for the entire range of the lift. Applies to both single and multiple-crane/machine lifts.

(3) A rigging plan, showing the lift points, rigging equipment, and rigging procedures.

(4) The environmental conditions under which lift operations are to be stopped.

(5) For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR 1926.1431.

For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

(6) For barge mounted mobile cranes, barge stability calculations identifying crane placement/footprint; barge list and trim based on anticipated loading; and load charts based on calculated list and trim specific to the barge the crane is mounted on. The amount of list and trim shall be within the crane OEM’s requirements.

(7) For lifts in the vicinity of overhead power lines (i.e., if any part of the crane or other machine, including the fully extended boom of a telescoping boom crane or machine, or the load could approach the distances noted in figure 10-3 during a proposed operation), the plan shall demonstrate compliance with 29 CFR 1926.1408-1411. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

h. Require the contractor to notify the contracting officer as soon as practical, but not later than four hours, after any WHE accident. (See definition in paragraph 4.) Require the contractor to secure the accident site and protect evidence until released by the contracting officer. Require the contractor to conduct an investigation to establish the root cause(s) of any WHE accident, near miss, or unplanned occurrence. Crane operations shall not proceed until the cause is determined and corrective actions have been implemented to the satisfaction of the contracting officer. The contractor shall certify (Enclosure 2, figure P-1) that the operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.

i. Require the contractor to provide the contracting officer a report for an accident or near miss within 30 days using the appropriate form provided in Enclosure 3 consisting of a summary of circumstances, an explanation of causes(s), photographs (if available), and corrective actions taken. These notifications and reporting requirements are in addition to those promulgated by OPNAVINST 5100.23 and related command instructions.

j. Require the contractor to certify (Enclosure 2, figure P-1) that signal persons employed in construction work are qualified in accordance with 29 CFR 1926.1428. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

k. Require the contractor to certify (Enclosure 1, figure P-1) that the riggers are qualified to perform the work by either signing a statement of compliance, providing proof of successful completion of a rigging apprenticeship by a union or other organization providing apprenticeship training, or proof of successful completion of training courses from a recognized source such as a trade union, a government agency, or an organization that tests and qualifies riggers.

l. The following additional documentation is required for contracts involving tower cranes:

(1) Foundation design and requirements.

(2) Installation instructions.

(3) Assembly and disassembly instructions including climbing/jumping instructions if applicable.

(4) Operating manual, limitations, and precautions.

(5) Periodic inspection and maintenance requirements.

For tower cranes at Navy activities in foreign countries, the tower cranes shall comply with the appropriate host nation safety standards and industry consensus safety standards (e.g., EN or ISO standards).

m. The following additional requirements apply to contracts involving work on telecommunication towers or with personnel hoists on telecommunication towers:

(1) Base mounted drum hoists used in communication tower work shall comply with TIA-1019, TIA-222G, ASME B30.7, and 29 CFR 1926.552 and 29 CFR 1926.553. For Navy activities in foreign countries follow host nation requirements as applicable in lieu of the CFR.

(2) When used for hoisting personnel, base mounted drum hoists shall comply with OSHA Instruction CPL 02- 01-056; National Association of Tower Erectors standard “Base Mounted Hoist Mechanism Design Use Standard for Lifting Personnel While Working on Telecommunication Structures”; ANSI/ASSE A10.22; and AMSE B30.23 (or equivalent host nation safety standards for Navy activities in foreign countries).

(3) The use of a pickup truck or any other equipment besides a base mounted drum hoist for hoisting materials and/or personnel is prohibited.

(4) Rough-terrain forklifts, bulldozers, and similar equipment may be utilized for towing and anchorage purposes of guys. The use of such equipment for trolley/tag and load lines is prohibited, with the exception of using construction equipment for the sole purpose of anchorage that will not be moved during operations.

(5) Rigging gear utilized in communication tower work shall comply with the applicable ASME/OSHA standards. Operator, signal person, and rigger qualifications shall be in accordance with OSHA standards and this section. For Navy activities in foreign countries, follow host nation requirements as applicable in lieu of the CFR or ASME standards.

n. For construction contracts, follow the Unified Facilities Guide Specification UFGS-01 35 26 and U.S. Army Corps of Engineers EM-385-1-1 in lieu of paragraphs 3.a through 3.g, 3.j through 3.m, and Enclosure 2, figures P-1 and figure P-2.

4 Investigation and Reporting of Crane and Rigging Gear Accidents as specified by Section 12 of reference (a):

4.1 General. In addition to the investigation and reporting requirements of OPNAVINST 5102.1, activities shall investigate and report weight handling accidents, near misses, and unplanned occurrences in accordance with this section. Such investigations are a significant element of an accident prevention program. Activities shall promptly investigate all suspected accidents commensurate with the seriousness/severity of the event. The investigation process provides an opportunity for activities to identify causal information and to develop meaningful corrective actions to prevent similar events from recurring. An additional method of identifying process deficiencies that could lead to an accident is by way of an effective monitor program (see section 2 of reference (a)). This section focuses on the reporting of weight handling accidents or near accidents and distinguishes the differences between accidents, near misses, and unplanned occurrences.

4.2 Categories. There are two general categories of accidents as defined below. Crane accidents are those that occur during operation of a category 1, 2, 3, or 4 crane. Rigging accidents are those that occur when gear and equipment identified in section 14 of reference (a) is used by itself in a weight handling operation, i.e., without category 1 through 4 cranes, or when section 14 gear is used with multi-purpose machines, MHE (e.g., forklifts), and equipment covered by NAVFAC P-300 in a weight handling operation. In addition, accidents that occur during the operation of entertainment hoists (see section 13 of reference (a)) shall be reported as rigging accidents.

4.3 Significant Accident. A significant accident is an accident that typically has a greater potential to result in serious injury or substantial property damage. The following accident types are considered significant accidents: injuries (regardless of severity), overloads, dropped loads, two-blocks, crane derailments, or contact with overhead electrical power lines. Other types of accidents that result in OPNAV Class A, B, C, or D reporting thresholds for material property damage are also considered significant accidents.

4.4 Crane Accidents. For the purpose of this definition, it is assumed there is an "operating envelope" around any crane. The operating envelope consists of any of the following elements:

a. The crane (exception: a crane being operated in transit as defined in appendix A).

b. The operator.

c. The riggers, signal persons, and crane walker.

d. Other personnel involved in the operation (supervisor, mechanic, tagline handler, engineer, etc.).

e. The rigging gear between the hook and the load.

f. The load.

g. The crane’s supporting structure (ground, rail, etc.).

h. The lift procedure.

4.4.1 Definition. A crane accident occurs when any of the elements in the crane operating envelope fails to perform correctly during a crane operation, including operation during maintenance or testing, resulting in any of the following:

a. Personnel injury or death. (Minor injuries that are inherent in any industrial operation, including strains and repetitive motion related injuries, shall be reported by the normal personnel injury reporting process of the activity in lieu of these requirements.)

b. Material or equipment damage.

c. Dropped load (includes any part of the load or rigging gear and any item lifted with the load or rigging gear).

d. Derailment.

e. Two-blocking.

f. Overload (includes load tests when the nominal test load is exceeded).

g. Collision (avoidable contact between the load, crane, and/or other objects). Avoidable contact is defined as contact that would have been prevented with proper lift planning and execution.

Simply briefing that contact will occur is not sufficient.

Note: Items c, d, e, f, and g are considered accidents even though no material damage or injury occurs.

4.4.2 Exceptions.

a. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) shall be considered an accident only if damage to the load or another crane component occurs as a result of the failure.

b. An accident involving a mobile crane (cat 1 or 4) that is configured for transit is considered an unplanned occurrence and shall be reported in accordance with paragraph 4.7.3.

4.5 Rigging Accidents. For the purpose of this definition, it is assumed there is an “operating envelope” around any rigging or other section 14 equipment operation, and inside the envelope are the following:

a. Rigging gear or miscellaneous equipment identified in section 14 of reference (a).

b. The user of the gear or equipment (including operators of multi-purpose machines, MHE, and construction equipment)

c. Other personnel involved in the operation (supervisor, mechanic, tagline handler, etc.).

d. The load.

e. The gear or equipment’s supporting structure (pad eyes, ship’s structure, building structure, etc.).

f. The load’s rigging path.

g. The rigging or lift procedure.

4.5.1 Definition. A rigging accident occurs when any of the elements in the operating envelope fails to perform correctly during a rigging operation resulting in any of the following:

a. Personnel injury or death. (Minor injuries that are inherent in any industrial operation, including strains and repetitive motion related injuries, shall be reported by the normal personnel injury reporting process of the activity in lieu of these requirements.)

b. Material or equipment damage that requires the damaged item to be repaired because it can no longer perform its intended function. This does not include superficial damage such as scratched paint, minor lagging damage, or normal wear on rigging gear.

c. Dropped load (Includes any part of the load or rigging gear and any item lifted with the load or rigging gear).

d. Two-blocking of cranes and powered hoists identified in section 14 of reference (a).

e. Overload (Includes load tests when the test load tolerance is exceeded).

Note: Items c, d, and e are considered accidents even though no material damage or injury occurs.

4.5.2 Exception. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) shall be considered an accident only if damage to the load or another component occurs as a result of the failure.

4.6 Action. Upon having an accident or having seen evidence of damage (suspected accident), the crane team, riggers, equipment users, etc., shall stop all operations and notify immediate supervisor(s). If there is impending danger to the equipment or personnel, place the crane and/or load in a safe position prior to notifying supervision. Ensure the accident scene is secured and undisturbed so as to facilitate the investigation. The supervisor shall review the situation and take any further emergency action, including stopping production work or other operations that could aggravate the situation. The supervisor shall notify management personnel as well as the activity safety office.

4.6.1 Initial Accident Notification. For accidents involving a fatality, inpatient hospitalization, overturned crane, collapsed boom, or any other major damage to the crane, load, or adjacent property, notify the Navy Crane Center by e-mail (m_nfsh_ncc_accident@navy.mil) as soon as practical but not later than eight hours following the accident. Notification for all other accidents shall be made as soon as practical but no later than three working days after the accident. Initial notification shall include the following:

a. Name and UIC of the activity responsible for the accident

b. Contact information (name/phone and email)

c. Date and location of the accident

d. A brief description of the accident

e. Accident type and crane type (Navy identification number if known)

f. description of any injuries or damage associated with the accident

4.6.2 Accident Investigation and Reporting. For each suspected accident, activities shall promptly perform an investigation. Activities shall prepare a crane and rigging accident report, Enclosure 3, figure 12-1 (available on the Navy Crane Center web site), and forward a copy to the Navy Crane Center (Code

06) within 30 days of the accident. The activity that is responsible for the weight handling operation at the time of the accident (for accidents involving a RIC, the activity that assigned the RIC) shall initiate the investigation and submit the accident report. If the crane or rigging gear is owned by another activity, obtain concurrence from the activity that owns the equipment prior to submitting to the Navy Crane Center. If another activity is responsible for the accident, obtain concurrence from the activity responsible. Concurrence shall also be obtained from the weight handling program manager, if applicable, and for crane accidents, the certifying official. Photographs of the accident scene and material/property damage shall be taken, if possible, and attached to the report. The Navy Crane Center will review accident reports and issue lessons learned and other directives as appropriate. Any request for copies of these reports should be directed to the reporting activity. Rigging accident reports shall be kept on file for seven years.

4.7 Near Misses and Unplanned Occurrences.

4.7.1 Near Misses. A near miss is an unplanned event during a weight handling operation that did not result in a definable accident noted above but easily had the potential to do so. Only a break in the chain of events prevented an accident. Simply put, a near miss is an accident that almost took place. The difference between a near miss and an accident (serious or otherwise) is often a fraction of an inch or a split second of time. A near-miss report is used to learn from situations where an accident “almost” happened so that the real event can be averted. By focusing on and learning from minor events, it is possible to reduce the probability of an actual accident from occurring. Near-miss reporting provides an opportunity to identify risks and mitigate the potential for an accident. It is a means for correcting issues that did not result in loss or injury, and it increases awareness of those personnel involved in or performing work. It is not intended that a near-miss investigation and report be as thorough as that for a crane or rigging accident; however, the investigation and report should be commensurate with the significance of the event.

4.7.2 Unplanned Occurrences. An “unplanned occurrence” describes an event that does not meet the definition of a crane or rigging accident but results in injury, or damage to a crane, crane component, or related equipment due to an event not directly related to a weight handling operation. Examples include, but are not limited to, injury or damage caused by weather, damage to a parked or stationary crane caused by another moving object (e.g. vehicle, forklift), significant maintenance errors, and flooding or fire damage.

4.7.3 Reporting of Near Misses and Unplanned Occurrences. Near misses and unplanned occurrences that do not fall under the crane and rigging accident definitions shall be reported using Enclosure 3, figure 12-2 (available on the Navy Crane Center website). These reports shall be submitted in accordance with this section within 30 days of the event.

Enclosure (1)

WATERFRONT CRANE/VEHICLE USAGE REQUEST

Please provide the following information a minimum of Five (5) WORKING days prior to the intended crane/vehicle use date.

Form will be verified by the BSVE POC or FMD POC for the required information and submitted for a structural assessment as necessary. POC will forward you the results of the assessment.

Required Assessment Completion Date: Lift Date and Duration:

Crane / Vehicle Information:

Manufacturer/Model:

Gross Vehicle Weight (GVW):

Wheel / Axel Information:

Axel

# of Wheels

Distance to next Axel

Axel Weight

Outrigger pad Spacing: 3 Side to Side Front to back Offset 4

Lifting Orientation/setup: Parallel to Wharf Edge Perpendicular to Wharf Edge

Travel Path:

Lift / Load Information:

Location/Dock Marks:

Payload Weight:

Payload Type:

Boom Length/Reach & Angle Rotation:

Outrigger Load with maximum load and reach:

O1: O2: O3: O4:

Outrigger Load with no load, short boom up, counterweight rotated over outrigger:

O1: O2: O3: O4:

User / Requesting Authority, Crane Operator and Supervisor Activity:

Point of Contact:

Code:

Email:

Phone:

Cell:

Pager:

Fax:

APPROVED AS NOTED: DISAPPROVED:

Operators / supervisors shall perform travel & lifting operations in accordance with posted signs & pier markings.

Place 6'-0" x 4'-0" x 4-1/2" rigid dunnage with steel plates and HSS 5 x 3 x 3/8" framing below all outrigger pads.

BE ADVISED THAT THIS REQUEST FOR CRANE/VEHICLE USAGE MAY NOT BE APPROVED.

REQUESTING ACTIVITY SHOULD ASSURE THAT CONTINGENCY PLANS ARE AVAILABLE.

Enclosure (2) Figure P-1

CERTIFICATE OF COMPLIANCE

This certificate shall be signed by an official of the company that provides cranes (or multi-purpose machines, MHE, or construction equipment used to lift loads suspended by rigging gear) or rigging gear for any application under this contract. Post a completed certificate on each crane or alternate machine (or in the contractor’s on-site office for rigging operations) brought onto Navy property.

CONTRACTING OFFICER’S POINT OF CONTACT

(Government Representative)

PHONE

PRIME CONTRACTOR/PHONE CONTRACT NUMBER

CRANE OR ALTERNATE MACHINE SUPPLIER/PHONE

(if different from prime contractor)

CRANE OR

ALTERNATE MACHINE

NUMBER (i.e., ID number)

CRANE OR ALTERNATE MACHINE MANUFACTURER/TYPE/CAPACITY

CRANE OR ALTERNATE MACHINE OPERATOR'S NAME(S)

I certify that

1. The above noted crane or alternate machine and all rigging gear conform to applicable OSHA regulations (host nation regulations for naval activities in foreign countries) and applicable ASME B30 or other standards. The following OSHA regulations and ASME or other standards apply:

2. The operators noted above have been trained and are qualified for the operation of the above noted crane(s) or alternate machine(s).

3. All safety devices and operator aids are enabled and functioning properly and the operators noted above have been trained not to bypass safety devices and operator aids during lifting operations.

4. The operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.

5. Signal persons used in construction work are qualified in accordance with 29 CFR 1926.1428.

6. Riggers are qualified in accordance with NAVFAC P-307, paragraph 11.1.k.

7. All personnel working on the job site have been trained to not stand under a load or in the fall zone of a suspended load unless specifically allowed by USACE EM 385-1-1.

COMPANY OFFICIAL SIGNATURE DATE

COMPANY OFFICIAL NAME/TITLE

POST ON CRANE (OR ALTERNATE MACHINE)

(IN CAB OR VEHICLE)

(or in the contractor’s on-site office for rigging operations)

Enclosure (2) Figure P-2

CONTRACTOR CRANE OR RIGGING OPERATION CHECKLIST

YES NO N/A

1 Is the Certificate of Compliance, P-1, in the operator’s cab (or in the contractor’s on-site office for rigging operations) with the current operator’s name listed?

2 Is the crane/machine transited to and from the job site correctly? Are the OEM instructions for travel being followed?

3 Does the operator know the weight of the load to be lifted?

4 Is the load to be lifted within the crane/machine manufacturer's rated capacity in its present configuration?

5 Are outriggers/stabilizers required and, if so, are they properly extended and down?

6 If outrigger/stabilizers are used, and the wheels are not off the ground is this the correct setup in accordance with the OEM?

7 Is the crane/machine level and on firm ground, or if the ground is not firm are adequate supporting materials provided?

8 If supporting materials are provided, is the entire surface of the outrigger/stabilizer pad supported and is the supporting material of sufficient strength to safely support the loaded outrigger/stabilizer pad?

9 If outriggers/stabilizers are not used, is the crane/machine rated for on-rubber lifts by the OEM’s load chart?

10 Is the swing radius of the crane counterweight clear of people and obstructions and are accessible areas within the swing area barricaded to prevent injury or damage?

11 Has the hook been centered over the load in such a manner to minimize swing?

12 Is the load well secured and balanced in the sling or lifting device after it is lifted a few inches for verification?

13 Is the lift and rotation path clear of obstructions?

14 If rotation of the load being lifted is hazardous, is a tagline or other restraint being used?

15 Are personnel prevented from standing or passing under a suspended load?

16 Is the operator paying full attention to the signal person?

17 Are proper signals being used? Is the operator responding properly to the signals? Are radios used for blind lifts?

18 Are empty hooks lashed or otherwise secured during travel to prevent swinging?

19 Does the operator remain at the controls while the load is suspended?

20 Does the operator ensure that side loading is prohibited?

21 Are personnel prevented from riding on a load?

22 Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?

23 Is the lift a critical lift?

24 If so, is a lift plan provided and understood and check-off sheets initialed and signed off?

25 If overhead power lines are in the vicinity, is a critical lift plan provided addressing the requirements of 29 CFR 1926.1407-1411?

26 If pick and carry operations are allowed and performed, are OEM directions followed (e.g. rotation lock engaged, boom centered over front or rear, etc.)?

27 When the crane/machine is left unattended, is it in a safe condition?

28 Is rigging gear undamaged and acceptable for the application?

Enclosure (2) Figure P-2

YES NO N/A

29 Does rigging gear meet applicable ASME or host nation standards (e.g., ASME

B30.9 for slings, B30.10 for hooks, B30.26 for rigging hardware such as shackles, safety hoist rings, and eyebolts, B30.20 for below the hook lifting devices)?

30 Was the rigging gear inspected prior to use?

31 Is sling protection used to protect slings (especially synthetic slings) and equipment from damage due to abrasion and sharp corners and edges?

32 Is the rigging gear used in accordance with its working load limit? Is the working load limit marked on the rigging gear?

33 Are positive latching devices (or “mousing”) used on crane and rigging hooks?

34 If a mobile crane is used on a barge, are all rules of 29 CFR 1926.1437(construction) being followed?

35 If a mobile crane is used on a barge are the outriggers/stabilizers blocked or are the crawlers traveling in a defined space as allowed by 29 CFR 1926.1437 (construction)?

36 For floating cranes, are rules of 29 CFR 1915 (ship repair) or 29 CFR

1926.1437 (construction) being followed?

37 If a multi-purpose machine, forklift, or construction equipment is being used, is there proof from the OEM (or qualified PE) that the machine is approved for suspended load lifting and is there a load chart?

38 If a personnel lift is being performed with a crane or base mounted hoist, are all requirements of NAVFAC P-307, paragraph 11.1.g (5) for a crane or 11.1.m for a base mounted hoist being followed?

Contractor: Subcontractor:

Location: Date:

Notes:

Signature of Government Representative:

FOR OFFICIAL USE ONLY (when filled in) Enclosure (3) Figure 12-1 (1 of 2)

FOR OFFICIAL USE ONLY (when filled in)

CRANE AND RIGGING ACCIDENT REPORT

Accident Category: Crane Accident Rigging Accident Reporting Activity:

UIC:

Copy To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709 Fax: 757-967-3808

Activity Responsible for the Accident:

UIC:

Report No:

Accident Location: Accident Date: Time:

BOS Contractor: Yes No If Yes, Contract No: Contractor Equip. Yes No

Crane No: Crane Type: Category: Crane OEM:

Crane Capacity: Hoist Capacity: Weight of Load on hook: Weather:

Complex Lift or Complex Non-Crane Rigging Operation? Yes No

Lost Work Days? Yes No Fatality or Permanent Disability? Yes No Material/ Property Cost Estimate:

Accident Type (check all that apply):

Personal Injury Overload Two Blocked Power Line Contact

Dropped Load Derail Crane Collision Damaged Crane

Damaged Rigging Gear Damaged Load Load Collision Other: Specify

Cause of Accident (check all that apply):

Improper Operation Equipment Failure Inadequate Visibility

Improper Rigging Switch Alignment Inadequate Communication

Track Condition Procedural Failure Other: Specify

Responsibility (check all that apply):

Crane Walker Rigger Operator Signal Person

Maintenance Management/Supervision Other: Specify

Crane Function:

Travel Hoist Rotate Luffing Telescoping Other N/A

Is this accident indicative of a recurring problem? Yes No

If yes, list Accident Report Nos.:

ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS ENCLOSURE (1). Include root cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.

INCLUDE: Printed Name, Code and Date.

Preparer: Phone: E-mail: Code: Date:

Concurrence Code: Date:

Concurrence WHE Program Manager (if Applicable) Code: Date:

Certifying Official (Crane Accident Only):

NOTE: This report may be generated utilizing activity approved software provided all information required above is included.

Enclosure (3) Figure 12-1 (2 of 2)

CRANE AND RIGGING ACCIDENT REPORT INSTRUCTIONS

This form is designed for e-mail transmission, and with enclosures shall be the official document. Electronic submission will be accepted but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil.

1. Accident Category: Indicate either crane accident or rigging accident.

2. Reporting Activity/UIC: The activity and unit identification code responsible for reporting the accident.

3. Activity Responsible for the Accident/UIC: Self-explanatory.

4. Report No.: The activity assigned accident number (e.g., Activity UIC-FY-CA-01).

5. Accident Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).

6. Accident Date: The date the accident occurred.

7. Time: The time (24 hour clock) the accident occurred (e.g., 1300).

8. Is the responsible party a BOS Contractor? Check yes or no. If yes, enter contract number.

9. Was the crane/equipment owned by a contractor? Check yes or no.

10. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

11. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.

12. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

13. Crane OEM: The original equipment manufacturer of the crane (e.g., Samsung, Grove, P&H), if applicable.

14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

15. Hoist Capacity: The capacity of the hoist involved in the accident at the max radius of the operation, if applicable.

16. Weight of Load on Hook: The weight of the load on the hook, if applicable.

17. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).

18. Complex lift: Was the crane or rigging gear being used in a complex lift? Check yes or no.

19. Lost Work Days? Check yes or no.

20. Fatality or Permanent Disability: Check yes or no.

21. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.

22. Accident Type: Check all that apply.

23. Cause of Accident: Check all that apply.

24. Responsibility: Check all that apply.

25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.

26. Is this a recurring problem? Check yes or no. If yes, list Accident Report numbers.

27. Preparer: Printed name must be provided.

28. Concurrences: Printed name must be provided.

29. Certifying Official (Crane Accidents Only): Printed name must be provided.

Enclosure (1)

Brief Description: No more than one paragraph summarizing the resultant incident.

Root Cause and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident.

Short Term Corrective Actions are those actions taken that will allow return to work in short time frame. Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.

FOR OFFICIAL USE ONLY (when filled in) Enclosure (3) Figure 12-2 (1 of 2)

FOR OFFICIAL USE ONLY (when filled in)

NEAR MISS AND UNPLANNED OCCURRENCE REPORT

Near Miss Category: Crane Near Miss Rigging Near Miss

Unplanned Occurrence

Reporting Activity:

UIC:

Copy To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709 Fax: 757-967-3808

Activity Responsible for the Near Miss:

UIC:

Report No:

Location: Near Miss Date: Time:

BOS Contractor: Yes No If Yes, Contract No: Contractor Equip.

Yes No Crane No: Crane Type: Category: Crane OEM:

Crane Capacity: Hoist Capacity: Weight of Load on hook: Weather:

Complex Lift or Complex Non-Crane Rigging Operation? Yes No

Is this near miss indicative of a recurring problem? Yes No

In the space below, include a description of the event, root cause and corrective actions taken to prevent recurrence:

Brief description:

Root cause:

Corrective Actions:

INCLUDE: Printed Name, Code and Date unless otherwise specified.

Preparer: Phone: E-mail: Code: Date:

NOTE: This report may be generated utilizing activity approved software provided all information required above is included.

Enclosure (3) Figure 12-2 (2 of 2)

CRANE AND RIGGING NEAR MISS INSTRUCTIONS

This form is designed for e-mail transmission and with enclosures and signatures shall be the official document.

Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil.

1. Near Miss Category: Indicate crane near miss, rigging near miss, or unplanned occurrence.

2. Reporting Activity/UIC: The activity and unit identification code responsible for reporting the near miss.

3. Activity Responsible for the Near Miss/UIC: Self-explanatory.

4. Report No.: The activity assigned near miss number (e.g., Activity UIC-FY-CA-01).

5. Location: The detailed location where the near miss took place (e.g., building 213, dry dock 5).

6. Near Miss Date: The date the near miss occurred.

7. Time: The time (24 hour clock) the near miss occurred (e.g., 1300).

8. Is the responsible party a BOS Contractor? Check yes or no. If yes enter contract number.

9. Is the crane/equipment owned by a contractor? Check yes or no.

10. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

11. Crane Type: The type of crane involved in the near miss (e.g., mobile, bridge), if applicable.

12. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

13. Crane OEM: The original equipment manufacturer of the crane (e.g., Samsung, Grove, P&H), if applicable.

14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

15. Hoist Capacity: The capacity of the hoist involved in the near miss at the max radius of the operation, if applicable.

16. Weight of Load on Hook: If applicable, the weight of the load on the hook.

17. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).

18. Complex lift: Was the crane or rigging gear being used in a complex lift?

19. Is this a recurring problem? Check yes or no. Identify any other similar near misses or accidents.

20. Brief Description: No more than one paragraph summarizing the resultant incident.

21. Root Cause and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

22. Corrective Actions: List all short term and long term corrective actions that were/will be taken to prevent recurrence of the incident. Short term corrective actions are those actions taken that will allow return to work in short time frame. Long term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’,

File details come from the government source that posted it. Updated .