Dry Dock Construction Hoist Dismantle and Erection Federal contract opportunity
Solicitation number
N32253-24-Q-0058
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is an amendment to a solicitation for an IDIQ contract to perform the dismantling and erection of a construction hoist at the Pearl Harbor Naval Shipyard. The key details are:

The amendment extends the solicitation offer due date from July 24, 2024 to August 7, 2024, and revises the period of performance from August 1, 2024 - July 31, 2029 to September 3, 2024 - September 2, 2029. The procurement is for a Firm Fixed-Price IDIQ contract with a five-year period of performance. The North American Industry Classification System (NAICS) code is 238990 - All Other Specialty Trade Contractors, and the Product Service Code is J035 - Maint/Repair/Rebuild Of Equipment- Service And Trade Equipment. The solicitation number is N32253-24-Q-0058, and quotes are due by July 10, 2024 at 8:00 AM HST. The procuring agency is the Department of the Navy Naval Sea Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to Dry Dock Construction Hoist Dismantle and Erection, newest first.
File Type Posted
70_N3225324Q0058_AMD3.pdf PDF
70_N32253-24-Q0058_AMD1.pdf PDF
A4_Cranes_on_Base.pdf PDF
A2_Environmental_Protection.pdf PDF
A1_Safety_and_Health.pdf PDF
A3_Contractor_Security.pdf PDF
OPSEC.pdf PDF
N32253-24-Q-0058 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N3225324Q0058

X 9B. DATED (SEE ITEM 11)

10-Jun-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jul-2024

CODE

PEARL HARBOR NAVAL SHIPYARD & IMF

667 SAFEGUARD ST., STE 100,

JBPHH HI 96860-5033

N32253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3225324Q0058

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES2

The purpose of this amendment is to incorporate the following:

1. Extend the solicitation offer due date from 24 July 2024 to 07 August 2024, 10 AM, Hawaii Standard Time

(HST).

2. Revise the period of performance (POP) as follows:

From:

0001 POP 01-AUG-2024 TO 31-JUL-2029

0002 POP 01-AUG-2024 TO 31-JUL-2029

TO:

0001 POP 03-SEP-2024 TO 02-SEP-2029

0002 POP 03-SEP-2024 TO 02-SEP-2029

3. All other terms and conditions remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-AUG-2024 TO

31-JUL-2029

N/A N/A

FOB: Destination

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 03-SEP-2024 TO

02-SEP-2029

The following Delivery Schedule item for CLIN 0002 has been changed from:

N3225324Q0058

CAGE

POP 01-AUG-2024 TO

31-JUL-2029

To:

CAGE

POP 03-SEP-2024 TO

02-SEP-2029

The following have been deleted:

PERFORMANCE WORK STATEMENT