This document is a set of Questions and Answers (Q&A) related to Solicitation No. N32253-24-Q-0043 for the Dismantle and Removal of Vertical Turret Lathes at the Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF).
The solicitation seeks a contractor to dismantle and remove three Vertical Turret Lathes (VTL), one Computed Numerical Control (CNC) lathe, and two manual lathes located in Building 67. The contractor will be required to carefully disassemble the equipment, crate smaller parts, and place larger parts on shipping skids. The equipment will be moved and stored, not scrapped. The Period of Performance is 06/03/2024 - 12/13/2024. The applicable NAICS code is 238910 Site Preparation Contractors, and the Product Service Code is P500 Salvage - Demolition of Structures / Facilities. This is a 100% small business set-aside acquisition. Offerors must submit a technical proposal demonstrating their capability to meet the solicitation requirements and complete the required FAR forms.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. N32253-24-Q-0043., Dismantle and Removal of Vertical Turret Lathes
Questions and Answers #2
Q u es
Reference
(para/page #, etc.)
Question Government Response
1 General question Will excess oil surrounding machines be drained and removed? Or does this fall on contractor?
PHNSY will drain oil and fluids from the machines.
Residuals may be encountered.
2 General question Are equipment manuals for machines available? Yes
3 General question
Will tools surround the machine need to be removed as well? Any shop material/tool in the area will be relocated.
4 General question
Did the scope of work change? From (Removal & salvage/scrap) to (Dismantle/crate & save?)
No, the scope of work has remained true to the PWS
5 General question
Do you have to move /transport the crated/skid mounted machines to another location on base? See section 3.10 of the PWS
6 General question
Will The sign in sheet be made available for those unable to attend the site visit walkthrough? No
7 General question
Is building 67 inside the CIA?
Yes
Solicitation No. N32253-24-Q-0043., Dismantle and Removal of Vertical Turret Lathes
Questions and Answers #2
8 General question
These machines are to be diligently disassembled and loose/smaller parts crated up, and larger parts put on shipping skids either wood or metal?
Larger parts can be placed on wooden skids.
9 General question
There is no agreement/back channel to salvage/scrap these machines?
No, these machines will not be scraped they will be moved and stored
10 General question
Every bidder will have to abide by and submit the same bidders package? It's entirely NOT the cheapest price?
Contractors will have to complete requirements set forth in ADDENDUM TO FAR 52.212-1 of the solicitation to be considered for award. The evaluation criteria of quotes is set forth in ADDENDUM TO FAR 52.212-2 of the solicitation.