This document contains questions and answers regarding Solicitation Number N32253-23-Q-0048 for the removal and dismantling of six overhead cranes in Building 155. The solicitation is a small business set-aside issued by the Department of the Navy Naval Sea Systems Command. Contractors must remove two wall cranes, with one crane able to be pushed down to columns 15A & 16A by the contractor. Drawings of the building layout and crane equipment are provided to support contractors' estimates of lifting requirements. A laydown area will be provided outside of Building 155. The original crane wiring from 1941 remains. The allowable floor capacity for installation equipment is 2.75ksf.

View the file

Other files

File Type Posted
N3225323Q0048 Drawing 1_Redacted.pdf PDF
N3225323Q0048 Drawing 2.pdf PDF
N3225323Q0048 Q and A Part 1.pdf PDF
N32253Q0048 Amd 2.pdf PDF
N32253Q0048 Site Visit.pdf PDF
Crane Pictures.pdf PDF
N3225323Q0048 Amd 1.pdf PDF
N3225323Q0048.pdf PDF
N32253-23-Q-0048.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. N32253-23-Q-0048, Removal and Dismantle of Bldg. 155 Wall Cranes

Questions and Answers Part II

Q ue s.

Reference (para/page #, etc.) Question Government Response

1 General question How tall/high is it from floor to bottom of the cranes? Approximately 23ft.

2 General question Can the area underneath the crane closest to the wall/front bldg. side be cleaned out temporarily?

The fencing is permanent. Shelving and pallets can be moved.

3 General question

The 5th crane nearest the (Nuke Shop), can that large temporary tent structure be moved? Or can you slide that crane down to columns 15A & 16A?

Contractor can push crane down to columns 15A &16A.

In-service crane in between the two cranes that are to be removed can be moved by Government at Contractor’s request.

4 General question Will you have sufficient laydown area, outside of bldg.

155? Yes.

5 General question Do you know to the best of your knowledge if the six overhead cranes have ever been rewired, or if they still have the original wiring from 1941?

They have original wiring.

6 General question How many other bidders attended the site visit? Not available.

7 General question This is still a small business set-aside correct? Yes.

Solicitation No. N32253-23-Q-0048, Removal and Dismantle of Bldg. 155 Wall Cranes

Questions and Answers Part II

8 General question

Are there building drawings (elevation and plan views) so we can estimate the machinery required to perform the lifts?

Please see attached (Drawing 1).

9 General question Are there drawings and equipment manuals so that we can estimate the lifting requirements?

Please see attached (Drawing 2).

10 General question Can allowable floor capacity for installation equipment reactions be provided?

The allowable ground load limit is 2.75ksf.