N3225323Q0048 Q and A Part 1.pdf
PDF 115 KB Posted
- Attached to
- Removal and Dismantling of Bldg. 155 Wall Cranes
- Solicitation number
- N32253-23-Q-0048
About this file
This document contains questions and answers regarding Solicitation Number N32253-23-Q-0048 from the Department of the Navy Naval Sea Systems Command to remove and dismantle six wall cranes located in Building 155. The solicitation seeks the removal of two wall cranes on each side of the center bay and one wall crane on each side of the south bay. A site visit is scheduled for August 7, 2023 at 7:00 am local time with RSVP required. Pictures of the existing cranes are provided but no site map can be shared due to security concerns. Various obstructions will exist beneath the cranes but the center of each bay will be clear approximately 22 feet wide. A laydown area will be provided outside of Building 155 for semi-processing the cranes. Hazardous materials like asbestos and lead paint should be assumed based on the age of the cranes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3225323Q0048 Drawing 1_Redacted.pdf | ||
| N3225323Q0048 Drawing 2.pdf | ||
| N3225323Q0048 Q and A Part 2.pdf | ||
| N32253Q0048 Amd 2.pdf | ||
| N32253Q0048 Site Visit.pdf | ||
| Crane Pictures.pdf | ||
| N3225323Q0048 Amd 1.pdf | ||
| N3225323Q0048.pdf | ||
| N32253-23-Q-0048.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Remove and Dismantle of bldg. 155 Wall Cranes Solicitation # N32253-23-Q-0048
QUESTIONS and GOVERNMENT RESPONSE
PART 1
1. QUESTION: Is it possible to obtain access to the building to do a site visit?
2. GOVERNMENT RESPONSE: Site Visit is scheduled, RSVP Monday, 08/07/2023, 7 am HST.
3. QUESTION: Can you provide photos of the existing cranes including all obstacles that the contractor may have to avoid in order to complete the work?
GOVERNMENT RESPONSE: Pictures attached.
4. QUESTION: Can you provide a map to the facility?
GOVERNMENT RESPONSE: No, a site map cannot be provided to the public due to security concerns. The site visit will provide an escorted tour of the location.
5. QUESTION: Is it possible to make this site visit mandatory?
GOVERNMENT RESPONSE: Site visit is NOT mandatory.
6. QUESTION: Will there be any chance of getting travel expenses reimbursed for the site visit?
GOVERNMENT RESPONSE: No, site visits are not mandatory for offerors.
7. QUESTION: Are these cranes in the pictures some of the one's slated for removal?
GOVERNMENT RESPONSE: Yes, pictures are of wall cranes to be removed.
8. QUESTION: Are they all located in same area in bldg. 155?
GOVERNMENT RESPONSE: 2 wall cranes are located on each side of Center Bay (4 total), 1 on each side of South Bay (2 total).
9. QUESTION: Will the floor area beneath each crane be free of obstructions/encumbrance's?
GOVERNMENT RESPONSE: There will be various interferences on each side of each Bay. Center of each bay will be clear approximately 22 ft wide.
10. QUESTION: Will you have a laydown area outside of bldg 155, for (semi) processing these cranes?
GOVERNMENT RESPONSE: Yes.
11. QUESTION: The Solicitation states there's two different types of cranes to be removed, wall cranes and jib cranes? Which one is the one in the picture?
GOVERNMENT RESPONSE: Picture is of wall crane.
1. QUESTION: Has there been any type of hazardous material survey performed?
GOVERNMENT RESPONSE: No, based on age of crane, assume asbestos and lead paint.