N32253-21-Q-0046 Solicitation AMEND 1.pdf
PDF 206 KB Posted
- Attached to
- Third Level Manager Training AMENDMENT 2 Federal contract opportunity
- Solicitation number
- N32253-21-Q-0046
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 2 Solicitation - Questions and Answers.pdf | ||
| N32253-21-Q-0046 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Solicitation N32253-21-Q-0046 Amendment No. 1 is to adjust the Period of Performance base and option period dates, update the Extended Descriptions for the base and option periods, and revise the PWS PoP dates.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3225321Q0046
X 9B. DATED (SEE ITEM 11)
12-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2021
CODE
PEARL HARBOR NAVAL SHIPYARD & IMF
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
N32253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3225321Q0046
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
The contractor shall provide (3) three senior level manager training in first year, (2) two senior level manager training in the second year, then (1) one senior level manager training each year over the next three years.
Contractor shall create curriculum not to exceed 5 days or shorter than 3 days of instruction. Schedule for classes will be determined by the Government with 30 calendar day notice. FIP: NW2253 HD UD HD 252F V000 000
AATN
To:
Contractor to provide senior level manager training that complies with the specifications outlined and in accordance with the Performance Work Statement. FIP: NW2253 HD UD HD 252F V000 000 AATN
CLIN 1001
The contractor shall provide (3) three senior level manager training in first year, (2) two senior level manager training in the second year, then (1) one senior level manager training each year over the next three years.
Contractor shall create curriculum not to exceed 5 days or shorter than 3 days of instruction. Schedule for classes will be determined by the Government with 30 calendar day notice. FIP:
Contractor to provide senior level manager training that complies with the specifications outlined and in accordance with the Performance Work Statement. FIP:
CLIN 2001
The contractor shall provide (3) three senior level manager training in first year, (2) two senior level manager training in the second year, then (1) one senior level manager training each year over the next three years.
Contractor shall create curriculum not to exceed 5 days or shorter than 3 days of instruction. Schedule for classes
Contractor to provide senior level manager training that complies with the specifications outlined and in accordance
CLIN 3001
The contractor shall provide (3) three senior level manager training in first year, (2) two senior level manager training in the second year, then (1) one senior level manager training each year over the next three years.
Contractor shall create curriculum not to exceed 5 days or shorter than 3 days of instruction. Schedule for classes
Contractor to provide senior level manager training that complies with the specifications outlined and in accordance
CLIN 4001
The contractor shall provide (3) three senior level manager training in first year, (2) two senior level manager training in the second year, then (1) one senior level manager training each year over the next three years.
Contractor shall create curriculum not to exceed 5 days or shorter than 3 days of instruction. Schedule for classes
Contractor to provide senior level manager training that complies with the specifications outlined and in accordance with the Performance Work Statement. FIP:
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 17-MAY-2021 TO
30-APR-2022
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198 FOB: Destination
N32253
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 17-MAY-2021 TO
16-MAY-2022
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
The following Delivery Schedule item for CLIN 1001 has been changed from:
CAGE
POP 17-MAY-2022 TO
30-APR-2023
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
CAGE
POP 17-MAY-2022 TO
16-MAY-2023
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
The following Delivery Schedule item for CLIN 2001 has been changed from:
CAGE
POP 17-MAY-2023 TO
30-APR-2024
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
CAGE
POP 17-MAY-2023 TO
16-MAY-2024
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
The following Delivery Schedule item for CLIN 3001 has been changed from:
CAGE
POP 17-MAY-2024 TO
30-APR-2025
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
CAGE
POP 17-MAY-2024 TO
16-MAY-2025
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
The following Delivery Schedule item for CLIN 4001 has been changed from:
CAGE
POP 17-MAY-2025 TO
30-APR-2026
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
CAGE
POP 17-MAY-2025 TO
16-MAY-2026
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
MICHELLE E SATO
667 SAFEGUARD ST., STE 100,
JBPHH HI 96860-5033
(808)473-8000X2198
The following have been modified:
PERFORMANCE WORK STATEMENT
CODE 1180 COMMAND UNIVERSITY DIVISION
SENIOR LEVEL MANAGER TRAINING
PERFORMANCE WORK STATEMENT (PWS)
1.0 BACKGROUND
Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY& IMF) is a U.S. Navy regional industrial center that maintains overhauls, and repairs vessels of the U.S. Navy. The Code 1180 Command University Division serves as principal advisor to the Director on matters relating to Command Leadership Training and Mandatory Training applicable to all Command employees.
2.0 SCOPE
The contractor shall provide (3) three senior level manager training in first year, (2) two senior level manager training in the second year, then (1) one senior level manager training each year over the next three years.
Contractor shall create curriculum not to exceed 5 days or shorter than 3 days of instruction. Schedule for classes will be determined by the Government with 30 calendar day notice.
Training to be in an instructor-led classroom environment on the island of Oahu on/near Pearl Harbor area with approximately 20-25 participants per class. Training shall be conducted during normal business hours 0630-1500 hrs Monday through Friday. Classroom facilities will be provided by Pearl Harbor Naval Shipyard.
Estimated Period of Performance:
Date Training
Base Year- May 17, 2021 – May 16, 2022
Senior Level Manager Training
1st Option Year- May 17, 2022 - May 16, 2023
Senior Level Manager Training
2nd Option Year- May 17, 2023 - May 16, 2024
Senior Level Manager Training
3rd Option Year- May 17, 2024 – May 16, 2025
Senior Level Manager Training
4th Option Year- May 17, 2025 – May 16, 2026
Senior Level Manager Training
3.0 PERFORMANCE REQUIREMENTS
3.1 The contractor shall provide a curriculum based on requirements in 3.2 and Appendix I for senior level managers to improve their leadership capabilities. Contractor will provide the Government a final curriculum and student workbook to be used 21 calendar days before the first day of each training. Government will provide feedback 7 calendar days before the first day of each training. Government feedback shall be incorporated into the training. The curriculum should include the contractor’s delivery approach that includes, but is not limited to the following:
Icebreakers Group Work Handouts to support learning Team learning activities
3.2 The contractor to build curriculum that is aligned to Senior Level Manager Course Objectives for the following topics Covered by Contractor o 360° assessment Review o Personal Mastery o Leadership Engagement o Developing and Empowering Others o Enable Diversity o Drive Completion of Goals o Organization Assessment o Continuous Process Improvement & Innovation o External Awareness o Course Application Plan o Change Management o Systems Thinking
NOTE: Objectives covered by PHNSY & IMF o View from the Bridge o Resource Stewardship o Human Resources/EEO o Financial Management
3.3 The contractor shall provide a workbook and relevant handouts for each participants’ use, during and after the training; as well as source documents and references.
3.4 Instruct PHNSY & IMF senior level managers during the specified number of sessions during the contract year. Ensure all corporate learning objectives are adequately covered, but verbatim adherence to specific course materials is not required. See Appendix I, NAVSEA Corporate Leadership Development Program (CLDP), Senior Level Manager Curriculum.
3.5 The contractor shall provide a 360° assessment for each participant.
3.6 The contractor shall provide all materials, supplies, and effective instruction, to include: a) arranging for delivery of training materials; b) making clear and effective presentations to individuals and groups; c) organize and communicate ideas and information appropriate to the listener and the situation and d) listen to others and provide appropriate feedback.
3.7 The contractor shall provide own laptop to conduct training. NOTE: No internet capability in classroom.
3.8 Travel will be in accordance with the Federal Acquisition Regulation 31.205-46 and current Department of
Defense (DoD) Joint Travel Regulations. Travel receipts will be provided upon request.
4.0 SERVICE DELIVERY SUMMARY
Performance Requirement PWS Paragraph(s) Performance Threshold
1. Conduct training of topics 3.1, 3.2 100% delivery and compliance.
2. Provide each participant with materials listed 3.3, 3.5 100% delivery and compliance.
5.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES
5.1 Government facilities to support classroom training will be provided.
5.2 Government will provide projector and audio visual equipment.
6.0 CONTRACTOR QUALIFICATIONS/REQUIREMENTS
6.1 The Contractor shall provide trained personnel fully capable of providing the deliverables requested and have the knowledge, skills and expertise to meet the requirements specified in this PWS. The Contractor/Instructor must have a thorough knowledge and understanding of the curriculum in senior level manager training. See Appendix I for Senior Level Manager Curriculum.
6.2 Contractor to provide proof of past performance, similar scope and size and evaluation or equivalent of training effectiveness.
7.0 CONTRACT ADMINISTRATION
The contractor shall establish processes and assign appropriate resources to effectively administer the requirements of the contract. The contractor shall respond to government requests for action in a timely fashion. The contractor shall have a single point of contact between themselves and the government to support the contract.
8.0 QUALITY ASSURANCE
8.1 The Contractor is responsible for implementing and maintaining a Quality Control Plan (QCP) that identifies and results in the correction of potential and actual problems. The QCP shall be implemented on the first day of contract performance and a copy of QCP shall be provided to the government representative prior to contract performance.
8.2 The QCP shall outline the Contractor’s plan to ensure the quality of deliverables as outlined in this PWS.
The QCP shall address contractor performance, and corrective actions, should the review(s) identify areas requiring remedial action.
8.3 The Contractor shall keep records of any inspections and corrective actions taken, as outlined in the QCP and shall make such records available to the COR upon request.
9.0 PLACE OF PERFORMANCE
Training to be in an instructor-led classroom environment on the island of Oahu on/near Pearl Harbor area.
Classroom facilities will be provided by Pearl Harbor Naval Shipyard.
10.0 HOURS OF OPERATION
10.1 Government operating hours are between 6:30 AM to 3:00 PM Monday through Friday, excluding Federal holidays and weekends.
Federal Holidays:
New Year’s Day 1st of January Dr. Martin Luther King’s Birthday 3rd Monday in January President’s Day 3rd Monday in February Memorial Day 5th Monday in May Independence Day 4th of July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day 11th of November Thanksgiving Day 4th Thursday in November Christmas Day 25th of December
If the federal holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the federal holiday falls on a Sunday, the holiday is observed on the following Monday.
11.0 SECURITY REQUIREMENTS
11.1 The contractor’s employees must be a U.S. citizen and registered with the Defense Biometric Identification
System (DBIDS). Sufficient time shall be allowed by the contractor to obtain the necessary badges prior to work.
11.2 The contractor will coordinate with the TPOC or COR to obtain a DBIDS pass located at:
Nimitz Visitor Control Ctr. / Pass & ID 1250 South Drive, Honolulu, HI 96818 Joint Base Pearl Harbor-Hickam, Hawaii https://www.cnic.navy.mil/regions/cnrh/installations/jb_pearl_harbor_hickam/om/pass_and_id.html
11.3 Prior to the start of work, the contractor shall provide the COR on company letterhead, a request for access.
The request for access shall include the following information: full name, social security number, date of birth, place of birth, and citizenship.
11.4 The contractor shall verify and certify the request for personnel access. Contractor shall have supporting records on file if required for examination.
11.5 Each contract employee requesting access shall complete form SECNAV 5512/1, latest revision. 5512/1 form shall be word processed. Signature and initials shall be written in black ink.
11.6 Should contractor personnel receive or suspect they have learned classified information beyond their level of clearance, the contractor shall identify and immediately report suspicions to the COR.
11.7 This contract does not require a security clearance level and clearance granted by the Defense Security
Service (DSS).
11.8 Normal shipyard business hours of operation are 0630 – 1500, with a 30 minute lunch break, Monday through Friday, except for federal holidays.
12.0 CONTRACTOR PERSONNEL
12.1 The Contractor shall furnish sufficient personnel to perform all work specified within this performance work statement. Contractor is required to comply with Public Law 105-270, Section 5(2)(A). This law states that contractors will not perform inherently governmental functions. Section 5(2)(A) of this Public Law defines the term “inherently governmental function” as “a function that is so intimately related to the public interest as to require performance by Federal Government employees.” Per Section 5(2)(B), inherently governmental functions include management of Government programs requiring value judgments, conduct of foreign relations, selection of program priorities, and the direction of intelligence and counter-intelligence operations.
Per Section 5(2)(C), inherent governmental functions DO NOT include, (i) gathering information for or providing advice, opinions, recommendations, or ideas to Federal Government officials; or (ii) any function that is primarily ministerial and internal in nature.”
12.2 Contractor personnel shall not establish an employee-employer relationship with Government personnel under this contract.
12.3 The contractor shall not provide personal services.
12.4 Contractor personnel will make clear to all individuals they engage with that they are Contractor employees and not Government employees. When participating and introducing themselves during official events wherein Government, non-Government, or foreign personnel are present, Contractor personnel will identify themselves as employees of the Contractor. Contractor personnel must be clearly identified (i.e. company shirt, pin, visible company ID, etc.) in a visible location as to who their employer is.
12.5 Contractor personnel shall not manage, supervise, or task Government employees or military personnel.
Contractor personnel may not make any commitment to non-Government personnel, including a foreign official, which commits the expenditure of U.S. Government resources.
13. ATTACHMENTS:
APPENDIX I
NAVSEA CORPORATE LEADERSHIP DEVELOPMENT PROGRAM (CLDP), SENIOR LEVEL
MANAGER CURRICULUM
(April 2019)
APPENDIX II
SAFETY AND HEALTH WORK PRACTICES FOR CONTRACTORS WORKING WITH PEARL HARBOR
NAVAL SHIPYARD AND INTERMEDIATE MAINTENANCE FACILITY (PHNSY & IMF)
(Revised May 27, 2020)
APPENDIX I
Senior Level Manager Training Program Curriculum
360° Assessment
Review of 360° Assessment
Personal Mastery
Learning Objectives
Identify your definition of success Demonstrate the ability to perform a critical self-assessment Assess alignment of personal values and organizational values Discuss strategies to balance organization priorities and personal priorities
Description
Participants define what success for them would look like. Could be in the form of a mission statement, etc.
Recommended Delivery Method Instructor led with small group evaluation of scenarios
Leadership Engagement
Understand Leadership engagement Discuss the key practices of Leadership engagement Discuss the advantages of Leadership engagement Apply the key practices of Leadership engagement
Understand how to build trust as key practices of leadership engagement Role play or provide examples of how a conversation with an employee could be executed utilizing principles
Instructor led
Developing and Empowering Others
Understand how well developed competencies can impact your area of responsibility Discuss senior level manager competencies at a high level
Description Review what the 70/20/10 model is and how senior level managers can utilize it in developing employees Discuss the advantages to competency development for a department Discuss employee development and succession planning
Enable Diversity
Understand all aspects diversity within an organization Discuss how perception can impact the implementation of diversity in an organization Develop a plan to implement diversity in your area of responsibility Analyze utilization of emotional intelligence in diversity
Drive Completion of Goals
Understand senior level manager’s role in conveying a clear picture for goal execution Examine successes and failures of past goals Discuss gaining buy-in on organizational goals Explore utilizing a disciplined process to enable goal completion Create an environment of accountability Recognize the importance of celebrating wins
Discuss ways to encourage accountability
Instructor led with small group evaluation of scenarios
Organization Assessment
Understand the effectiveness of your organization Review organizational assessment Identify organizational strengths and weaknesses
Continuous Process Improvement & Innovation
Understand Continuous Process Improvement and Innovation Describe the value in creating an environment that fosters CPI & I within the organization Identify CPI&I initiatives to implement in the organization
External Awareness
Understand the external environment and external stakeholders who impact decisions Take into account multiple, diverse views and needs of other organization or external organizations Reflect industry best practices in the development of agency-wide policies and procedures Synthesize complex information gathered from a variety of external sources, and disseminate to staff
Course Application Plan
Review continue/Start/Stop actions identified throughout the training Develop a Plan of Action to execute
Change Management
Recognize effective approaches to lead organizational change Articulate the intended result of the change process Demonstrate commitment and support for change
Systems Thinking
Apply practical systems thinking approaches to solve complex problems Recognize how organizational culture can impact different positions, organization work units, and teams Identify relationships and patterns using management and organizational diagnostic tools Understand systems thinking as it relates to leading organizational change efforts
Objectives covered by PHNSY & IMF
View from the Bridge – Delivered by PHNSY & IMF Commander or Acting Commander with Q&A
Learning Objectives
Understand local Command strategic initiatives Understand current and future business issues impacting the Command Understand how business issues impact personal and Command successes Understand connection between individual accountability, team goals, and organizational vision and strategies Share examples of past successes and lessons learned
Briefing by Commander or Acting Commander with Q&A
Resource Stewardship – Delivered by PHNSY C1200
Describe the process by which shift work is assigned to the Shipyards Explain the role of each of you play in the development and maintenance of our Workload and Resource
Report (WARR) Explain how manning profiles are created and dispersed Apply mentoring, succession planning and individual development plans as tools for workforce planning Describe NAVSEA requirements and self-assessment in the area of workforce planning Use AIM budget development (Task to ICP/FRE) Understand Workload Forecasting Analyze Mission Funding Understand PPBE Process
Recommended Delivery Methods
Human Resources/EEO – Delivered by HRO/EEO Office
Understand Nepotism Understand the role of LER Advisor and EEO Counselor Understand Reprisal and Retaliation Discuss Reasonable Accommodation Discuss Labor Relation Discuss FECA Review Whistleblower Review Personal Liability
Financial Management – Delivered by PHNSY Code 600
Describe Mission Funding and Cost Reimbursable Identify the Different Types of Funding Describe how the Shipyard Manages its Financial Parameters Describe how Financial Management Parameters are established Describe how Finances are Managed on an Availability Describe how Overhead is Managed
(End of Summary of Changes)