This Statement of Work (SOW) outlines requirements for testing and repairing two Aqua-Chem SPD35-53TPD single-stage waste heat double plate seawater distillers aboard the USNS ROBERT E. PEARY. The work is to be performed at Norfolk Naval Station between February 7-28, 2025.

The contractor must provide an authorized Aqua-Chem service representative to conduct underway operational testing of both distilling units, which have been non-operational for over six months. The representative will spend approximately 5 days onboard during testing. If performance falls below manufacturer specifications, the units must be opened, inspected, and repaired using ship's spare parts. Any repairs that cannot be completed must be documented in an electronic condition found report (CFR) with recommendations submitted to the port engineer. The work requires proper tag-out procedures and disposal of liquids in accordance with regulations. The point of contact is Andrew Maksimowicz, Principal Port Engineer.

View the file

Other files

File Type Posted
SSJ-25Q4056_Redacted.pdf PDF
N3220525Q4056.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT

This item describes the requirement to test and repair the Aqua-Chem evaporators while underway.

REFERENCES

NAVSEA Drawing No. 531-7488738, SRD-Distilling Plant Sys Diagram NAVSEA Tech Manual T9531-AU-MMC-010, Distilling Plant And Bromination Disinfection System, Model SPD35-53TPD

ITEM LOCATION/DESCRIPTION

Location/Quantity Location: Main Machinery Room (5-66-0), 4th Deck, Port, Frame 67 Quantity: Two (2) Unit No.1 Unit No.2 Description of Equipment/Systems Manufacturer: Aqua-Chem Model: SPD35-53TPD Type: Single Stage Waste Heat Double Plate Seawater Distiller GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

NOTES

The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.

The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to Work Items 020, 021, and 023, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

1.1 Point of contact:

Andrew Maksimowicz Principle port engineer Robert E Peary Email: Andrew.j.Maksimowicz.civ@us.navy.mil Phone: 757-443-2832

1.2 Location:

1.2.1 Norfolk naval Station, Norfolk Virginia, Pier: TBD

1.2.2 Period of Performance:

February 07, 2025 – February 28, 2025 QUALITY ASSURANCE REQUIREMENTS: None additional

STATEMENT OF WORK REQUIRED

Tag-Out all required systems and equipment. Drain and dispose of any liquid in accordance with all federal, state, and local regulations.

Provide the services of the Original Equipment Manufacturer (OEM) representative identified in paragraph 7.5.1.

OEM to ride the vessel while underway. Estimate 5 days in total onboard Operational Test both unit while underway with full heat load.

Both units have not been operated in over six months. Contractor may need to assist ships force in cleaning and maintain the unit prior to operations.

1.3 If performance during testing is less than manufacture recommendations. Open, inspect and, make all repair Distiller with ships spares available to unit No.1 and No.2. any repairs unable to be made are to be documented and submitted to the port engineer via electronic condition found report (CFR) with recommendations and parts to repair Manufacturer’s Representative:

Provide the Services of an authorized Aqua-Chem service representative during all removals, repairs, installations, and testing.

Possible Source Aqua-Chem Inc Service Department P.O. Box 14824 Knoxville TN 37914 1-800-964-7035 865-544-2065

OR

Carl McMillan Technical Service Manager T: +1 865 286 8404 M: +1 865 850 2985 cmcmillan@aqua-chem.com

Preparation of Drawings: None GENERAL REQUIREMENTS: None additional.