N3220524R4052 0001.docx
DOCX document 32 KB Posted
- Attached to
- USNS ZEUS (T ARC 7) Mid Term and Dry-Docking
- Solicitation number
- N3220524R4052
About this file
This document is a modification to a solicitation for the USNS ZEUS (T-ARC 7) Mid Term and Dry-Docking. The modification provides additional references, drawings, and manuals that were previously missing, including items related to the diesel starting air system, potable water system, Scott Air Pak, fire alarm control panel, and power block wiring. It also deletes a previous requirement for relief valves. The solicitation is a total small business set-aside with a response due date of July 2, 2024 at 1:00 PM Eastern Standard Time. The work items, references, and Contract Data Requirements List will be provided to contractors who have signed the required Technical Non-Disclosure Agreement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFC 02.pdf | ||
| RFC 02 REV 1.pdf | ||
| RFC 01.pdf | ||
| J-3-Cat-B REV 1 (2023.11.03).xlsx | XLSX spreadsheet | |
| J-9 Disclsr Lobbying Act.doc | DOC document | |
| GFP_Template_Version_2.0_4-24.xlsx | XLSX spreadsheet | |
| N3220524R4052.docx | DOCX document | |
| J-14-TechnicalNDA(2023.07.07).docx | DOCX document | |
| J-12 Past Perf Data.docx | DOCX document | |
| J-8-RFC(2022.12.28).docx | DOCX document | |
| J-7 MSC Ship Repair Facility Survey.docx | DOCX document | |
| J-3-Cat-B(2023.11.03).xlsx | XLSX spreadsheet | |
| J-13-PastPerfQuestionaire(2022.11.22).docx | DOCX document | |
| J - 11 Dry Dock Evaluation Form.docx | DOCX document | |
| CDRLs_ShipRepairAvails_2024_01_11.pdf | ||
| J-2-Cat-A(2022.11.22).xlsx | XLSX spreadsheet | |
| J-1 Work Item Index.docx | DOCX document | |
| J-10 Interport Differential.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220524R4052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CONTINUATION PAGE
The following missing references were provided via DoD Safe.
Item 0553
| · 2.1.5 | MSC Drawing No. 551-5985441, Diagram, Diesel Starting Air System |
| · 2.1.6 | NAVSEA Drawing No. 553-5503381, Diagram, Potable Water System |
| · 2.2.2 | Enclosure 2.2.2 Relief Valves is deleted from the work item. |
Item 0561
· 2.3 USNS ZEUS (T-ARC 7) Master Ship and Instrumentation List Item 0562
· 2.1.1 Tech Manual, 595160-01-E, Scott Air Pak Item 0569
· 2.1.4 Tech Manual No. 15037_D2 LCD080 Installation
· Tech Manual 52545_E NFS2-3030 Fire Alarm Control Panel Programming Manual
· Tech Manual 52545_E NFS2-3030 Fire Alarm Control Panel Operations Manual
· Drawing 5503243 Fire/Smoke Alarm System
· Drawing 5503244 Fire/Smoke Alarm System ELEM WRG DIAG
· Tech Manual NFS2-3030_G, Fire Alarm Control Panel Installation Manual Item 0703
| · 2.2 | T-ALT: T-ARC – 13 – 02144MC Power Block Wiring Diagram, F- 94421-301-8614883 Rev A |
| · 2.3 | 44MC System New Arrangement Plan F – 94421 – 430-8614881 |
Item 0704
| · 2.2 | T-ALT: T-ARC – 13 – 02144MC Power Block Wiring Diagram, F- 94421-301-8614883 Rev A |
| · 2.3 | 44MC System New Arrangement Plan F – 94421 – 430-8614881 |
Item 0709
| · 2.1 | Kongsberg Cable Details 1411859_C |
| · 2.2 | Kongsberg Cable List 1411860_B and 1411860_C |
| · 2.3 | Kongsberg Layout Drawing 1411857 Rev B |
| · 2.4 | Kongsberg Layout Drawing 1411858 Rev C |
Item 0901
· 2.2.1 Docking Report, Forms NAVSEA 9997/1, 2, 3, 4, and 5.
Other Drawings include:
11121 Scantling Plan Boat Deck & above 56326_E Sperry Marine Operation, Installation and Service Manual NAVIGAT 3000 2883859_A Painting Schedule 5503817_N Hatch & Scuttle List D313901_C Electrical General Arrangement
SUMMARY OF CHANGES
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .