J-3 CAT B Rev1 Items.XLSX
XLSX spreadsheet 15 KB Posted
- Attached to
- USNS NEWPORT Regular Overhaul/Dry-Docking Federal contract opportunity
- Solicitation number
- N3220523R2506
About this file
This spreadsheet outlines costs for various Category B items required for the regular overhaul and dry-docking of the USNS NEWPORT. The Navy's Military Sealift Command is soliciting proposals under solicitation number N3220523R2506.
The spreadsheet contains line items for physical security measures at private contractor facilities under different force protection conditions, general services required for ship support during the overhaul such as telephone services and fire protection, labor and material costs for specific repair and maintenance tasks like installing rescue backboards and access doors, and costs for equipment like a CHT transfer pump. For each item, the spreadsheet includes the estimated labor hours and prices for both prime and subcontractor work as well as estimated material costs. Pricing is required to support the overhaul and dry-docking of the USNS NEWPORT as outlined in the attached solicitation and documents from the Military Sealift Command.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT B
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME / SUBCONTRACTOR | OEM MANDATED SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA | |||||||||||||||
| 7.12 | Cost to Establish Physical Security at Private Facility in FPCON C | 1 | DAY | |||||||||||||
| 7.12.2 | Cost to Maintain Physical Security at private contractors facility FPCON C | 1 | DAY | |||||||||||||
| 7.13 | Cost to Establish Physical Security at private contractors facility FPCON D | 1 | DAY | |||||||||||||
| 7.13.2 | Cost to Maintan Physical Security at private contractors facility FPCON D | 1 | DAY | |||||||||||||
| WI 025 SUBTOTAL | ||||||||||||||||
| 030 | CONTINUATION OF SERVICES | |||||||||||||||
| 7.1 | Overhaul Management Team | 15 | DAY | |||||||||||||
| 7.2 | General Services For The Ship | 15 | DAY | |||||||||||||
| 7.3 | Telephone Services | 15 | DAY | |||||||||||||
| 7.4 | Project Planning and Monitoring | 15 | DAY | |||||||||||||
| 7.5 | Fire Protection and Ship's Safety | 15 | DAY | |||||||||||||
| 7.7 | Shipboard Access and Security | 15 | DAY | |||||||||||||
| 7.8 | Gas Free Certificates | 15 | DAY | |||||||||||||
| WI 030 SUBTOTAL | ||||||||||||||||
| 0113 | Backboard rescue from below deck spaces (TALT 17-162) | |||||||||||||||
| 7.1 | Labor | hours | ||||||||||||||
| 7.2 | Material | total | ||||||||||||||
| 7.3 | Subcontractor | total | ||||||||||||||
| WI 113 SUBTOTAL |
0115 Access doors for rescue padeyes (TALT 16-097)
| 7.1 | Labor | hours |
| 7.1 | Material | total |
| WI 115 SUBTOTAL |
| 0520 | CHT Transfer Pump (TALT 16-093) | |
| 7.1 | Labor | hours |
| 7.1 | ODC | total |
| WI 520 SUBTOTAL |
CAT B TOTALS
File details come from the government source that posted it. Updated .