Attachment F - Basic Pricing Data (revised).xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Time Charter for U. S. Air Force Container Ship Federal contract opportunity
Solicitation number
N3220523R0009
Issued by
Department of the Navy Military Sealift Command

About this file

This file contains pricing templates for a time charter solicitation for the U.S. Air Force. The templates require offerors to provide pricing details for crew costs, vessel costs, insurance costs, fuel costs and total evaluated prices for a base period of 365 days plus four option periods ranging from 335 to 366 days. Pricing must be provided in U.S. dollars and is to assume standard fuel prices from the Defense Logistics Agency - Energy. The related federal contract opportunity is solicitation number N3220523R0009 for a time charter to transport cargo for the U.S. Air Force, issued by the Department of the Navy Military Sealift Command. Offerors must submit pricing using the templates to be considered for this contract.

View the file

Other files for this federal contract opportunity

Other files attached to Time Charter for U. S. Air Force Container Ship, newest first.
File Type Posted
A0004.pdf PDF
Attachment Q - Ship Characteristics Card.docx DOCX document
Attachment J - Technical Offer Worksheet (revised).XLSX XLSX spreadsheet
Attachment K - CBRN Requirements (revised).pdf PDF
Attachment B - CBA 2023-478.pdf PDF
23R0009 A0003.pdf PDF
Attachment B - CBA 2023-465.pdf PDF
23R0009 A0002.pdf PDF
23R0009 RFP.pdf PDF
Attachment E - PWS.docx DOCX document
Attachment F - Basic Pricing Data.xlsx XLSX spreadsheet
Attachment J - Technical Offer Worksheet.XLSX XLSX spreadsheet
Attachment L - Contract Data Requirement List (CDRL).docx DOCX document
Attachment M - Government Furnished Property (GFP).xlsx XLSX spreadsheet
Attachment U - Monthly Budget Status Report Template (Example).xlsx XLSX spreadsheet
Attachment K - CBRN Requirements.pdf PDF
Attachment O - Speficiations for CBR-D Decontamination Station.docx DOCX document
Attachment R - Clarification and Question Form.docx DOCX document
23R0009 A0001.pdf PDF
Attachment I - Missions Essential Contractor Service Plan (MECSP) Worksheet.docx DOCX document
Attachment N - Anti-Terrorism Force Protection (ATFP) Requirements.pdf PDF
Attachment T - Decontamination Station Drawing.pdf PDF
Attachment S - Mission Cargo Data.pdf PDF
Attachment H - Disclosure of Lobbying Activities (SFLLL).pdf PDF
Attachment G - Crew Complement.docx DOCX document
Attachment P - DD 254 Form.pdf PDF
23R4017 Attachment IX (E) - GFP.xlsx XLSX spreadsheet
23R4017 Attachment IX (J) - Technical Offer Worksheet.XLSX XLSX spreadsheet
23R4017 Attachment IX (G) - Crew Complement.docx DOCX document
23R4017 Attachment IX (N) - Shipboard Security System.pdf PDF
23R4017 Attachment IX (O) - CONSOL Station Requirement.pdf PDF
23R4017 Attachment IX (S) - MSC Standard Operating Manual (SOM).pdf PDF
23R4017 Attachment IX (H) - DD Form 254 2025.pdf PDF
23R4017 Attachment IX (I) - Performance Work Statement.pdf PDF
23R4017 Attachment IX (K) - ATFP CBRD Requirements.pdf PDF
23R4017 Attachment IX (T) - Clarification and Question Form.docx DOCX document
RFP N3220523R4017.pdf PDF
23R4017 Attachment IX (B) - CBA 2022-0235 REV 1.pdf PDF
23R4017 Attachment IX (F) - Basic Pricing Data.xlsx XLSX spreadsheet
23R4017 Attachment IX (L) - CBRN Requirements.pdf PDF
23R4017 Attachment IX (M) - CBRN-D Decon Station.pdf PDF
23R4017 Attachment IX (Q) - MECSP Worksheet.docx DOCX document
23R4017 Attachment IX (R) - CDRL.pdf PDF
23R4017 Attachment IX (P) - Disclosure of Lobbying Activities (SFLLL).pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE

PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSESTIMATED FUEL COSTTOTAL PER DIEM/PERIOD
BASE PERIOD365
OPTION 1365
OPTION 2365
OPTION 3366
OPTION 4335
FAR 52.217-8183
1979

TOTAL EVALUATED FUEL $ - 0

PORT CHARGES DIFFERENTIAL N/A

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

TOTAL EVALUATED PRICE $ - 0

Note:
1. OFFERORS SHALL USE THE OPTION PERIOD 5 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD.

Fuel Consumption Data

Attachment BVessel:
Basic Pricing DataRFP: N32205-23-R-0009

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below and enter in the corresponding price per metric ton for that fuel type in Column G. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
68Fuel Underway (laden)337
Other Fuel Type (if necessary)
71In-Port Idle1642
Other Fuel Type (if necessary)
1979TOTAL:$ - 0
Notes:
1Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
MGO/MDO:per metric ton$ 1,141.36
IFO-180:per metric ton$ 729.08
IFO-380:per metric ton$ 722.60
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO/MDO:7.507 barrels per metric ton
IFO-180:6.526 barrels per metric ton
IFO-380:6.468 barrels per metric ton

2 Fuel Consumption shall be assuming moderate weather

3 Fuel Consumption shall be based upon Box 68 and 71 consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.

Base Period

Attachment BVessel:
Basic Pricing DataRFP: N32205-23-R-0009
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365 day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by ( c ) $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment BVessel:
Basic Pricing DataRFP: N32205-23-R-0009
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365 day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by ( c ) $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment BVessel:
Basic Pricing DataRFP: N32205-23-R-0009
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365 day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by ( c ) $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment BVessel:
Basic Pricing DataRFP: N32205-23-R-0009
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366 day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by ( c ) $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment BVessel:
Basic Pricing DataRFP: N32205-23-R-0009
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 335 day option
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by ( c ) $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

File details come from the government source that posted it. Updated .