22R5433 Attachment IX (F) - Basic Pricing Data Rev 2.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Medium Range Tanker Time Charter Federal contract opportunity
Solicitation number
N32205-22-R-5433
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains pricing templates for a medium range tanker time charter federal contract opportunity. The templates require offerors to provide daily pricing rates for crew, vessel maintenance, insurance, and fuel costs for the base period of 366 days and four option periods ranging from 365 to 336 days. Pricing should be provided in U.S. dollars and is to remain fixed for the potential five-year contract duration. The templates also include fields for total evaluated prices by period. The related federal contract opportunity is solicitation number N32205-22-R-5433 issued by the Department of the Navy Military Sealift Command for a medium range tanker time charter.

View the file

Other files for this federal contract opportunity

Other files attached to Medium Range Tanker Time Charter, newest first.
File Type Posted
22R5433 A0003.pdf PDF
DOD MANUAL AND COMSEC SUPPLEMENT.pdf PDF
SECNAVINST 5510.36B.pdf PDF
22R5433 Attachment IX (I) - PWS Rev.pdf PDF
22R5433 Attachment IX (F) - Basic Pricing Data Rev.xlsx XLSX spreadsheet
22R5433 Attachment IX (J) - Technical Offer Worksheet Rev.XLSX XLSX spreadsheet
COMSCNOTE 2280.3.PDF PDF
COMSCINST 3541.5 PART 1 APPENDIX C.pdf PDF
Drawings Decon Station.pdf PDF
22R5433 A0002.pdf PDF
SECNAVINST 5510.30C.pdf PDF
22R5433 A0001 Released.pdf PDF
22R5433 Attachment IX (J) - Technical Offer Worksheet.XLSX XLSX spreadsheet
22R5433 Attachment IX (F) - Basic Pricing Data.xlsx XLSX spreadsheet
N3220522R5433 RFP.pdf PDF
22R5433 Attachment IX (R) - CDRL.pdf PDF
22R5433 Attachment IX (S) - MSC Standard Operating Manual (SOM).pdf PDF
22R5433 Attachment IX (E) - GFP.xlsx XLSX spreadsheet
22R5433 Attachment IX (P) - Disclosure of Lobbying Activities (SFLLL).pdf PDF
22R5433 Attachment IX (B) - US Department of Labor Wage Determination.pdf PDF
22R5433 Attachment IX (L) - CBRN Requirements.pdf PDF
22R5433 Attachment IX (N) - Shipboard Security System.pdf PDF
22R5433 Attachment IX (T) - Clarification and Question Form.docx DOCX document
22R5433 Attachment IX (I) - PWS.pdf PDF
22R5433 Attachment IX (G) - Crew Complement.docx DOCX document
22R5433 Attachment IX (Q) - MECSP Worksheet.docx DOCX document
22R5433 Attachment IX (K) - ATFP CBRD Requirements.pdf PDF
22R5433 Attachment IX (O) - CONSOL Station Requirement.pdf PDF
22R5433 Attachment IX (M) - CBRN-D Decon Station.pdf PDF
22R5433 Attachment IX (H) - DD Form 254.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE* MANUALLY ENTER RATES/COSTS IN COLUMNS BELOW UP TO TWO DECIMAL POINTS TO AVOID ROUNDING ERRORS*
PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSTOTAL PER DIEM/PERIOD
BASE PERIOD366$ - 0
OPTION 1365$ - 0
OPTION 2365$ - 0
OPTION 3365$ - 0
OPTION 4336$ - 0
FAR 52.217-8183$ - 0
1980
TOTAL EVALUATED FUEL$ - 0

PORT CHARGES DIFFERENTIAL

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR

TOTAL EVALUATED PRICE

Note: OFFERORS SHALL USE THE OPTION PERIOD 4 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD.

Base Period

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220522R5433
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220522R5433
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220522R5433
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220522R5433
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment IX(F)Vessel:
Basic Pricing DataRFP: N3220522R5433
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 336-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment G
2Crew Training, not separately itemized in Attachment G
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 336 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Fuel Consumption Data

Attachment IX(F)Vessel:
Fuel Consumption DataRFP: INDOPACOM MR TANKER 1 LONG-TERM TIME CHARTER

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
89Fuel Underway (laden)1546
Other Fuel Type (if necessary)
90Fuel Underway (ballast)157
Other Fuel Type (if necessary)
92aIn-Port Loading157
Other Fuel Type (if necessary)
92bIn-Port Discharging120
Other Fuel Type (if necessary)
1980TOTAL:$ - 0
Notes:
1Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
DLA Std Price Jul 15, 2022
MGO/MDO: (Very Low Sulphur 0.5%) Fuel Oilper metric ton$ 1,002.65
IFO-180:per metric ton$ 638.63
IFO-380:per metric ton$ 632.94
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO/MDO:7.507 barrels per metric ton
IFO-180:6.526 barrels per metric ton
IFO-380:6.468 barrels per metric ton

2 Fuel Consumption shall be assuming moderate weather

3 Fuel Consumption shall be based upon Box 89, 90, 92a and 92b consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.

File details come from the government source that posted it. Updated .