J-3 Category B Items 01.16.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- USNS KANAWHA ROH/DD N3220520R4017
- Solicitation number
- N3220520R4017
About this file
This document contains a federal contract opportunity for the upcoming Regular Overhaul/Dry-Docking of the USNS Kanawha. The Military Sealift Command requires services including JP-5 tank preservation, expansion joint replacement, tie down renewal, house preservation, tank deck preservation, degaussing system removal, steel renewal and replacement, valve maintenance, structural steel replacement, main engine overhaul, generator cleaning and inspection, diesel generator overhaul, pressure vessel testing, incinerator maintenance, piping replacement, hose replacement, fire and smoke damper service, propeller and shaft repairs, docking and undocking, hull cleaning and painting, winch booth deck renewal, and auxiliary steering drive refurbishment for a period of approximately 75 calendar days commencing on or around March 25, 2020. The solicitation is expected to be issued on or around November 5, 2019 with a closing date of December 11, 2019. The opportunity will be full and open competition with the estimated value over $2 million.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA | |||||||||||||||
| 7.11 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | |||||||||||||
| 7.12 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | |||||||||||||
| 7.11 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | |||||||||||||
| 7.12 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | |||||||||||||
| WI 025 SUBTOTAL | ||||||||||||||||
| 030 | CONTINUATION OF SERVICES | |||||||||||||||
| 7.1 | Overhaul Management Team | 30 | DAY | |||||||||||||
| 7.2 | General Services For The Ship | 30 | DAY | |||||||||||||
| 7.3 | Information Technology Services | 30 | DAY | |||||||||||||
| 7.4 | Project Planning and Monitoring | 30 | DAY | |||||||||||||
| 7.5 | Fire Protection and Ship's Safety | 30 | DAY | |||||||||||||
| 7.6 | Shipboard Access and Security | 30 | DAY | |||||||||||||
| 7.7 | Gas Free Certificates | 30 | DAY | |||||||||||||
| WI 030 SUBTOTAL | ||||||||||||||||
| 108 | KINGPOST REPAIRS | |||||||||||||||
| 7.1.1 | FAS Station | 5 | EA | |||||||||||||
| 7.2.2 | RAS Station | 2 | EA | |||||||||||||
| WI 108 SUBTOTAL | ||||||||||||||||
| 909 | DRYDOCKING LAYDAYS | |||||||||||||||
| 7.1 | Submit unit price per day up to a maximum of TEN (10) days to continue all services in accordance with parent item if directed | 10 | DAY | |||||||||||||
| WI 909 SUBTOTAL | ||||||||||||||||
| 965 | STEEL REPAIRS | |||||||||||||||
| 7.3.1 | Flat Shell Plating | 10,000 | LBS | |||||||||||||
| 7.3.2 | Shaped Shell Plating | 5,000 | LBS | |||||||||||||
| 7.3.3 | Tank Builkhead | 5,000 | LBS | |||||||||||||
| 7.3.4 | Tank Internal Structure | 5,000 | LBS | |||||||||||||
| 7.3.5 | Misc. Bulkheads & Decks | 10,000 | LBS | |||||||||||||
| 7.3.6 | Clad Welding | 50 | PITS | |||||||||||||
| 7.4.1 | Dry Dock Block Removal | 150 | EA BLK | |||||||||||||
| WI 965 SUBTOTAL | ||||||||||||||||
| 114 | STEEL REPLACEMENT | |||||||||||||||
| 7.1.1 | Steel Plate Replacement | 10,000 | LBS | |||||||||||||
| 7.1.2 | Rolled Steel Structual Shapes | 5,000 | LBS | |||||||||||||
| 7.2.1 | Fillet Welds 6" or Less | 50 | EA | |||||||||||||
| 7.2.2 | Fillet Welds 7" -12 " | 50 | EA | |||||||||||||
| 7.3.1 | Striker Plate | 20 | EA | |||||||||||||
| WI 114 SUBTOTAL | ||||||||||||||||
| 508 | MISC PIPING REPLACEMENT | |||||||||||||||
| 7.1.1 | Eight Inch Schdeule 80 Steel Pipe | 60 | FT | |||||||||||||
| 7.1.2 | Eight Inch Flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||||
| 7.1.3 | Eight Inch 90 Degree Elbows | 4 | EA | |||||||||||||
| 7.1.4 | Six Inch Schedule 80 Steel Pop | 80 | FT | |||||||||||||
| 7.1.5 | Six Inch Flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||||
| 7.1.6 | Six Inch 90 Degree Elbows | 4 | EA | |||||||||||||
| 7.1.7 | Five Inch Schedule 80 Steel Pop | 80 | FT | |||||||||||||
| 7.1.8 | Five Inch Flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||||
| 7.1.9 | Five Inch 90 Degree Elbows | 4 | EA | |||||||||||||
| 7.1.10 | Three Inch Schedule 80 Steel Pop | 80 | FT | |||||||||||||
| 7.1.11 | Three Inch Flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||||
| 7.1.12 | Three Inch 90 Degree Elbows | 4 | EA | |||||||||||||
| 7.1.13 | Two and a half Inch Schedule 80 Steel Pop | 80 | FT | |||||||||||||
| 7.1.14 | Two and a half Inch Flanges four bolt 150# flat face, socket welded | 8 | EA | |||||||||||||
| 7.1.15 | Two and a Half Inch 90 Degree Elbows | 4 | EA | |||||||||||||
| WI 508 SUBTOTAL | ||||||||||||||||
| Total CAT "B" |
| &14USNS LARAMIE (T-AO 203) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N32205-18-R-4007 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .