This document outlines the requirements for the upcoming Regular Overhaul/Dry-Docking (ROH/DD) of the USNS KANAWHA (T-AO 196). The Military Sealift Command requires maintenance and repair services for the USNS KANAWHA for seventy-five calendar days commencing on or about 25 March 2020 at an East/Gulf Coast facility. Major work items include preservation and repair of fuel tanks, expansion joints, cargo tie downs, hull structures, generators, pumps, relief valves, piping, hoses, fire suppression systems, propellers, rudders, anchors, and unrep equipment. Bids are due by 11 December 2019 in response to solicitation N3220520R4017 to be issued on or about 5 November 2019. Questions may be directed to Lindsay Bonnema.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHE PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 100 | HULL STRUCTURES | |||||||||||
| 101 | JP5 TANK 10C PRESERVATION | |||||||||||
| 102 | EXPANSION JOIN REPLACEMENT | |||||||||||
| 103 | 01 LEVEL CARGO TIEDOWNS RENEWAL | |||||||||||
| 104 | BULWARK REPAIRS | |||||||||||
| 105 | HOUSE PRESERVATIONS | |||||||||||
| 106 | PUMP ROOM BILGE POWER TOOL CLEAN AND RECOAT | |||||||||||
| 107 | NDT KINGPOSTS | |||||||||||
| 109 | REPAIR 01 DECK BRACING | |||||||||||
| 110 | TANK DECK OVERHEAD PRESERVATION | |||||||||||
| 111 | SPOT REPAIR TANK DECK AND 01 LEVEL NONSKID | |||||||||||
| 112 | REMOVALS DEGAUSSING SYSTEM T-AO CLASS M COIL | |||||||||||
| 113 | ABS MANDATED STEEL RENEWAL | |||||||||||
| 115 | PV VALVES | |||||||||||
| 117 | FLIGHT DECK NON-SKID RENEWAL | |||||||||||
| 163 | FLIGHT DECK SAFETY NET INSPECTION AND TEST (3 YEAR) | |||||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | MAIN ENGINE 12K OVERHAUL RIGGING & SHIPPING SUPPORT | |||||||||||
| 252 | MAIN REDUCTION GEAR INSPECTION (5 YEAR) | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | MOTOR REPAIRS | |||||||||||
| 302 | THERMO SURVEY OF SWITCHBOARDS & MOTOR CONTROL CENTERS | |||||||||||
| 303 | PTO GROOM | |||||||||||
| 304 | CLEANING SWITCHBOARDS | |||||||||||
| 305 | ANNUAL CARGO CONSOLE GROOM | |||||||||||
| 354 | GENERATOR CLEANING & INSPECTION | |||||||||||
| 400 | COMMUNICATION & NAV AIDS | |||||||||||
| 401 | ANNUAL GMDSS RECERTIFICATION | |||||||||||
| 402 | OE-82 UHF SATCOM ANTENNA OVERHAUL | |||||||||||
| 451 | ANNUAL RADAR SERVICE | |||||||||||
| 452 | ANNUAL ECDIS SERVICE | |||||||||||
| 453 | ANNUAL GYRO SERVICE | |||||||||||
| 454 | ANNUAL VDR RECERTIFICATION | |||||||||||
| 455 | ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | |||||||||||
| 456 | MAGNETIC COMPASS SERVICE (2 YEAR) | |||||||||||
| 457 | EPIRB SERVICE (5 YEAR) | |||||||||||
| 458 | WHIP ANTENNA MAINTENANCE | |||||||||||
| 459 | ECHO SOUNDER SERVICE | |||||||||||
| 460 | ANNUAL INSPECTION OF ALARMS | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | PUMP OVERHAUL | |||||||||||
| 502 | SHIP'S SERVICE AIR COMPRESSOR OVERHAUL | |||||||||||
| 503 | SSDG 60K HOUR OVERHAUL | |||||||||||
| 504 | OVERHAUL MSW DISCH HYDRO LUBE OIL & FUEL OIL RELIEF VALVES | |||||||||||
| 505 | CLAYTON E-204 BOILER MAINTENANCE | |||||||||||
| 506 | INCINERATOR MAINTENANCE & REPAIR | |||||||||||
| 507 | RELIEF VALVE AND PRESSURE VESSEL TESTING | |||||||||||
| 509 | ABS MANDATED PIPE RENEWAL | |||||||||||
| 552 | HOSE REPLACEMENT (5 YEAR) | |||||||||||
| 554 | INSPECT, TEST & CERTIFY MACHINERY SPACE CRANES & HOISTS (1 YEAR) | |||||||||||
| 560 | PERSONNEL ELEVATOR INSPECTION & TEST (5 YEAR) | |||||||||||
| 600 | OUTFIT, FURNISHING & HABITABILITY | |||||||||||
| 601 | LIFEBOATS DAVIT PAINTING & PRESERVATION | |||||||||||
| 602 | STBD RESCUE BOAT DAVIT REPAIRS | |||||||||||
| 603 | PORT RESCUE BOAT SINGLE POINT DAVIT ANNUAL | |||||||||||
| 604 | SCBA COMPRESSOR SERVICE | |||||||||||
| 605 | SCBA EQUIPMENT ANNUAL SERVICING | |||||||||||
| 606 | RESCUE BOAT RECERTIFY | |||||||||||
| 607 | INTEROR JOINER DOORS REPLACEMENT | |||||||||||
| 652 | LIFEBOAT & DAVIT SERVICE (5 YEAR) | |||||||||||
| 655 | IMMERSION SUIT SERVICE (3 YEAR) | |||||||||||
| 656 | ANNUAL LIFERAFT CERTIFICATION | |||||||||||
| 657 | FIXED GAS FIREFIGHTING SYSTEM INSPECTION & TEST (1 YEAR) | |||||||||||
| 659 | FIXED FOAM FIREFIGHTING SYSTEM INSPECTION & TEST | |||||||||||
| 661 | FIRE & SMOKE DETECTION & ALARM SYSTEM | |||||||||||
| 662 | PORTABLE FIRE EXTINGUISHER SERVICE | |||||||||||
| 663 | FIRE & SMOKE DAMPER SERVICE | |||||||||||
| 664 | DEEP FAT FRYER, GRILL & RANGE HOOD FIRE EXTINGUISHER SYSTEM | |||||||||||
| 665 | FIRE HOSES | |||||||||||
| 666 | ACCOMODATION LADDER INSPECTION (1 YEAR) | |||||||||||
| 672 | DEEP FAT FRYER INSPECTION | |||||||||||
| 800 | HVAC | |||||||||||
| 851 | ANNUAL GALLEY VENTILATION & GAYLORD HOOD CLEANING | |||||||||||
| 852 | ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| 900 | DRYDOCKING | |||||||||||
| 901 | STERN TAIL SHAFT AND PROPELLER REPAIRS | |||||||||||
| 902 | PROPELLER SYSTEM MAINTENANCE AND OD BOX GROOM | |||||||||||
| 903 | PROPELLER SHAFT WEARDOWN | |||||||||||
| 904 | STERN TUBE SEAL MAINTENANCE | |||||||||||
| 905 | SPUR LINE AND NET CUTTER INSPECTION | |||||||||||
| 907 | ROPE GUARD ZINC ANODE REPLACEMENT | |||||||||||
| 908 | DOCKING AND UNDOCKING | |||||||||||
| 911 | OVERHAUL SEAWATER BALLAST VALVES | |||||||||||
| 953 | ANCHORS, CHAINS & LOCKERS (5 YEAR) | |||||||||||
| 954 | RUDDER AND STERN TUBE FRAME EXAM AND REPAIR | |||||||||||
| 956 | OVERHAUL SEA VALVES | |||||||||||
| 957 | PROPELLER CLEAN AND POLISH- ON DOCK (2.5 YEAR) | |||||||||||
| 960 | UNDERWATER HULL CLEANING & PAINTING SPOT BLAST | |||||||||||
| 961 | FREEBOARD PRESERVATION | |||||||||||
| 962 | CATHODIC PROTECTION SYSTEM | |||||||||||
| 963 | SEA CHEST MARINE GROWTH PRESERVATION SYSTEM | |||||||||||
| 966 | SHAFT ALIGNMENT & BEARING REACTION CHECKS | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | SLIDING BLOCK TRANSFER HEAD REFURBISHMENT AND HOIST CHAIN REPLACEMENT | |||||||||||
| 1002 | WINCH BOOTH DECK RENEWAL | |||||||||||
| 1003 | ASD REFURBISHMENT | |||||||||||
| 1004 | HYDRAULIC TRANSMISSION HEAT EXCHANGER FRAME | |||||||||||
| 1005 | SADDLE WINCH MOTOR REPAIRS | |||||||||||
| 1006 | SADDLE WINCH DRUM SHAFT AND SEAL REPLACEMENT | |||||||||||
| 1007 | DOUBLE PROBE RECEIVING STATIONS BASE PLATE ASSEMBLIES | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS KANAWHA (T-AO 196) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220520R4017 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .