J_-_8_Request_for_Spec_Clarification_-_11.doc

DOC document 48 KB Posted

Attached to
SOLICITATION - USNS SPEARHEAD ROH/DD N3220519R6714
Solicitation number
N3220519R6714
Issued by

View the file

Other files

File Type Posted
USNS_SPEARHEAD_ROH_N3220519R6714_Amendment_0007.docx DOCX document
USNS_SPEARHEAD_ROH_Amendment_0006.docx DOCX document
RFP_Q_and_A_1_-_10_Solicitation_N3220519R6714.zip ZIP file
RFP_Q_and_A_11_-_15_Solicitation_N3220519R6714.zip ZIP file
RFP_Q_and_A_22_-_28_Solicitation_N3220519R6714.zip ZIP file
RFP_Q_and_A_16_-_21_Solicitation_N3220519R6714.zip ZIP file
RFP_Q_&_A_29_-_34_Solicitation_N3220519R6714.zip ZIP file
J-8_RFC_-_Questions_and_Answers_1_-_10.zip ZIP file
RFP_Q_&_A_Solicitation_N3220519R6714_(_29_-__34).zip ZIP file
RFP_Q_and_A_11_-_15_Solicitation_N3220519R6714.zip ZIP file
RFP_Q_and_A_22_-_28_Solicitation_N3220519R6714.zip ZIP file
RFP_Q_and_A_16_-_21_Solicitation_N3220519R6714.zip ZIP file
RFP_Q_and_A's__35_-__38_Solicitation_N3220519P6714.zip ZIP file
USNS_SPEARHEAD_ROH_CONFORMED_SOLICITATION.docx DOCX document
USNS_SPEARHEAD_ROH_Amendment_0005.docx DOCX document
J_Attachments_(J-1_through_J-14_except_J-6).zip ZIP file
RFP_Q_&_A_Solicitation_N3220519R6714_(_29_-__34).zip ZIP file
J_-_6_EPF_CDRLs.zip ZIP file
Amendment_0003_SPEARHEAD.docx DOCX document
Amendment_0004_SPEARHEAD_ROH.docx DOCX document
Amendment_0002_-_USNS_SPEARHEAD_ROH_N3220519R6714.docx DOCX document
Amendment_0001_-_USNS_SPEARHEAD_ROH_N3220519R6714.docx DOCX document
J_-_8_Request_for_Spec_Clarification_-_15.doc DOC document
J_-_8_Request_for_Spec_Clarification_-_12.doc DOC document
J_-_8_Request_for_Spec_Clarification_-_14.doc DOC document
J_-_8_Request_for_Spec_Clarification_-_13.doc DOC document
J-8_RFC_-_Questions_&_Answers_1_-_10.zip ZIP file
0108__TOW_MODIFICATION_TLT-026_Specification.doc DOC document
0022_A_DOCK_TRIALS_AND_SEA_TRIALS.docx DOCX document
0107__ULTRSONIC_THICKNESS_GUGING_Specifiction_(Rev_1).doc.doc DOC document
0011__GENERL_SERVICES_FOR_SHIP_PR_19_Specifiction.doc.doc DOC document
0018_A_DELIVERY_AND_REDELIVERY_REV_MAY_16.docx DOCX document
J&A_-_USNS_SPEARHEAD_ROH-DD_19R6714_Redacted.pdf PDF
Solicitation_-_USNS_SPEARHEAD_N3220519R6714.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SPEARHEAD (T-EPF 1)

N3220519R6714

REQUEST FOR SPECIFICATION CLARIFICATION

#11

NAME OF CONTRACTOR: __DETYENS SHIPYARDS, INC.____________

SPECIFICATION ITEM NO.: __WI 102_________________________

PARAGRAPH / SECTION NO:___7.0_________________________

TITLE: __ALUMINUM REQUIREMENTS________________________

QUESTION:

· For areas in 7.4 needing weld repair in paragraphs 7.6 – 7.7, how should materials be considered?

· Is the contractor to assume material has never been heat cycled before?

· In what specific areas areas is paragraph 7.9.2 referring to that will be limited to the three cycle maximum requirement?

ANSWER:

All area in way of the exhausts for the generators or main propulsion engines or exterior of the ship in way of solar heat input shall be considered moderately sensitized. All other internal structure or area not directly in way of solar input shall be considered non sensitized.

For any weld onboard one heat cycle will be assumed prior to work. If there is a concern from the contractor as to if additional weld cycles have been applied to an area, a CFR should be submitted to the MSCREP for clarification.

Paragraph 7.9.2 refers to all aluminum repairs onboard the EPF vessel.

ATTACHMENT J - 8