j_-_7_msc_ship_repair_facility_survey_-_burlington_19-r-6712.docx

DOCX document 221 KB Posted

Attached to
USNS BURLINGTON PSA/DD N3220519R6712 SOLICITATION
Solicitation number
N3220519R6712
Issued by

About this file

This document contains a facility survey template for shipyards to submit information to the Military Sealift Command regarding their repair capabilities and facilities. The template requests detailed technical information about shipyard infrastructure like drydocks, building ways, cranes, shops, and equipment. It also requests information on management experience, normal and maximum employment levels, and certifications. Shipyards are asked to include supplemental documents with the survey like a yard plot plan, depth of water plot, machine listings for shops, examples of prior repair work, and points of contact. The purpose of the template is to collect shipyard capability data to support future repair opportunities with the Navy's Military Sealift Command.

J-7

View the file

Other files

File Type Posted
Final Amendment 0005.docx DOCX document
Final Amendment 0004.docx DOCX document
Q AND A Responses 4.docx DOCX document
J - 2 CATEGORY A ITEMS BURLGINTON 19R6712 PSA IGE.xlsx XLSX spreadsheet
Q AND A Responses 3.docx DOCX document
Final Amendment 0003.docx DOCX document
J - 10 Interport Differential - BURLINGTON 19-R-6712.doc DOC document
Q AND A Responses 1.docx DOCX document
Final Amendment 0002.docx DOCX document
Q AND A Responses 2.docx DOCX document
Final Amendment 0001.docx DOCX document
j_-_14_technical_data_non-disclosure_-_burlington_19-r-6712.docx DOCX document
j_-_1_burlington_work_item_index.doc DOC document
J_-_13_Past_Performance_Questionnaire_-_BURLINGTON_19-R-6712.docx DOCX document
BURLINGTON_JA_PS_08-2019_9.19.docx DOCX document
J_-_12_Past_Performance_Data_-_BURLINGTON_19-R-6712.doc DOC document
J_-_9_Disclosure_of_Lobbying_Activities_-_BURLINGTON_19-R-6712.doc DOC document
ATTACHMENT_4_(NDA).docx DOCX document
j_-_4_gfp_module_attachment.xlsx XLSX spreadsheet
J_-_10_Interport_Differential_-_BURLINGTON_19-R-6712.doc DOC document
J_-_6_EPF_CDRLs.zip ZIP file
J_-_2__CATEGORY_A_ITEMS_BURLGINTON_19R6712_PSA.xlsx XLSX spreadsheet
j_-_3_category_b_items_-_burlington_19r6712.xls XLS spreadsheet
J_-_8_Request_for_Spec_Clarification_-_BURLINGTON_19-R-6712.doc DOC document
Final_(N3220519R6712).docx DOCX document
Final_(N3220519R6712).docx DOCX document
j_-_7_msc_ship_repair_facility_survey_-_burlington_19-r-6712.docx DOCX document
j_-_1_burlington_work_item_index.doc DOC document
J_-_2__CATEGORY_A_ITEMS_BURLGINTON_19R6712_PSA_IGE.xlsx XLSX spreadsheet
J_-_10_Interport_Differential_-_BURLINGTON_19-R-6712.doc DOC document
j_-_14_technical_data_non-disclosure_-_burlington_19-r-6712.docx DOCX document
J_-_13_Past_Performance_Questionnaire_-_BURLINGTON_19-R-6712.docx DOCX document
J_-_8_Request_for_Spec_Clarification_-_BURLINGTON_19-R-6712.doc DOC document
j_-_3_category_b_items_-_burlington_19r6712.xls XLS spreadsheet
J_-_12_Past_Performance_Data_-_BURLINGTON_19-R-6712.doc DOC document
J_-_6_EPF_CDRLs.zip ZIP file
J_-_11_Dry_Dock_Evaluation_Form_-_BURLINGTON_19-R-6712.docx DOCX document
J_-_9_Disclosure_of_Lobbying_Activities_-_BURLINGTON_19-R-6712.doc DOC document
j_-_4_gfp_module_attachment.xlsx XLSX spreadsheet
BURLINGTON_JA_PS_08-2019_9.19.docx DOCX document
ATTACHMENT_4_(NDA).docx DOCX document
J__A-BURLINGTON_PSA_19R6712_Redacted.pdf PDF
J_ATTACHMENTS.zip ZIP file
Solicitation_USNS_BURLINGTON_(N3220519R6712).docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220519R6712

USNS BURLINGTON (T-EPF 10)

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

SHIPYARD AND ADDRESS

Commander (Code M-4E3) Military Sealift Command Washington, DC 20390

SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

DEPTH OF WATER

CRANES SERVING WAY

CERTIFICATION DATE &

CERTIFIED BY WHOM

LIFT CAPACITY

(std. tons)

TYPE

NO.

AT DROP

OFF

OVER

WAY END

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

TIDAL RANGE (DIFF. OF M.L. M.H)

IS SNUBBING NECESSARY?

YES NO

IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

SHEET 1 OF 5

DOCK

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON

(FD)

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD) BLOCKS

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

DRY DOCKS (continued)

MATERIAL TYPE

Floating--(FD) Graving--(GD) Marine Railway (MR)

DOCK

SERVICES AVAILABLE

(use abbreviation of service below)

USE

REPAIR/

OUTFIT-

ING

HEIGHT

OF

DOCK

(M.L.W.)

OUT-

BOARD

IN-

BOARD

TYPE

LENGTH

(actual & usable)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

WATER DEPTH

(M. L. W.)

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.)DRY DOCKS (means high water)
MSC SHIP REPAIR FACILITY SURVEY (continued)SHIPYARD:

LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT

RAILROAD CONNECTION (identify)

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

PRINCIPAL SHOPS AND BUILDINGS

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

LARGEST EXIT

WIDTH HEIGHT

DIMENSIONS OF

SHOP OR BUILDING

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

SHIPYARD:
MSC SHIP REPAIR FACILITY SURVEY (continued)

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUDE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NORMAL

SHIFTS

NORMAL

MAXIMUM

POTENTIAL MAXIMUM

CURRENT

CURRENT

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO

SHEET 5 OF 5

ATTACHMENT J - 7 MSC Form 4330/26

File details come from the government source that posted it. Updated .