J-2_Category_A_Items_revised.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- N3220519R4015 USNS LEROY GRUMMAN MID-TERM AVAILABLITY Federal contract opportunity
- Solicitation number
- N3220519R4015
About this file
Revised J-2
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| USNS LEROY GRUMMAN (T-AO 195) FY20 MTA | ||||||||||||
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS, AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 100 | HULL AND STRUCTURAL ITEMS | |||||||||||
| 101 | NDT KINGPOSTS | |||||||||||
| 102 | TANK DECK PEDESTRIANS NON-SKID | |||||||||||
| 104 | 01 LEVEL NON SKID FR 30-60 | |||||||||||
| 105 | TANK DECK OVERHEAD PRESERVATION FR50 TO FR60 | |||||||||||
| 107 | EVAPORATOR DECK | |||||||||||
| 108 | CFW ROOM STEEL DECK RENEWAL | |||||||||||
| 109 | PUMP ROOM DECK REPLACE | |||||||||||
| 110 | PORT SIDE SHELL FR 98 to 76 25 FT LEVEL STEEL REPLACEMENT | |||||||||||
| 113 | CARGO TIE DOWN REPLACE | |||||||||||
| 114 | FIRE MAIN AND AFFF PIPING REPLACEMENT | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | P_S MAIN ENGINE REPAIRS | |||||||||||
| 202 | PTO COUPLING SEAL REPLACEMENT | |||||||||||
| 252 | MAIN REDUCTION GEAR INSPECTION | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | AC MOTOR OVERHAULS | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 451 | ANNUAL RADAR SERVICE | |||||||||||
| 452 | ANNUAL ECDIS SERVICE | |||||||||||
| 453 | ANNUAL GYRO SERVICE | |||||||||||
| 454 | ANNUAL SVDR CERTIFICATION | |||||||||||
| 455 | ANNUAL RADIO COMM EQUIPMENT | |||||||||||
| 456 | MAGNETIC COMPASS SERVICE | |||||||||||
| 459 | ECHO SOUNDER SERVICE | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 502 | MISC PUMP REPAIRS | |||||||||||
| 505 | AUXILIARY BOILER MAINT, COIL REPL | |||||||||||
| 506 | AUXILIARY BOILER MAINT, | |||||||||||
| 507 | PRESSURE VESSEL AND RELIEF VALVE TESTING | |||||||||||
| 509 | ANNUAL INCINERATOR MAINTENANCE | |||||||||||
| 515 | AC AND REFRIGERATION PM | |||||||||||
| 516 | AFFF SKID REPLACEMENT T-ALT 0937 | |||||||||||
| 524 | ER OWS AMD CARGO OCM CERTIFICATION | |||||||||||
| 538 | GAYLORD BOOSTER HEATER REPLACEMENT (T-ALT 0634)-19 | |||||||||||
| 558 | PERSONAL ELEVATOR ANNUAL INSPECTION | |||||||||||
| 561 | GUAGE CALIBRATION | |||||||||||
| 562 | SCBA ANNUAL INSPECTION | |||||||||||
| 563 | SCBA SIR COMPRESSION INSPECTION | |||||||||||
| 565 | ANNUAL HALON INSPECTION TEST | |||||||||||
| 567 | ANNUAL AFFF INSPECTION TEST | |||||||||||
| 569 | ANNUAL FIRE & SMOKE DETECTION & ALARM | |||||||||||
| 570 | PORTABLE EXTINGUISHER SERVICE | |||||||||||
| 572 | DEEP FAT FRYER, GRILL & RANGE HOOD FIRE EXTINGUISHING SYSTEM | |||||||||||
| 573 | FIRE HOSES | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 613 | FLOOR COVERING RENEWAL | |||||||||||
| 616 | ANNUAL FIRE AND SMOKE DAMPER INSPECTION | |||||||||||
| 630 | INSTALLING SPLIT - AC - T-ALT 0916 | |||||||||||
| 651 | ANNUAL LIFEBOAT DAVIT INSPECTION | |||||||||||
| 653 | ANNUAL RESCUE BOAT DAVIT INSPECTION | |||||||||||
| 655 | IMMERSION SUIT SERVICE | |||||||||||
| 656 | ANNUAL LIFERAFT CERTIFICATION | |||||||||||
| 657 | ACCOMMODATION LADDER INSPECT AND TEST | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 830 | MISC INSULATION LAGGING RENEWAL | |||||||||||
| 851 | ANNUAL GALLEY VENT AND GAYLORD HOOD CLEANING | |||||||||||
| 852 | ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | DOCKING/UNDOCKING | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | UNREP STATION 8 DECK AND STEEL REP | |||||||||||
| 1002 | UNREP STATION BLOW DECK FOUNDATION REPLACEMENT | |||||||||||
| 1003 | INSTALLATION OF NEW POWER CABLE FROM UNREP STATION 3 | |||||||||||
| 1004 | GYPSY WINCH FOUNDATION REPAIR | |||||||||||
| 1005 | TRANSMISSION REPLENISHMENT PUMP MOTOR BEARING REFURB | |||||||||||
| 1006 | HAULING FAN CLUTCH FAN REPAIRS | |||||||||||
| 1007 | HL LEAD ANGLE COMPENSATOR SHAFT REPAIR | |||||||||||
| 1009 | SLIDING BLOCK BUMPER REPLACEMENT | |||||||||||
| 1010 | UNREP STATION BLOW DECK FOUNDATION REPLACEMENT | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS LEROY GRUMMAN (T-AO 195) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220519R4011 |
ATTACHMENT J-2
File details come from the government source that posted it.