19R3505_ATTACHMENT_P_TECH_OFFER_WORKSHEET.XLSX

XLSX spreadsheet 13 KB Posted

Attached to
Time Charter for Carriage of USA Cargo - Prepositioning
Solicitation number
N32205-19-R-3505
Issued by

About this file

Attach "P"

View the file

Other files

File Type Posted
N32205-19-R-3505-0003.docx DOCX document
19R3505_Attach_O_MECSP_Worksheet_.docx DOCX document
MSC_Form_9010-8_(rev_11-81).docx DOCX document
19R3505_ATTACHMENT_E_PWS_Rev2.docx DOCX document
19R3505_ATTACHMENT_B_Basic_Pricing_Data_(rev_1).xlsx XLSX spreadsheet
N32205-19-R-3505-0002.docx DOCX document
19R3505_ATTACHMENT_E_PWS_Rev1.docx DOCX document
N32205-19-R-3505-0001.docx DOCX document
19R3505_ATTACHMENT_E_PWS.docx DOCX document
19R3505_ATTACHMENT_G_DOL_WD.pdf PDF
19R3505_ATTACHMENT_D_DD254.pdf PDF
19R3505_ATTACHMENT_A_GFP.xlsx XLSX spreadsheet
19R3505_ATTACHMENT_H_ATFP.docx DOCX document
19R3505_ATTACHMENT_L_SOM.pdf PDF
19R3505_ATTACHMENT_C_Crew_Complement.docx DOCX document
19R3505_ATTACHMENT_M_CDRL.docx DOCX document
19R3505_ATTACHMENT_I_SPECS_FOR_CBRD.docx DOCX document
N32205-19-R-3505.docx DOCX document
19R3505_ATTACHMENT_N_MISSION_CARGO_DATA.xlsx XLSX spreadsheet
19R3505_ATTACHMENT_K_SFLLL.pdf PDF
19R3505_ATTACHMENT_J_SSS.doc DOC document
19R3505_ATTACHMENT_F_Request_for_Clarification_Question.docx DOCX document
19R3505_ATTACHMENT_I_DRAWINGS_DECON_STATION.pdf PDF
19R3505_ATTACHMENT_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 N32205-19-R-3505 Attachment P: TECHNICAL OFFER WORKSHEET Author: Author:

Let's make sure that the requirement listed in the column is what is actually stated in the PWS for that section. Please insure that all sections in the PWS are addressed in the Tech Eal worksheet that the Program deems important to evaluate.

LOCATIONREQUIREMENTOFFEROR'S PROPOSAL (Box/Page #)
E-3.5.1Self-Sustaining
E-3.5.1Vessel Age
E-3.5.1Speed
E-3.5.1Range
E-3.5.1Endurance
E-3.5.1Breadth
E-3.5.1Draft
E-3.5.1Berthing
E-3.5.1Interoperability with MS Office Program (Office 2007 or newer)
E-3.5.1Stowage
E-3.5.1Capacity
E-3.5.1Cargo Hold Fixed Spray Water Cooling System
E-3.5.1Stores Gear
E-3.5.1Fender System
E-3.5.1Transport Capability
E-3.5.2Cargo Gear
E-3.5.3.2Controlled Cargo Environment
E-3.5.3.3Environmental Control and Monitoring Sensors
E-3.5.3.8Installation Acceptance and General Layout drawings
E-3.5.5.1Dry Docking
E-3.5.5.2Tin-Free Delivery
E-3.5.6.2Air Draft
E-3.5.6.3Boat Fueling Station
E-3.5.6.4Bunkering
E-3.5.6.5Accommodation Ladders

Author: Author:

E-3.5.6.6Water-Making Capability
E-3.5.6.7Laundry Equipment
E-3.5.7.1MSD
E-3.5.7.2Incinerator
E-3.5.7.3Oily Water Separator
E-3.5.8Spare Parts Storage Space
E-3.5.8.1Onboard Stores
E-3.5.8.2Paint Locker
E-3.5.9Miscellaneous Equipment
E-3.5.10Vessel Name
E-8.3Capacity, Stowage and Characteristics Card
E-8.3.1Stability Calculations
E-8.3.2Hull Perimeter Lighting
E-8.3.3Crew-Served Weapon Mount Bases
E-8.3.4Previous Voyage Itinerary
E-10.8.1Cargo Hatch Safety Sockets
E-11.2Communications Equipment
E-11.2.3Radiotelephone and Radiotelegraph Services
E-11.2.5Communication Administrative Services
E-11.2.6DOD GENSER Messaging
E-11.3.1Navigation Equipment
E-11.3.2ECDIS
E-15.1.4Certificates
E-18.1.2CBR-D Equipment and Training
SF 1449
Block 28General Requirements Acceptance Statement

File details come from the government source that posted it.