19R3505_ATTACHMENT_B_Basic_Pricing_Data_(rev_1).xlsx

XLSX spreadsheet 40 KB Posted

Attached to
Time Charter for Carriage of USA Cargo - Prepositioning
Solicitation number
N32205-19-R-3505
Issued by

About this file

Attachment B - Revised Pricing Spreadsheet

View the file

Other files

File Type Posted
N32205-19-R-3505-0003.docx DOCX document
19R3505_Attach_O_MECSP_Worksheet_.docx DOCX document
MSC_Form_9010-8_(rev_11-81).docx DOCX document
19R3505_ATTACHMENT_E_PWS_Rev2.docx DOCX document
N32205-19-R-3505-0002.docx DOCX document
19R3505_ATTACHMENT_E_PWS_Rev1.docx DOCX document
N32205-19-R-3505-0001.docx DOCX document
19R3505_ATTACHMENT_E_PWS.docx DOCX document
19R3505_ATTACHMENT_G_DOL_WD.pdf PDF
19R3505_ATTACHMENT_D_DD254.pdf PDF
19R3505_ATTACHMENT_A_GFP.xlsx XLSX spreadsheet
19R3505_ATTACHMENT_H_ATFP.docx DOCX document
19R3505_ATTACHMENT_L_SOM.pdf PDF
19R3505_ATTACHMENT_C_Crew_Complement.docx DOCX document
19R3505_ATTACHMENT_M_CDRL.docx DOCX document
19R3505_ATTACHMENT_I_SPECS_FOR_CBRD.docx DOCX document
19R3505_ATTACHMENT_P_TECH_OFFER_WORKSHEET.XLSX XLSX spreadsheet
N32205-19-R-3505.docx DOCX document
19R3505_ATTACHMENT_N_MISSION_CARGO_DATA.xlsx XLSX spreadsheet
19R3505_ATTACHMENT_K_SFLLL.pdf PDF
19R3505_ATTACHMENT_J_SSS.doc DOC document
19R3505_ATTACHMENT_F_Request_for_Clarification_Question.docx DOCX document
19R3505_ATTACHMENT_I_DRAWINGS_DECON_STATION.pdf PDF
19R3505_ATTACHMENT_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE

PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSESTIMATED FUEL COSTCHARTER HIRE TOTAL
BASE PERIOD221
OPTION 1365
OPTION 2365
OPTION 3365
OPTION 4366
OPTION 546
FAR 52.217-8182

TOTAL EVALUATED FUEL

PORT CHARGES DIFFERENTIAL N/A

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

TOTAL EVALUATED PRICE $ - 0

Note:
(1) OFFERORS SHALL USE THE OPTION PERIOD 5 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD.
(2) THE ONLY ALLOWABLE FUEL UNDER THE CONTRACT IS ULS MGO and DFM.

Fuel Consumption Data

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Enter in the corresponding price per metric ton for that fuel type in Column G.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
68Fuel Underway (laden)433$ - 0
Other Fuel Type (if necessary)
69Fuel Underway (ballast)0$ - 0
Other Fuel Type (if necessary)
70Fuel Underway (auxiliaries)433
Other Fuel Type (if necessary)
71In-Port Idle1551
Other Fuel Type (if necessary)
TOTAL:$ - 0
Notes:
1Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
DLA Std Price 180402
ULS MGO:per metric ton$ 971.12
DFM:per metric ton$945.88

Fuel conversion factors are as follows:

ULS MGO:7.507 barrels per metric ton
DFM:7.507 barrels per metric ton

2 Fuel Consumption shall be assuming 16 knots in moderate weather

3 Fuel Consumption shall be based upon Box 68, 70, and 71 consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.

Basic Pricing Data

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 221-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 221 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 5

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 46-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 46 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

52.217-8

Attachment BVessel:
Basic Pricing DataRFP: N32205-19-R-3505
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 182-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 182 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

File details come from the government source that posted it.