USNS MILLINOCKET SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED_SYNOPSIS_SOLICITATION.docx | DOCX document | |
| CLASS_JA_FMSNA_N104-T-EPF_(FY19)_Redacted.pdf | ||
| TAX_LIABILITY.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS MILLINOCKET
(T-EPF 3)
MACHINERY, AUXILIARY
| 24 May 2019 | ||
| ITEM NO. SO-3-009-19 | CATEGORY “A” | MSC/RDR |
FMSNA CASAREP Idler Gear Repair and Data Logger installation
1.0 ABSTRACT
1.1 This item describes technical services of FMSNA;
1.1.1 Repair / replace N4 4 SSDG Idler gear failure.
1.1.2 Provide, install and commission (1) one data logger on (1) one SSDG.
2.0 REFERENCES:
2.1 None
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Locations:
3.1.1 Generator Room
3.2 Quantity:
3.2.1 Repair Nr4 Idler Gear issue and install Data Logger as designated by the MTU PM and Chief Engineer
4.0 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: None
5.0 NOTES:
5.1 Performance Period:
5.1.1 08-14 July 2019
5.2 Location: UniThai SY Laem Chabang Thailand
5.3 Port Engineer:
5.3.1 Darren Randall
Cell: 757-237-2848 Email: richard.randall@navy.mil
5.4 Contact the Port Engineer for details and requirements concerning access to an MSC vessel.
5.5 Contractor is required to submit personnel on the EPIC spreadsheet. To gain access to MSC vessel's on the East Coast, contractors must submit an EPIC request to MSFSC(underscore)EPIC(underscore)EAST(at)navy(dot)mil MSFSC_EPIC_EAST@navy.mil.
5.6 Contractor’s, shall allow 3 business days (5 for NASSCO, OCONUS, & Earl NJ) for processing of all requests. EPIC will take up to 48 hrs to process, the request must be approved by EPIC before access can be sent to the facility for approval, access will not be guaranteed without approval from EPIC.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Provide the service of an authorized FMSNA OEM Rep during the performance period stated in 5.1.
7.1.1 Remove and install “new” idler gear shaft and cover. Renew all gaskets, seals and hardware to ensure zero leaks during post operational repair testing.
7.1.2 Install new cylinder head P/N: 00D00701C on the number 2 SSDG in the B1 bank providing all materials as CFM. Install new gasket. Install new Head bolts with the newest configuration changes. Perform Optest and Run in procedures for head replacement IAW with OEM procedures with the Chief Engineer present.
7.1.3 Furnish one (1) each M5X data logger, thermocouples, and all other necessary components to accomplish install of the SSDG monitoring equipment.
7.1.4 In presence of CHENG or his representative, demonstrate the operation of the data logger.
7.1.4.1 Ensure the CHENG or his representative is familiar with the operation of the data logger and can operate the device without Tech Rep assistance.
7.1.4.2 Provide instructions and, if necessary, demonstrate export of data to readable and editable file.
7.1.5 Test all installations and repairs to ensure no leaks exist at the completion of all work. If any leaks are present from the areas worked, then FMSNA will re-work to ensure zero leaks.
7.2 Manufacturer’s Representative:
Sarah Davy Program Manager Fincantieri Marine Systems North America Principal Court Chesapeake, VA 23320 Phone: (757) 548-6000 ext. 303 Cell: (757) 288-7277 Fax: (757) 548-6012 Teresa Digges Contracts/Project Administrator Fincantieri Marine Systems North America, Inc.
Ingleside, TX 78362 Phone: (361) 758-7198 ext. 102 Cell: (757) 685-2248
FAX: (361) 758-7853
8.0 GENERAL REQUIREMENTS:
SO-3-009-19