J-2_Category_A_Items.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- USNS YUKON Mid-Term Availability Federal contract opportunity
- Solicitation number
- N32205-18-R-4011
About this file
J-2 Cat "A" Items
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | |||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | |||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | ||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | ||||||||||
| 012 | TELEPHONE SERVICES | ||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | ||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | ||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | ||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | ||||||||||
| 017 | NOT USED | ||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | ||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | ||||||||||
| 020 | GAS FREE CERTIFICATES | ||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | ||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | ||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | ||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | ||||||||||
| 100 | HULL STRUCTURES | ||||||||||
| 101 | NDT KINGPOSTS (ABS & USCG) | ||||||||||
| 102 | TANK DECK OVERHEAD PRESERVATION | ||||||||||
| 103 | PROPELLER AND SEACHEST CLEANING | ||||||||||
| 104 | FLIGHT DECK NON-SKID RENEWAL | ||||||||||
| 105 | FLIGHT DECK SAFETY NETS AND FRAMES | ||||||||||
| 106 | JP-5 CONTAMINATED TANK REPAIRS | ||||||||||
| 107 | DECK PRESERVATION | ||||||||||
| 108 | CHAIN LOCKER SUMP STEEL REPAIRS | ||||||||||
| 109 | TANK DECK DFM PIPING REPAIRS | ||||||||||
| 110 | KINGPOST LADDER INSPECTION | ||||||||||
| 111 | CARGO TIEDOWN REPLACEMENT | ||||||||||
| 112 | JACKET WATER AND CFW COOLER DECK REPLACEMENT | ||||||||||
| 113 | EXTERIOR LADDERWAY REPAIRS | ||||||||||
| 114 | ANNUAL ACCOM LADDER INSPECTION | ||||||||||
| 115 | MAIN AND FWD MAST PRESERVATION | ||||||||||
| 116 | STRUCTURAL STEEL REPAIRS | ||||||||||
| 200 | MAIN PROPULSION | ||||||||||
| 201 | PORT MAIN ENGINE 12K OVERHAUL | ||||||||||
| 202 | PORT MAIN ENGINE TURBOS OVERHAUL | ||||||||||
| 203 | PORT AND STARBOAD MAIN ENGINE COUPLING MAINTENANCE | ||||||||||
| 204 | PORT AND STARBOARD MAIN ENGINE CONNECTING ROD BOLT REPLACEMENT | ||||||||||
| 205 | PORT AND STARBORAD MAIN ENGINE REAR OIL SEAL REPLACEMENT | ||||||||||
| 300 | ELECTRICAL | ||||||||||
| 301 | CIRCUIT BREAKER SERVICING AND INSPECTION | ||||||||||
| 302 | MAIN AND EMERGENCY SWITCHBOARD CLEANING | ||||||||||
| 303 | GROUP CONTROL CENTERS AND MOTOR CONTROLLERS CLEANING AND INSPECTION | ||||||||||
| 304 | MOTOR REPAIRS | ||||||||||
| 305 | GROUND STRAPS INSTALLED | ||||||||||
| 306 | ANNUAL PTO CONTOLS GROOM | ||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | ||||||||||
| 401 | MAGNETIC COMPASS ANNUAL | ||||||||||
| 402 | RADAR-ECDIS ANNUAL MAINTENANCE | ||||||||||
| 403 | URT-23 (D) URR-2368A HF SET GROOM | ||||||||||
| 404 | GYRO ANNUAL MAINTENANCE | ||||||||||
| 405 | GMDSS ANNUAL RECERTIFICATION | ||||||||||
| 406 | SVDR ANNUAL CERTIFICATION | ||||||||||
| 408 | UHF SATCOM AND LOS TRANSCEIVER | ||||||||||
| 409 | OE-82 ANTENNA MAINTENANCE | ||||||||||
| 410 | TVDTS STUFFING TUBE TO MCT REPLACEMENT | ||||||||||
| 411 | NGW ANTENNA MOUNT RENEWAL | ||||||||||
| 412 | WHIP ANTENNA OVERHAUL | ||||||||||
| 413 | TV DTS ANTENNA REPLACEMENT | ||||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||
| 501 | NO. 3 SSDG 60K HOUR OVERHAUL | ||||||||||
| 502 | GAYLORD BOOSTER HEATER | ||||||||||
| 503 | PUMP REPAIR | ||||||||||
| 504 | BALLAST TANK SUCTION PIPING | ||||||||||
| 506 | INCINERATOR MAINTENANCE | ||||||||||
| 507 | AUX BOILER GROOM AND TESTING | ||||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | ||||||||||
| 601 | HABITABILITY REPAIRS | ||||||||||
| 602 | FIRE AND AFFF HOSES ANNUAL INPECTION | ||||||||||
| 603 | NEW LIFEBOAT INSTALLATION | ||||||||||
| 604 | SCBA EQUIPMENT ANNUAL SERVICING | ||||||||||
| 605 | RESCUE BOATS ANNUAL SERVICE | ||||||||||
| 606 | SCBA COMPRESSOR ANNUAL SERVICING | ||||||||||
| 607 | ANNUAL ELEVATOR SERVICING |
| 608 | ANNUAL FIREFIGHTING RECERT |
| 609 | ANNUAL LIFERAFT RECERIFICATION |
| 610 | PORT RESCUE BOAT DAVIT ANNUAL MAINTENANCE |
| 611 | IMMERSION SUITS ANNUAL SERVICE |
| 612 | ACCOMODATION LADDER ANNUAL INSPECTION |
| 613 | STBD RESCUE BOAT WINCHES & DAVITS ANNUAL INSPECTION |
| 614 | LIFEBOAT DAVIT AND WINCHES ANNUAL SERVICE |
| 615 | GALLEY EQUIPMENT REPLACEMENT |
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING |
| 801 | GALLEY AND SCULLERY VENT DUCT CLEANING |
| 802 | HOUSE DUCT CLEANING |
| 803 | 01 LEVEL SUPPLY VENT PLENUM REPAIRS AND PRESERVATION |
| 804 | HVAC COIL CLEANING |
| 805 | AIR HANDLER FAN AND MOTOR OVERHAUL |
| 806 | ENGINE ROOM SUPPLY AND EXHAUST FANS OVERHAUL |
| 1000 | UNREP REPLENISHMENT |
| 1001 | RAM TENSIONER BEARING RENEWAL |
| 1002 | SLIDING BLOCK CHAIN REPLACEMENT RAS STATIONS 3 AND 4 |
| TOTAL |
| USNS YUKON T-AO 202 | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N3220518R4011 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .