N3220518R4003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
SECTION 000 – GENERAL REQUIREMENTS
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS AND DEFINITIONS | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP |
| 006 | HEAVY WEATHER PLAN | NSP |
| 007 | REMOVED | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | A |
| 011 | FURNISH GENERAL SERVICES | A |
| 012 | TELEPHONE SERVICES | A |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS (REV) | A |
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | A |
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | A |
| 016 | FIRE PROTECTION AND SHIP’S SAFETY PROGRAM | A |
| 017 | HANDLING SHIP’S STORES | A |
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | A |
| 019 | SHIPBOARD ACCESS AND SECURITY | A |
| 020 | GAS FREE CERTIFICATES | A |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | A |
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | A |
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY | A |
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY | NSP |
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY | B |
| 030 | CONTINUATION OF SERVICES | B |
SECTION 100 – HULL STRUCTURE
| 101 | NDT KINGPOST AREAS (ABS & USCG) (18) | A |
| 102 | TANK INSPECTION FOR ABS INTERMEDIATE SURVEY NO. 5 (18) | B |
| 103 | ULTRASONIC THICKNESS GAUGING – INTERMEDIATE SURVEY NO.5 (18) | B |
| 104 | INSPECTION OF PV VALVES (USCG) (18) | A |
| 105 | FLIGHT DECK NON-SKID REPLACEMENT & REPAIRS (18) | A |
| 106 | FLIGHT DECK SAFETY NETS; REFURBISH & WEIGHT TEST (18) | A |
| 107 | TANK DECK OVERHEAD PRESERVATION (18) REVISION A | A |
| 108 | NON-SKID DECK RESURFACING (18) REVISION A | A |
| 109 | CARGO OILY WASTE TANK PRESERVATION (18) REVISION A | |
| 110 | BALLAST TANK PRESERVATION; NO.9 P/S (18) REVISION A | A |
| 111 | PREP & PAINT VARIOUS DECK AREAS (18) | A |
| 112 | STEEL REPAIRS TO CARGO OILY WASTE TANK (18) REVISION A | A |
| 113 | MISCELLANEOUS STEEL REPAIRS (18) | A |
| 115 | MISCELLANEOUS TANK REPAIRS (18) | A |
| 116 | PUMP ROOM BILGE POWER TOOL CLEAN & RECOAT (18) REVISION A | A |
| 117 | LIFEBOAT DAVIT PRESERVATION & EMBARKATION OVERHEAD (18) REVISION A | A |
| 118 | SECURITY LIGHT BRACKETS; OVERAHAUL AND REPLACEMENT (18) | A |
| 120 | 01 DECK EXPANSION JOINT REPAIRS (18) | A |
| 121 | SIDE PORT DOOR OVERHAUL (18) | A |
| 122 | FAS KING POST & LIGHT POST PRESERVATION (18) | A |
| 123 | FAS STATION MAINTENANCE PLATFORM REPAIRS (18) | A |
| 124 | RAM TENSIONER & TOPPING WINCH PRESERVATION (18) REVISION A | A |
| 125 | HOTWELL & CONTAMINATED DRAIN TANK PRESERVATION (18) | A |
| 126 | STEEL REPLACEMENT (18) | B |
| 127 | RAS & FAS KINGPOST SUPPORT BRACKETS (T-ALT 0819) (18) | B |
SECTION 200 – MACHINERY, PROPULSION
| 201 | P & S MAIN ENGINE 12,000 HOUR OVERHAUL (18) | A |
| 205 | ME FUEL INJECTOR SHOP OVERHAUL (18) | A |
| 206 | MN ENGINE TURBO CHARGERS OVERHAUL (18) | A |
| 208 | STARBOARD MAIN ENGINE CLUTCH/COUPLING OVERHAUL (18) | A |
| 210 | MAIN ENGINE OIL MIST DETECTOR, REPLACE (T-ALT 0758.2) (18) | A |
SECTION 300 - ELECTRICAL
| 301 | ANNUAL SWITCHBOARD AND CONTROL CENTER CLEANING (18) | A |
| 302 | ANNUAL CIRCUIT BREAKER MAINTENANCE (18) | A |
| 305 | ANNUAL GENERATOR INSPECTION (18) | A |
| 306 | THERMOGRAPHIC SURVEY OF SWBD & MOTOR CONTROL CENTERS (18) | A |
| 309 | ANNUAL PTO CONTROL GROOM (18) | A |
| 310 | ERC UPS BATTERY RENEWAL (18) | A |
| 311 | THERMOCOUPLE & WIRE REPLACEMENT ON SSDG (18) | A |
SECTION 400 – COMMUNICATION AND NAVIGATION
| 401 | ANNUAL RADAR AND ECDIS PREVENTATIVE MAINTENANCE (18) | A |
| 402 | ANNUAL NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE (18) | A |
| 403 | ANNUAL GMDSS SAFETY RADIO CERTIFICATION & REPAIR (18) | A |
| 404 | ANNUAL SVDR RECERTIFICATION (18) | A |
| 405 | T-AO CLASS ORBIT TV DIRECT TO SAILOR REPLACEMENT_T-ALT 0915 | A |
| 406 | ANNUAL SERVICE AND ADJUST MAGNETIC COMPASS (18) | A |
| 407 | OE-82 UHF SATCOM ANTENNA OVERHAUL (18) | A |
| 408 | ANTENNA MAINTENANCE WHIP AND DIPOLE (18) | A |
| 409 | DOPPLER SPEED LOG PREVENTATIVE MAINTENANCE (18) | A |
| 410 | FATHOMETER DUAL TRANSDUCER MAINTENANCE (18) | A |
| 411 | AVAYA TELEPHONE SYSTEM GROOM (18) | A |
| 412 | UHF SATCOM AND LOS TRANSCEIVER GROOM (18) | A |
| 413 | AN/URT-23(D) AND AN/URR-2368A HF SET GROOM (18) | A |
| 416 | GAUGE METER & THERMOMETER CALIBRATION - 2018 (18) | A |
| 417 | GPS AND NAVTEX MOUNTING AND TESTING (18) | A |
SECTION 500 - MACHINERY, AUXILIARY SYSTEM
| 504 | NO.4 SSDG 60,000 HOUR OVERHAUL (STD) (18) | A |
| 506 | SSDG TURBOCHARGER MAINTENANCE (16) (18) | A |
| 508 | DIESEL ENGINE GOVERNORS PREVENTATIVE MAINTENANCE (18) | A |
| 510 | AUXILIARY BOILER GROOM & TESTING (18) | A |
| 512 | EVAPORATOR MAINTENANCE (18) | A |
| 513 | EMERGENCY DIESEL GENERATOR RADIATOR REPAIR | A |
| 514 | OVERHAUL NO.3 MSW PUMP & MOTOR (18) | A |
| 515 | REFRIGERATION & AC SYSTEM PREVENTATIVE MAINTENANCE (18) | A |
| 520 | ANNUAL INCINERATOR SERVICE (18) | A |
| 522 | PORT PTO CLUTCH/COUPLING INSPECTION & OVERHAUL (18) | A |
| 527 | PRESSURE VESSEL & RELIEF VALVE TESTING (18) | A |
| 529 | ENGINE ROOM OILY WATER SEPERATOR & CARGO OCM CALIBRATION (18) | A |
| 530 | INSPECTION & TEST OF MACHINERY SPACE CRANES AND HOISTS (18) | A |
| 534 | START AIR COMPRESSOR REPLACEMENT & OVERHAUL (18) | A |
| 536 | PORT ANCHOR WINDLASS CAPSTAN REPAIR (18) | A |
| 537 | CONSTANT TENSION WINCHES No.3 and No.4 (18) | A |
| 538 | GAYLORD BOOSTER HEATER REPLACEMENT (T-ALT 06-34) (18) | A |
| 539 | OVERHAUL NO.2 DFM CARGO PUMP (18) | A |
| 540 | OVERHAUL NO.1 THROUGH NO.4 CPP PUMPS (18) | A |
| 541 | OVERHAUL MISCELLANEOUS VALVES & OPERATORS (18) REVISION A | A |
| 542 | MISCELLANEOUS PIPE REPAIRS (18) | A |
| 543 | OVERHAUL LESLIE 3-WAY JACKET WATER VALVES (18) | A |
SECTION 600 - OUTFITTING, FURNISHING AND HABITABILITY
| 601 | ANNUAL LIFEBOAT DAVIT & WINCH INSPECTIONS (ABS) (18) REVISION A | A |
| 602 | ANNUAL LIFEBOAT INSPECTIONS (ABS) (18) | A |
| 603 | ANNUAL PORT RHIB DAVIT & WINCH INSPECTIONS (ABS) (18) | A |
| 604 | ANNUAL STBD RHIB DAVIT & WINCH INSPECTIONS AND REPAIRS (ABS) | A |
| 605 | ANNUAL RHIB INSPECTION SERVICE & REPAIRS (ABS) (18) | A |
| 606 | ANNUAL LIFE RAFT RECERTIFICATION (ABS) (18) | A |
| 607 | ANNUAL SCBA COMPRESSOR SERVICE (ABS) (18) | A |
| 608 | ANNUAL SCBA EQUIPMENT INSPECTIONS (ABS) (18) | A |
| 609 | REPLACEMENT OF COLD FOOD COUNTERS (18) | A |
| 610 | ANNUAL OVHL OF FIREFIGHTING EQUIPMENT (ABS) (18) | A |
| 611 | FLOOR COVERING RENEWAL (18) | A |
| 614 | ANNUAL ELEVATOR RECERTIFICATION (18) | A |
| 615 | SHOWER STALL BULKHEAD PANEL RENEWALS (18) | A |
| 616 | ACCOMMODATION LADDER INSPECT & REPAIR (18) | A |
| 617 | INSPECTION OF SHIP’S IMMERSION SUITS (18) | A |
| 618 | SPIDER STAGING LIFTS OVERHAUL & CERTIFICATION (18) | A |
| 619 | WINDOW REGASKETING AND STEEL REPAIR (18) | A |
| 620 | THERMOSTATIC SWITCH REACTION TIME TEST (18) | A |
SECTION 800 – HEATING VENTILATION AND AIR CONDITIONING
| 801 | VENTILATION SYSTEMS CLEANING (18) | A |
| 803 | MISC. LAGGING AND INSULATION RENEWALS (18) | A |
SECTION 900 – DRYDOCKING AND UNDOCKING
| 901 | DRYDOCKING AND UNDOCKING VESSEL (18) | A |
| 902 | RUDDER AND STERN FRAME EXAM AND REPAIR (18) | A |
| 903 | INSPECTION OF BILGE KEELS, BOW VOID & SKEGS (18) | A |
| 904 | PROPELLER SYSTEM MAINTENANCE (18) | A |
| 905 | PROPELLER SHAFT WEARDOWN READINGS (18) | A |
| 906 | ANCHORS, CHAINS & CHAIN LOCKER CLEANING AND PAINTING (18) REVISION A | A |
| 907 | UNDERWATER HULL PRESERVATION (18) | A |
| 908 | FREEBOARD CLEANING, PREPPING AND PAINTING (18) | A |
| 909 | STERN TUBE SEAL MAINTENANCE (18) (REV) | A |
| 910 | MARINE GROWTH INHIBITOR ANODE REPLACEMENT (18) | A |
| 911 | OVERHAULING SEA VALVES (18) | A |
| 912 | INSPECT & REPAIR HULL CATHODIC PROTECTION SYSTEM (18) | A |
| 913 | SPURS LINE AND NET CUTTER MAINTENANCE (18) | A |
| 914 | PORT AND STBD MSW STRAINER REPAIR (18) | A |
| 915 | ROPE GUARD ZINC ANODE REPLACEMENT (18) | A |
| 917 | DRYDOCKING AND UNDOCKING SHIP – ADDITIONAL DAYS (18) | B |
| 918 | RUDDER BEARING REPLACEMENT (18) | B |
SECTION 1000 – UNREP GEAR
| 1001 | TRANS REPLEN PUMP ELECTRIC MOTOR BEARING REFURBISHMENT (18) | A |
| 1002 | ASD COOLING FAN MOTOR OVERHAUL AND SHROUD FABRICATION (18) | A |
| 1003 | WINCH CONTROL BOOTH SUB FLOOR REFURBISHMENT (18) | A |
| 1004 | HYDRAULIC TRANSMISSION HEAT EXCHANGER FRAME (18) REVISION A | A |
| 1005 | SADDLE WINCH GEARBOX REPAIR AND SHAFT REPLACMENT-REPAIR (18) | A |
| 1006 | SLIDING BLOCK DRIVE SPROCKETS & PILLOW BLOCK REPLACEMENT (18) | A |
| 1007 | SLIDING BLOCK CHAIN REPLACEMENT (18) | A |
| 1008 | CARGO GEAR QUADRENNIAL RECERTIFICATION (18) | A |
| 1009 | RAM TENSIONER SAMPLE/CHARGING/AIR BLEED VALVE REPLACEMENT | A |
(End of Summary of Changes) image1.wmf