18R3500_Attach_B_Basic_Pricing_Data_Rev1.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
OFFSHORE SUPPORT VESSEL (OSV) LONG-TERM SBX RESUPPLY
Solicitation number
N32205-18-R-3500
Issued by

About this file

Attach B_Rev1

View the file

Other files

File Type Posted
18R3500_RFP_PROFORMA_2018_Rev2.docx DOCX document
18R3500_amend0003.docx DOCX document
18R3500_Attach_B_Basic_Pricing_Data_Rev2.xlsx XLSX spreadsheet
3500_RFP_QA__3.docx DOCX document
3500_RFP_QA_2.docx DOCX document
18R3500_RFP_PROFORMA_2018_Rev1.docx DOCX document
18R3500_Amend_0002.docx DOCX document
18R3500_Amend0001.docx DOCX document
18R3500_Attach_E_PWS_amend1.docx DOCX document
3500_RFP_Q_AND_A.docx DOCX document
18R3500_Attach_G_ATFP_CBRD_and_Training_Requirements.pdf PDF
18R3500_Attach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3500_Attach_F_Technical_Offer_Worksheet.xlsx XLSX spreadsheet
18R3500_Attach_H_Wage_Determination_201408019.txt TXT text file
18R3500_SF1449.pdf PDF
18R3500_Attach_J_MECSP_Worksheet.doc DOC document
18R3500_RFP_PROFORMA_2018_REV.docx DOCX document
18R3500_Attach_H_Wage_Determination_2014080010.txt TXT text file
18R3500_Attach_K_Specs_for_CBR-D_Decon_Station.docx DOCX document
18R3500_Attach_M_Clarification_and_Question_Form.docx DOCX document
18R3500_Attach_I_SF_LLL.pdf PDF
18R3500_Attach_D_DD_Form_254.pdf PDF
18R3500_Attach_C_Crew_Complement.docx DOCX document
18R3500_Attach_E_PWS.docx DOCX document
18R3500_Attach_L_Decon_Station_DWG.pdf PDF
18R3500_Attach_A_GovernmentFurnishedProperty1.2.xlsx XLSX spreadsheet
18R3500_SYNOPSIS.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE

PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSESTIMATED FUEL COSTTOTAL PER DIEM/PERIOD
BASE PERIOD365
OPTION 1366
OPTION 2365
OPTION 3365
OPTION 4335
Option 5 (FAR 52.217-8)183

TOTAL EVALUATED FUEL

PORT CHARGES DIFFERENTIAL N/A

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

TOTAL EVALUATED PRICE $ - 0

Note:
1. OFFERORS SHALL USE THE OPTION PERIOD 4 DAILY CHARTER RATE AS THE DAILY RATE IN THE "FAR 52.217-8" PERIOD.

Fuel Consumption Data

Attachment BVessel:
Basic Pricing DataRFP: N32205-18-R-3500

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below and enter in the corresponding price per metric ton for that fuel type in Column G. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
68Fuel Underway (laden)1041IFO-380:
Other Fuel Type (if necessary)
69Fuel Underway (ballast)260IFO-380:
Other Fuel Type (if necessary)
71In-Port Idle678IFO-380:
Other Fuel Type (if necessary)
TOTAL:$ - 0
Notes:
1Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
DLA Std Price 180402
MGO/MDO:per metric ton$ 901.26
IFO-180:per metric ton$ 570.11
IFO-380:per metric ton$ 565.03
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO/MDO:7.507 barrels per metric ton
IFO-180:6.526 barrels per metric ton
IFO-380:6.468 barrels per metric ton

2 Fuel Consumption shall be assuming moderate weather

3 Fuel Consumption shall be based upon Box 68, 69, and 71 consumption rates. Fuel consumed during in-port periods when on shore power will not be evaluated.

Basic Pricing Data

Attachment BVessel:
Basic Pricing DataRFP: N32205-18-R-3500
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment BVessel:
Basic Pricing DataRFP: N32205-18-R-3500
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment BVessel:
Basic Pricing DataRFP: N32205-18-R-3500
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment BVessel:
Basic Pricing DataRFP: N32205-18-R-3500
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment BVessel:
Basic Pricing DataRFP: N32205-18-R-3500
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 335-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 335 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 5

Attachment BVessel:
Basic Pricing DataRFP: N32205-18-R-3500
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 183-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment H
2Crew Training, not separately itemized in Attachment H
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 183 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

File details come from the government source that posted it.