Eight lifeboats, davits, and winches for USNS MERCY
Solicitation number
N3220518Q4679
Issued by

About this file

Performance Standards

View the file

Other files

File Type Posted
MERCY_Lifeboat_PWS.docx DOCX document
MERCY_Lifeboat_PWS_20_Sept_2018.docx DOCX document
COMBINED_SYNOPSIS_SOLICITATION_N3220518Q4679_AM_2.docx DOCX document
COMBINED_SYNOPSIS_SOLICITATION_N3220518Q4679_AM_1.docx DOCX document
Technical_Data_Non-Disclosure.docx DOCX document
MERCY_Lifeboat_PWS_-_10_July_2018.docx DOCX document
COMBINED_SYNOPSIS_SOLICITATION_N3220518Q4679.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The performance standards for this PWS are stated in the PRS Below:

Task
Metric Type
Performance Standards*
Frequency
Acceptable

Quality level

(AQL)

Surveillance Method Incentive (Negative)

Timeliness of Deliverables Required by the Contract
Efficiency
Deliverables shall be submitted in accordance with the delivery requirements required by the PWS.
Continual
100% of the deliverables are submitted on time.
COR

Tracking / Customer Complaints $250.00 for every five (5) business day late, up to a maximum of $2,000.00. Notwithstanding the foregoing, the Government may terminate the Contract for cause if deliverables are not provided by the due date.

Accuracy of Deliverables Required by the Contract
Quality
Reports, Drawings, Cost Estimates, Material Lists, Tech Manuals, Test procedures, Maintenance Plan and Other Deliverables are Correct when

submitted.

Continual
No more than 4 Errors per

Deliverable

COR

Review for completion and accuracy Deliverables received that have more than four (4) errors will result in rejection of the deliverable as incomplete and returned to the Contractor. MSC shall not inspect the entire deliverable, rather MSC shall identify, if present, the first four errors and return the deliverable to the Contractor. Each time the deliverable is returned, $200.00 for each instance in which a deliverable is determined to be incomplete, up to a maximum of $2,000.00. Notwithstanding the foregoing, the Government may terminate the Contract for cause if deliverables are not provided by the due date.