17R3002_Attachment_K_-_Technical_Proposal_Datasheets.docx

DOCX document 24 KB Posted

Attached to
OPERATION AND MAINTENANCE OF THE OFFSHORE PETROLEUM DISCHARGE SYSTEM (OPDS)
Solicitation number
N32205-17-R-3002
Issued by

About this file

J - Attachment K

View the file

Other files

File Type Posted
N32205-17-R-3002-0007.docx DOCX document
N32205-17-R-3002-0006.docx DOCX document
N32205-17-R-3002-0005.docx DOCX document
N32205-17-R-3002_Conformed_Solicitation.docx DOCX document
N32205-17-R-3002-0004.docx DOCX document
N32205-17-R-3002-0003.docx DOCX document
17R3002_Attachment_O-__Pricing_Sheets-_OPDS_(rev).xls XLS spreadsheet
N32205-17-R-3002-0002.docx DOCX document
17R3002_Attachment_B_-_Wage_Determination.pdf PDF
17R3002_Attachment_A_-_WHEELER_TM_6_-_PM3_Revised.docx DOCX document
N32205-17-R-3002-0001.docx DOCX document
17R3002_Attachment_B_(add'l_info)_-_Wage_Determination.pdf PDF
17R3002_Attachment_R-_Technical_Past_Performance_Questionnaire.doc DOC document
17R3002_Attachment_C_-_DD254.pdf PDF
17R3002_Attachment_B_-_DOL_CBA_Wage_Determination.pdf PDF
17R3002_Attachment_A_-_WHEELER_TM_6_Sep.docx DOCX document
17R3002_Attachment_O-__Pricing_Sheets-_OPDS.xls XLS spreadsheet
17R3002_Attachment_E_-_Hull_Clauses.pdf PDF
17R3002_Attachment_J_-_Monthly_Budget_Status_Report.xlsx XLSX spreadsheet
17R3002_Attachment_N_-_GFP.xlsx XLSX spreadsheet
17R3002_Attachment_G_-_SFLLL.pdf PDF
17R3002_Attachment_M_-_Award_Fee_Plan.docx DOCX document
17R3002_Attachment_L-_Govt._Estimate_of_Reimbursable_Costs.docx DOCX document
17R3002_Attachment_Q_-Training_Information.docx DOCX document
17R3002_Attachment_D_-_P_&_I_Guidelines.doc DOC document
17R3002_Attachment_I-_Past_Performance_Narrative.docx DOCX document
17R3002_Attachment_P_-_Mission_Essential_Contractor_Services.doc DOC document
17R3002_OPDS_Solicitation.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT K-1

Exhibit (1) Ship Operating Experience – The offeror shall complete this table per L-14.B.3.1.A. Insert additional rows as applicable. Sample data has been provided as guidance.

Ship Name
Ship Type
Ship Owner
Relationship of Contractor to Ship
Dates Operated (MM/YYYY)
DWT
Propulsion Type
Propulsion HP
LOA
Beam
M/V Noah Zark
Container
Theolmyti Inc.
Operator
06/1999-01/2002; 02/2005-10/2012
15,000
Slow Speed Diesel
25,000
650’
85’
M/V Kent Goh Strait
Oil Tanker
Dinoco
Maintenance Manager
04/2002-09/2003
30,000
Slow Speed Diesel
28,500
705’
125’

ATTACHMENT K-2

Exhibit (2) – Dry Dock Repair Experience: The offeror shall complete this table per L-14.B.3.1.B. Insert additional rows as applicable. Sample data has been provided as guidance.

Ship Name
Year Dry Docked
Dry Dock Location
Final Cost
Final Duration
Reason for Dry Docking the Ship
M/V Noah Zark
2000
Dubai
$6.6M
45 days
Regulatory Surveys Due
M/V Noah Zark
2005
Singapore
$4.2M
40 days
Regulatory Surveys Due
M/V Kent Goa Strait
2003
Portugal
$5.2M
27 days
Repair U/W hull plating damaged by grounding.
Proposed Individual (First and Last Name)
Current Job Title
Current Employee?
Proposed Percent Dedication to this Contract
Proposed Total Percent Dedication to Other Duties
Minimum Key Billet Requirements
KEY PERSONNEL TO BE CONSIDERED FOR TECHNICAL TRADE-OFF FACTOR L-14.B.II.A.1 -Key Personnel Qualifications exceed requirements or number of Key Personnel proposed exceed requirements
Port Engineer (Example)
Jim Nasium
Engineering Superintendent
Yes
100%
0%
X
Assistant Operations Manager/POC for Operations (Example)
Rick O’Shay
Scheduler
Yes
40%
60%

X

ATTACHMENT K-3

Exhibit (3) – Technical Approach, Key Shore Based Personnel: The offeror shall complete this table for individuals proposed as Key Shore Side Personnel as part of L-14. B.3.1.E. Insert additional rows as applicable. Sample data has been provided as guidance.

Attachment K – Technical Proposal Data Sheets

File details come from the government source that posted it. Updated .