J-2_Category_A_Work_Items_ZEUS_rev1.xls
XLS spreadsheet 54 KB Posted
- Attached to
- USNS ZEUS ROH/DD Federal contract opportunity
- Solicitation number
- N32205-16-R-4503
About this file
J-2
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | |||||||||
| 002 | TECHNICAL AND MANUFACTURER'S REPRESENTATIVES | NSP | NSP | |||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | |||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | |||||||||
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | NSP | |||||||||
| 006 | HEAVY WEATHER PLAN | NSP | NSP | |||||||||
| 007 | COLD WEATHER PLAN | NSP | NSP | |||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | - 0 | $ - 0 | $0 | ||||||||
| 011 | FURNISH GENERAL SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 012 | TELEPHONE SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | - 0 | $ - 0 | $0 | ||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | - 0 | $ - 0 | $0 | ||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | - 0 | $ - 0 | $0 | ||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | - 0 | $ - 0 | $0 | ||||||||
| 017 | HANDLING SHIPS STORES | - 0 | $ - 0 | $0 | ||||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | - 0 | $ - 0 | $0 | ||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | - 0 | $ - 0 | $0 | ||||||||
| 020 | GAS FREE CERTIFICATES | - 0 | $ - 0 | $0 | ||||||||
| 021 | CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS & SPACES | - 0 | $ - 0 | $0 | ||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | - 0 | $ - 0 | $0 | ||||||||
| 023 | HAZARDOUS WASTE DISPOSAL | - 0 | $ - 0 | $0 | ||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | |||||||||
| 100 | HULL AND STRUCTURE | |||||||||||
| 102 | CABLE DECK SCUTTLE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 104 | CLEAN AND PRESERVE FWD/AFT CHE CONSOLE DECK AREAS | |||||||||||
| 106 | RELOCATE CONNEX BOX & FOUNDATION (T ALT T-ARC 7 -15-011) | - 0 | $ - 0 | $0 | ||||||||
| 108 | REMOVE FOUNDATION FOR EMERGENCY GENERATOR (T ALT T ARC 7 15-012) | |||||||||||
| 109 | TANK RAFTING AND INSPECTION | |||||||||||
| 110 | ULTRASONIC THICKNESS GAUGING (ABS INTERMEDIATE SURVEY) | |||||||||||
| 111 | BOW AND STERN SHELL FAIRING | |||||||||||
| 200 | PROPULSION MACHINERY | |||||||||||
| 202 | STERN TUBE COOLING MODS (TALT TARC 7 -15-004) | - 0 | $ - 0 | $0 | ||||||||
| 203 | NO. 3 MDG 50K HOUR OVERHUAL | - 0 | $ - 0 | $0 | ||||||||
| 204 | NO. 4 MDG 60K HOUR OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 205 | SSDG NO. 2 - NO. 5 REPLACE SILENCER AND EXPANSION JOINT | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 304 | MCT REPLACEMENT AFT BULKHEAD MISSION CONTROL (VRR-16-065) | - 0 | $ - 0 | $0 | ||||||||
| 306 | BOW TROLLEY POWER CABLE REPLACE | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATION | |||||||||||
| 402 | SVDR GMDSS ANNUAL RECERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 405 | SCC SHIPYARD ASSIST (TALT 13-024) | - 0 | $ - 0 | $0 | ||||||||
| 406 | ECDIS INSTALLATION SHIPYARD ASSIST (TALT 14-006) | - 0 | $ - 0 | $0 | ||||||||
| 407 | DPS INSTALLATION SHIPYARD ASSIST (TALT 15-006) | - 0 | $ - 0 | $0 | ||||||||
| 408 | GYRO REPLACEMENT (TALT 13-022) | - 0 | $ - 0 | $0 | ||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 502 | CABLE HANDLING EQUIPMENT UPGRADE SHIPYARD ASSIST (TALT 13-030) | - 0 | $ - 0 | $0 | ||||||||
| 505 | HALON AND CO2 EXTINGUISHING SYS ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 506 | FIRE ALARM ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 507 | PORTABLE EXTINGUISHERS TEST AND INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 508 | AUX BOILER INSPECTION AND LAY UP | - 0 | $ - 0 | $0 | ||||||||
| 509 | FORWARD CRANE ANNUAL CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 510 | AFT CRANE ANNUAL CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 512 | GAUGE CALIBRATION (VR 16-004) | - 0 | $ - 0 | $0 | ||||||||
| 514 | OILY WATER SEPERATOR ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 515 | BOW THRUSTER NO. 1 OIL LEAK REPAIR | |||||||||||
| 519 | HOS HPU PUMP REPLACEMENT | |||||||||||
| 520 | RISER PIPING REPLACEMENT | |||||||||||
| 521 | MSD TANK PIPING REPLACEMENT | |||||||||||
| 522 | LP AIR AND START AIR RECEIVERS OPEN/INSPECT | |||||||||||
| 523 | HOS REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS and HABITABILITY | |||||||||||
| 601 | INFLATABLE LIFERAFTS ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 602 | LIFERAFT DAVIT ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 607 | RESCUE BOAT INSTALLATION | - 0 | $ - 0 | $0 | ||||||||
| 609 | CARGO ELEVATOR ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 610 | SCBA ANNUAL INSPECTION | |||||||||||
| 800 | HEATING, VENTILATION and AIR CONDITIONING | |||||||||||
| 801 | GALLEY AND LAUNDRY VENTILATION DUCT CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 802 | REPLACE PREHEATER 1-45-1 (VR-016-015) | - 0 | $ - 0 | $0 | ||||||||
| 803 | REPLACE PREHEATER 1-20-1 (VR-016-016) | - 0 | $ - 0 | $0 | ||||||||
| 804 | REPLACE PREHEATER 01-39-2 | |||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | DOCKING AND UNDOCKING | - 0 | $ - 0 | $0 | ||||||||
| 902 | SEACHEST AND STRAINER PLATES | - 0 | $ - 0 | $0 | ||||||||
| 903 | UNDERWATER HULL PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 904 | ANCHOR AND ANCHOR CHAIN INSPECT | - 0 | $ - 0 | $0 | ||||||||
| 905 | RUDDER/BILGE KEEL EXAMINATION | - 0 | $ - 0 | $0 | ||||||||
| 906 | SEA VALVES | - 0 | $ - 0 | $0 | ||||||||
| 907 | CATHODIC PROTECTION SYSTEM INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 908 | PROPELLER POLISHING & EXAMINATION (VR-15-0030) | - 0 | $ - 0 | $0 | ||||||||
| 909 | TRASNDUCER DOME CLEANING & INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 914 | PORT SHAFT ROPE GUARD REPAIR (CASREP 15-010) | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 | |||||||||||
| SPONSOR CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE SPONSOR CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| SPONSOR CATEGORY "A" | ||||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 518 | STEERING GEAR RAM LEAK | |||||||||||
| 700 | MISSION RELATED EQUIPMENT | |||||||||||
| 702 | VERTICAL ROLLER INSALL & FWD & STERN SHELL FAIRING | |||||||||||
| 704 | SEANAV GPS SYSTEM UPGRADE | |||||||||||
| 705 | PROVIDE CRANE, FORKLIFT, RIGGING AND JLG SERVICES | |||||||||||
| 707 | HI PAP MAINTENANCE | |||||||||||
| 709 | CCTV SYSTEM MODIFICATIONS (VRR-16-070) | |||||||||||
| 710 | INSTALLATION OF SUB BOTTOM FRAME AND TOPSIDE ELE (VRR-16-0052) | |||||||||||
| 712 | AFT STARBOARD CABLE DRUM PRESERVATION | |||||||||||
| TOTAL SPONSOR CAT "A" | $0.00 |
&LUSNS ZEUS (T-ARC 7) ROH/DD
&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-16-R-4503
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .